HomeMy WebLinkAboutDEQ-CFW_00066631REVIEW OF TITLE V 2016 ANNUAL COMPLIANCE CERTIFICATION FACILITY NAME: CHEMOURS COMPANY — FAYETTEVILLE WORKS I FACILITY ID: 0900009 1. Is the Certification sheet signed by the authorized/responsible official? N 2. Print the "Summary of Violations for a Facility" report from IBEAM and attach. 2�1� 3. Are all NOD/NOV/NREs accounted for in the Deviation Summary Report? N W 4. If deviations are noted, did FRO address them all? (i.e. send letter)? Check paper file �; for any issues that may not be recorded in IBEAM Violations. Cam` N il'�o4AnoNS 5. Discuss deviations details -with Compliance Coordinator. Fk--i N�A 6. If there was more than one permit applicable during the year, have all the permits been addressed in this ACC? (0 N 7. Do reported sources and conditions match those in the permit(s)? (Y N 8. Is the Compliance Summary Report for Specific Conditions complete and accurate? Y N 9. Is the Compliance Summary Report for General Conditions complete and accurate? , Y N 10. Is compliance with the ACC requirements indicated? Y N 11. Record in IBEAM Actions/Reporting (date received, date reviewed, compliance status, comments). Completed on oz%t& Lz o n (date) REMEMBER — Compliance determination here refers to the ACC submitting requirements (late, not submitted, incomplete, etc). Talk to the Compliance Coordinator before you code a facility in violation. 12. Initial and date the top of the ACC Certification Sheet (not this cover sheet). 13. File FRO copy in a "Reports" or an "ACC" folder in facility file after Compliance Coordinator review. Reviewed by: Date: 0 9 (initials) Coordinator Review: ke Date _A%17 (ini ials) DEQ-CFW 00066631 02/16/2017 Page 1 of 1 Summary of Violations Violator: Chemours Company - Fayetteville Works Facility ID: 0900009 Letter Date(s): 10/27/2009 Violation(s): County: Bladen Letter Type: FYI/Facilities Case #: ���� V" ZU/ Date Assessed: Amount Assessed: Case Closed: Total Amount Paid: $0.00 Letter Date(s): 01/06/2009 Violation(s): NC General Statutes NCGS 143-215.108 Control of sources of air pollution; permits required. County: Bladen Letter Type: NOV/NRE Case #: 2009-049 Date Assessed: 04/30/2009 Amount Assessed: $3,285.00 Case Closed: 05/14/2009 Total Amount Paid: $3,285.00 Letter Date(s): 11/30/2007 Violation(s): Permit Condition(s) Part II, Section 2; submit complete app within months County: Bladen Letter Type: NOV Case #: Date Assessed: Amount Assessed: Case Closed: Total Amount Paid: $0.00 Letter Date(s): 08/13/2007 Violation(s): County: Bladen Letter Type: FYI/Facilities Case #: Date Assessed: Amount Assessed: Case Closed: Total Amount Paid: $0.00 DEQ-CFW 00066632 �lGIlCG'` Y ChemoursTM Y FEB 14 2017 The Chemours Company 910-483-4681 0 Fluoroproducts chemours.com 22828 NC Hwy 87 W Fayetteville, NC 28306-7332 �Wlklsa, Uf at DEO-FAYETTEVILLE REGIONAL OFFICE February 7, 2017 CERTIFIED MAIL CERTIFIED MAIL 7002 0860 0006 9104 8498 7002 0860 0006 9104 8504 Return Receipt Requested Return Receipt Requested Mr. Steven F. Vozzo NCDEQ Division of Air Quality 225 Green Street Suite 714 Fayetteville, NC 28301-5043 U.S. EPA Region 4 Air and EPCRA Enforcement Section Mail Code: 4APT-AEEB 61 Forsyth Street S.W. Atlanta, GA 30303 SUBJECT: 2016 Title V Air Permit — Annual Compliance Certification Chemours Company — Fayetteville Works Title V Permit Number 03537T43 Facility ID: 0900009 Dear Sirs: Attached is the Chemours Company — Fayetteville Works' Title V Air Permit Annual Compliance Certification report for calendar year 2016. The required photocopy of this report is enclosed in the NCDEQ Division of Air Quality mailing. If you should have any questions, please call me at 910-678-1155. Attachment / Enclosure Sincerely, E. Johnson, PE nental Manager DEQ-CFW 00066633 North Carolina Department of Environmental Quality Division of Air Quality (DAQ)ggp Title V Annual Compliance Certification Forms �� v ll 04 Facility Name: Chemours Company — Fayetteville Works Facility Address: 22828 NC HighwayHighw4y 87 W Fayetteville, NC 28306-7332 Facility Location: 22828 NC Highway 87 W Bladen County NC 28306 Facility fD Number: 0900009 Title V Permit Number: 03735T41 03735T42 and 03735T43 Start of Reporting Period: JanuM 1 2016 End of Reporting Period: December 31 2016 Compliance Statement (Check only one of the following options) X During the reporting period specified above, this facility was in compliance with all terms and conditions identified in the above referenced Title V Operating Permit. As such, there were no deviations, excess emissions events, or other reportable incidents including those attributable to equipment malfunctions, breakdown, or upset conditions (please fill out the Compliance Summary Report). During the reporting period specified above, this facility was in compliance with ALL terms and conditions identified in the above referenced Title V Operating Permit, EXCEPT for the deviations identified in the Deviation Summary Report (please fill out both the Compliance Summary Report and Deviation Summary Report). Does the above compliance statement differ from what is indicated on your most recent Title V Report (i.e. last Semi -Annual Monitoring Report, Annual Emissions Inventory, etc)? Yes ❑ No Are you submitting this Annual Compliance Certification form to also fulfill a Title V Semi -Annual Monitoring reporting requirement? If so, this certification must be submitted by January 30. Yes ❑ No 0 Certification By Responsible Official Based on information and belief formed after reasonable inquiry, the undersigned certifies under penalty of law (federal rule 40 CFR 70.5(d)) that all information and statements provided in this form (including any attachments) are true, accurate, and pomplete. 5 Of Naive: Ellis H. McGaughy (Type or Print) Number of Attached Pages (not including Instructions Page) 37 February 7, 2017 (Date) Revision 3.0 DEQ-CFW 00066634 Permits 03735T41, 03735T42, and 03735T43 Page 1 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 ;O_/ee- ac.IA- - Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) (Yes / No / non- compliance Compliance Status Particulates from Fuel Burning Indirect Heat Exchangers Emissions of p articulate matter from the combustion of fuel oil Natural gas/ � AP-42 No. 2 fuel oil- PS -A and 2.1(A)(1)(a) that are discharged from the affected boilers (ID Nos. PS -A and No NA NA emission fired boiler PS-B PS-B) into the atmosphere shall not exceed 0.2667 pounds per factors million Btu heat input. 15A NCAC 2D .0503 Emissions of particulate matter from the combustion of fuel oil Natural gas/ that are discharged from the affected boiler (ID No. PS-C) into Boiler PS-C No. 2 fuel oil- PS-C 2.1(A)(1)(b) the atmosphere shall not exceed 0.2268 pounds per million Btu No NA NA has not been fired boiler heat input. constructed 15ANCAC 2D .0503 Natural gas/ PS -A, ✓ If emissions testing is required, the testing shall be performed in Emissions testing is not No. 2 fuel oil- PS-B, 2.1(A)(1)(c) accordance General Condition JJ. No NA NA required for fired boiler and PS-C [15A NCAC 2Q .0508(f)] these sources Natural gas/ PS -A, ✓ No monitorin /recordkee to re ortin is required for g p p g q Only natural gas or No. 2 Boiler PS-C No. 2 fuel oil- PS-B, 2.1(A)(1)(d) particulate emissions from the firing of natural gas or fuel oil in No NA NA fuel oil was has not been fired boiler and PS-C these sources. burned in constructed [15A NCAC 2Q .0508(f)] 2016 Sulfur Dioxide Emissions from Combustion Sources 0.5% Sulfur Emissions of sulfur dioxide from the affected boilers (ID Nos. Natural gas/ PS -A, f No. 2 fuel oil Boiler PS-C No. 2 fuel oil- PS-B, 2.1(A)(2)(a) PS -A and PS-B) when firing natural gas or No. 2 fuel oil, and No Yes NA equates to has not been fired boiler and PS-C from the affected boiler (ID No. PS-C) when firing natural gas 0.5 lb. S02 constructed only, shall not exceed 2.3 pounds per million Btu heat input. per 15A NCAC 2D .0516 million BTU. Natural gas/ PS -A, ✓ If emissions testing is required, the testing shall be performed in Emissions No. 2 fuel oil- PS-B, 2.1(A)(2)(b) accordance with General Condition JJ found in Section 3. No NA NA testing is not fired boiler and PS-C [I5A NCAC 2D . 0508(f)] required for these sources Only natural Natural gas/ PS -A, No monitoring/recordkeeping is required for sulfur dioxide gas or No. 2 Boiler PS-C No. 2 fuel oil- PS-B, 2.1(A)(2)(c) emissions from natural gas or fuel oil burned in these sources. No NA NA fuel oil was has not been fired boiler and PS-C [15A NCAC 2Q .0508(f)] burned in constructed 2016 Permits 03735T41, 03735T42, and 03735T43 Page 2 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) ( Yes / No i non- compliance Compliance P Status Control of Visible Emissions Visible emissions from the boiler (ID No. PS -A) shall not be ✓ more than 40 percent opacity when averaged over a six -minute Natural gas/ No. 2 fuel oil- PS -A 2.1(A)(3)(a) period. However, six -minute averaging periods may exceed 40 No NA NA No deviations percent not more than once in any hour and not more than four noted fired boiler times in any 24-hour period. In no event shall the six -minute average exceed 90 percent opacity. 15A NCAC 2D .0521 Visible emissions from the boiler (ID No. PS-B) shall not be ✓ more than 20 percent opacity when averaged over a six -minute Natural gas/ period. However, six -minute averaging periods may exceed 20 No deviations No. 2 fuel oil- PS-B 2.1(A)(3)(b) percent not more than once in any hour and not more than four No NA NA noted fired boiler times in any 24-hour period. In no event shall the six -minute average exceed 87 percent opacity. 15A NCAC 2D .0521 Visible emissions from the affected boiler (ID No. PS-C) shall not be more than 20 percent opacity when averaged over a six - Natural gas- minute period when natural gas is fired in the boiler. However, Boiler PS-C fired boiler PS-C 2.1(A)(3)(c) six -minute averaging periods may exceed 20 percent not more No NA NA has not been than once in any hour and not more than four times in any 24- constructed hour period. In no event shall the six -minute average exceed 87 percent opacity Natural gas/ PS -A, j' If emissions testing is required, the testing shall be performed in Emissions No. 2 fuel oil- PS-B, 2.1(A)(3)(d) accordance with 15ANCAC 2D .2601 and General Condition No NA NA testing is not fired boiler and PS-C JJ. required for 15A NCAC 2 .0508 these sources Natural gas/ PS -A, No monitoring/recordkeeping/reporting is required for visible Only natural gas or No. 2 Boiler PS-C No. 2 fuel oil- PS-B, 2.1(A)(3)(e) emissions from the firing of natural gas or fuel oil in these No NA NA fuel oil was has not been fired boiler and PS-C sources. [15A NCAC 2Q .0508(f)] burned in constructed 2016 Permits 03735T41, 03735T42, and 03735T43 Page 3 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control ? Maintained Deviation a Determining Comments Description Device ID No.(s) Condition Number Summary (Yes/No) ? ( Yes ( No ( non- compliance Compliance p Status New Source Performance Standards (40 CFR 60. Subpart DO For the affected boiler, while firing No. 2 fuel oil only, the Permittee shall comply with all applicable provisions, including Natural gas/ '� the notification, testing, recordkeeping, and monitoring Boiler PS-C No. 2 fuel oil- PS-C 2.1(A)(4)(a) requirements contained in Environmental Management No NA NA has not been fired boiler Commission Standard 15A NCAC 02D .0524, "New Source constructed Performance Standards" (NSPS) as promulgated in 40 CFR 60, Subpart Dc, including Subpart A, "General Provisions." 15A NCAC 02D .0524 Natural gas/ The maximum sulfur content of any fuel oil received and fired Boiler PS-C No. 2 fuel oil- PS-C 2.1(A)(4)(b) in the affected boiler shall not exceed 0.5 percent by weight. No NA NA has not been fired boiler 15A NCAC 2D .0524 constructed Visible emissions from the affected boiler shall not be more than Natural gas/ 20 percent opacity when averaged over a six -minute period, Boiler PS-C No. 2 fuel oil- PS-C 2.1(A)(4)(c) except for one six -minute period per hour of not more than 27 No NA NA has not been fired boiler percent opacity. constructed 15A NCAC 2D .0524 and 40 CFR 60.43c(c Natural gas/ The opacity standards in Section 2.1 A.4.c, above, applies at all Boiler PS-C No. 2 fuel oil- PS-C 2.1(A)(4)(d) times when firing No. 2 fuel oil, except during periods of No NA NA has not been fired boiler startup, shutdown or malfunction. constructed 40 CFR 60.43c d Natural gas/ f No fuel sulfur limits or opacity limits apply under 15A NCAC Boiler PS-C No. 2 fuel oil- PS-C 2.1(A)(4)(e) 02D .0524 when firing natural gas in the affected boiler. No NA NA has not been fired boiler 15A NCAC 2D .0524 constructed If emissions testing is required, the testing shall be performed in Natural gas( 4/accordance with General Condition JJ. If the results of this test Boiler PS-C No. 2 fuel oil- PS-C 2.1(A)(4)(f) are above the limits given in Section 2.1 A.4.b or A.4.c, above, No NA NA has not been fired boiler the Permittee shall be deemed in noncompliance with 15A constructed NCAC 02D .0524. 15A NCAC 2Q .0508 i ! The Permittee shall conduct an initial performance test using Natural gas/ Method 9 of Appendix A-4 of 40 CFR Part 60 and in accordance Boiler PS-C No. 2 fuel oil- PS-C 2.1(A)(4)(g) with General Condition JJ to demonstrate compliance with the No NA NA has not been fired boiler opacity limit in Section 2.1 A.4.c, above, and as specified in constructed 2. 1 (A)(4)(g)(i) through 2.1(A)(4)(g)(iii). [40 CFR 60.47c(a)] Permits 03735T41, 03735T42, and 03735T43 Page 4 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) ? ( Yes ! No ( non- compliance Compliance p Status To assure compliance with the fuel sulfur limit in Section 2.1 Natural gas/ A.4.b, above the Permittee shall retain a copy of the fuel Boiler PS-C No. 2 fuel oil- PS-C 2.1(A)(4)(h) supplier certification for any fuel oil fired at the affected boiler. No NA NA has not been fired boiler The fuel supplier certification shall include the information constructed specified in 2. 1 (A)(4)(h)(i) through 2. 1 (A)(4)(h)(iii). 15A NCAC 2Q .0508 After completion of the initial performance testing in Section 2.1 Natural gas/ A.4.g, above, the Permittee shall comply with visible emissions Boiler PS-C No. 2 fuel oil- PS-C 2.1(A)(4)(i) monitoring according to the requirements specified in No NA NA has not been fired boiler 2.I(A)(4)(i)(i) through 2.1(A)(4)(i)(iii). constructed 40 CFR 60.47c a (2 Natural gas/ The Permittee shall record and maintain records of the amounts Boiler PS-C No. 2 fuel oil- PS-C 2.1(A)(4)0) of each fuel fired during each month. No NA NA has not been fired boiler 15A NCAC 02 .0508 and 40 CFR 60.48c 2 constructed Natural gas/ The Permittee shall maintain records of No. 2 fuel oil supplier Boiler PS-C No. 2 fuel oil- PS-C 2.1(A)(4)(k) certifications as specified in Section 2.1 A.4.h.i, above. No NA NA has not been fired boiler 40 CFR 60.48c e 11 , 1 constructed Natural gas/ The Permittee shall keep the opacity monitoring records Boiler PS-C No. 2 fuel oil- PS-C 2.1(A)(4)(1) specified in 2.1(A)(4)(1)(i) and 2. 1 (A)(4)(1)(ii). No NA NA has not been fired boiler 40 CFR 60.48c c 1 , 2 constructed Natural gas/ The Permittee shall maintain records of any occurrence and Boiler PS-C No. 2 fuel oil- PS-C 2.1(A)(4)(m) duration of any startup, shutdown, or malfunction in the No NA NA has not been fired boiler operation the affected boiler (ID No. PS-C). constructed 40 CFR 60.7 b Natural gas/ ✓ No. 2 fuel oil- PS-C 2.1(A)(4)(n) Paragraph (n) missing from permit NA NA NA fired boiler Natural gas/ f All records required under Section 2.1 AAJ through A.4.m shall Boiler PS-C No. 2 fuel oil- PS-C 2.1(A)(4)(o) be maintained by the Permittee for a period of two years No NA NA has not been fired boiler following the date of such record. constructed 40 CFR 60.48c i Natural gas/ The Permittee shall submit a construction notification of the date Boiler PS-C No. 2 fuel oil- PS-C 2.1(A)(4)(p) construction of the affected boiler (ID No. PS-C) is commenced, No NA NA has not been fired boiler postmarked no later than 30 days after such date. constructed 40 CFR 60.7(a)(1) Permits 03735T41, 03735T42, and 03735T43 Page 5 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) ( Yes / No / non- compliance Compliance P Status The Permittee shall submit an initial notification to the Regional Natural gas/ /` Supervisor within 15 days of actual startup of the affected boiler Boiler PS-C No. 2 fuel oil- PS-C 2.1(A)(4)(q) (ID No. PS-C). The notification shall include the information No NA NA has not been fired boiler specified in 2. 1 (A)(4)(q)(i) and 2. 1 (A)(4)(q)(ii). constructed 40 CFR 60.48c a , 40 CFR 60.7(a)(3 The Permittee shall submit a semiannual summary report postmarked on or before January 30 of each calendar year for ✓ the preceding six-month period between July and December and Natural gas/ July 30 of each calendar year for the preceding six-month period Boiler PS-C No. 2 fuel oil- PS-C 2.1(A)(4)(r) between January and June. All instances of noncompliance from No NA NA has not been fired boiler the requirements of this permit and excess emissions must be constructed clearly identified. The summary report shall include specified information. 15A NCAC 02 .0508 Prevention of Significant Deterioration Natural gas/ ✓ In order to avoid applicability of 15A NCAC 2D .0530(g) for Monthly PSD No. 2 fuel oil- PS-B 2.1(A)(5)(a) major sources and major modifications, the affected boiler shall No Yes NA avoidance fired boiler discharge into the atmosphere less than 40 tons of Nitrogen reports Oxide per consecutive 12-month period. 15A NCAC 2 .0317 ✓ In order to avoid applicability of 15A NCAC 2D .0530(g) for Natural gas/ major sources and major modifications, the affected boiler shall Monthly PSD No. 2 fuel oil- PS-B 2.1(A)(5)(a) discharge into the atmosphere less than 40 tons of Sulfur No Yes NA avoidance fired boiler Dioxide per consecutive 12-month period. reports 15A NCAC 2Q .0317 Natural gas/ ✓ If emissions testing is required, the Permittee shall perform such Emissions testing is not No. 2 fuel oil- PS-B 2.1(A)(5)(b) testing in accordance with General Condition JJ. No NA NA required for fired boiler [15A NCAC 2Q .0508(f)] this source Natural gas/ ,/ The Permittee shall keep monthly records of fuel usage in a Fuel consumption No. 2 fuel oil- PS-B 2.1(A)(5)(c) logbook (written or in electronic format), as specified in No Yes NA and sulfur fired boiler 2 1(A)(5)(c)(i) through 2. 1 (A)(5)(c)(iii). content [15A NCAC 2Q .0508(f)] records Permits 03735T41, 03735T42, and 03735T43 Page 6 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control ? Maintained Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) ? / / (Yes No non- compliance Compliance Status The Permittee shall calculate monthly and 12-month rolling NOx emissions from the affected boiler within 30 days after the Monthly PSD Natural gas/ No. 2 fuel oil- PS-B v` 2.1(A)(5)(d) end of each calendar month. Calculations shall be recorded in a No Yes NA avoidance fired boiler logbook (written or electronic format), according to formula reports specified in 2. 1 (A)(5)(d)(i) and 2. 1 (A)(5)(d)(ii). 15A NCAC 2D .0530 The Permittee shall calculate monthly and 12-month rolling SO2 Natural gas/ v emissions from the affected boiler within 30 days after the end Monthly PSD No. 2 fuel oil- PS-B 2.1(A)(5)(e) of each calendar month. Calculations shall be recorded in a No Yes NA avoidance fired boiler logbook (written or electronic format), according to formula reports specified in 2.1(A)(5)(e)(i) and 2. 1 (A)(5)(e)(ii). 15A NCAC 2D .0530 The Permittee shall submit a semi-annual summary report, acceptable to the Regional Air Quality Supervisor, of monitoring and recordkeeping activities postmarked on or Semi-annual Natural gas/ before January 30 of each calendar year for the preceding six- reports to NC No. 2 fuel oil- PS-B 2.1(A)(5)(f) month period between July and December, and July 30 of each No Yes NA Division of fired boiler calendar year for the preceding six-month period between Air Quality January and June. The report shall contain the information FRO specified in 2. 1 (A)(5)(f)(i) through 2. 1 (A)(5)(f)(iii). 15A NCAC 02 .0508( Case -by -Case "Boiler" MACT The initial compliance date for the emission limitations and No excess associated monitoring, recordkeeping, and reporting requirements listed below is December 12, 2013. These emissions were noted Natural gas/ PS-B conditions need not be included on the annual compliance dring Boiler PS-C No. 2 fuel oil- 2.1(A)(6)(a) certification until after the initial compliance date. These limits No NA NA period of has not been fired boiler PS-C apply except for periods of startup, shutdown, and malfunction. startup, constructed The Permittee shall follow the procedures in 15A NCAC 2D shutdown, or .0535 for any excess emissions that occur during periods of malfunction startup, shutdown, or malfunction. 15A NCAC 2D .1109 Permits 03735T41, 03735T42, and 03735T43 Page 7 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) (Yes / No / non- compliance Compliance Com p Status The Permittee shall comply with this CAA § 1120) standard This facility until May 19, 2019. The initial compliance date for the is following applicable CAA § 112(d) standard for "National Emission the Natural gas/ PS -A ✓ Standards for Hazardous Air Pollutants for Industrial, conditions Boiler PS-C No. 2 fuel oil- PS-B 2.1(A)(6)(b) Commercial, and Institutional Boilers and Process Heaters" is No NA NA specified by has not been fired boiler PS-C May 20, 2019. On and after May 20, 2019, the Permittee shall this CAA constructed comply with Section 2.1 A.7 for boilers (ID Nos. PS -A and PS- 112�) C) and Section 2.1 A.8 for boiler (ID No. PS-B). standard 15A NCAC 2D .1109 Natural gas/ PS -A If emissions testing is required, the Permittee shall perform such Emissions testing is not No. 2 fuel oil- PS-B 2.1(A)(6)(c) testing in accordance with General Condition JJ No NA NA required for fired boiler PS-C [15A NCAC 2Q .0508(f)] these sources Annual boiler The Permittee shall perform an annual boiler inspection and inspections and tune-ups maintenance as recommended by the manufacturer, or as a of boilers Natural gas/ minimum, the inspection and maintenance requirement shall PS -A and Boiler PS-C No. 2 fuel oil- PS -A 2.1(A)(6)(d) include the requirements specified in 2. 1 (A)(6)(d)(i) through No Yes NA PS-B were has not been fired boiler PS-B 2 1(A)(6)(d)(iii). The Permittee shall conduct at least one tune- completed on constructed PS-C up per calendar year to demonstrate compliance with this 10-17-2016 requirement. and [15A NCAC 2Q .0508(f)] 05-02-2016 respectively. The results of any required The results of any required annual burner inspection and annual burner Natural gas/ maintenance shall be maintained in a logbook (written or inspections and tune-ups No. 2 fuel oil- PS -A 2.1(A)(6)(e) electronic format) on -site and made available to an authorized No Yes NA are fired boiler PS-B representative upon request. The logbook shall record the mainain maintained as PS-C information specified in 2. 1 (A)(6)(e)(i) through 2. 1 (A)(6)(e)(iii). [15A NCAC 2Q .0508(f)] pdf files on the site's computer server Permits 03735T41, 03735T42, and 03735T43 Page 8 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) (Yes / No / non- compliance Compliance p Status Natural gas/ ✓ The Permittee shall submit an initial notification according to Boiler PS-C No. 2 fuel oil- PS -A 2.1(A)(6)(f) 40 CFR 63.9(b)(4) and (5) not later than 15 days after the actual No Yes NA has not been fired boiler PS-B date of startup of boiler (ID No. PS-C). constructed PS-C 15A NCAC 2Q .0508(f) Semiannual Summary Report. The Permittee shall submit a summary report by January 30 of each calendar year for the preceding six-month period between July and December, and Semi-annual Natural gas/ PS -A ✓ July 30 of each calendar year for the preceding six-month reports to NC No. 2 fuel oil- PS-B 2.1(A)(6)(g) period between January and June. The first summary report No Yes NA Division of fired boiler shall be required on January 30, 2015. The report shall include Air Quality PS-C the information specified in 2. 1 (A)(6)(g)(i) through FRO 2. 1 (A)(6)(g)(iv). 15ANCAC 2 .0508( 40 CFR 63, Subpart DDDDD — Boiler MACT For the boilers (ID Nos. PS -A and PS-C), the Permittee shall Natural gas/ comply with all applicable provisions for the "unit designed to This No. 2 fuel oil- PS -A 2.1(A)(7)(a) burn gas 1 subcategory," including the monitoring, No No NA condition is fired boiler PS-C recordkeeping, and reporting contained in 15A NCAC 02D effective on .I I I I "Maximum Achievable Control Technology" (MALT) as May 20, 2019 promulgated in 40 CFR 63, Subpart DDDDD. 40 CFR 63.7485, 63.7490 d , 63.7499 1 In order for the boilers (ID Nos. PS -A and PS-C) to be considered in the "unit designed to burn gas 1 subcategory," the Natural gas/ Permittee shall only burn liquid fuel for periodic testing of This No. 2 fuel oil- PS -A 2.1(A)(7)(b) liquid fuel, maintenance, or operator training, not to exceed a No No NA condition is fired boiler PS-C combined total of 48 hours during any calendar year, and during effective on periods of gas curtailment or gas supply interruptions of any May 20, 2019 duration. 40 CFR 63.7575 Natural gas/ PS -A ✓ For the purpose of Section 2.1 TA, the definitions and This condition is No. 2 fuel oil- PS-C 2.1(A)(7)(c) nomenclature contained in 40 CFR 63.7575 shall apply. No No NA effective on fired boiler [40 CFR 63.7575] May 20, 2019 The Permittee shall comply with the requirements of 40 CFR 63 This Natural gas/ PS -A Subpart A, General Provisions, according to the applicability of condition is No. 2 fuel oil- PS-C 2.1(A)(7)(d) Subpart A to such sources as identified in Table 10 to 40 CFR No No NA effective on fired boiler Part 63, Subpart DDDDD. 40 CFR 63.7565] May 20, 2019 Permits 03735T41, 03735T42, and 03735T43 Page 9 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control ? Maintained Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) ? (Yes No / / non- compliance Compliance p Status The Pennittee shall comply with the CAA §1120) standards in Section 2.1 A.6 through May 19, 2019. 2.1(A)(7)(e) f i. On and after May 20, 2019, the Permittee shall comply See Section paragraphs Natural gas/ PS -A with the requirements of Section 2.1 A.7 for the boiler (ID 2.1(A)(6) (i) and (ii) No. 2 fuel oil- PS-C 2.1(A)(7)(e) No. PS -A) No No NA Case -by -Case e effective fired boiler ii. The Pennittee shall comply with the requirements of this `Boiler" o on May 20, section for boiler (ID No. PS-C) on May 20, 2019 or upon MALT 2019 startup, whichever is later. 40 CFR 63.7495 a and b , 63.56 b As specified in 40 CFR 63.9(b)(4) and (5), if the initial startup This Natural gas/ PS -A ✓ of the boiler (ID No. PS-C) is after May 20, 2019, the Permittee condition is No. 2 fuel oil- PS-C 2.1(A)(7)(f) shall submit an Initial Notification not later than 15 days after No No NA effective on fired boiler the actual date of startup of the boiler. May 20, 2019 40 CFR 63.7545 c The Pennittee shall submit a Notification of Compliance Status Natural gas/ / for the boilers (ID Nos. PS -A and PS-C). The notification must This No. 2 fuel oil- PS -A 2.1(A)(7)(g) be signed by a responsible official and postmarked before the No No NA condition is fired boiler PS-C close of business within 60 days of the compliance date effective on specified in Section 2.1 A.Te, above. May 20, 2019 40 CFR 63.7545(e)(8 and 63.7530(e), and Natural gas/ The Permittee shall submit a notification of intent to fire an This No. 2 fuel oil- PS -A 2.1(A)(7)(h) alternative fuel within 48 hours of the declaration of each period No No NA condition is fired boiler PS-C of natural gas curtailment or supply interruption. effective on 40 CFR 63.7545 May 20, 2019 Natural gas/ The Permittee shall comply with the work practice standards in This No. 2 fuel oil - PS -A ✓ 2.1(A)(7)(i) Section 2.1 A.7.j, below at all times the boilers (ID Nos. PS -A No No NA condition is fired boiler PS-C and PS-C) are operating. effective on 40 CFR 63.7500 and 63.7505 a May 20, 2019 The Permittee shall conduct a tune-up of the boilers (ID Nos. Natural gas/ PS -A and PS-C) as specified below. The Permittee shall This No. 2 fuel oil- PS -A 2 1(A)(7)(j) conduct the tune-up while burning the type of fuel that provided No No NA condition is fired boiler PS-C the majority of the heat input to the boiler of the 12 months effective on prior to the tune-up. May 20, 2019 40 CFR 63.7500 a and 63.7540(a)(10)] Natural gas/ The tune-ups for the boilers (ID Nos. PS -A and PS-C) shall be This No. 2 fuel oil- PS -A 2.1(A)(7)(k) conducted according to the following schedule. [Table 3 of No No NA condition is fired boiler PS-C Subpart DDDDD] effective on 40 CFR 63.7540 a 12 , 63.7515 d May 20, 2019 Permits 03735T41, 03735T42, and 03735T43 Page 10 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) � / I (Yes No non- compliance Compliance p Status Natural gas/ If the boilers (ID Nos. PS -A and PS-C) are not operating on the This No. 2 fuel oil- PS -A 2.1(A)(7)(1) required date for a tune-up, the tune-up must be conducted No No NA condition is PS-C within 30 calendar days of startup. effective on fired boiler [40 CFR 63.7515(g) and 63.7540(a)(13) May 20, 2019 At all times, the Permittee shall operate and maintain the boiler, This Natural gas/ PS -A including associated air pollution control equipment and condition is No. 2 fuel oil- PS-C 2.1(A)(7)(m) monitoring equipment, in a manner consistent with safety and No No NA effective on fired boiler good air pollution control practices for minimizing emissions. May 20, 2019 40 CFR 63.7500 a (3 To demonstrate initial compliance, the Permittee shall also conduct a one-time energy assessment for the existing boiler This Natural gas/ PS -A (ID No. PS -A) performed by a qualified energy assessor. The condition is No. 2 fuel oil- PS-C 2.1(A)(7)(n) energy assessment must be conducted no later than May 20, No No NA effective on fired boiler 2019. The energy assessment must include the 32 on -site May 20, 2019 technical hours as defined in 40 CFR 63.7575. 40 CFR 63.7500 a 1 , Table 3 Natural gas/ PS -A ✓ The Permittee shall keep the records specified in 2. 1 (A)(7)(o)(i) This condition is No. 2 fuel oil- PS-C 2.1(A)(7)(o) through 2. 1 (A)(7)(o)(iv). No No NA effective on fired boiler [15A NCAC 02Q .0508(f)] May 20, 2019 Natural gas/ PS -A The Permittee shall comply with the recordkeeping requirements This condition is No. 2 fuel oil- PS-C 2.1(A)(7)(p) specified in 2. 1 (A)(7)(p)(i) through 2. 1 (A)(7)(p)(iii). No No NA effective on fired boiler [15A NCAC 02Q .0508(f)] May 20, 2019 The Permittee shall submit compliance reports to the DAQ every five years. The first report shall cover the period beginning on the compliance date specified in Section 2.1 A.7.e, This Natural gas/ No. 2 fuel PS -A 2.1(A)(7)(q)v above, and ending on December 31 within five years after the date in Section 2.1 A.Te, Subsequent No No NA condition is oil- PS-C compliance above. reports effective on fired boiler shall cover the five-year periods from January 1 to December 31. The compliance reports shall be postmarked on or before May 20, 2019 January 31. 40 CFR 63.7550(a), (b) and 63.10(a)(4), (5) Permits 03735T41, 03735T42, and 03735T43 Page 11 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) (Yes / No / non- compliance Compliance p Status The Permittee shall submit the annual compliance report via the CEDRI. The Permittee shall use the appropriate electronic report in CEDRI 40 CFR Part 63, Subpart DDDDD. Instead of using the electronic report in CEDRI for this 40 CFR Part 63, Subpart DDDDD, the Permittee may submit an alternate This Natural gas/ PS -A electronic file consistent with the XML schema listed on the condition is No. 2 fuel oil- PS-C 2.1(A)(7)(r) CEDRI Web site once the XML schema is available. If the No No NA effective on fired boiler reporting form specific to 40 CFR Part 63, Subpart DDDDD is May 20, 2019 not available in CEDRI at the time that the report is due, the Permittee shall submit the report to DAQ. The Permittee shall begin submitting reports via CEDRI no later than 90 days after the form becomes available in CEDRI. 40 CFR 63.7550(h)(3)] Natural gas/ The Permittee shall include the information specified in This No. 2 fuel oil- PS -A 2.1(A)(7)(s) 2. 1 (A)(7)(s)(i) through 2.1(A)(7)(s)(v) in the annual compliance No No NA condition is fired boiler PS-C report. effective on 40 CFR 63.7550 and Table 9 May 20, 2019 If the Permittee has a period of noncompliance with a work This Natural gas/ PS -A practice standard for periods of startup and shutdown during the condition is No. 2 fuel oil- PS-C 2.1(A)(7)(t) reporting period, the compliance report must also contain the No No NA effective on fired boiler information specified in 2. 1 (A)(7)(t)(i) and 2. 1 (A)(7)(t)(ii). May 20, 2019 40 CFR 63.7540 b , 63.7550(a and d and Table 9 40 CFR 63, Subpart DDDDD — Boiler MACT For the existing boiler (ID No. PS-B) designed to burn light liquid fuel with a heat input capacity 10 million Btu per hour or greater, the Permittee shall comply with all applicable Natural gas/ r; provisions, including the monitoring, recordkeeping, and This No. 2 fuel oil- PS-B 2.1(A)(8)(a) reporting contained in Environmental Management No No NA condition is fired boiler Commission Standard 15A NCAC 02D .1 I I I "Maximum effective on Achievable Control Technology" (MALT) as promulgated in 40 May 20, 2019 CFR 63, Subpart DDDDD "National Emission Standards for Hazardous Air Pollutants for Major Sources: Industrial, Commercial, and Institutional Boilers and Process Heaters" (Subpart DDDDD and Subpart A "General Provisions." Natural gas/ .: For the purpose of this permit condition, the definitions and This No. 2 fuel oil- PS-B 2.1(A)(8)(b) nomenclature contained in 40 CFR 63.7575 shall apply. No No NA condition is fired boiler [40 CFR 63.75751 effective on May 20, 2019 Permits 03735T41, 03735T42, and 03735T43 Page 12 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) ( Yes / No / non- compliance Compliance p Status The Permittee shall comply with the requirements of 40 CFR 63 This Natural gas/ i/ Subpart A General Provisions according to the applicability of condition is No. 2 fuel oil- PS-B 2.1(A)(8)(c) Subpart A to such sources as identified in Table 10 to Subpart No No NA effective on fired boiler 5D. 20, 2019 40 CFR 63.75651May The Permittee shall comply with the CAA § 1126) standard in This Natural gas/ v' Section 2.1 A.6 through May 19, 2019. The Permittee shall be condition is No. 2 fuel oil- PS-B 2.1(A)(8)(d) subject to the requirements of this standard starting May 20, No No NA effective on fired boiler 2019. 20, 2019 40 CFR 63.56 b and 63.7510(e)]May Natural gas/ q/ The Permittee shall complete the requirements specified in This condition is No. 2 fuel oil- PS-B 2.1(A)(8)(e) 2. 1 (A)(8)(e)(i) and 2.1(A)(8)(e)(ii). No No NA effective on fired boiler [40 CFR 63.56(b) and 63.7510(e)] May 20, 2019 At all times the boiler (ID No. PS-B) is operating, the Permittee Natural gas/ f shall be in compliance with the emission standards in Section This No. 2 fuel oil- PS-B 2.1(A)(8)(f) 2.1 A.8.h, except during periods of startup and shutdown. No No NA condition is fired boiler During startup and shutdown, the Permittee shall comply with effective on the requirements of Section 2.1 A.8.v and A.8.w. May 20, 2019 40 CFR 63.7500(a)(3), 63.7505 a At all times, then Permittee shall operate and maintain the boiler (ID No. PS-B), including associated air pollution control equipment and monitoring equipment, in a manner consistent with safety and good air pollution control practices for This Natural gas/ % minimizing emissions. Determination of whether such operation condition is No. 2 fuel oil- PS-B 2.1(A)(8)(g) and maintenance procedures are being used will be based on No No NA effective on fired boiler information available to the Administrator that may include, but May 20, 2019 is not limited to, monitoring results, review of operation and maintenance procedures, review of operation and maintenance records, and inspection of the source. 40 CFR 63.7500 a (3), 63.7505(a Natural gas/ V The boiler (ID No. PS-B) shall meet the emission limits This No. 2 fuel oil- PS-B 2.1(A)(8)(h) specified in the table in 2. 1 (A)(8)(h). No No NA condition is fired boiler [15A NCAC 02Q .0508(f) 40 CFR 63.7500(a)(1), Table 2 of effective on 40 CFR Part 63, Subpart DDDDD May 20, 2019 Permits 03735T41, 03735T42, and 03735T43 Page 13 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control Maintained Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) � (Yes / No / non- compliance Compliance p Status If emissions testing is required, the testing shall be performed in ✓ accordance with General Condition JJ. If the results of this This Natural gas/ No. 2 fuel oil- PS-B 2.1(A)(8)(i) test(s) are above the limit given in Section 2.1 A.8.h, above, the No No NA condition is Permittee shall be deemed in noncompliance with 15A NCAC effective on fired boiler 02D .I 111. May 20, 2019 15A NCAC 02Q .0508 Natural gas/ Ir The Permittee shall submit the notifications specified in This is condition is No. 2 fuel oil- PS-B 2.1(A)(8)0) 2.1(A)(8)0)(i) and 2. 1 (A)(8)0)(ii). No No NA effective on fired boiler [40 CFR 63.9(h)(2)(ii), 63.10(d)(2), 63.7530(e) and 63.7545(e)] May 20, 2019 The Permittee shall demonstrate compliance with the CO emission limits in Section 2.1 A.81, above, by developing a This Natural gas/ �/ site -specific stack test plan and conducting initial performance condition is No. 2 fuel oil- PS-B 2.1(A)(8)(k) stack tests according to the schedule specified in Section 2.1 No No NA effective on fired boiler A.8.e, above. The Permittee shall conduct each performance May 20, 2019 stack test according to the procedures in 40 CFR 63.7520. 40 CFR 63.7510 a 1 The Permittee shall demonstrate initial compliance with the This Natural gas/ hydrogen chloride, mercury and total selected metal emission condition is No. 2 fuel oil- PS-B 2.1(A)(8)(1) limits in Section 2.1 A.8.h, above, according to the requirements No No NA effective on fired boiler specified in 2.1(A)(8)(1)(i) through 2.1(A)(8)(1)(iii). May 20, 2019 40 CFR 63.7510(a) and b and 63.7530 c The Permittee shall establish an oxygen operating limit for the This Natural gas/ oxygen trim system installed on the boiler (ID No. PS-B) condition is No. 2 fuel oil- PS-B 2.1(A)(8)(m) according to the procedures in 40 CFR 63.7530(b)(4)(viii) and No No NA effective on fired boiler Table 7 of Part 63, Subpart DDDDD. 40 CFR 63.7510(a 3 May 20, 2019 The Permittee shall meet the work practice standard This Natural gas/ requirements specified in Section 2.1 A.8.s and A.81 The No. 2 fuel oil- PS-B 2.1(A)(8)(n) Permittee shall demonstrate initial compliance with the work No No NA condition is fired boiler practice standard according to the schedule in Section 2.1 A.8.e. effective on 40 CFR 63.7510 e May 20, 2019 Permits 03735T41, 03735T42, and 03735T43 Page 14 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) (Yes / No / non- compliance Compliance p Status If the boiler combusts ultra -low sulfur liquid fuel, the Permittee is not required to conduct subsequent performance tests (i.e., stack tests or fuel analyses) if the pollutants measured during the This Natural gas/ ✓ initial compliance performance tests meet the emission limits in condition is No. 2 fuel oil- PS-B 2.1(A)(8)(o) Section 2.1 A.81. The Permittee shall demonstrate ongoing No No NA effective on fired boiler compliance with the emissions limits by monitoring and May 20, 2019 recording the type of fuel combusted on a monthly basis, as required in Section 2.1 A.8.r. 40 CFR 63.7515(h If the Permittee intends to use a fuel other than ultra -low sulfur liquid fuel, natural gas, refinery gas, or other gas 1 fuel, the This Natural gas/ % Permittee shall conduct new performance tests (i.e., stack tests condition is No. 2 fuel oil- PS-B 2.1(A)(8)(p) or fuel analyses) within 60 days of burning the new fuel type. In No No NA effective on fired boiler addition, the Permittee shall comply with the requirements May 20, 2019 specified in 2. 1 (A)(8)(p)(i) through 2. 1 (A)(8)(p)(iii). 40 CFR 63.7540(a)(1) Natural gas/ f The Permittee shall install, operate, and maintain an oxygen trim This No. 2 fuel oil- PS-B 2.1(A)(8)(q) system on the boiler according to the procedures specified in No No NA condition is fired boiler 2. 1 (A)(8)(q)(i) through 2. 1 (A)(8)(q)(vi). effective on 40 CFR 63.7525(a) and (d)] May 20, 2019 The Permittee shall monitor the type and amount of all fuels Natural gas/ J burned in the boiler to demonstrate that all fuel types and This No. 2 fuel oil- PS-B 2.1(A)(8)(r) mixtures of fuels burned would result in equal to or lower No No NA condition is fired boiler emissions of hydrogen chloride, mercury, and TSM than the effective on applicable emission limit for each pollutant. May 20, 2019 40 CFR 63.7540(a)(2)] The Permittee shall conduct the tune-up of the boiler while burning the type of fuel that provided the majority of the heat This Natural gas/ input to the boiler or process heater over the 12 months prior to condition is No. 2 fuel oil- PS-B 2.1(A)(8)(s) the tune-up. The Permittee shall conduct the tune-up of the No No NA effective on fired boiler boiler following the requirements specified in 2. 1 (A)(8)(s)(i) through 2.1(A)(8)(s)(v). May 20, 2019 40 CFR 63.7500 a , 63.7540 a (10) and 12 Each tune-up for the boiler shall be conducted every five years This Natural gas/ ✓ and no more than 61 months after the previous tune-up. If the condition is No. 2 fuel oil- PS-B 2.1(A)(8)(t) unit is not operating on the required date for a tune-up, the tune- No No NA fired boiler up must be conducted within 30 calendar days of startup. effective on 40 CFR 63.7515(d), 63.7515( ), and 63.7540 a)(13) May 20, 2019 Permits 03735T41, 03735T42, and 03735T43 Page 15 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) ( Yes / No / non- compliance Compliance p Status The Permittee shall have a one-time energy assessment ✓ performed by a qualified energy assessor for the boiler. The This Natural gas/ energy assessment must address the specific requirements listed condition is No. 2 fuel oil- PS-B 2.1(A)(8)(u) in Section 2.1 (A)(8)(u)(i) through (A)(8)(u)(v), appropriate for No No NA effective on fired boiler the on -site technical hours listed in 40 CFR 63.7575. May 20, 2019 [40 CFR 63.7500(a)(1) and Table 3 to Part 63, Subpart DDDDD The Permittee shall comply with all applicable emission limits at This Natural gas/ f all times except during startup and shutdown periods. The condition is No. 2 fuel oil- PS-B 2.1(A)(8)(v) Permittee shall meet the startup work practice requirements No No NA effective on fired boiler listed in Section 2.1 (A)(8)(v)(i) through A)(8)(v)(v) May 20, 2019 15A NCAC 02D .I 111 "� The Permittee shall comply with all applicable emission limits at This Natural gas/ all times except during startup and shutdown periods. The condition is No. 2 fuel oil- PS-B 2.1(A)(8)(w) Permittee shall meet the shutdown work practice requirements No No NA effective on fired boiler listed in Section 2.1 (A)(8)(w)(i) through (A)(8)(w)(vi) May 20, 2019 15A NCAC 02D .1111 Natural gas/ v1 The Permittee shall keep the records listed in Section 2.1 This condition is No. 2 fuel oil- PS-B 2.1(A)(8)(x) (A)(8)(x)(i) through (A)(8)(x)(vi). No No NA effective on fired boiler [15A NCAC 02Q .0508(f)] May 20, 2019 Natural gas/ ✓ The Permittee shall comply with the recordkeeping requirements This condition is No. 2 fuel oil- PS-B 2.1(A)(8)(y) specified in 2. 1 (A)(8)(y)(i) through 2. 1 (A)(8)(y)(iii). No No NA effective on fired boiler [40 CFR 63.7560 and 63.10(b)(1)] May 20, 2019 The Permittee shall submit a compliance report to the DAQ on a semi-annual basis, postmarked on or before January 30 of each calendar year for the preceding six-month period between July and December and July 30 of each calendar year for the Natural gas/ preceding six-month period between January and June. This No. 2 fuel oil- PS-B 2.1(A)(8)(z) i. The first compliance report shall be postmarked on or No No NA condition is fired boiler before July 30, 2019 and cover the period from May 20, effective on 2019 through June 30, 2019. May 20, 2019 I The compliance reports shall also be submitted electronically to the EPA via the procedures in 40 CFR 63.7550(h). 15A NCAC 02Q .0508(f) Permits 03735T41, 03735T42, and 03735T43 Page 16 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining g Comments Description Device ID Condition Summary (Yes/No) ? non- Compliance p No.(s) Number ( Yes / No / compliance Status Natural gas/ / The compliance report shall contain the information specified in This condition is No. 2 fuel oil- PS-13 2.1(A)(8)(aa) 2. 1 (A)(8)(aa)(i) and 2. 1 (A)(8)(aa)(ii). No No NA effective on fired boiler [40 CFR 63.7550(c)] May 20, 2019 Within 60 days after the date of completing each performance test (defined in 40 CFR 63.2) including any associated fuel Natural gas/ analyses and/or CMS performance evaluation (defined in 40 This No. 2 fuel oil- PS-B 2.1(A)(8)(bb) CFR 63.2) as required by 40 CFR Part 63, Subpart DDDDD, the No No NA condition is fired boiler Permittee shall submit the results to the DAQ pursuant to 40 effective on CFR 63.10(d)(2) and to the EPA via the procedures in 40 CFR May 20, 2019 63.7550(h). 40 CFR 63.7550(h) IXM f Particulates from Miscellaneous Industrial Processes Emission membrane NS-I 2.1(C)(1)(a) Emissions of particulate matter from the affected source shall No NA NA source NS-I coating not exceed an allowable emission rate. has no visible process 15A NCAC 2D.05151 emissions IXM If emissions testing is required, the testing shall be performed in Emissions membrane NS-I 2.1(C)(1)(b) accordance with General Condition JJ. No NA NA testing is not coating [15A NCAC 2Q .0508(f)] required for process this source The Permittee shall maintain production records such that the IXM ') process rates "P" in tons per hour, as specified by the formulas Nafion® membrane NS-I 2.1(C)(1)(c contained above (or the formulas contained in 15A NCAC 2D No Yes NA Production coating .0515) can be derived, and shall make these records available to Records process a DAQ authorized representative upon request. 15A NCAC 2Q .0508(f) The Permittee shall submit a summary report of monitoring and recordkeeping activities postmarked on or before January 30 of Semi-annual IXM each calendar year for the preceding six-month period between to NC membrane NS-I 2.1(C)(1)(d) July and December and July 30 of each calendar year for the No Yes NA reports Division of coating preceding six-month period between January and June. All process instances of deviations from the requirements of this permit Air Quality must be clearly identified. FRO 15A NCAC 2Q .0508( Permits 03735T41, 03735T42, and 03735T43 Page 17 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) (Yes / No / non- compliance Compliance Status Control of Visible Emissions Visible emissions from the affected source shall not be more IXM than 20 percent opacity when averaged over a six -minute period. Emission membrane NS-I 2.1(C)(2)(a) However, six -minute averaging periods may exceed 20 percent No NA NA source NS-I coating not more than once in any hour and not more than four times in has no visible process any 24-hour period. In no event shall the six -minute average emissions exceed 87 percent opacity. 15A NCAC 2D .0521 IXM ✓ If emissions testing is required, the testing shall be performed in Emissions membrane NS-I 2.1(C)(2)(b) accordance with 15A NCAC 2D .2601 and General Condition No NA NA testing is not coating JJ required for process 15A NCAC 2Q .0508(f)] this source IXM membrane No monitoring/recordkeeping/ reporting is required for visible coating NS-I 2.1(C)(2)(c) emissions from this source. No NA NA NA [15A NCAC 2Q .0508(f)] process Prevention of Significant Deterioration Vinyl Ethers In order to avoid applicability of this regulation, the Vinyl Monthly PSD North process NS-B 2.1(C)(3)(a) Ethers North process shall discharge into the atmosphere less No NA NA avoidance than 68.9 tons of VOCs per consecutive 12-month period. reports 15A NCAC 2 .0317 Vinyl Ethers If emissions testing is required, the Permittee shall perform such Emissions testing is not North process NS-B 2.1(C)(3)(b) testing in accordance with General Condition JJ. No NA NA required for [15ANCAC 2Q .0508(f)] this source To demonstrate compliance with the limit provided in Section 2.1 C.3.a., within 30 days of the end of each calendar month the Vinyl Ethers 1 Permittee shall create and retain production records and estimate Monthly PSD North process NS-B 2.1(C)(3)(c) associated VOC emissions for the previous calendar month, No Yes NA avoidance following the specified steps listed in 2. 1 (C)(3)(c)(i) through reports (C)(3)(c)(x). 15A NCAC 2Q .0508 f Required records shall be maintained in a logbook (written or Monthly PSD Vinyl Ethers NS-B 2.1(C)(3)(d) electronic format) on -site and made available to an authorized No Yes NA avoidance reports are North process representative upon request. [15A NCAC 2Q .0508(f)] posted on the site web age Permits 03735T41, 03735T42, and 03735T43 Page 18 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) ? (Yes / No / non- compliance Compliance p Status The Permittee shall submit a semi-annual summary report, acceptable to the Regional Air Quality Supervisor, of monitoring and recordkeeping activities postmarked on or Semi-annual ✓ before January 30 of each calendar year for the preceding six- reports to NC Vinyl Ethers NS-B 2.1(C)(3)(e) month period between July and December, and July 30 of each No Yes NA Division of North process calendar year for the preceding six-month period between Air Quality January and June. The report shall contain the information FRO specified in 2. 1 (C)(3)(e)(i) through 2.1(C)(3)(e)(iii). 15A NCAC 2 .0508 Prevention of Significant Deterioration Resins ✓ In order to avoid applicability of this regulation, the resins Monthly PSD NS-G 2.1(C)(4)(a) process shall discharge into the atmosphere less than 40 tons of No Yes NA avoidance process VOCs per consecutive 12-month period. reports 15A NCAC 2Q .0317 Resins If emissions testing is required, the Permittee shall perform such Emissions testing is not NS-G 2.1(C)(4)(b) testing in accordance with General Condition JJ. No NA NA required for process [15A NCAC 2Q .0508(f)] this source To demonstrate compliance with the limit provided in Section 2.1 CA.a., within 30 days of the end of each calendar month the Resins Permittee shall create and retain production records and estimate Monthly PSD NS-G 2.1(C)(4)(c) associated VOC emissions for the previous calendar month, No Yes NA avoidance process following the specified steps listed in 2. 1 (C)(4)(c)(i) through reports (C)(4)(c)(vi). 15A NCAC 2Q .0508 Required records shall be maintained in a logbook (written or Monthly PSD avoidance Resins NS-G 2.1(C)(4)(d) electronic format) on -site and made available to an authorized No Yes NA reports are process representative upon request. posted on the [15A NCAC 2Q .0508(f)] site web age Permits 03735T41, 03735T42, and 03735T43 Page 19 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control ? Maintained Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) ? ( Yes / No / non- compliance p Compliance Status The Permittee shall submit a semi-annual summary report, acceptable to the Regional Air Quality Supervisor, of monitoring and recordkeeping activities postmarked on or Semi-annual ✓ before January 30 of each calendar year for the preceding six- reports to NC Resins NS-G 2.1(C)(4)(e) month period between July and December, and July 30 of each No Yes NA Division of process calendar year for the preceding six-month period between Air Quality January and June. The report shall contain the information FRO specified in 2. 1 (C)(4)(e)(i) through 2. 1 (C)(4)(e)(iii). 15A NCAC 2Q .0508( Prevention of Significant Deterioration HFPO ✓ In order to avoid applicability of this regulation, the HFPO Monthly PSD NS-A 2.1(C)(5)(a) process shall discharge into the atmosphere less than 85.3 tons No Yes NA avoidance process of VOCs per consecutive 12-month period. [15A NCAC 2Q reports .0317 HFPO f If emissions testing is required, the Permittee shall perform such Emissions testing is not process NS-A 2.1(C)(5)(b) testing in accordance with General Condition JJ No NA NA required for [15ANCAC 2Q .0508(f)] this source To demonstrate compliance with the limit provided in Section 2.1 C.5.a., within 30 days of the end of each calendar month the HFPO Permittee shall create and retain production records and estimate Monthly PSD NS-A 2.1(C)(5)(c) associated VOC emissions for the previous calendar month, No Yes NA avoidance process following the specified steps listed in 2. 1 (C)(5)(c)(i) through reports (C)(5)(c)(viii). 15A NCAC 2 .0508( Required records shall be maintained in a logbook (written or Monthly PSD HFPO NS-A 2.1(C)(5)(d) electronic format) on -site and made available to an authorized No Yes NA avoidance reports are process representative upon request. posted on the [15A NCAC 2Q .0508(f)] site web age Permits 03735T41, 03735T42, and 03735T43 Page 20 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) (Yes / No / non- compliance Compliance Status The Permittee shall submit a semi-annual summary report, acceptable to the Regional Air Quality Supervisor, of . monitoring and recordkeeping activities postmarked on or Semi-annual / before January 30 of each calendar year for the preceding six- reports to NC 14FPO NS-A 2.1(C)(5)(e) month period between July and December, and July 30 of each No Yes NA Division of process calendar year for the preceding six-month period between Air Quality January and June. The report shall contain the information FRO specified in 2. 1 (C)(5)(e)(i) through 2. 1 (C)(5)(e)(iii). 15A NCAC 2 .0508( HFPO Prevention of Significant Deterioration Product In order to avoid applicability of this regulation, the HFPO MonthlyPSD Container NS-N 2.1(C)(6)(a) Product Container Decontamination Process shall discharge into No Yes NA avoidance Decontami- the atmosphere less than 40.0 tons of VOCs per consecutive 12- reports nation month period. Process 15A NCAC 2Q .0317 HFPO Product Container If emissions testing is required, the Permittee shall perform such Emissions testing is not Decontami- NS-N 2.1(C)(6)(b) testing in accordance with General Condition JJ No NA NA required for nation [15ANCAC 2Q .0508(f)] this source Process HFPO To demonstrate compliance with the limit provided in Section Product 2.1 C.6.a., within 30 days of the end of each calendar month the Container ;J Permittee shall create and retain production records and estimate Monthly PSD Decontami- NS-N 2.1(C)(6)(c) associated VOC emissions for the previous calendar month, No Yes NA avoidance nation following the specified steps listed in 2. 1 (C)(6)(c)(i) through reports Process (C)(6)(c)(iii). 15A NCAC 2Q .0508 HFPO Product Required records shall be maintained in a logbook (written or Monthly PSD Container NS-N 2.1(C)(6)(d) electronic format) on -site and made available to an authorized No Yes NA avoidance reports are Decontami- representative upon request. posted on the nation [15A NCAC 2Q .0508(f)] Process site webpage Permits 03735T41, 03735T42, and 03735T43 Page 21 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) (Yes / No / non- compliance Compliance p Status The Permittee shall submit a semi-annual summary report, acceptable to the Regional Air Quality Supervisor, of HFPO monitoring and recordkeeping activities postmarked on or Semi-annual Product ✓ before January 30 of each calendar year for the preceding six- reports to NC Container NS-N 2.1(C)(6)(e) month period between July and December, and July 30 of each No Yes NA Division of Decontami- calendar year for the preceding six-month period between Air Quality nation January and June. The report shall contain the information FRO Process specified in 2. 1 (C)(6)(e)(i) through 2. 1 (C)(6)(e)(iii). 15A NCAC 2Q .0508 Prevention of Significant Deterioration The Permittee has used projected actual emissions to avoid Annual report IXM ✓' applicability of prevention of significant deterioration to NC Membrane NS-I 2.1(C)(7)(a) requirements pursuant to the application for the Spray Coating No Yes NA Division of Coating Throughput Increase Project. In order to verify the assumptions Air Quality Process used in the projected actual emissions calculations, the Permittee FRO shall comply with the requirements in Section 2.1 C.7.b, below. 15A NCAC 02D .0530 u IXM Annual report Membrane The Permittee shall perform the specified steps listed in to NC Coating NS-I 2.1(C)(7)(b) 2. 1 (C)(7)(b)(i) through (C)(7)(b)(iv). No Yes NA Division of Process [15A NCAC 02D .0530(u) and 02Q.03081. Air Quality FRO NESHAP for Miscellaneous Organic Chemical Manufacturing - For each miscellaneous organic chemical manufacturing process NS-A, unit, MCPU, the Permittee shall comply with all applicable FPS/IXM NS-B, provisions, including the notification, testing, recordkeeping, Semi-annual NS-C, 2.1(C)(8)(a) and monitoring requirements contained in 15ANCAC 2D .I I11, No Yes NA Compliance processes and "Maximum Achievable Control Technology" as promulgated in Report NS-G 40 CFR 63, Subpart FFFF, including Subpart A, "General Provisions". 15A NCAC 2D . 1111 NS-A, FPS/IXM NS-B, ./ Opening a safety device, as defined in §63.2550, is allowed at NS-C, 2.1(C)(8)(b) any time conditions require it to avoid unsafe conditions. No NA NA NA processes and [40 CFR 63.2450(p)] NS-G Permits 03735T41, 03735T42, and 03735T43 Page 22 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining g Comments Description Device ID Na(s) Condition Number Summary (Yes/No) ? (Yes / No / non- compliance Compliance p Status Site Procedure NG-18 is the The Permittee shall identify each pump, compressor, agitator, MON pressure relief device, sampling connection system, open-ended Physical MACT NS-A, NS-B, valve or line, valve, connector, and instrumentation system in tagging in LDAR FPS/IXM NS-C, 2.1(C)(8)(cc) organic HAP service within each MCPU. Identification of the No Yes NA field and written plan processes and equipment does not require physical tagging of the equipment. identification and The Permittee must identify equipment as specified in on P&I identifies NS-G 2. 1 (C)(8)(c)(i) through 2.1(C)(8)(c)(iv). drawings unsafe-to- [40 CFR 63.2480(a), 40 CFR 63.1022] monitor and unsafe -to - repair equipment. If the Permittee designates equipment as unsafe -to -monitor or NS-A, difficult to monitor, the Permittee shall create written plans as Site NS-B, , specified below. The Permittee shall retain the written plans on- Procedure FPS/IXM NS-C, 2.1(C)(8)(d) and make them available to NC DAQ for review upon No Yes NA NG-18 is the processes and request, including 2.1(site C)(8)(d)(i) "unsafe -to -monitor MON MACT NS-G equipment" and 2. 1 (C)(8)(d)(ii) "difficult -to -monitor LDAR equipment." written plan 40 CFR 63.1022(c)(4 NS-A, Valves in Light Liquid. Gas and Vapor Service FPS/IXM NS-C, 2.1(C)(8)( )^ The instrument reading that defines a leaking valve is 500 ppm No NA NA NA processes and and or greater. [15A NCAC 2D .I 111] Valves in Light Liquid, Gas and Vapor Service The Permittee shall monitor valves for leaks using the NS-A, instrument monitoring methods described in 40 CFR NS-B, f) 63.1023(b)-(c) at the frequency specified in 2. 1 (C)(8)(f)(i) LDAR FPS/IXM NS-C, 2.1(C)(8)(f) through 2.1(C)(8)(f)(v). The Permittee may choose to subdivide No Yes NA monitoring processes and the valves in the applicable process units or groups of process reports from NS-G units and apply the provisions above to each subgroup. If the Team Inc. Permittee elects to subdivide the valves, it shall comply with the provisions of 40 CFR 63.1025(b)(4). 40 CFR 63.1022(c)(4 Permits 03735T41, 03735T42, and 03735T43 Page 23 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining Comments Description Device ID No.(s) Condition Number Summary (Yes/No) ? (Yes / No / non- compliance Compliance Status NS-A, Valves in Light Liquid, Gas and Vapor Service LDAR FPS/IXM NS-B, ,% The percentage of leaking valves, used to determine the required monitoring NS-C, 2.1(C)(8)(g) monitoring frequency in Section 2.1(C)(7)(f) shall be calculated No Yes NA reports from processes and according to the procedures in 40 CFR 63.1025(c). Team Inc. NS-G 40 CFR 63.1025 c NS-A, NS-B, v/ Valves in Light Liquid, Gas and Vapor Service Scheduled FPS/IXM NS-C, 2.1(C)(8)(h) The Permittee shall create and retain a record of the monitoring No Yes NA and retained processes and and schedule for each process unit. via SAP [40 CFR 63. 1025(b)(3)(vi), 40 CFR 63. 1038(c)(1)(i)] Work Order Valves in Light Liquid, Gas and Vapor Service If a leak is identified: NS-A, i. It shall be repaired as provided in the repair provisions of FPS/IXM NS-B, ✓ Section 2. 1 (C)(7)(bb) through (C)(7)(dd). Leaker Detail NS-C, 2.1(C)(8)(i) ii. After a leak has been repaired, the valve shall be monitored No Yes NA Report from processes and at least once within the first 3 months after its repair. This Team Inc. NS-G requirement is in addition to the monitoring required to satisfy the definition of repaired and first attempt at repair. 15A NCAC 2D .1111 Valves in Light Liquid, Gas and Vapor Service Site NS-A, ✓ Any valve that is designated unsafe -to -monitor according to Procedure FPS/IXM NS-B, Section 2.1(C)(7)(c) is exempt from the monitoring and repair NG-18 is the NS-C 2.1(C)(8)0) requirements specified in Section 2.1(C)(7)(f) and (C)(7)(i), and No Yes NA MON MACT processes and the Permittee shall monitor the valve according to the written NS-G plan in Section 2.1 C.7.d. LDAR written plan 15A NCAC 2D .1 I III Valves in Light Liquid, Gas and Vapor Service NS-A, Any valve that is designated as difficult -to -monitor according to The site has FPS/IXM NS-B, ✓ Section 2.1(C)(7)(c) is exempt from the monitoring no difficult - NS-C, 2.1(C)(8)(k) requirements of Section 2.1(C)(7)(f) and (C)(7)(i), and the No NA NA to processes and Permittee shall monitor the valve according to the written plan -monitor NS-G in Section 2.1 C.7.d. valves 15A NCAC 2D .1111 Permits 03735T41, 03735T42, and 03735T43 Page 24 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) � ! / (Yes No non- compliance Compliance P Status All pumps subject to the MON MACT are designed NS-A, s Pumps in Light Liquid Service with no FPS/IXM NS-B, ✓ The instrument reading that defines a leaking pump is 1,000 externally NS-C, 2.1(C)(8)(1) ppm or greater. Repair is not required unless an instrument No NA NA actuated shaft processes and reading of 2,000 ppm or greater is detected. penetrating NS-G [40 CFR 63.1026(b)(2)(iii) and (b)(3)] the pump housing and therefore are exempt from §63.1026 b All pumps Pumps in Light t Liquid Service subject to the Each pump within the MCPUs shall be checked by visual MON MACT inspection each calendar week for indications of liquids dripping are designed NS-A, from the pump seal. The visual inspection shall be consistent with no FPS/IXM NS-B, with the methods described in 40 CFR 63.1023(d). The externally NS-C, 2.1(C)(8)(m) Permittee shall document that the inspection was conducted and No NA NA actuated shaft processes and the date of the inspection. If there are indications of liquids penetrating NS-G dripping from the pump seal at the time of the weekly the pump inspection, follow either of the procedures listed in housing and 2.1(C)(8)(m)(i) or 2. 1 (C)(8)(m)(ii). therefore are [40 CFR 63.1026(b)(4), 40 CFR 63.1038(c)(2)(i)] exempt from §63.1026 b All pumps subject to the Pumps in Light Liquid Service MON MACT NS-A, The Permittee shall monitor affected pumps once per calendar are designed with no NS-B, ✓ month using the instrument monitoring methods described in 40 externally FPS/IXM NS-C, 2.1(C)(8)(n) CFR 63.1023(b) and (c). Leaks shall be repaired as provided in No NA NA actuated shaft processes and Section 2. 1 (C)(7)(bb) through (C)(7)(dd). The Permittee shall penetrating NS-G calculate the percent leaking pumps using the procedures the pump specified in 40 CFR 63.1026(c). housing and [40 CFR 63.1026(b)(1), (c) and (d)] therefore are exempt from §63.1026(b) Permits 03735T41, 03735T42, and 03735T43 Page 25 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) (Yes / No / non- compliance Compliance Status Pumps in Light Liquid Service NS-A, Any pump that is designated as unsafe -to -monitor according to There are no FPS/IXM NS-B, / Section 2.1 (C)(7)(c), above is exempt from the inspection NS-C, 2.1(C)(8)(o) requirements provided in Section 2.1(C)(7)(m) and (C)(7)(n), No NA NA m-to- monitor moni processes and above, and the Permittee shall monitor and inspect the pump in NS-G accordance with the written plan in Section 2. 1 (C)(7)(d). pumps 40 CFR 63.1026(e)(6 Connectors in Gas and Vapor and Light Liquid Service The Permittee shall comply with the requirements of 40 CFR NS-A, / LDAR FPS/IXM NS-B, ✓ 63.1027 for connectors in gas/vapor and light liquid service. The monitoring NS-C, 2.1(C)(8)(p) Permittee may elect to comply with the requirements in Section No Yes NA reports from processes and 2.1(C)(7)(q) through (C)(7)(t), below, for connectors in heavy Team Inc. NS-G liquid service. 40 CFR 63.2480(b)(4)] Connectors in Gas and Vapor and Light Liquid Service The Permittee shall monitor connectors in each MCPU within 5 NS-A, Site NS-B, calendar days for leaks using the instrument monitoring methods operating FPS/IXM NS-C, 2.1(C)(8)(q) described in 40 CFR 63.1023(b) and (c) as applicable, if No Yes NA NA procedures processes and evidence of a potential leak to the atmosphere is found by visual, prohibit NS-G audible, olfactory, or any other detection method, unless the leaking potential leak is repaired according to Section 2. 1 (C)(7)(s). equipment 40 CFR 63.1029(b)(1)] NS-A, Connectors in Gas and Vapor and Light Liquid Service If an instrument reading of 500 parts per million or greater is NS-B, / r) LDAR FPS/IXM NS-C ' 2.1(C)(8)(r) measured as required in Section 2.1(C)(7)(q), a leak is detected. No Yes NA monitoring processes and The Permittee shall repair the leak according to Section 2.1 reports from NS-G (C)(7)(bb) through (C)(7)(dd). Team Inc. 40 CFR 63.1029 b 2 Connectors in Gas and Vapor and Li hg t Liquid Service All repairs NS-A For equipment identified in Section 2.1 (C)(7)(q) that is not LDAR are verified FPS/IXM NS-B, monitored by the method specified in 40 CFR 63.1023(b) and monitoring via use of a processes NS-C, 2.1(C)(8)(s) (c), as applicable, a leak is considered repaired one of the No Yes NA reports from VOC and conditions listed in 2. 1 (C)(8)(s)(i) through 2.1(C)(8)(s)(ii) is Team Inc. detector NS-G met. instrument 40 CFR 63.1029 c Permits 03735T41, 03735T42, and 03735T43 Page 26 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining Comments Description Device ID Condition Summary (Yes/No) Compliance No.(s) Number / / (yes NoStatus compliance Connectors in Gas and Vapor and Light Liquid Service The following are special provisions for connectors: i. Unsafe -to -repair connectors. Any connector that is designated as unsafe -to -repair as described in Section 2.1 (C)(7)(c) is exempt from the repair requirements in Site NS-A, Section 2.1 (C)(7)(bb). The Permittee shall monitor these Procedure FPS/IXM NS-B, ✓ connectors according to the written plan as specified in is the NS-C 2.1(C)(8)(t) Section 2.1 (C)(7)(d). No Yes NA MON ACT processes and ii. Inaccessible, ceramic, or ceramic -lined connectors. Any LDAR NS-G connector that is inaccessible or that is ceramic -lined is written plan exempt from the monitoring requirements specified in 40 CFR 63.1023(b) and (c); from the leak repair requirements of Section 2.1 (C)(7)(bb); from the recordkeeping and reporting requirements in this section. 40 CFR 63.1024 e ; 40 CFR 63.1027(e)(2)] NS-A, Agitators in Gas and Vapor and Li hg t Liquid Service FPS/IXM NS-B, NS-C, 2.1(C)(8)(u) No NA NA NA The instrument reading that defines a leaking agitator is 10,000 processes and ppm or greater. NS-G [40 CFR 63.10281 Weekly VEN NS-A, CMT NS-B, ` Agitators in Gas and Vapor and Light Liquid Service Agitator The Permittee shall conduct visual and instrument inspections as FPS/IXM NS-C, 2.1(C)(8)(v) No Yes NA Inspection; processes and provided in 2.1(C)(8)(v)(i) and 2. 1 (C)(8)(v)(ii). LDAR NS-G [40 CFR 63.1028] monitoring reports from Team Inc. NS-A, Agitators in Gas and Vapor and Light Liquid Service Site If the Permittee designates agitator seals as either unsafe -to- NS-B, Procedure FPS/IXM NS-C 2.1(C)(8)O monitor or difficult -to -monitor, the permittee shall comply with No Yes NA NG-18 is the processes and the requirements specified in 2.1(C)(8)(w)(i) and MON MACT NS-G 2.1(C)(8)(w)(ii). LDAR 40 CFR 63.1028 written plan Permits 03735T41, 03735T42, and 03735T43 Page 27 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained `? Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) ( Yes / No / non- compliance P Compliance p Status liance NS-A, Pressure Relief Valves Site has no FPS/IXM NS-B, / The instrument reading that defines a leaking pressure relief pressure NS-C, 2.1(C)(8)(x) valve is 500 ppm or greater. This standard does not apply No NA NA relief valves processes and during pressure releases as provided in Section 2. 1 (C)(7)(y). subject to the NS-G 40 CFR 63.1030 MON MACT NS-A, Pressure Relief Valves Site has no FPS/IXM NS-B, NS-C, 2.1(C)(8)(y) The pressure relief device shall be monitored as specified in No NA NA pressure relief valves processes and 2. 1 (C)(8)(y)(i) through 2.1(C)(8)(y)(iii). subject to the NS-G [40 CFR 63.10301 MON MACT NS-A, Leaker Tags NS-B, f When a leak is detected using either sensory or instrument hung by FPS/IXM NS-C, 2.1(C)(8)(z) monitoring methods, a weatherproof and readily visible No Yes NA Team Inc. processes and identification shall be attached to the leaking equipment. upon NS-G [40 CFR 63.2480(a)] discovery of a leak NS-A, Leaker Tags FPS/IXM NS-B, Leak identifications that are placed on leaking equipment may removed by NS-C, 2. 1 (C)(8)(aa) be removed as specified in 2. 1 (C)(8)(w)(i) and 2.1(C)(8)(w)(ii). No Yes NA Team Inc. processes and [40 CFR 63.1024(c)] following re- NS-G monitoring The Permittee shall repair each leak detected as soon as practical, but not later than 15 calendar days after it is detected, except where "Delay of Repair" or "Unsafe to Repair" provisions apply. A first attempt at repair shall be made no later NS-A, than 5 calendar days after the leak is detected. NS-B, i. First attempt at repair for pumps includes, but is not limited Leaker Detail FPS/IXM NS-C, ,/ 21(C)(8)(bb) to, tightening the packing gland nuts and/or ensuring that No Yes NA Report from processes and the seal flush is operating at design pressure and Team Inc. NS-G temperature. ii. First attempt at repair for valves includes, but is not limited to, tightening the bonnet bolts, and/or replacing the bonnet bolts, and/or tightening the packing gland nuts, and/or injecting lubricant into the lubricated packing. 40 CFR 63.2480 a , 40 CFR 63, Subpart UU Permits 03735T41, 03735T42, and 03735T43 Page 28 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) ( Yes / No / non- compliance Compliance P Status NS-A, Delay of repair is allowed for any of the conditions listed in No delay of NS-B, �` 2.1(C)(8)(cc)(i) through 2.1(C)(8)(cc)(v). The Permittee shall repair FPS/IXM NS-C, 2.1(C)(8)(cc) maintain a record of the facts that explain any delay of repairs No NA NA situations processes and and, where appropriate, why the repair was technically occurred in NS-G infeasible without a process unit shutdown. 2016 15A NCAC 2D .1111] NS-A, r For each leak detected, the information specified in NS-B, 2.1(C)(8)(ee)(i) through 2. 1 (C)(8)(ee)(v) shall be recorded and Leaker Detail FPS/IXM NS-C, 2. 1 (C)(8)(ee) maintained. No Yes NA Report from processes and [40 CFR 63.1023(e)(2), 40 CFR 63.1024(f), 40 CFR 63. Team Inc. NS-G 1038 b All equipment is physically NS-A, tagged FPS/IXM NS-B, l�! The Permittee shall create and retain the general records as NS-C, 2.1(C)(8)(ff) specified in 2.1(C)(8)(ff)(i) through 2.1(C)(8)(ff)(iii). No Yes NA Site processes and [40 CFR 63.1038(b)] Procedure NS-G NG-18 is the MON MACT LDAR written plan Site Procedure Heat Exchanger Requirements NG-18 is the NS-A, The Permittee shall prepare and implement a monitoring plan MON MACT FPS/IXM NS-B, / that documents the procedures that will be used to detect leaks LDAR NS-C, 2.1(C)(8)(gg) of process fluids into cooling water. The plan shall meet the No Yes NA written plan processes and requirements specified in 2. 1 (C)(8)(gg)(i) through NS-G 2.1(C)(8)(gg)(iii). Analytical [40 CFR 63.2490, 40 CFR 63.104(c)] reports from TBL Laboratory Permits 03735T41, 03735T42, and 03735T43 Page 29 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control ? Maintained Deviation a Determinin g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) ? (Yes / No / non- compliance Compliance p Status Heat Exchanger Requirements If a leak is detected in any heat exchanger system, the Permittee Electronic shall be repair the leak as soon as practical but not later than 45 Log Book on NS-A, calendar days after the Permittee receives results of monitoring Chemours FPS/IXM NS-BC, 2.1(C)(8)(h) tests indicating a leak, unless the Permittee demonstrates that the No Yes NA FW Intranet processes and and results are due to a condition other than a leak. Once the leak has been repaired, the owner or operator shall confirm that the No leaks heat exchange system has been repaired within 7 calendar days occurred in of the repair or startup, whichever is later. 2016 40 CFR 63.2490, 40 CFR 63.104 d Heat Exchanger Requirements NS-A, Delay of repair of heat exchange systems is allowed if the No delay of FPSlIXM NS-B, >✓ equipment is isolated from the process. Delay of repair is also repairs NS-C, 2.1(C)(8)(ii) allowed if repair is technically infeasible without a shutdown No NA NA occurred in processes and and any one of the conditions listed in 40 CFR 63.104(e)(1)-(2) 2016 NS-G is met. 40 CFR 63.2490, 40 CFR 63.104(e NS-A, Heat Exchanger Requirements FPS/IXM NS-B, For each affected heat exchanger system, the Permittee shall No leaks NS-C, 2.1(C)(8)�j) retain the records specified in 2. 1 (C)(8)0j)(i) through No NA NA occurred in processes and 2.1(C)(8)0j)(iv). 2016 NS-G 40 CFR 63.2490, 40 CFR 63.104 NS-A, NS-B, The Permittee shall create and retain the records specified in Notification FPSAXM NS-C' 2.1(C)(8)(kk) 2 1(C)(8)(kk)(i) through 2.1(C)(8)(kk)(vi) on each affected No Yes NA of processes and and MCPU. Compliance [40 CFR 63.2525(b)] Status Report NS-A, FPS/IXM NS-B, ✓ Create and retain a record of each time a safety device is opened Safety NS-C, 2.1(C)(8)(11) to avoid unsafe conditions. No Yes NA Incident processes and [40 CFR 63.2525(f)] Reports NS-G NS-A, For each affected Group 2 wastewater stream, the Permittee Notification FPS/IXM NS-B, ,/ shall retain the records specified in 2.1(C)(8)(mm)(i) through of processes NS-C, 2.1(C)(8)(mm) 2.1(C)(8)(mm)(iv). No Yes NA Compliance and [Table 7 of 40 CFR Part 63, Subpart F and Report NS-G 40 CFR 63.147(b)(8)]Status Permits 03735T41, 03735T42, and 03735T43 Page 30 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) � (Yes / No / non- compliance Compliance p Status No Group 2 If a Group 2 emission point becomes a Group 1 emission point, NS-A, the Permittee must be in compliance with the Group 1 emission points FPS/IXM NS-B, ✓ requirements beginning on the date the switch occurs. An initial became NS-C 2.1(C)(8)(nn) compliance demonstration as specified in 40 CFR 63, Subpart No NA NA Group 1 processes and FFFF must be conducted within 150 days after the switch NS-G occurs. emission points in [40 CFR 63.2445(d)] 2016 The Permittee shall submit a semi-annual compliance report of NS-A, monitoring and recordkeeping activities postmarked on or NS-B, 'o before February 28 of each calendar year for the preceding six- Semi-annual FPS/IXM NS-C, 2.1(C)(8)(0) month period between July and December, and August 31 of No Yes NA Compliance processes and each calendar year for the preceding six-month period between Report p NS-G January and June. The report shall contain the items specified in 2. 1 (C)(8)(oo)(i) through 2.1(C)(8)(oo)(xi). 40 CFR 63.2520(a), (b) and e Natural Particulates from Fuel Burning Indirect Heat Exchangers No rental Gas/No. 2 Emissions of particulate matter discharged into the atmosphere AP-42 boiler was fuel oil -fired PS -Temp 2.1(F)(1)(a) from the combustion of No. 2 fuel oil in the temporary boiler No NA NA emission on -site in temporary shall not exceed 0.2426 pounds per million Btu heat input. factors 2016. boiler 15A NCAC 2D .0503 Natural Emissions No rental Gas/No. 2 / If emissions testing is required, the testing shall be performed in testing is not boiler was fuel oil -fired PS -Temp 2.1(F)(1)(b) accordance General Condition JJ. No NA NA required for on -site in temporary [15A NCAC 2Q .0508(f)] this source 2016. boiler Natural Gas/No. 2 ✓ No monitoring/recordkeeping/reporting is required for No rental fuel oil -fired PS -Temp 2.1(F)(1)(c) particulate emissions from the firing of fuel oil in this source for No NA NA NA boiler was this regulation. on -site in temporary boiler [15A NCAC 2Q .0508(f)] 2016. Sulfur Dioxide Emissions from Combustion Sources 0.5% Sulfur Emissions of sulfur dioxide from the temporary boiler shall not Natural No. 2 fuel oil No rental Gas/No. 2 ✓ exceed 2.3 pounds per million Btu heat input. Sulfur dioxide equates to boiler was fuel oil -fired PS -Temp 2.1(17)(2)(a) formed by the combustion of sulfur in fuels, wastes, ores, and No Yes NA temporary other substances shall be included when determining compliance 0.5 lb. S02 on -site in boiler with this standard. per 2016. 15A NCAC 2D .0524 million BTU Permits 03735T41, 03735T42, and 03735T43 Page 31 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining g Comments Description Device ID Condition Summary (Yes/No) ? non- Compliance p No.(s) Number (Yes / No / compliance Status Natural ✓ in Emissions No rental Gas/No. 2 If emissions testing is required, the testing shall be performed testing is not boiler was fuel oil -fired PS -Temp 2.1(17)(2)(b) accordance with General Condition JJ. No NA NA required for on -site in temporary [15ANCAC 2Q .0508(f)] this source 2016. boiler Natural r No rental Gas/No. 2 ✓ No monitoring/recordkeeping is required for sulfur dioxide boiler was fuel oil -fired PS -Temp 2.1(F)(2)(c) emissions from the firing of natural gas or fuel oil in this source. No NA NA NA on -site in temporary [15A NCAC 2Q .0508(f)] 2016. boiler Control of Visible Emissions Natural Visible emissions from the temporary boiler shall not be more Gas/No. 2 than 20 percent opacity when averaged over a six -minute period. No rental No rental fuel oilfired PS -Temp 2.1(F)(3)(a) However, six -minute averaging periods may exceed 20 percent No NA NA boiler was boiler was not more than once in any hour and not more than four times in on -site in on -site in temporary boiler any 24-hour period. In no event shall the six -minute average 2016. 2016. exceed 87 percent opacity. 15A NCAC 2D .0521 Natural 2 Emissions No rental Gas/No. If emissions testing is required, the testing shall be performed in testing is not boiler was fuel oil -fired PS -Temp 2.1(F)(3)(b) accordance with General Condition JJ. No Yes NA required for on -site in temporary [15A NCAC 2Q .0508(f)] this source 2016. boiler Natural Gas/No. 2 ,d No monitoring/recordkeeping/reporting is required for visible No rental fuel oil -fired PS -Temp 2.1(17)(3)(c) emissions from the firing of natural gas or fuel oil in this source. No NA NA NA boiler was temporary [15A NCAC 2D .05241 on -site in boiler 2016. Natural Prevention of Significant Deterioration Gas/No. 2 , In order to avoid applicability of 15A NCAC 2D .0530(g) for Monthly PSD No rental fuel oil -fired PS -Temp 2.1(F)(4)(a) major sources and major modifications, the temporary boiler No Yes NA avoidance boiler was shall discharge into the atmosphere less 40 tons of sulfur dioxide on -site in temporary boiler per consecutive twelve-month period. reports 2016. 15A NCAC 2Q .0317 Permits 03735T41, 03735T42, and 03735T43 Page 32 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining g Comments Description Device ID Condition Summary (Yes/No) non- Compliance No.(s) Number (Yes / No / compliance Status Natural Emissions No rental Gas/No. 2 ✓ If emissions testing is required, the testing shall be performed in testing is not boiler was fuel oil -fired PS -Temp 2.1(17)(4)(b) accordance with General Condition JJ. No NA NA required for on -site in temporary [15A NCAC 2Q .0508(f)] this source 2016. boiler Natural ✓ The Permittee shall keep monthly records of fuel usage in a No rental No rental Gas/No. 2 fuel oil -fired PS -Temp 2.1(F)(4)(c) logbook (written or in electronic format), as specified in No Yes NA boiler was boiler was 2.1 4 c i and 2.1 F 4 c ii . (F)( )( )O O( )( )O on -site in on -site in temporary [15A NCAC 2Q .0508(f)] 2016. 2016. boiler The Permittee shall calculate monthly and 12-month rolling S02 Natural Gas/No. 2 �/ emissions from the temporary boiler within 30 days after the end Monthly PSD No rental fuel oil -fired PS -Temp 2.1(F)(4)(d) of each calendar month. Calculations shall be recorded in a No Yes NA avoidance boiler was logbook (written or electronic format), according to formulas on -site in temporary specified in 2. 1 (F)(4)(d)(i) and 2.1(F)(4)(d)(ii). reports 2016. boiler 15A NCAC 2 .0317 The Permittee shall submit a semi-annual summary report, acceptable to the Regional Air Quality Supervisor, of Natural monitoring and recordkeeping activities postmarked on or Semi-annual No rental Gas/No. 2 ✓ before January 30 of each calendar year for the preceding six- reports to NC boiler was fuel oil -fired PS -Temp 2.1(F)(4)(e) month period between July and December, and July 30 of each No Yes NA Division of on -site in temporary calendar year for the preceding six-month period between Air Quality 2016. boiler January and June. The report shall contain the information FRO specified in 2. 1 (F)(4)(e)(i) through 2. 1 (F)(4)(e)(iii). 15A NCAC 2Q .0508 Natural Avoidance Condition — Case -by -Case MACT for Boilers Gas/No. 2 ✓ No rental No rental Prior to May 20, 2019, in order to avoid the applicability of 15A fuel oil -fired PS -Temp 2.1(F)(5)(a) NCAC 02D .1109NCAC 02D, the temporary boiler shall not No Yes NA boiler was boiler was temporary remain on site for more than 180 consecutive days. on -site in on -site in boiler 15A NCAC 2Q .0317 2016. 2016. Natural Gas/No. 2 j If any of these boilers remains on site for longer than 180 No rental No rental fuel oil -fired PS -Temp !/ 2.1(F)(5)(b) consecutive days, the Permittee shall notify the Regional Office No Yes NA boiler was boiler was in writing within ten days of exceeding the 180 day period. on -site in on -site in temporary boiler [15A NCAC 2Q .0317] 2016. 2016. Permits 03735T41, 03735T42, and 03735T43 Page 33 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control ? Maintained Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) ? (Yes / No / non- compliance Compliance Status Natural 2 The Permittee shall submit a startup notification to the No rental No rental Gas/No. fuel oil -fired PS -Temp 'f 2.1(F)(5)(c) Fayetteville Regional Office within 15 days of startup of the No Yes NA boiler was boiler was temporary boiler. on -site in on -site in temporary [15A NCAC 2Q .0317] 2016. 2016. boiler PS -A Prevention of Significant Deterioration Natural gas / In order to avoid applicability of this regulation, the affected Monthly PSD No. 2 fuel oil- PS-B PS-C 2.2(A)(1)(a) boilers shall discharge into the atmosphere less than 702.5 tons No Yes NA Avoidance fired boilers PS -Temp of S02 per consecutive 12-month period. Report 15A NCAC 2 .0317 Natural gas 1 PS -A PS-B ✓ If emissions testing is required, the Permittee shall perform such Emissions testing is not No. 2 fuel oil- PS-C 2.2(A)(1)(b) testing in accordance with General Condition JJ. No NA NA required for fired boilers PS -Temp [15ANCAC 2Q .0508(f)] these sources Fuel Natural gas / PS -A The Permittee shall keep monthly records of fuel usage in a Consumption Records and No. 2 fuel oil- PS-B . 22(A)(1)(c) logbook (written or in electronic format), as specified in No Yes NA Certificates fired boilers PS-C 2.2(A)(1)(c)(i) through 2.2(A)(1)(c)(iii). of Analysis PS -Temp [15A NCAC 2Q .0508(f)] from Oil Supplier The Permittee shall calculate monthly and 12-month rolling S02 Natural gas / PS -A ; j emissions from the affected boilers within 30 days after the end Monthly PSD No. 2 fuel oil- PS-B 2.2(A)(1)(d) of each calendar month. Calculations shall be recorded in a log No Yes NA Avoidance fired boilers PS-C (written or electronic format), according to the formulas Report PS -Temp specified in 2.2(A)(1)(d)(i) and 2.2(A)(1)(d)(ii). 15A NCAC 2Q .0317 The Permittee shall submit a semi-annual summary report of monitoring and recordkeeping activities postmarked on or Semi-annual Natural gas / PS -A before January 30 of each calendar year for the preceding six - reports to NC No. 2 fuel oil- PS-B 2.2(A)(1)(e) month period between July and December, and July 30 of each No Yes NA Division of fired boilers PS-C calendar year for the preceding six-month period between Air Quality PS -Temp January and June. The report shall contain the information FRO specified in 2.2(A)(1)(e)(i) through 2.2(A)(1)(e)(iii). 15A NCAC 2Q .0508 Permits 03735T41, 03735T42, and 03735T43 Page 34 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining g Comments Description Device ID No.(s) Condition Number Summary (Yes/No) (Yes / No / non- compliance Compliance p Status CAA Section 112(r) — Risk Management Programs Review of The Permittee is subject to Section 112(r) of the Clean Air Act current All sources All 2.2(B)(3)(a) and shall comply with all applicable requirements in accordance No Yes NA Risk with 40 CFR Part 68. Management 40 CFR Part 681 Plan The Permittee submitted a Risk Management Plan (RMP) to All sources All 2.2(B)(3)(b) EPA pursuant to 40 CFR Part 68.150 on August 18, 2014. No Yes NA NA 15A NCAC 02Q .0508( The Permittee shall revise and update the RMP submitted under 40 CFR 68.150 by August 31, 2019, and at least once every five All sources All 2.2(13)(3)(c) years after that date or most recent update required by 40 CFR No Yes NA NA 68.190(b)(2) through (b)(7), whichever is later. 40 CFR Part 68 Option for Obtaining Construction and Operation Permit The physical As required under 15A NCAC 02Q .0501(c)(2), the Permittee modification shall have one year from the date of beginning normal operation of the IXM All sources All 2.2(C)(1)(a) of the modified IXM Membrane Coating Process (ID No. NS-I), No Yes NA Membrane to file an amended application following the procedures of Coating Section 15A NCAC 02Q .0504. Process has 15A NCAC 02 .0504 d not occurred The physical The Permittee shall notify the Regional Office, in writing, of the modification date of beginning normal operation of the modified IXM of the IXM All sources All 2.2(C)(1)(b) Membrane Coating Operation (ID Nos. NS-1) postmarked no No Yes NA Membrane later than 30 days after such date. Coating [15A NCAC 02Q .0504(f)] Process has not occurred Permit Shield for Nonapplicable Requirements Natural The NSPS for Small Industrial -Commercial -Institutional Steam Gas/No. 2 Generating units (40 CFR Part 60, Subpart Dc) and 15A NCAC No rental No rental fuel oil -fired PS -Temp 2.3(A) 02D .0524 are not applicable to the natural gas/No. 2 fuel oil- No NA NA boiler was boiler was fired temporary boiler because the boiler is a temporary boiler, on -site in on -site in temporary boiler as defined in §60.41c, provided the criteria specified in 2016. 2016. 2.3(A)(1) through 2.3(A)(4) are met. 15A NCAC 02Q .0512 a 1 (B Permits 03735T41, 03735T42, and 03735T43 Page 35 of 35 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2016 Emission Source or Terms and Conditions Deviation Records Was Method(s) of Permit Condition Source Control � Maintained Deviation a Determining g Comments Description Device ID Condition Summary non- Compliance pliance No.(s) Number (Yes / No / compliance Status Permit Shield for Nonapplicable Requirements The National Emission Standards for Hazardous Air Pollutants Natural for Major Sources: Industrial, Commercial, and Institutional No rental No rental Gas/No. 2 it Boilers and Process Heaters (40 CFR Part 63, Subpart DDDDD) boiler was boiler was fuel oil -fired PS -Temp 2.3(B) and 15A NCAC 02D .1111 are not applicable to the natural No NA NA on -site in on -site in temporary gas/No. 2 fuel oil -fired temporary boiler because the boiler is a 2 201 016. 2016. boiler temporary boiler, as defined in §63.7575, provided the criteria in Section 2.3(A)(1) through (A)(4) are met. 15A NCAC 02Q .0512 a 1 B Permit Shield for Nonapplicable Requirements Natural The Permittee shall maintain the records specified in 2.3(C)(1) Gas/No. 2 through 2.3(C)(4) documenting that the natural gas/No. 2 fuel No rental No rental oil -fired temporary boiler meets the criteria for a temporary boiler was boiler was fuel oil -fired PS -Temp 2.3(C) boiler. These records shall be maintained in a logbook (written No NA NA on -site in on -site in temporary boiler or electronic format) on -site and made available to an authorized 2016. 2016. representative upon request. 15A NCAC 02Q .0512 a 1 B Natural Permit Shield for Nonapplicable Requirements No rental No rental Gas/No. 2 f The Permittee shall submit a startup notification to the boiler was boiler was fuel oil -fired PS -Temp 2.3(D) Fayetteville Regional Office within 15 days of startup of the No NA NA on -site in on -site in temporary temporary boiler. 2016. 2016. boiler 15A NCAC 02Q .0512(a 1 (B Permits 03735T41, 03735T42, and 03735T43 Page 1 of 2 ' COMPLIANCE SUMMARY REPORT FOR GENERAL CONDITIONS For Calendar Year 2016 Terms and Conditions Was Deviation Method(s) of Deviations? Records Maintained? a non - compliance Determining Comments Permit Condition Condition Summary (Yes/No) (Yes/No/NA) issue? Compliance Number Yes / No)Status 3.A r/ General Provisions No Yes NA Records review 3.13 f Permit available at facility No Yes NA Records review 3.1) Submissions of reports to regional office No Yes NA Records review 3.G f Permit modifications and applications No Yes NA Records review 3.H j Changes not requiring permit modifications No NA NA NA No changes not requiring a permit modification in 2016 3.I.A, / Reporting requirements for excess emissions and permit No Yes NA Records review No excess emissions or 3.I.13 deviations permit deviations in 2016 3.K /� Permit renewal every five year No Yes NA NA Permit renewal application was submitted in 2014 3.M f Duty to Provide Information (submittal of information) No NA NA NA No information was requested in 2016 3.N ✓' Duty to supplement No NA NA NA No supplemental information submitted in 2016 3.0 Retention of records No Yes NA Records review 3.P Compliance certification No Yes NA Records review 3.Q . Certification by responsible official No Yes NA Records review 3.T Insignificant activities records available at facility No Yes NA Records review 3.V/ Inspection and entry No Yes NA DAQ annual inspection 3. W L/ Annual fee payment No Yes NA Records review Permits 03735T41, 03735T42, and 03735T43 Page 2 of 2 . COMPLIANCE SUMMARY REPORT FOR GENERAL CONDITIONS For Calendar Year 2016 Terms and Conditions Deviations? Records Maintained? Was Deviation a non- Method(s) of Determining Comments Condition Condition Summary. (Yes/No) issue? Compliance Number es / No)Status 3.X / Annual emission inventory requirement No Yes NA Records review 3.Y / Confidential information No NA NA NA EPA requested no confidential information 32 Construction and operation permits No Yes NA Records review 3.AA Standard application form and required information No Yes NA Records review 3.CC Refrigerant requirements No Yes NA Records review 3.DD Vi Prevention of accidental releases —Section 112(r) No Yes NA Records review 3.EE ✓ Prevention of accidental releases - Section 112(r)(1) No NA NA NA Facility is required to register a 112(r) RMP III Ambient air quality standards No Yes NA DispersionGaussian Model 3.JJ ✓ Emission testing and reporting requirements No NA No emission testing required NA NA nor performed in 2016 3.LL I/Reporting requirements for non -operating equipment No Yes NA Records review INN ✓ Specific permit modifications No Yes NA Records review A permittee has no influence 3.00 Third Party Participation and EPA Review No NA NA NA with the EPA review or any 3td party partid—tion