Loading...
HomeMy WebLinkAboutDEQ-CFW_00066021lltek DuPont Fluoroproducts 22828 NC Highway 87 W Fayetteville, NC 28306-7332 aU PONT® DuPont Fluoroproducts CERTIFIED MAIL — RETURN RECEIPT REQUESTED (Article Number 7007 0710 0005 1455 9256) , Mr. Steven F. Vozzo NCDENR Division of Air Quality 225 Green Street Suite 714 Fayetteville, NC 28301-5043 January 23, 2014 'l `� »l3l � l-111 SUBJECT: Miscellaneous Organic Chemical Manufacturing NESHAP (MON) Compliance Report — July 1, 2013 through December 31, 2013 Title V Permit Number 03537T38 Facility ID: 0900009 Dear Mr. Vozzo: Attached is the DuPont Company — Fayetteville Works' Compliance Report for the Miscellaneous Organic Chemical Manufacturing NESHAP (40 CFR Part 63 Subpart FFFF) for the reporting period from July 1, 2013 through December 31, 2013. Enclosed is the required photocopy of this report. If you should have any questions, please call me at 910-678-1155. Michael E. Johnson Environmental Manager Attachment / Enclosure cc: U.S. EPA Region 4, Air and EPCRA Enforcement Section, Atlanta, GA (Certified Mail Article Number 7007 0710 0005 1455 9263) E. I. du Pont de Nemours and Company FL-4 Rev. 3/2000 DEQ-CFW 00066021 MiscellaneoPorg anic Chemical Manufacturing NIPHAP (MON) Part 63 Subpart FFFF Compliance Report 40 CFR 63.2520(e) DuPont Company — Fayetteville Works North Carolina Title V Air Permit No. 03537T38 Reporting Period from July 1, 2013 through December 31, 2013 40 CFR 63.2520(e)(1) Company name and address: DuPont Company — Fayetteville Works 22828 NC Highway 87 W Fayetteville, NC 28306-7332 40 CFR 63.2520(e)(2) Statement by a responsible official with that official's name, title, and signature, certifying the accuracy of the content of the report. See Attachment 1 for this certification statement. 40 CFR 63.2520(e)(3) Date of report and beginning and ending dates of the reporting period. The date of this report is January 23, 2014. The reporting period of this report is from July 1, 2013 through December 31, 2013. 40 CFR 63.2520(e)(4) For each SSM during which excess emissions occur, the compliance report must include records that the procedures specified in your startup, shutdown, and malfunction plan (SSMP) were followed or documentation of actions taken that are not consistent with the SSMP, and include a brief description of each malfunction. There are no sources subject to the Subpart FFFF NESHAP for which a startup, shutdown, and malfunction plan (SSMP) is required. 40 CFR 63.2520(e)(5) The compliance report must contain the information on deviations, as defined in §63.2550, according to paragraphs (e)(5)(i), (ii), (iii), and (iv) of this section. There were no deviations from the emission limits, operating limits, or work practice standards during the reporting period. 40 CFR 63.2520(e)(5)(i) If there are no deviations from any emission limit, operating limit or work practice standard specified in this subpart, include a statement that there were no deviations from the emission limits, operating limits, or work practice standards during the reporting period. There were no deviations from the emission limits, operating limits, or work practice standards during the reporting period. Page 1 of 3 DEQ-CFW 00066022 Miscellaneou rg anic Chemical Manufacturing NIPHAP (MON) Part 63 Subpart FFFF Compliance Report 40 CFR 63.2520(e) DuPont Company — Fayetteville Works North Carolina Title V Air Permit No. 03537T38 Reporting Period from July 1, 2013 through December 31, 2013 40 CFR 63.2520(e)(5)(ii) For each deviation from an emission limit, operating limit, and work practice standard that occurs at an affected source where you are not using a continuous monitoring system (CMS) to comply with the emission limit or work practice standard in this subpart, you must include the information in paragraphs (e) (5) (ii) (A) through (C) of this section. This includes periods of SSM. There were no deviations from the emission limits, operating limits, or work practice standards during the reporting period. 40 CFR 63.2520(e)(5)(iii) For each deviation from an emission limit or operating limit occurring at an affected source where you are using a CMS to comply with an emission limit in this subpart, you must include the information in paragraphs (e)(5)(iii)(A) through (L) of this section. This includes periods of SSM. There were no deviations during the reporting period. In addition, no affected sources at this facility use a continuous monitoring system to comply with an emission limit in this subpart. 40 CFR 63.2520(e)(5)(iv) If you documented in your notification of compliance status report that an MCPU has Group 2 batch process vents because the non -reactive HAP is the only HAP and usage is less than 10, 000 lb/yr, the total uncontrolled organic HAP emissions from the batch process vents in an MCP will be less than 1, 000 lb/yr for the anticipated number of standard batches, or total uncontrolled hydrogen halide and halogen HAP emissions from all batch process vents and continuous process vents in a process are less than 1, 000 lb/yr, include the records associated with each calculation required by §63.2525(e) that exceeds an applicable HAP usage or emissions threshold. This section is not applicable. None of the above three scenarios were documented in the notification of compliance status report. 40 CFR 63.2520(e)(6) If you use a CEMS, and there were no periods during which it was out -of -control as specified in §63.8(c)(7), include a statement that there were no periods during which the CEMS was out -of -control during the reporting period. This section is not applicable. No affected sources at this facility use a continuous emission monitoring system. Page 2 of 3 DEQ-CFW 00066023 0 Miscellaneous Organic Chemical Manufacturing NVHAP (MON) Part 63 Subpart FFFF Compliance Report 40 CFR 63.2520(e) DuPont Company — Fayetteville Works North Carolina Title V Air Permit No. 03537T38 Reporting Period from July 1, 2013 through December 31, 2013 40 CFR 63.2520(e)(7) Include each new operating scenario which has been operated since the time period covered by the last compliance report and has not been submitted in the notification of compliance status report or a previous compliance report. For each new operating scenario, you must provide verification that the operating conditions for any associated control or treatment device have not been exceeded and that any required calculations and engineering analyses have been performed. For the purposes of this paragraph, a revised operating scenario for an existing process is considered to be a new operating scenario. This section is not applicable. This site does not have any new operating scenarios that have been operating since the submittal of the notification of compliance status report. 40 CFR 63.2520(e)(8) Records of process units added to a PUG as specified in §63.2525(i)(4) and records of primary product redeterminations as specified in §63.2525(i)(5). This section is not applicable. This site does not have any process unit groups. 40 CFR 63.2520(e)(9) Applicable records and information for periodic reports as specified in referenced subparts F, G, H, SS, UU, WW, and GGG of this part and subpart F of 40 CFR part 65. The periodic report for Subpart UU as specified in 40 CFR 63.1039(b) is provided as Attachment 2. 40 CFR 63.2520(e)(10) Notification ofprocess change. This section is not applicable. Since the submittal of the notification of compliance status report, this site has not made any process changes that are not within the scope of an existing operating scenario. Page 3 of 3 DEQ-CFW 00066024 iscellaneous Or anic Chemical Manufacturing NRHAP (MON) M g g Part 63 Subpart FFFF Compliance Report 40 CFR 63.2520(e) DuPont Company — Fayetteville Works North Carolina Title V Air Permit No. 03537T38 Reporting Period from July 1, 2013 through December 31, 2013 ATTACHMENT 1 Certification of Report Accuracy As required by 40 CFR 63.2520(e)(2), this document is the statement by a responsible official certifying the accuracy of the content of the subject MON compliance report. By my signature below, I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document and all attachments and that, based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the information is accurate. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment. Ellis H. McGaughy Plant Manager January 23, 2014 Date DEQ-CFW 00066025 Miscellaneous Organic Chemical Manufacturing NESHAP (MON) Part 63 Subpart FFFF Compliance Report 40 CFR 63.2520(e) DuPont Company — Fayetteville Works North Carolina Title V Air Permit No. 03537T38 Reporting Period from July 1, 2013 through December 31, 2013 ATTACHMENT 2 Periodic Monitoring Summary Report Parameters Report: R80 i MON-UU Report Date: 12117/2013 9:37:05AM ! Report from 2013-7-1 00 To 2013-12-31 Compllauce Group: HF`P0 Percent Late Non Loan Inspected Lealdn Repairs Rewdrable VALVES AUGUST 1 178 0.56 0 0 SEPTEMBER 0 1 0.00 0 0 NOVEMBER 4 178 2.25 0 0 PUMPS JULY 0 3 0.00 0 0 AUGUST 0 3 0.00 0 0 SEPTEMBER 0 3 0.00 0 0 OCTOBER 0 3 0.00 0 0 NOVEMBER 0 3 0.00 0 0 DECEMBER 0 3 0.00 0 0 Page I of 4 DEQ-CFW 00066026 Miscellaneous Organic Chemical ManufacturinESHAP (MON) M g g Part 63 Subpart FFFF Compliance Report 40 CFR 63.2520(e) DuPont Company — Fayetteville Works North Carolina Title V Air Permit No. 03537T38 Reporting Period from July 1, 2013 through December 31, 2013 ATTACHMENT 2 Periodic Monitoring Summary Report Parameters Report: R807 'MON-UU Report Date: 12/1712013 9:37:05AM Report from: 2013-7-1 00 To 2013-12-31 Compliance Group: POLYMERS Percent Late Non Lowng Inspected Leakin Repairs Repairable VALVES AUGUST 0 69 0.00 0 0 NOVEMBER 0 69 0.00 0 0 PUMPS JULY 0 2 0.00 0 0 AUGUST 0 2 0.00 0 0 SEPTEMBER 0 2 0.00 0 0 OCTOBER 0 2 0.00 0 0 NOVEMBER 0 2 0.00 0 0 DECEMBER 0 2 0.00 0 0 Page 2 of 4 DEQ-CFW 00066027 Miscellaneous Organic Chemical ManufacturingRESHAP (MON) Part 63 Subpart FFFF Compliance Report 40 CFR 63.2520(e) DuPont Company — Fayetteville Works North Carolina Title V Air Permit No. 03537T38 Reporting Period from July 1, 2013 through December 31, 2013 ATTACHMENT 2 Periodic Monitoring Summary Report Parameters Report: R8011 j MON-UU Report Date: 12/17/2013 9:37:05AM ! Report flow: 2013-7-1 00 To 2013-12-31 Coinpllance Group: VE NORTH VALVES AUGUST SEPTEMBER NOVEMBER DECEMBER PUMPS JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER AGITATORS DULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER CONNECTORS NOVEMBER Percent Lote Non Leakiniz IvsRected Leakin¢ RenaL,s Reoalrable 0 166 0.00 0 0 0 1 0.00 0 0 0 189 0.00 0 0 0 11 0.00 0 0 0 3 0.00 0 0 0 3 0.00 0 0 0 3 0.00 0 0 0 3 0.00 0 0 0 3 0.00 0 0 0 3 0.00 0 0 0 1 0.00 0 0 0 1 0.00 0 0 0 1 0.00 0 0 0 1 0.00 0 0 0 1 0.00 0 0 0 1 0.00 0 0 0 66 0.00 0 0 Page 3 of 4 DEQ-CFW 00066028 Miscellaneous Organic Chemical Manufacturing NESHAP (MON) Part 63 Subpart FFFF Compliance Report 40 CFR 63.2520(e) DuPont Company — Fayetteville Works North Carolina Title V Air Permit No. 03537T38 Reporting Period from July 1, 2013 through December 31, 2013 ATTACHMENT 2 Periodic Monitoring Summary Report Parameters Report: R807 MON-UU Report Date: 12/17/2013 9:37:05AM Report fronv 2013-7-1 00 To 2013-12-31 ComphRuce Group: VE SOUTH Percent Late Non Llwdug Inspected Lealdag Repairs Repairable VALVES AUGUST 0 175 0,00 0 0 NOVEMBER 1 194 0.52 0 0 PUMPS DULY 0 6 0.00 0 0 AUGUST 0 6 0.00 0 0 SEPTEMBER 0 6 0.00 0 0 OCTOBER 0 6 0.00 0 0 NOVEMBER 0 6 0.00 0 0 DECEIv1BER 0 6 0.00 0 0 CONNECTORS NOVEMBER 1 67 1.49 0 0 Page 4 of 4 DEQ-CFW 00066029