Loading...
HomeMy WebLinkAboutDEQ-CFW_00027175Hazardous Waste Section it Room Document Transmittal Sheet Your Name: Lan-y Stanley I V EPA ID: N C D 0 4 7 3 6 8 6 4 2 Facility'Narne: DuPont-F a-yetteville Document Group: Corrective Action (CA) Document Type: RCR-,,It Facility Investigation (R.Fl) Description: Phase 1.11 RI -I Quarterly Update Date of Doc: 5/2- 8 1," 2 0 13 Author of Doc: DuPont-CRG .......... File Room Use )Iv Date Recieved by File Room Date Scanned. 17 DEQ-CFW-00027175 IUMPN--T-,-,) Ms, Elizabeth W. Cannon, Chief Hazardous Waste Section, Division of Waste Management Forth Carolina Department of Environment and Natural Resources 1646 Dail Service Center Raleigh, NC 2799-1 e,U4 Fall lied -Ro id u. rl�iic, IVY' 28210 lax f %:ski :>r2-tis3 May 28, 2013 RE: SECOND QUARTER 2013 PHASE III RFI PROGRESS REPORT UPDATE LETTER DUPONT FAYETTEVILLE WORKS F YETTEVILLE, NORTH C ROLIN EPA ID NO. ND 047 368 642 Dear Ms. Cannon. This letter provides an update on the status of implementing the Phase III Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) Work Plan at the E.I. du Pont de t emours and Company (DuPont) Fayetteville Forks facility (Site) located in Fayetteville, north Carolina. The Phase III RFI 'work Plan (revision 1; Mated April 5, 011) Was approved by the North Carolina Department of Environment and Natural Resources ( CDE R) in a letter dated December 2, 2011, Due to the specific data gaps left in the investigation, Certain objectives of the Phase III RFI had to be completed and the data analyzed prior to the implementation of the field investigation for other objectives. The Phase III RFI, therefore, is being implemented in a "staged" approach. Stage `I of the investigation consisted of further delineation of the perimeter of the Clay lens in the northern and western portions of the Site. The Stage 1 field activities Were completed in August 2012, and the details of these activities Were presented in a Stage 1 Technical Memorandum submitted to NCDENR on November 7. 2012. The Stage 1 investigation results Were used to develop the path forward for Stage 2 of the investigation, Details about the specific activities that are being Conducted to meet the Stage 2 objectives (including providing specific locations Where the proposed new permanent monitoring Wells Would be installed) Were included in the Stage 1 Technical Memorandum, The memorandum also provided information pertaining to supplemental activities to be performed during Stage 2 to address several potential releases to the environment that have occurred at the Site since March 2011. The Stage 1 Technical Memorandum Was approved by NCDENR in a letter dated December 7, 2012 and serves as an addendum to the approved Phase III DEQ-CFW 00027176 Page 2 May 28, 2013 Ms. Elizabeth W. Cannon FI Fork Plan (Rev. 1). The project team began implementation of Stage 2 Phase III (CFI field activities in March 2013. Progress on these activities is summarized below. The Stage 2 Phase III IFI field activities began in early Larch 2013. The initial step of the field work included a geophysical survey to clear all proposed drilling locations of potential underground obstructions. The geophysical survey was conducted the Week: of March 4, 2013. Installation of the proposed additional monitoring wells using Sonic drilling methods began the week of March 18, 2013 and was completed in April 2013, A total of thirteen new wells were installed at the Site as pert of the Stage 2 activities. During this field mobilization, soil samples were collected from three soil borings in AOC C (as part of the investigation of the total petroleum hydrocarbons at the Site) and from one monitoring well installation location (as part of the APFO investigation). In addition, the investigation of the ethylene glycol release area Was conducted and six piezometers were abandoned. The supplemental investigative activities that were recommended to address several potential releases to the environment that have occurred at the Site since March 2011 were also completed during this field event. This effort included the collection of b insitu groundwater samples and 8 soil samples.Scopes-of-work ( OWs) for addressing these releases were presented in the Stage 1 Technical Memorandum (November 7, 2012) and in the First Quarter 2013 phase III 1 F1 Progress Report Update letter (February 26, 2013). The final validated laboratory analytical data from these Stage 2 activities have not yet been received by the project team. The remaining Stage 2 field words Will include synoptic gauging of groundwater elevations from the expanded monitoring Well network and sampling of thesite-wide groundwater, =#,ated Deviation from the Phase I// RF1 Work Plan The drilling and soil sampling activities conducted during Stage 2 of the Phase III RFI took longer than originally anticipated in the schedule presented in Section 6.2 of the approved work plea. This delay was due in pert to the expansion of the field activities to include the supplemental release investigative activities and due to the unknown geology of several areas, which led to the need for additional drilling, deeper wells, and installation of deeper surface casing than originally estimated, These slight delays caused a shift in the field schedule, and the project teem has had to move the groundwater sampling back several Weeks. As indicated in a call to Mr. Larry Stanley on May 22, 2013, the groundwater sampling activities are currently scheduled to begin the week of June 3, 2013 and Will last approximately 3 weeks. According to this current updated schedule, the final Phase III PFI report Will be submitted by January `I, 2014. The updated schedule is shown below: DEQ-CFW 00027177 Page 3 May 28, 2013 Ms. Elizabeth W. Cannon .................................................................................................................................................... ......._.............----------------..------------ ctivity Duration Stage 2 Field Work (well installations, sail and groundwater Sixteen ;,peeks sampling)(currently scheduled to be completed by the end of June 2013) ------------ Laboratory c rat€ r,f Analyses/ Data, Validation E ght ;peeks -------------------------- ---------------- _------------- - - Data Evaluation, Final disk Assessment, and Final RFi Twenty-four Weeks Report Preparation (current submittal date is January 31, 2014) If you have any questions or comments, please do not hesitate to contact me via email at Jarrrie.A.)` nbuakiri u a.du ont.ccr or at (70 ) 362-6626, The Third Quarter iOl 3 Phase III RFI Progress report Update letter Will be submitted by August 1; 01 , Sincerely, I/ r Jamie VanBuskirk Project Director, DuPont Corporate Remediation Group cc: Mr. Larry Stanley — NCDENR, Hazardous Waste Section Ms. Tracy Ovbey - Parsons Environment & Infrastructure Mr. Michael Johnson ® DuPont Fayetteville Works File; DEQ-CFW 00027178