HomeMy WebLinkAboutDEQ-CFW_000685517iOZA.
NCDENR
North Carolina Department of Environment and Natural Resources
DIVISION OF AIR QUALITY
Michael F. Easley, Governor William G. Ross, Jr., Secretary
B. Keith Overcash, P.E., Director
January 9, 2009
Ms. Karen Wrigley, Plant Manager
DuPont Company - Fayetteville Works
22828 NC Highway 87 West
Fayetteville, NC 28306
SUBJECT: Title V Annual Compliance Certification
DuPont Company - Fayetteville Works
Fayetteville, Bladen County
Facility ID: 0900009; Permit No. 03735T33
Dear Ms. Wrigley:
Our records indicate that DuPont Company - Fayetteville Works, Fayetteville, Bladen County, has been issued
a Title V Permit, which requires the submittal of an annual compliance certification (ACC) each year by the date
specified in General Condition 3.P. of your Title V Permit. The ACC must be signed by a responsible official
(as defined under 40 CFR 70.2), and signed copies must be submitted to the following:
a. Two copies to the Fayetteville Regional Office of the Division of Air Quality (DAQ) at:
Systel Building, 225 Green Street, Suite 714, Fayetteville, North Carolina 28301-5094
b. One copy to the EPA at:
Air and I PCRA Enforcement Branch, EPA, Region 4, 61 Forsyth Street, Atlanta, GA 30303
We recommend that, as a minimum, you send the ACC to the EPA via certified mail.
The DAQ has developed forms that meet the requirements for the ACC. The DAQ forms are available for
download on the DAQ web site (http://www.ncair.org/enf/certification/). Instructions and examples to assist you in
properly completing the DAQ forms are included within the compliance certification forms themselves. You may
opt to use the DAQ forms or you may supply the information required for compliance certification in your own
format. If you choose to use the DAQ forms, please note that these forms have been modified slightly from
versions you have used in previous years. The current version is Revision 2.8, as noted in the bottom right hand
corner of the forms.
If you choose to use your own format, the compliance certification must include all the required information to
be considered complete. The required information is specified in the instruction section of the DAQ forms and is
also specified in General Condition 3.P. of your Title V Permit. Finally, please remember to include in your ACC
all violations cited in any Notices of Violation issued to your company during calendar year 2008.
If you have any questions with regard to the annual compliance certification, please do not hesitate to contact
Robert Hayden at (910) 433-3365.
Si erel�y,
1
Steven F. Vozzo
Regional Air Quality Supervisor
cc: Central Files
Fayetteville Regional Office Files
Fayetteville Regional Office ' �1 l T0,1C
1
Systel Building, 225 Green Street, Suite 714, Fayetteville, North Carolina 28301-5094 o rt11 Faro l l n a
Phone: (910) 433-3300 / FAX: (910) 485-7467 / Internet: http://daq.state.nc.us/
An Equal Opportunity / Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
DEQ-CFW 00068551