HomeMy WebLinkAboutDEQ-CFW_00067852n J
1�17
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Air Quality
Pat McCrory Sheila C. Holman John E. Skvarla, III
Governor Director Secretary
January 9, 2014
Mr. Ellis McGaughy
Plant Manager
DuPont Company - Fayetteville Works
22828 NC Highway 87 West
Fayetteville, NC 28306
SUBJECT: Air Permit Expiration, Title V
_Air Quality Permit No. 0373ST38
DuPont Company - Fayetteville Works
Facility ID: 0900009, Fayetteville, Bladen County
Dear Mr. McGaughy:
This letter serves to remind you that Air Permit No. 03735T38 will expire on January 31, 2015. Pursuant
to 15A NCAC 2Q .0513, the application for renewal must be received by the Division of Air Quality at
least nine months before the date of the permit expiration, or by April 30, 2014. Failure to submit this
application by this date may terminate the facility's right to operate pursuant to 15A NCAC 2Q .0513(b).
In order for your renewal request to be considered complete and obtain the application shield that will allow
your facility to continue to operate under the terms of your permit, a completed Form AA, Form E5, and
Form E6 should be filled out in their entirety and submitted to the Fayetteville Regional Office. These
forms are available on our website at http://www.ncair.org/permits/forms.shtml.
You are required to include an evaluation of the applicability of the Compliance Assurance Monitoring
(CAM) rule pursuant to 40 CFR Part 64 in your Title V permit renewal application in accordance with
Section 5 of Form E6. In addition, the remainder of Form E6 must be completed for each CAM -affected
Pollutant Specific Emission Unit (PSEU) identified at the facility (if applicable). For details on the
requirements of the CAM plan, please visit our web site at http://www.ncair.org/enf/cam or call Mr. Samir
Parekh at (919) 707-8409
Fayetteville Regional Office - Division of Air Quality
Systel Building, 225 Green Street, Suite 714, Fayetteville, North Carolina 28301-5094
Phone: 910-433-3300 / FAX: 910-485-7467
Internet: www,ncair.org
An Equal Opportunity 1 Affirmative Action Employer - Made in part by Recycled Paper
DEQ-CFW 00067852
Mr. Ellis McGaughy . •
January 9, 2014
Page 3
Furthermore, if you are requesting information to be held as confidential, you must submit written justification
as to how the information you have marked confidential should be held as such. This request must include the
following:
a. How the information meets the definition of "Trade Secret" per NCGS 132-1.2 and NCGS 66-152(3);
b. How the information is not "Emissions Data" as defined in 40 CFR 2.301;
c. How your facility would be affected if the information is disclosed; and
d. How the information is protected at your facility.
Only one copy of those pages which contain confidential information is required to be submitted.
Additional information concerning confidential business information can be found at
http://www.ncair.org/permits/memos/public_ records_ flyer_final.pdf. You are strongly encouraged to
read the linked document prior to submitting confidential information to NC DAQ. if it is
determined that the information for which confidential treatment was sought is NOT a trade secret
and does NOT qualify for confidential treatment, then that information cannot be returned to you
and it will be maintained by the DAQ as a public record subject to disclosure upon request.
You are required to submit your complete application for renewal by April 30, 2014. If you have any
questions, please contact Donald Van der Vaart at (919) 707-8475 or Jim Moser at (910) 433-3367.
In addition, we encourage you to consider pollution prevention as a potential way to reduce your emissions
and possibly qualify your facility or emission unit(s) for permit exemption pursuant to 15A NCAC 2Q
.0503. If you need assistance in identifying pollution prevention opportunities at your facility, you may
contact the Division of Environmental Assistance and Outreach (DEAD) at 1-877-623-6748
(http://www.p2pays.org). DEAO has experienced personnel that provide free, confidential pollution
prevention opportunity assessments to help NC business and industries reduce air emissions and releases to
other environmental media.
S' erely,
Steven F. Vozzo
Regional Air Quality Supervisor
cc: Fayetteville Regional Office Files
DEQ-CFW 00067853
DAQ - Toolbox - FacFinder
Page 1 of 1
Air Quality Toolbox
FacFinder
........... _ _ ..._... __...... _._. _ .. .......
Welcome to Facility Finder
.._ . ............ .........
Print Help Logoff
Find Facility
Compliance Data
Facility Data
Assigned Inspector: Gregory Reeves
DuPont Company - Fayetteville Works
Operating Status: Operating
Compliance Status: Compliance - inspection
22828 NC Highway 87 West
Inspection Date: 06/20/2013
Fayetteville, NC 28306
Inspected By: Gregory Reeves
County: Bladen Lat: 34d 50.6000m Long:
Action Code: FCE
78d 50.2930m
.................................
NC Facility ID: 0900009
Permit Data
SIC: 3081/ Unsupported Plastics Film And
permit 03735 / T38
Sheet
NAILS: 326113 / Unlaminated Plastics Film
Issued 12/16/2013
Expires 1/31/2015
and Sheet (except Packaging) Manufacturing
Classification Title V
Permit Status Active
Authorized Contact Data
Invoice Contact Data
Ellis McGaughy, Plant Manager
E I DuPont - Fayetteville Works
22828 NC Highway 87 West
Michael Johnson, Environmental Manager
Fayetteville, NC 28306
22828 NC Hwy 87 West
(910) 678-1546
Fayetteville, NC 28306 7332
Ellis.H.McGaughy@dupont.com
(910) 678-1155
michael.e.johnson@dupont.com
Facility Contact Data
Technical Contact Data
Michael Johnson, Environmental Manager
Michael Johnson, Environmental Manager
22828 NC Highway 87 West
22828 NC Highway 87 West
Fayetteville, NC 28306 7332
Fayetteville, NC 28306 7332
(910) 678-1155
(910) 678-1155
michael.e.johnson@dupont.com
michael.e.jobnson@dupont.com
Active Programs: NSPS (Subpart Dc), SIP, 112r, Title V, MACT Part 63 (Subpart ZZZZ,
Subpart FFFF)
Pending Reports: Quarterly - 01/30/2014; Semi-annual - 01/30/2014; Semi-annual - 01/31/2014;
Annual - 02/28/2014; Semi-annual - 02/28/2014;
Semi-annual - 02/28/2014; Annual -ACC -
03/01/2014
Pending Source Tests: Test Deadline - 09/30/2011
http://ibeamaq.nodenr.org/aq/Toolbox/FaeFiiiderjsp?lockey=L8 I OL0373 5 1 /9/2014
DEQ-CFW 00067854