Loading...
HomeMy WebLinkAboutDEQ-CFW_00061937Dupont-Bladen County-NC0003573 Subject: Dupont-Bladen County-NC0003573 From: Belinda Henson <Belinda.Henson@ncmail.net> Date: Wed, 25 Oct 2006 12:00:20 -0400 To: Mark Brantley <Mark.Brantley@ncmail.net>, Paul Rawls <paul.rawls@ncmai1.net> CC: trent allen <trent.allen@ncmail.net>, "Dale.Lopez" <Dale. Lopez@ncmai 1. net> Mike Johnson called today to give us an update on the study they are required to do to submit with their request to relocate their effluent discharge line above the Lock and Dam. Ruth Swanek (consultant) that Dupont has hired to do the study has been using the new EPA model for this study and has found it does not take into account dams in the stream. The old model does take into account this. She has talked with EPA and they have told her to change equations in the program of the new model to adjust for dams. She has also talked with Michelle Woolfolk on this. She is going to run the old model and the new model to compare results. Mike will keep us updated on their progress. Belinda S. Henson Regional Supervisor NC DENR-Division of Water Quality Surface Water Protection Section Fayetteville Regional Office (910)433-3326 1 of 1 11/3/2006 2:14 PM DEQ-CFW 00061937