HomeMy WebLinkAboutDEQ-CFW_00059833AQUIFER PROTECTION SECTION
APPLICATION REVIEW REQUEST FORM
Date: June 27, 2011
To: ❑ Landon Davidson, ARO-APS
r Art Barnhardt, FRO-APS
❑ Andrew Pitner, MRO-APS
❑ Jay Zimmerman, RRO-APS
From: Alice M. Wessner ®LAU
E-Mail: alice.wessner@ncdenr.gov
Telephone: (919) 715-5208 Fax:(919) 715-0588
❑ David May, WaRO-APS
❑ Charlie Stehman, WiRO-APS
❑ Sherri Knight, WSRO-APS
DENR-FAYETTEVILLE REGIONAL OFFICE
A. Permit Number: WQ0035431 B. Owner: DuPont Company
C. Facility/Operation: DuPont Company — Fayetteville Works
® Proposed ❑ Existing ❑ Facility ❑ Operation
D. Application:
1. Permit Type: ❑ Animal ❑ Surface Irrigation ❑ Reclaimed ❑ H-R Infiltration
❑ Recycle ❑ I/E Lagoon ❑ GW Remediation (ND)
❑ UIC - (5A7) open loop geothermal ❑ Single Family Residence
+ ® Residuals
2. Project Type: ® New ❑ Major Mod. ❑ Minor Mod. ❑ Renewal ❑ Renewal w/ Mod.
E. Comments/Other Information: ❑ I would like to accompany you on a site visit.
Attached, you will find all information submitted in support of the above -referenced application for your
review, comment, and/or action. Within 30 calendar days, please take the following actions:
Z Return a Completed APSARR Form.
❑ BIMS indicates monitoring wells locations are not complete. Please update monitoring well
locations not currently in BIMS.
❑ BUMS indicates ongoing ❑ NDMR ❑NDAR ❑ GW monitoring violations. Please investigate
reoccurring compliance issues and summarize results in staff report.
❑ Attach Well Construction Data Sheet.
❑ Process Attachment B for Certification by the Land Application Unit (LAU).
❑ Issue an Attachment B Certification from the RO. *
*coordinating site visits and reviews, as well as additional information requests with other RO-APS
representatives in order to prepare a complete Attachment B for certification. Refer to the RPP SOP for
additional detail.
Please indicate the name and date assigned in the spaces below, make a copy of this sheet, and return it to
the appropriate Central Office -Aquifer Protection Section contact person listed above.
l� Q
RO-APS Reviewer: Date: �1�
FORM: APSARR 03/10
Page 1 of 1
DEQ-CFW 00059833
'ALI
ii-A
NCDENR
North Carolina Department of Environment and
Division of Water Quality
Beverly Eaves Perdue
Governor
Ellis H. McGaughy — Plant Manager
DuPont Company - Fayetteville Works
22828 NC Hwy 87 West
Fayetteville, NC 28306-7332
Dear Mr. McGaughy:
Coleen H. Sullins
Director
June 22, 2011
Natural Resources
Dee Freeman
Secretary,
REEL IVED
1j ? U 2t� i
DENR-FAYETTEVILLE REGIONAL OFFICE
Subject: Acknowledgement of
Application No. WQ0035431
DuPont Company - Fayetteville Works
Distribution of Residuals Solids (503)
Exempt System
Bladen County
The Aquifer Protection Section acknowledges receipt of your permit application and supporting
documentation received on June 20, 2011. Your application package has been assigned the number listed
above, and the primary reviewer is Alice Wessner.
Central and Fayetteville Regional Office staff will perform a detailed review of the provided
application, and may contact you with a request for additional information. To ensure maximum
efficiency in processing permit applications, the Aquifer Protection Section requests your assistance in
providing a timely and complete response to any additional information requests.
Please note that processing standard review permit applications may take as long as 60 to 90 days
after receipt of a complete application. If you have any questions, please contact
Alice Wessner at (919) 715-5208 or alice.wessner@ncdenr.gov.
Sincerely,
for Jon Risgaard
Land Application Unit Supervisor
cc: Fayetteville Regional Office, Aquifer Protection Section
Teresa Rodriguez — AECOM 8540 Colonnade Center Drive, Suite 306, Raleigh. NC 27615
Permit File WQ0035431
1entrr, :'a e;ai:, wnrh �aroiina 27699-1636
ccarnr:. 27? sae tr,! Bost care. f<aieiot,. Doiin-. ori uar2760=,
12-2 FA'o .,. . „ _ c - 15 -04E ustomer Service: 1-677-623-6748
Interne- WW6y.ncwateraua1lty.orc
11
North Carol i1:,a
1ahra' � "
DEQ-CFW 00059834