Loading...
HomeMy WebLinkAboutDEQ-CFW_00086679Operating Scenario: OS — 19 Emission Source/Group ID: NS—I 10.Operating Schedule: (Source/Operating Scenario that best characterizes Calendar Year 2007) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 16 ) *1. Typical Start & End Times For Operating Scenario: Start: 0 End: 2359 12 Seasonal Periods Percent Annual Throu hnut: an —Feb +Dec 24% arch —May 29"/o une—Aug. 29% Sept. —Nov. 18% 007 007 007 2007 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. GAG. Pollutants CAS Emissions— GHG Pollutants Tons/Year Emission Estimation Method Code See Instructions Control Efficiency (Net after all controls Emission Factor Ef Control 2007 Criteria (NAAQS) Pollutants Pollutant Code Emissions— Criteria Pollutants (Tons/Year) Emission Estimation Method Code (See Instructions) Control Efficiency (Net after all controls) Emission Factor Ef Control 2007 CO CO 08 NOx NOx 08 TSP TSP 0.28 08 PM10 PM10 0.28 08 PM2.5 PM2.5 0.28 08 S02 S02 08 VOC VOC 24.3 08 HAP/TAP Pollutants (In Alphabetical Order) CAS (see instructions) Emissions HAP/TAPS (Pounds/Year) Emission Estimation Method Code See Instructions Control Efficiency (Net after all controls) Emission Factor EF Control 2007 • 75 DEQ-CFW 00086679