HomeMy WebLinkAboutDEQ-CFW_000344904WO DuPont Fluoroproducts Ais. Jill B. Pafford, Chief NCDENR — Division of Waste Management Hazardous Waste Section 1646 Mail Service Center FT-aleigh, NC 27699-1646 Attn: Mr. Karim Pathan SUBJECT: Class I Permit Modification Request Permit No. NCD 047 368 642 DuPont FiuoroprGducts 22828 NC Highway 87 W Fayetteville, NC 28306-7332 -19.910", A <bl Ice lAazaTdous Waste July 8, 2003 This letter is a request for a Class I permit modification, pursuant to 40 CFR 270.42 Appendix I Section A(6)(d), for changes in the names, addresses, and phone numbers of the emergency coordinators identified in the Part B permit's Contingency Plan. W-even copies of the modified pages of the Pav Please replace Page G-2 in Section G of the subject permit with one of the enclosed modified copies. Enclosures Michael E, Johnson Environmental Manager E. I A Pont do Nerriours and Company Printed an Recycied Paper FLA Rev 6j99 DEQ-CFW-00034490 AN facilities but applies to emergency situations in any operating facility on the plant site. As much as possible, the Contingency Plan described in the following sections has been condensed to present the organizational response if an emergency situation would develop in the bazardotilq waste facilities. If an emergency situation developed in another part of the plant, the bas response mechanisms would be the same but some personnel would be different -'e.g. I i I i I IT, I! I iI i i'' I i I I I! T I f 11111 1 1 1 1111 � OMMMMMUM Pursuant to 40 CFR 264.52(d), this Contingency Plan "must list names, addresses, and pho numbers (office and home) of A persons qualified to act as emergency coordinator, and this 11 must be kept up to date. Where more than one person is listed, one must be named as prima emergency coordinator and others must be listed in the order in which they will ass responsibility as alternates." I The DuPont — Fayetteville Works site is comprised of four shifts of workers, and at any given time • of those shifts is present at the site. This is true 24-hours per day, and includes weekends, holidays, and work outages. The site's Emergency Directors are defined as the two Nafiong Division first -line supervisors and the one Butacite(A) first -line supervisor for each of the four separate shifts. The primary Emergency Director is defined as the NafionS Products Area first -line supervisor for each of the four separate shifts, and would direct the response to an emergency. However, if the emergency was in either the NafionO Monomers Area or the ButaciteV manufacturing area, then the first -line supervisor of the affected area would become The Emergency Director is responsible for dealing with the emergency situation on the scene. If additional resources are needed, the off -duty management will be called in. However, the Emergency Director is in full charge of the emergency unless relieved and has complete authority to commit all necessary resources on the plant site to implement the contingency plan and call for assistance from off -plant emergency agencies. He/she has the authority of the Plant Manager throughout an emergency situation. 1] Revised 07/03 DEQ-CFW-00034491 11 E To comply with the requirementof 40 CFR 6' • the following table Emergency• DuPont DuPont Works Emergency Office P1 M 1 IPhone W-1111=. 57 MR. i .:_ _. • • i • • 0i Y • • OR •... :. i - R-M• %Gm� 910-863-42.5 • -Z1,14WO911 . __j Boyce Lennon �57 MR. 2. III I4� 'Rufus McQ • -4688 Harvey Inman 910-1678-1504 910-856-1256 Faye Godwin 910-678-1683 910-655-9149 L9 e: :jj • 1 * 1 Jir Soe Note I —Primary Emergency Director for his/her specific shift.. Revised 07/03 DEQ-CFW 00034492