Loading...
HomeMy WebLinkAboutDEQ-CFW_00065383r�T l',; r:,,!£�, ter'f.f 1�' y�, ;r..--t �.;�,s..s Ea`.;.✓' Reeves, Gregory W From: Walters, Hope <Hope.Walters@kuraray.com> Sent: Wednesday, April 26, 2017 11:48 AM To: Reeves, Gregory W Cc: Crews, Ross; Evans, Aaron Subject: New Imbibing Process Attachments: MSDS Momentive Silquest A-2120 (3).pdf, MSDS Silquest C-2287 Silane (3).pdf Greg Reeves Environmental Engineer Division of Air Quality Fayetteville Regional Office 225 Green Street, Suite 714 Fayetteville, NC 28301 Greg, Kuraray is proposing to implement a new process, and I have attached a few pictures below for clarification. Basically, this process will feed the currently used resin into a small blender, where silane will be injected at 1000ppm via a small metering pump. Attached is the SDS and the emissions of the ethanol or methanol emission of the two current silane options are as follows: Silquest A-2120 max emissions are 310g/1kg of McOH; CoatOSil 2287 max emissions are 370g/1kg of EtOH. The projected volume for SG6000 for 2018 is 1,085,OOOkg and for 2019 is 2,456,OOOkg. This means our consumption of silane for those two years will be 1/1000th of those values. This process will take place in ambient conditions for temperature and pressure considerations. I know you spoke with the Engineer on the project (Aaron Evans). I am submitting this to you so that you can provide guidance on anything that we need to do so that we can use this new process. Wasn't sure if we needed to add this to our existing permit, do a modification or if anything is required. Please let me know how we need to proceed and if you have any further questions please let me know. Best regards Hope A. Walters Environmental Specialist Kuraray Interlayer Solutions Fayetteville Site PVB Division 22824 Highway 87 West Fayetteville, NC 28306 phone: (910)433-7170 mobile: (910)374-5195 DEQ-CFW 00065383 Vacuum loader receiver Hopper, w% 1 additional ring (notice ba connecting sections Blender Ullit Silane metering pUrr)p ng control for receiver Silane supply tank Lab scale for developing and checking mass of Silane injected. NOTES * COMMENTS DEQ-CFW 00065384 Imbibing Process Schematic for SG5500 (Fayetteville Site) 5/1012016 M!. Lee f----------------------------------- r r r r r ' 15 ft ._ -- r 11 ft - i "Silane Metering e: i Pump (Newt ( Model MS4 i F--------- +I; ' 7 ft Virgin i AE-1028 + ( L 5tarage.sY`.'. Gaylord Box - ( lnYhTbed I � AC-1028 . I Gaylord Box *Roper w/bag filter (New) Knife ,Cate valve (new) Loss -in -Weight Feeder (New) MPM Pre -mixer (New) Model SO 4C--------- ! Imbibed AE.1028 Gaylord Box (unloading from box) ------------------------- i , , , Virgin Silo i ' vacuum conveying system with spare pump (new) ATM e To Extruder ------ * Feed Hopper 9W ! � � �-- � M-- � L � MR-- _! � _ - - - � CIF � } � � lR : ®! ' W1W d "W � � l ! "W "" -T " ------- The Sweeper Silane System Feed DRUM From (New) Maguire (New) Imbibed resin box to storage or direct feed to virgin Silo from the Pre -mixer 3 -Coy. r,5"Y sw tm Owates .4rT a level Cc4nTrof ,n the recev,ng Mower •" The initrrloCk fDr 54'.ant int2t„nQ Pump nit shae n -- Ex,sling line — Flexible lire 0