Loading...
HomeMy WebLinkAboutDEQ-CFW_00059833AQUIFER PROTECTION SECTION APPLICATION REVIEW REQUEST FORM Date: June 27, 2011 To: ❑ Landon Davidson, ARO-APS r Art Barnhardt, FRO-APS ❑ Andrew Pitner, MRO-APS ❑ Jay Zimmerman, RRO-APS From: Alice M. Wessner ®LAU E-Mail: alice.wessner@ncdenr.gov Telephone: (919) 715-5208 Fax:(919) 715-0588 ❑ David May, WaRO-APS ❑ Charlie Stehman, WiRO-APS ❑ Sherri Knight, WSRO-APS DENR-FAYETTEVILLE REGIONAL OFFICE A. Permit Number: WQ0035431 B. Owner: DuPont Company C. Facility/Operation: DuPont Company — Fayetteville Works ® Proposed ❑ Existing ❑ Facility ❑ Operation D. Application: 1. Permit Type: ❑ Animal ❑ Surface Irrigation ❑ Reclaimed ❑ H-R Infiltration ❑ Recycle ❑ I/E Lagoon ❑ GW Remediation (ND) ❑ UIC - (5A7) open loop geothermal ❑ Single Family Residence + ® Residuals 2. Project Type: ® New ❑ Major Mod. ❑ Minor Mod. ❑ Renewal ❑ Renewal w/ Mod. E. Comments/Other Information: ❑ I would like to accompany you on a site visit. Attached, you will find all information submitted in support of the above -referenced application for your review, comment, and/or action. Within 30 calendar days, please take the following actions: Z Return a Completed APSARR Form. ❑ BIMS indicates monitoring wells locations are not complete. Please update monitoring well locations not currently in BIMS. ❑ BUMS indicates ongoing ❑ NDMR ❑NDAR ❑ GW monitoring violations. Please investigate reoccurring compliance issues and summarize results in staff report. ❑ Attach Well Construction Data Sheet. ❑ Process Attachment B for Certification by the Land Application Unit (LAU). ❑ Issue an Attachment B Certification from the RO. * *coordinating site visits and reviews, as well as additional information requests with other RO-APS representatives in order to prepare a complete Attachment B for certification. Refer to the RPP SOP for additional detail. Please indicate the name and date assigned in the spaces below, make a copy of this sheet, and return it to the appropriate Central Office -Aquifer Protection Section contact person listed above. l� Q RO-APS Reviewer: Date: �1� FORM: APSARR 03/10 Page 1 of 1 DEQ-CFW 00059833 'ALI ii-A NCDENR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Governor Ellis H. McGaughy — Plant Manager DuPont Company - Fayetteville Works 22828 NC Hwy 87 West Fayetteville, NC 28306-7332 Dear Mr. McGaughy: Coleen H. Sullins Director June 22, 2011 Natural Resources Dee Freeman Secretary, REEL IVED 1j ? U 2t� i DENR-FAYETTEVILLE REGIONAL OFFICE Subject: Acknowledgement of Application No. WQ0035431 DuPont Company - Fayetteville Works Distribution of Residuals Solids (503) Exempt System Bladen County The Aquifer Protection Section acknowledges receipt of your permit application and supporting documentation received on June 20, 2011. Your application package has been assigned the number listed above, and the primary reviewer is Alice Wessner. Central and Fayetteville Regional Office staff will perform a detailed review of the provided application, and may contact you with a request for additional information. To ensure maximum efficiency in processing permit applications, the Aquifer Protection Section requests your assistance in providing a timely and complete response to any additional information requests. Please note that processing standard review permit applications may take as long as 60 to 90 days after receipt of a complete application. If you have any questions, please contact Alice Wessner at (919) 715-5208 or alice.wessner@ncdenr.gov. Sincerely, for Jon Risgaard Land Application Unit Supervisor cc: Fayetteville Regional Office, Aquifer Protection Section Teresa Rodriguez — AECOM 8540 Colonnade Center Drive, Suite 306, Raleigh. NC 27615 Permit File WQ0035431 1entrr, :'a e;ai:, wnrh �aroiina 27699-1636 ccarnr:. 27? sae tr,! Bost care. f<aieiot,. Doiin-. ori uar2760=, 12-2 FA'o .,. . „ _ c - 15 -04E ustomer Service: 1-677-623-6748 Interne- WW6y.ncwateraua1lty.orc 11 North Carol i1:,a 1ahra' � " DEQ-CFW 00059834