SUBJECT: Class I Permit Modification Request
Permit No. NCD 047 368 642
DuPont FiuoroprGducts
22828 NC Highway 87 W
Fayetteville, NC 28306-7332
-19.910",
A
<bl
Ice
lAazaTdous Waste
July 8, 2003
This letter is a request for a Class I permit modification, pursuant to 40 CFR 270.42 Appendix I
Section A(6)(d), for changes in the names, addresses, and phone numbers of the emergency
coordinators identified in the Part B permit's Contingency Plan.
W-even copies of the modified pages of the Pav
Please replace Page G-2 in Section G of the subject permit with one of the enclosed modified
copies.
Enclosures
Michael E, Johnson
Environmental Manager
E. I A Pont do Nerriours and Company
Printed an Recycied Paper
FLA Rev 6j99
DEQ-CFW-00034490
AN
facilities but applies to emergency situations in any operating facility on the plant site. As much
as possible, the Contingency Plan described in the following sections has been condensed to
present the organizational response if an emergency situation would develop in the bazardotilq
waste facilities. If an emergency situation developed in another part of the plant, the bas
response mechanisms would be the same but some personnel would be different -'e.g. I
i I i I IT, I! I iI i i'' I i I I I! T I f 11111 1 1 1 1111 �
OMMMMMUM
Pursuant to 40 CFR 264.52(d), this Contingency Plan "must list names, addresses, and pho
numbers (office and home) of A persons qualified to act as emergency coordinator, and this 11
must be kept up to date. Where more than one person is listed, one must be named as prima
emergency coordinator and others must be listed in the order in which they will ass
responsibility as alternates." I
The DuPont — Fayetteville Works site is comprised of four shifts of workers, and at any given
time • of those shifts is present at the site. This is true 24-hours per day, and includes
weekends, holidays, and work outages. The site's Emergency Directors are defined as the two
Nafiong Division first -line supervisors and the one Butacite(A) first -line supervisor for each of
the four separate shifts. The primary Emergency Director is defined as the NafionS Products
Area first -line supervisor for each of the four separate shifts, and would direct the response to an
emergency. However, if the emergency was in either the NafionO Monomers Area or the
ButaciteV manufacturing area, then the first -line supervisor of the affected area would become
The Emergency Director is responsible for dealing with the emergency situation on the scene. If
additional resources are needed, the off -duty management will be called in. However, the
Emergency Director is in full charge of the emergency unless relieved and has complete
authority to commit all necessary resources on the plant site to implement the contingency plan
and call for assistance from off -plant emergency agencies. He/she has the authority of the Plant
Manager throughout an emergency situation.
1]
Revised 07/03
DEQ-CFW-00034491
11
E
To comply with the requirementof 40 CFR 6' • the following table
Emergency• DuPont
DuPont Works Emergency
Office P1 M
1 IPhone
W-1111=.
57 MR. i .:_
_. • • i •
• 0i Y • •
OR •...
:.
i
- R-M•
%Gm�
910-863-42.5
• -Z1,14WO911
. __j
Boyce Lennon �57
MR. 2.
III
I4� 'Rufus McQ
•
-4688
Harvey Inman
910-1678-1504
910-856-1256
Faye Godwin
910-678-1683
910-655-9149
L9 e:
:jj
• 1
* 1 Jir
Soe
Note I —Primary Emergency Director for his/her specific shift..