HomeMy WebLinkAboutDEQ-CFW_00066099Miscellaneous Organic Chemical Manufacturing NES P (MON)
Part 63 Subpart FFFF
Compliance Report
40 CFR 63.2520(e)
Reporting Period from January 1, 2009 through June 30, 2009
40 CFR 63.2520(e)(1) Company name and address:
DuPont Company — Fayetteville Works, 22828 NC Hwy 87 W, Fayetteville, NC 28306-7332.
40 CFR 63.2520(e)(2) Statement by a responsible official with that official's name, title, and
signature, certifying the accuracy of the content of the report.
See Attachment 1 for this certification statement.
40 CFR 63.2520(e)(3) Date of report and beginning and ending dates of the reporting period.
The date of this report is October 29, 2009. The reporting period of this report is from
January 1, 2009 through June 30, 2009.
40 CFR 63.2520(e)(4) For each SSM during which excess emissions occur, the compliance
report must include records that the procedures specified in your startup, shutdown, and
malfunction plan (SSMP) were followed or documentation of actions taken that are not
consistent with the SSMP, and include a brief description of each malfunction.
There are no sources subject to the Subpart FFFF NESHAP for which a startup, shutdown,
and malfunction plan (SSMP) is required.
40 CFR 63.2520(e)(5) The compliance report must contain the information on deviations, as
defined in §63.2550, according to paragraphs (e)(5)(i), (ii), (iii), and (iv) of this section.
There were no deviations during the reporting period.
40 CFR 63.2520(e)(5)(i) If there are no deviations from any emission limit, operating limit or
work practice standard specified in this subpart, include a statement that there were no
deviations from the emission limits, operating limits, or work practice standards during the
reporting period.
There were no deviations from the emission limits, operating limits, or work practice
standards during the reporting period.
40 CFR 63.2520(e)(5)(ii) For each deviation from an emission limit, operating limit, and work
practice standard that occurs at an affected source where you are not using a continuous
monitoring system (CMS) to comply with the emission limit or work practice standard in this
subpart, you must include the information in paragraphs (e)(5)(ii)(A) through (C) of this section.
This includes periods of SSM.
There were no deviations from the emission limits, operating limits, or work practice
standards during the reporting period.
Page 1 of 3
DEQ-CFW 00066099
rg0
Miscellaneous Organic Chemical Manufacturing NESHAP ON)
Part 63 Subpart FFFF
Compliance Report
40 CFR 63.2520(e)
Reporting Period from January 1, 2009 through June 30, 2009
40 CFR 63.2520(e)(5)(iii) For each deviation from an emission limit or operating limit
occurring at an affected source where you are using a CMS to comply with an emission limit in
this subpart, you must include the information in paragraphs (e)(5)(iii)(A) through (L) of this
section. This includes periods of SSM.
There were no deviations during the reporting period.
40 CFR 63.2520(e)(5)(iv) If you documented in your notification of compliance status report
that an MCPU has Group 2 batch process vents because the non -reactive HAP is the only HAP
and usage is less than 10, 000 lblyr, the total uncontrolled organic HAP emissions from the batch
process vents in an MCPU will be less than 1,000 lblyr for the anticipated number of standard
batches, or total uncontrolled hydrogen halide and halogen HAP emissions from all batch
process vents and continuous process vents in a process are less than 1,000 lblyr, include the
records associated with each calculation required by §63.2525(e) that exceeds an applicable
HAP usage or emissions threshold.
This section is not applicable.
40 CFR 63.2520(e)(6) If you use a CEMS, and there were no periods during which it was out -
of -control as specified in §63.8(c)(7), include a statement that there were no periods during
which the CEMS was out -of -control during the reporting period.
This section is not applicable. This site does not have a continuous emission monitoring
system.
40 CFR 63.2520(e)(7) Include each new operating scenario which has been operated since the
time period covered by the last compliance report and has not been submitted in the notification
of compliance status report or a previous compliance report. For each new operating scenario,
you must provide verification that the operating conditions for any associated control or
treatment device have not been exceeded and that any required calculations and engineering
analyses have been performed. For the purposes of this paragraph, a revised operating scenario
for an existing process is considered to be a new operating scenario.
This section is not applicable. This site does not have any new operating scenarios that have
been operating since the submittal of the notification of compliance status report.
40 CFR 63.2520(e)(8) Records of process units added to a PUG as specified in §63.2525(i)(4)
and records ofprimary product redetermination as specified in §63.2525(i)(5).
This section is not applicable. This site does not have any process unit groups.
Page 2 of 3
DEQ-CFW 00066100
Miscellaneous Organic Chemical Manufacturing NESHAP MON
0 0
Mi g g ( )
Part 63 Subpart FFFF
Compliance Report
40 CFR 63.2520(e)
Reporting Period from January 1, 2009 through June 30, 2009
40 CFR 63.2520(e)(9) Applicable records and information for periodic reports as specified in
referenced subparts F, G, H, SS, UU, WW, and GGG of this part and subpart F of 40 CFR part
65.
The periodic report for Subpart UU as specified in 40 CFR 63.1039(b) is provided as
Attachment 2.
40 CFR 63.2520(e)(10) Notification ofprocess change.
This section is not applicable. Since the submittal of the notification of compliance status
report, this site has not made any process changes that are not within the scope of an existing
operating scenario.
Page 3 of 3
DEQ-CFW 00066101
ATTACHMENT 1
Miscellaneous Organic Chemical Manufacturing NESHAP (MON)
Part 63 Subpart FFFF
Compliance Report
40 CFR 63.2520(e)
Reporting Period from May 10, 2008 through December 31, 2008
Certification of Report Accuracy
As required by 40 CFR 63.2520(e)(2), this document is the statement by a responsible
official certifying the accuracy of the content of the subject MON compliance report.
By my signature below, I certify under penalty of law that I have personally examined
and am familiar with the information submitted in this document and all attachments
and that, based on my inquiry of those individuals immediately responsible for
obtaining the information, I believe that the information is accurate. I am aware that
there are significant penalties for submitting false information, including the possibility
of fine and imprisonment.
Karen B. Wrigley
Plant Manager
October 29, 200
Date
DEQ-CFW 00066102
ATTACHMENT2
Compliance Group:
Periodic Monitoo Summary
Report: R807
Report Date: 6/26/2009 3:49:38PM
Report from: 2009-1-1 00 To 2009-6-30 2
HFPO
Percent
Late
Non
Leaking
Inspected
LeakinE
Repairs
Repairable
VALVES
JANUARY
0
0
0.00
0
0
FEBRUARY
3
168
1.79
3
0
MARCH
0
0
0.00
0
0
APRIL
0
0
0.00
0
0
MAY
1
167
0.60
0
0
JUNE
0
0
0.00
0
0
PUMPS
JANUARY
0
3
0.00
0
0
FEBRUARY
0
3
0.00
0
0
MARCH
0
3
0.00
0
0
APRIL
0
3
0.00
0
0
MAY
0
3
0.00
0
0
JUNE
0
3
0.00
0
0
COMPRESSORS
JANUARY
0
0
0.00
0
0
FEBRUARY
0
0
0.00
0
0
MARCH
0
0
0.00
0
0
APRIL
0
0
0.00
0
0
MAY
0
0
0.00
0
0
JUNE
0
0
0.00
0
0
AGITATORS
JANUARY
0
0
0.00
0
0
FEBRUARY
0
0
0.00
0
0
MARCH
0
0
0.00
0
0
APRIL
0
0
0.00
0
0
MAY
0
0
0.00
0
0
JUNE
0
0
0.00
0
0
CONNECTORS
JANUARY
0
0
0.00
0
0
FEBRUARY
0
0
0.00
0
0
MARCH
0
0
0.00
0
0
APRIL
0
0
0.00
0
0
MAY
0
0
0.00
0
0
JUNE
0
0
0.00
0
0
This report produced using Orr LeakDAS Page 1 of 4
DEQ-CFW 00066103
ATTACHMENT2
Compliance Group:
Periodic Monitoo Summary
Report: R807
Report Date: 6/26/2009 3:49:39PM
Report from: 2009-1-1 00 To 2009-6-30 2
POLYMERS
Percent
Late
Non
Leaking
Inspected
Leaking
Repairs
Repairable
VALVES
JANUARY
0
0
0.00
0
0
FEBRUARY
0
65
0.00
0
0
MARCH
0
0
0.00
0
0
APRIL
0
0
0.00
0
0
MAY
0
65
0.00
0
0
JUNE
0
0
0.00
0
0
PUMPS
JANUARY
0
2
0.00
0
0
FEBRUARY
0
2
0.00
0
0
MARCH
0
2
0.00
0
0
APRIL
0
2
0.00
0
0
MAY
0
2
0.00
0
0
JUNE
0
2
0.00
0
0
COMPRESSORS
JANUARY
0
0
0.00
0
0
FEBRUARY
0
0
0.00
0
0
MARCH
0
0
0.00
0
0
APRIL
0
0
0.00
0
0
MAY
0
0
0.00
0
0
JUNE
0
0
0.00
0
0
AGITATORS
JANUARY
0
0
0.00
0
0
FEBRUARY
0
0
0.00
0
0
MARCH
0
0
0.00
0
0
APRIL,
0
0
0.00
0
0
MAY
0
0
0.00
0
0
JUNE
0
0
0.00
0
0
CONNECTORS
JANUARY
0
0
0.00
0
0
FEBRUARY
0
0
0.00
0
0
MARCH
0
0
0.00
0
0
APRIL
0
0
0.00
0
0
MAY
0
0
0.00
0
0
JUNE
0
0
0.00
0
0
This report produced using Orr LeakDAS Page 2 of 4
DEQ-CFW 00066104
ATTACHMENT2
Compliance Group:
Periodic Monitoo Summary
Report: R807
Report Date: 6/26/2009 3:49:39PM
Report from: 2009-1-1 00 To 2009-6-30 2
VE NORTH
Percent
Late
Non
Leaking
Inspected
Leaking
Repairs
Repairable
VALVES
JANUARY
0
0
0.00
0
0
FEBRUARY
0
183
0.00
0
0
MARCH
0
0
0.00
0
0
APRIL
0
0
0.00
0
0
MAY
1
183
0.55
0
0
JUNE
0
0
0.00
0
0
PUMPS
JANUARY
0
5
0.00
0
0
FEBRUARY
0
5
0.00
0
0
MARCH
0
5
0.00
0
0
APRIL
0
5
0.00
0
0
MAY
0
5
0.00
0
0
JUNE
0
5
0.00
0
0
COMPRESSORS
JANUARY
0
0
0.00
0
0
FEBRUARY
0
0
0.00
0
0
MARCH
0
0
0.00
0
0
APRIL
0
0
0.00
0
0
MAY
0
0
0.00
0
0
JUNE
0
0
0.00
0
0
AGITATORS
JANUARY
0
1
0.00
0
0
FEBRUARY
0
1
0.00
0
0
MARCH
0
1
0.00
0
0
APRIL
0
1
0.00
0
0
MAY
0
1
0.00
0
0
JUNE
0
1
0.00
0
0
CONNECTORS
JANUARY
0
0
0.00
0
0
FEBRUARY
0
0
0.00
0
0
MARCH
0
0
0.00
0
0
APRIL
0
0
0.00
0
0
MAY
0
0
0.00
0
0
JUNE
0
0
0.00
0
0
This report produced using Orr LeakDAS Page 3 of 4
DEQ-CFW 00066105
ATTACHMENT2
Compliance Group:
Periodic Monitoo Summary
Report: R807
Report Date: 6/26/2009 3:49:39PM
Report from: 2009-1-1 00 To 2009-6-30 2
VE SOUTH
Percent
Late
Non
Leaking
Inspected
Leaking
Repairs
Repairable
VALVES
JANUARY
0
0
0.00
0
0
FEBRUARY
0
181
0.00
0
0
MARCH
0
0
0.00
0
0
APRIL
0
0
0.00
0
0
MAY
0
181
0.00
0
0
JUNE
0
0
0.00
0
0
PUMPS
JANUARY
0
6
0.00
0
0
FEBRUARY
0
6
0.00
0
0
MARCH
0
6
0.00
0
0
APRIL
0
6
0.00
0
0
MAY
0
6
0.00
0
0
JUNE
0
6
0.00
0
0
COMPRESSORS
JANUARY
0
0
0.00
0
0
FEBRUARY
0
0
0.00
0
0
MARCH
0
0
0.00
0
0
APRIL
0
0
0.00
0
0
MAY
0
0
0.00
0
0
JUNE
0
0
0.00
0
0
AGITATORS
JANUARY
0
0
0.00
0
0
FEBRUARY
0
0
0.00
0
0
MARCH
0
0
0.00
0
0
APRIL
0
0
0.00
0
0
MAY
0
0
0.00
0
0
JUNE
0
0
0.00
0
0
CONNECTORS
JANUARY
0
0
0.00
0
0
FEBRUARY
0
0
0.00
0
0
MARCH
0
0
0.00
0
0
APRIL
0
0
0.00
0
0
MAY
0
0
0.00
0
0
JUNE
0
0
0.00
0
0
This report produced using Orr LeakDAS Page 4 of 4