Loading...
HomeMy WebLinkAboutDEQ-CFW_00012270From: 8e|nickTom [/D=EXCHANG[LAB5/OU=EXCHANGEADMINISTRATIVE GROUP (FYD|BOHF2]SPDLT)/CN=REOP|ENTS/CN=982643549]E148398G9]5598AC3]9B1B-TBELN|CN Sent: 8/1I/I0I58:I3:29PW1 To: Zimmer, Andrea (Zimmer.Andmo@epa.gmv)[Zimmer.Andrea@pepa.gov] CC: Risgaard,Jon [/o=[xchangeLabs/ou=ExchangeAdministrative Group (FYD|BOHFI]3PD[n/cn=Kedpients/cn=dIee26774Z7748cf995eac]d56a4eIIeirrisXaard];HennessK]ohn [/o=ExchanXeLabs/ou=ExchanXeAdministrative Group (FYD|BOHFI]3PD[n/cn=Kedpients/cn=9OI3dO4Ocb5O4Oaf95f7734c7ee19af8-jehennessy];6oyb,]u|ie [/o=ExchanXeLabs/ou=ExchanXeAdministrative Group (FY08OHF23SPDLT)/cn=Redpient$cn=75d1654d45l54c2abbO8596a2c9af282-jagrzyb] Subject: NCUpdated FYl6Priority Permit List Attachments: NCFY16Priority Permit List Update 1lAug2O15.x|sx Hello Andrea- welcome to Priority Permits! I'm sure Gina left you some good notes. I've attached our update to your initial list, which included 70 backlogged permits (>2 years). \Nehave highlighted those permits that have already been issued inYELLOW, which drops the list ofbacklogged permits down toZ9. The large discrepancy in backlog numbers appears to be due to the fact that NC has not uploaded permit data to ICIS since Oct 2014. Our IT folks indicate that EPA changed JAVA, and we have been working with EPA to update our system and get them talking again (N[ loads data indirectly from 8|K4S to |[|S). VVewould like torequest Zpermits for Candidate removal for the following reasons: w N[OOD45l4(RDUAirport)'basedonskevishvvithStormvvaterUnhstaff,vvep|antoconvertthispermitfroman N[OOvvautevvater permit to an N[S stormvvater permit. We have given the facility deadlines to apply for stormw/atercovera8e and will rescind the wastewater permit following conversion. NCO056731 (Chesson Group)- long story short, the original WWTP Owner skipped town, and the WWTP has been operated byN[Utilities Commission since. About 1Ohomes total insubdivision. The hope isfor the City of Durham to extend sewer line and connect them, but it is not within City limits and is on/off the City budget from year-to-year. There is no "Owner" to issue a permit to. |w/iU beonvacation from 9/10through 9/25so I've copied several NPDESfo|ks (Jon Risgaard,]ohn Hennessy, Julie Goyb)incase the process iustill ongoing and you need additional info. For the benefit ufJohngun/Ju|ie,the process (at least last year) went asfollows. Assuming EPA concurs with our Candidate removal request, the Candidate List drops to 27Permits. We then take 20% of that list (5 permits) and identify those 5 specific permits as our Priority Permits for FY16; EPA might have specific criteria for permit selection. We will ultimately be responsible for reissuing 80% of our Priority Permits (0.8 x 5 permits = 4 permits = FY16 commitment). Once again, that was last year's process, sonot sure ifthere are any changes planned for FY16. Hope this helps. Let me know if any questions. NCDWR/Water Quality Programs 519-807-6390 E-mail correspondence toand from this address may besubject tothe North Carolina Public Records Law and may bedisclosed tothird parties OEQ-CFVV_00012270