Loading...
HomeMy WebLinkAboutDEQ-CFW_00048555From: Drew,Steve[SteveDrew@greensbono-nc.gov Sent: 8/26/201612:08:I1AN1 To: Mick Noland [mickno|and@faypwczom] CC: 6oyb,Julie [/o=ExchangeLabs/ou=ExzhanXeAdministrative Group (FYD|8OHFZ33PDO)/cn=Redpient$cn=75d1654d45154cZabbO8596aZc9atIQI-jaXrzyb];HiU,Tammy [/o=ExchangeLabs/ou=ExchangeAdministrative Group (FYD|8OHFZ33PDO)/cn=Redpient$cn=90bd5eIe634f49Z38375d9bOae5dfaOe-t|hi||];6ore,Deborah [/o=ExchangeLabs/ou=ExchangeAdministrative Group (FYD|8OHFZ33PDO)/cn=Redpient$cn=OacecZ54%d]o477caa1f8bcOe77I%3bf-dagore];Reeder,Tom [/o=ExchangeLabs/ou=ExchangpAdministrative Group (FYD|BOHF2]SPDQ]/cn=Redpient$cn=8cbfb56cl]dd4p3683733a4b7cd94197-tarepdprl];Gndreau,]pssica [/o=ExchangeLabs/ou=ExchangpAdministrative Group (FYD|BOHF2]SPDQ]/cn=Redpient$cn=754d92G6f43445529e8892420aa44el-jcXudreau];ChadHam [chad.ham@faypwrzom];Chris Smith [chrissmith@faypwczom];Michael Rhuney(mrhoney@d.ashpbonn.ncus) [mrhnney8yd.asheboro.nc.us];Kevin Eason (keasnn@d.reidsvi||eocus)[keason@cireidsviUeocus];Det|efKnappe [knappe@ncsuedu];Williams, Kristine [Kristine.VVi||iams@gneensburo-nc.gnv] Subject: Re: Follow -Up re: 1,4 dioxane Thanks Mick. Iwill he speaking with her on Monday when back from vacation. Steven D.Drew, Director Department n[Water Resources City of P(]Box 3}3h'Greensboro. NC 27402-3130 (]ffimn: OnAug 25,2Ol6at3:43PM, Mick Noland i wrote: Woalso sent her this presentation that Chad did last November. From: Mick Noland Sent: 25,20163:23PM To: 'Grrvh,Juli«/; - ,1Reeder,Ton/'; Jessica' Cc:'Stcvc[rcvv ; Chad Ham; Ch�mSmith; yNichacl Rhoney Kevin Eason Subject: RE: FW: Follow -Up no: 1.4dioxanc Chad and ltalked with Catherine this morning and gave her the background and where things are a1this point ofthe initiative. When she asked what the cities were doing "/esuggested she contact the State or the cities themselves since we v/crcn"t in u position to say where they stood intheir efforts tnreduce Cioxancthat iabeing discharged b`their vvv/treatment facilities. More than one time vvoreiterated that the intent ofthis initiative was nocooperatively work oo reducing the exposure of downstream drinking water users to Dioxaneand not pursue an Mick Noland, PE Chief Operations Officer Water Resources Division Public Works Commission of the City of Fayetteville 955 Old Wilmington Road P 0 Box 1089 Fayetteville, NC 283102 (W) 910-223-4733 (F) 910-829-0207 mick.noland(a) ,faypwc.com<mailto:mick.iiolandLa)favpwc.com> From: Mick Noland Sent: Tuesday, August 23, 2016 4:36 PM To:'Grzyb, Julie'; 'tammy.l.tiffl(L q�ncdenr.gov` 'Deborah. gore(a) nedenr.gov'; 'Reeder, Tom'; 'Godreau, Jessica' Cc: 'Steve Drew (Steve. Drew(2( greensb oro-nc. gov<mailto: Steve.Drew(.(Tgreensb oro-ne. gov Chad Ham; Chris Smith Subject: FW: FW: Follow -Up re: 1,4 dioxane LWA From: Detlef Knappe [mailto:knappe(2(ncsu.edu] Sent: Tuesday, August 231, 2016 10:50 AM To: Mick Noland Subject: Re: FW: Follow -Up re: 1,4 dioxane Thank you for letting me know, Mick. She has talked with me once and told me that she wants to follow up. Detlef On 8/23/16 10:46 AM, Mick Noland wrote: FYI From: Catherine Clabby [tnailto:catherine.clabbyg.gmail.cotn] Sent: Tuesday, August 23, 2016 10:19 AM To: Chad Ham Cc: Mick Noland Subject: Re: Follow -Up re: 1,4 dioxane Great Chad! Thank you so much to both of you for making time on short notice. Google Maps tells me it will take me 1.5 hours to the Public Works Commission, 955 Old Wilmington Road, Fayetteville. (Correct address?) I can plan to leave Durham by 7:30. To be safe regarding morning traffic etc., shall we plan to meet at 9:30? Is there anything you think I should read in advance of our interview? Would it be possible for DEQ-CFW-00048556 me to get a peek at any adjustments you've made to your water treatment, intake processes to address the presence of 1,4 dioxane? Best wishes, Cathy Catherine Clabby I Journalist<ttps://www.linkedin.com/in/catherineclabby> 919.423.6163 @cathyclabby On Aug 23, 2016, at 10: 10 AM, Chad Ham <chad.hamLa)faypwc.cotn<mailto:chad.hamLa)faypwc.com>> wrote: Cathy, Thursday looks like the best day for us. We are free from 9:30 until 12 in the AM and any time after about 1: 15 in the PM. Just let me know what works for you. We can meet at my office. 601 North Eastern Boulevard, Fayetteville NC Miffli W/R Environmental Programs Manager Fayetteville Public Works Commission PO Box 1089 Fayetteville, NC 28302 910-2231-4702 910-797-4203 (mobile) The information contained in this communication (including any attachment) is privileged and confidential information that is intended for the sole use of the addressee. Access to this communication by anyone else is unauthorized. If the reader is not the intended recipient, or an employee or agent responsible for delivering this communication to the intended recipient, you are hereby notified that any distribution or copying of this communication is strictly prohibited and may be unlawful. If you have received this transmission in error, please reply and notify us of this error and delete this message. Finally, the recipient should check this communication and any attachments for the presence of viruses. The Public Works Commission of the City of Fayetteville, NC, accepts no liability for any damage caused by any virus transmitted by this communication. From: Catherine Clabby [m ai Ito: catherine. cl abb yLa) gmai 1. com Sent: Tuesday, August 23, 2016 7:59 AM To: Chad Ham Subject: Re: Follow -Up re: 1,4 dioxane Super. Thank you! DEQ-CFW-00048557 Cathy On Aug 23, 2016, at 7:24 AM, Chad Ham <chad.hamLa)faypwc.cotn<mailto:chad.hamLa)faypwc.com>> wrote: Catherine, I was in Raleigh yesterday. I am trying to coordinate with Mick to see if he can work it in. I will let you know as soon as I get an answer. Em W/R Environmental Programs Manager Fayetteville Public Works Commission PO Box 1089 Fayetteville, NC 28302 910-223-4702 910-797-4203 (mobile) The information contained in this communication (including any attachment) is privileged and confidential information that is intended for the sole use of the addressee. Access to this communication by anyone else is unauthorized. If the reader is not the intended recipient, or an employee or agent responsible for delivering this communication to the intended recipient, you are hereby notified that any distribution or copying of this communication is strictly prohibited and may be unlawful. If you have received this transmission in error, please reply and notify us of this error and delete this message. Finally, the recipient should check this communication and any attachments for the presence of viruses. The Public Works Commission of the City of Fayetteville, NC, accepts no liability for any damage caused by any virus transmitted by this communication. From: Catherine Clabby [mailto:catherine._c_1_a4by q��-ginai ------ ---- LLcom] Sent: Monday, August 22, 2016 7:15 PM To: Chad Ham Cc: Mick Noland Subject: Re: Follow -Up re: 1,4 dioxane Hi Chad and Mick. I'm resenting my message to you. Can I come to Fayetteville this week and talk to you about your creative response to the detection of 1,4 dioxane? All the best, Cathy Clabby 919.423.6163 On Aug 19, 2016, at 8:39 PM, Catherine Clabby <catheri tie. clabbyLa) gniail. com<niailto: catheri ne. cl abby L-�,gmail.coni>> wrote: Hi Chad. I must apologize for taking so darn long to get back in touch. My work for NC Health News got gobbled up legislative coverage for much of the time since we spoke way back in May. The coal ash story persisted after that. But I am finally able to turn back to this important story. I'd love to drive down to Fayetteville to talk over the work you folks have done to respond to findings about 1,4 dioxane. If it's feasible DEQ-CFW-00048558 to do so early next week, I'd love to head down then. Cathy Catherine Clabby I Journalist<ttps://www.linkedin.com/in/catherineclabby> 919.423.6163 @cathyclabby On May 17, 2016, at 9:07 AM, Chad Ham <chad.ham(LDfqvpwc. com<maj Ito: chad. hamLa)fqypwc. corn>> wrote: Hi Catherine, I am following up on our conversation this morning. We would be happy to set up a time for you to come to Fayetteville to discuss your story. Please email us a few possible dates and we will see what we can do. Thanks, Chad Ham W/R Environmental Programs Manager Fayetteville Public Works Commission PO Box 1089 Fayetteville, NC 28302 910-223-4702 910-797-4203 (mobile) The information contained in this communication (including any attachment) is privileged and confidential information that is intended for the sole use of the addressee. Access to this communication by anyone else is unauthorized. If the reader is not the intended recipient, or an employee or agent responsible for delivering this communication to the intended recipient, you are hereby notified that any distribution or copying of this communication is strictly prohibited and may be unlawful. If you have received this transmission in error, please reply and notify us of this error and delete this message. Finally, the recipient should check this communication and any attachments for the presence of viruses. The Public Works Commission of the City of Fayetteville, NC, accepts no liability for any damage caused by any virus transmitted by this communication. Detlef Knappe Professor 319-E Mann Hall DEQ-CFW-00048559 Department of Civil, Construction, and Environmental Engineering North Carolina State University Raleigh, NC 27695-7908 MWVTFJ' r Fax: 919-515-7908 E-mail: kriappeLo) ncs u. edu<rn ai Ito: knappe0a. riesu. edu> Web page: http://knappelab.wordl)i-ess.ncsu.edu/ <14-DioxanePresentation 11-2015.pptx> Please note that email sent to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. DEQ-CFW-00048560