Loading...
HomeMy WebLinkAboutDEQ-CFW_00024480From: Gregson,Jim [/O=EXCHANGELABS/OU=EXCHANGEADMINISTRATIVE GROUP (FYD|BOHF2]SPDLT)/CN=REOP|ENTS/CN=]8932BE1890F40FEA7O7]5CO2DOACA5]-JHGREGSON] Sent: 8/1I/I0I72:I6:39PW1 To: Culpepper, Linda [/b=ExchanXeLabs/ou=[xchangeAdministrative Group (FYD|8OHFZ33PDO)/cn=Redpient$cn=73d475cbae3Z4aI9687e171Idc9a79c5'|mcu|pepper] Subject: FVV:Advance Copy ofFast-Track Application with FTSE Attachments 3[ngineerin17080916II0.pdf Jim Gregswn Regional Supervisor Water Quality Regional OperationsScction Division ofWater Resources Department of Environmental 910.796.7215 Reception Desk 910.796.7386 Direct 910.350.2004 Fax Wilmington Regional Office 127 Cardinal Drive Ext Sent: Wednesday, August 09, 2017 4:35 PM To: Gre0uon,Jim <jim.8re8sun@ncdenc8ov> Cc: [are|Vandermeyden<[are|.Vandermeyden@cfpua.or8>; Matthew Tribet1<MatthewTribett@cfpua.or8> Subject: Advance Copy ofFast-Track Application with FTSE Hi Jim, The attached is an advance copy of a Fast Track application and FTSE for discharge to sewer from ASIR. Since the piping is being designed and constructed by our emergency contractor as bypass pumping, I've not included engineering drawings, nor sized the pipe (through we anticipate that the RPZ and HDPE size will be 6-inch). If you require revisions, additions or clarification prior to approval, please let me know. We a prepared to start construction on or about August 16 , pending permit application approval. Best Regards, GaryMcSm�h, P.E, Assistant Engineering Director 238 Government Center Drive Wilmington, IBC 2.8403 910-332-6629 Desk 91.0-833-4:1.97 Cell DEQ-CFW 00024481