Loading...
HomeMy WebLinkAboutDEQ-CFW_00027193Hazardous Waste Section File Room Document Transmittal Sheet Your Name: Lam, Stanley EPA ID: N C D 0 4 7 3 6 8 6 4 2 Facility Name: DuPont - .Fayetteville Document Group: Corrective Action (CA) Document J'ype: RCRA Facility Investigation (RFl) Description: 4th quarter 2013 Phase III RFI progress report update Date of Doc: 11/22/Ml3 Author of Doc: DuPont CRG File Room Use OnIv Date Recieved by File Room Date Scanned: Mo nth Day year Scanner's Initials: le DEQ-CFW-00027193 DuPont Engineering 6324 Fairview Road Charbite, NC 28210 Tel '704 J 362-6630 Fax (704) 362-6636 November 22, 2613 Ms. Elizabeth W. Cannon, Chief Hazardous Waste Section, Division of Waste Management North Carolina department of Environment and Natural Resources 1646 Mail Service Center Raleigh, NC 2769-146 rE: FOURTH QUARTER 0PHASE PROGRESS OUPDATE DUPONT Dear Ms. Cannon: This letter provides an update on the status of implementing the Phase Ili Resource Conservation and Recovery fist (RCRA) Facility Investigation (RFI) Mork Plan at the E.I. du Pont de Nemours and Company (DuPont) Fayetteville Works facility (Site) located in Fayetteville, North Carolina. The phase [if RFI Work Plan (revision 1, dated April 5, 2611) was approved by the North Carolina Department of Environment and Natural Resources (NCDENR) in a letter dated December 2, 2611. Due to the specific data gaps left in the investigation, certain objectives of the Phase Ill RFI had to be completed and the data analyzed prior to the implementation of the field investigation for other objectives. The Phase III RFI, therefore, was implemented in a "staged" approach. Stage 1 of the investigation consisted of further delineation of the perimeter of the clay lens in the northern and western portions of the Site. The Stage 1 field activities were completed in August 2012, and the details of these activities were presented in a Stage 1 Technical Memorandum submitted to NCDENR on November 7, 2012. The Stage 1 investigation results were used to establish the path forward for Stage 2 of the investigation. Details about the specific activities developed to meet the Stage 2 objectives (including providing specific locations where the proposed new permanent monitoring wells would be installed) were included in the Stage 1 Technical Memorandum, The memorandum also provided information pertaining to supplemental activities to address several potential releases to the environment that have occurred at the Site since March 2011. The Stage 1 Technical Memorandum was approved by NCDENR in a letter dated December 7, 2012 and served as an addendum to the approved Phase III RFI Work Plan (Rev. 1). DEQ-CFW 00027194 Page 2 November 22, 2013 Ms, Elizabeth W. Cannon The project team began implementation of the Stage 2 Phase III RFI Meld activities in March 2013, and the majority of the field Work was completed in early August 2013. The team returned to the Site in early October 2013 to finalize a few remaining field tasks. These tasks included the collection of samples from the two monitoring wells (although one Was dry) that are only accessible When operations in the area are shut down for annual maintenance (the Wells are in the blast zone), supplemental confirmation groundwater sampling, and an additional round of synoptic gauging of groundwater elevations from the expanded monitoring Well network. The team has now received the finalized data from all of the Phase III RFI sampling efforts Conducted this year at the Site, and preparation of the final Phase III RFI report is currently underway, As discussed in email correspondence With NCDENR from September 18, 2013, none of the analytical data is included With this letter report; the project team Will instead include the complete Phase III RFI analytical results as part of the Phase III RFI report. Lkemaining 'Schedule As outlined in the previous Phase III RFI Progress Report Update letter, the Current schedule calls for the final Phase III RFI report to be submitted by January 31, 2014, The project is on -track to adhere to this schedule. If you have any questions or Comments, please do not hesitate to contact me via email at Jam ie.A.Vanbuskirk a],usa.du pont.corn or at (704) 2- 62 . Sincerely, Jamie VanBuskirk Project Director, DuPont Corporate Remediation Group cc: Mr. Larry Stanley -- NCDENR, Hazardous Waste Section Ms. Tracy Ovbey — Parsons Environment & Infrastructure Mr.. Michael Johnson — DuPont Fayetteville Works File DEQ-CFW 00027195