HomeMy WebLinkAboutDEQ-CFW_00056441October 1, 2010
MEMORANDUM
To: Regional Surface Water Supervisors
From: Cindy iNloore
Aquatic Toxicity Unit
Subject: Aquatic Toxicity Testing 2010-2011
2010-2011 Fiscal Year Request
in DWQ's efforts to be responsive to our
commitment from your offices to monitor 2
each federal fiscal year. Our goal is to moniti
Regional
tonneretttw"::.. No
for
2€a0Q011
6 ni of #ac
2 split
6 majorfac
2 split U--
9 major fac
2 split tests
major facilities
2 split tests
I ajor facilities
2 split tests
2
T
Dee Freeman
Secretary
are requesting a
(see table below)
Lists of all major facilities by; region fallow. These lists detail the most recent test dates that we have on record for
individual facilities. Please review the list'that. is appropriate for your region. Facilities that have not been tested in the
past five years have been highlighted add bolded for easy reference.
We appreciate your cooperation in this endeavor for the 2010-2011 fiscal year. Feel free to contact us with any questions
at 919-743-8401.
cc: Jay Sauber, ESS; Christopher Ventaloro, ATU, Jeff Menzel, ARO; Dale Lopez, FRO; John Lesley, MRO; Vicki Webb,
RRO; Jeff Manning, WaRO, Kipp Glazier, WiRO; Jenifer Carter, WSRO
161 r Mo.::: Se rvco Center, Raloi; h, N.'Ah C, aroma 2769 -1617
l ,rdiior ^� ) f �ali5k�.arj �I 2ahu P "J ita t; ar line )'. ��
Hicx'e 919 07 �tC, ti FAX. a , 8 ; 61921 J a.tuner S ery c- 1 6r 62 674E
Ir�rret VvvrnvrrV��.,rq�;e_, ri4
Ar• EQu d Gpp rur•ity', alrmntivegctiori Emplo,;er
One
NorthCarofina
DEQ-CFW 00056441
Natural Resources
Dee Freeman
Secretary
Asheville Region Mai or Permitted Facilities FFY 2010-2011
Facility
Permit #
Date of testing
TTate of prior
ATU test
Split
by ATU for
testing by ATU
results
testing lab
9/2009-10/201[l
(Results)
Andrews WWTP
NC0020800
04/19/1990
Pass
Baxter Healthcare Corp.
NC0006564
05/16/2€307
Pass
Blue Ridge Paper Products
NCO000272
06/0 /2010
10/18/200h
Pass
ETS (Pass)
Brevard WWTP
NC0O6O53 i
03/29/2006
Pass
Buncombe County MSD
NC0024911
07/2I/2010
02/09/2005
Pass
Coats American-Servier Plant
NCO004243
03/16/2005':
Pass,.
+Cliffside':Sanitar District WWTP
NCO00440
No Data
CP&L-Asheville Ash Pond/001
NC00€10396
07/14/2010
02/23/2005
Pass
ETS (Pass)
Duke
;07/23/2008
Pass
/Foer-C1ifFsTidie�'-e g�
L iFDiyyp DavidsonILLC-Mill Plsah
1N7�Cy0g0�0gA5�t(1q8pp8p
NC00000 f S7 :.
--No Data
Forest
Feldspar Corp.
NC0000353
08/11/2010
04/1312005
Pass
Forest City WWTP
NCQ025984
07I2312008
Pass
Grover Indust, Inc. —Polk Tyroa
1SC"0004391
07/11/1985':
1 Cso,>50"lu
Pl. xNi1 Flow"
Hendersonville WWTP
NC0025534
03/28/2007
Pass
Huffman Finishing
NC"0025135
04/19/1997
Fail
K-T Felds ar
NC0O0O400
08/04/1999':
Pass
Lake Rhodhis-ialdese WWTP
NC0041696
04/22/2009
Pass
Lenoir -Gunpowder Creek WWTP
NC0023736
06/1`6/2010
No Data
Pass
Lenoir -Lower Creek WWTP
NC0023981
08/05/2010
09/24/1997
Fail
Maggie ValleyWWTP
07/27/005':
Pass
Marian-Corpeiung Cr. WWTP
NC0031879
09/16/09
Invalid
Tritest
(ChrV =
91.7 %)
Morganton -Catawba R. PCF
NC€3026573
04/22/09
Pass
Rutherfordton WWTP
NC0025909
01/07/09
Pass
SGL Carbon, LLC
NC005258
10/22/08
Pass
Meritech
(Pass)
Spindale WWTP
NCO020664
10/01/08
Pass
Tyron WWTP
NCO021601
06/06/07
Pass
Ilnimin Corp.
NCO000175
No Data
Unimin Corp. Red Hill Plant =JN+CO085839
No Data
-----
Waynesville VMITP
I NCO025321:
02/22/06':
bass
*Highlighted facilities have not been tested by ATL)
in the past five years.
Updated 09/01/2010
161 r Mo.::: Service Center, Raloi; h, f o th Carolina ' %690-1617
L-c,cafion.)f�ali5k.arj�I 2ahuP J itaCar line)'.��
Phone 919 07 �tC, ti FAX.. a , 8 ; 6492 1 C a.tuner S ery c- 1 6r 62 ,74S
Irerret VvvrnvrrV��.,rq�;e_, rr4
One
Ar• EqualGpportur•ity'�,AtfrrantiveActiori Emplo,;er
DEQ-CFW 00056442
W
on Mai or Permitted
Natural Resources
s FFY 2010-2011
Dee Freeman
Secretary
Facility
Permit #
Date of testing`
Date of prier
ATU test results
Split testing lab
by ATU for"
testing by AT 7
(Results)
9/2009-0/2010
Alanuc-Lumberton WWTP
NC0003522
10/22/2008
Sxz alid
Anson. Co.
J C0041408
04/20/200
Pass
Burlington Industries WWTP'
t�1COi143320
N Data
Clinton-Larl ►ns WPCF'
NCO020117
10/(14/200f�
Pass
DAK Americas, LLC-Cedar Creek Site
NC00071
OS/09/2007
Pass
DunnBlackriver WWTP
NC0043176
02:/27l2008
Pass
Dupont -Fayetteville Works
NC0003573
08/04/2004
Invalid
Elizabethtown WWTP
NC0026671
12/10/2008
Pass
Meritech (?)
Erwin WWTP
tTCOi164521
10/0/2002
Pass
-----------------------------------------
Fairmont Regional WWTP
NC0086550
051� 3/2003
Pass
Fayetteville -Cross Creek WWTP
NC0023957
10/21/09 :
09V1212007
Pass
Fayetteville -Rockfish WWTP
NC005, ,105
WMV09
05/17/2006
Pass
Meritech (Pass)
Fort Bragg WWTP/001
NC000964
10/03/2007
Pass
Meritech (?)
Hamlet WWTP
N
12/06/2006
Pass
Laurinburg-Leith CW
N
07/08/2009
Pass
Laurinburg Max1n Airport (L>vIAC
NC004.4725
07/16/2008
Pass
WWTP
Lumberton WWTP
tTCO024571
2/21/2001'
Pass
Moore County WWTP
NC0037508
12/16/09
O1/24/2007
Pass
RNA & Meritech
(Pass)
Pembroke WWTP
NCO027103
10/15/2008
Invalid
Red Springs WWTP
NCtI025577
02/13l2008
Fail
North Hamett County Regional WWTP
NC0021636
08/08/2007
Pass
Raeford WWTP
%1C0026514
10/28/09
05/10/2006
Pass
Robbins WWTP
1�C0062855
04/02/2008
Pass
Rockingham WWTP
NCO020427
10/13/2004
Pass
Southfield Packing Co., Tarheel Div.
NCO078344
03/26/2008
Pass
ETS (Pass)
Spring Lake WWTP
NCO030970
11/18/09
06/13/2007
Pass
Meritech (Pass)
JP (Westpoint) Stevens-Wagram WWTP
NC0005762
10/29/2008
Pass
*Highlighted
facilities have not been tested by ATU in the past five years.
Updated 09/1/2010
161 r Mo.::: Service Center, Raloi; h, N.,Ah Crarolina'%690-1617
l.,caiion. �2aleir h J ita Car line )7 t4
Phone 919 07 �tC, ti FAX.. a , 8 ; 61Gr? 1 C a.tuner ory c� 1 6r 67 ,74S
Irorrot VvvrnvrrV��.,rq�;e_, rr4
011e
Ar•'Qual Gpportur•ity', Atf rrantive Action Emplo,;er
DEQ-CFW 00056443
Dee Freeman
Secretary
Mooresville Reuion Mai or Permitted Facilities FFY 2010-2011
Facility
Permit #
Date of testing by
ATU for
9/2009-10/2010
Date of prior
testing,bv ATU
ATU test results
Split testing lab
(Results)
Albemarle -Long Creek WWTP
NCO024244
10/14/2009
a 1ifi75/2008
Invalid (ATU controls)
ATI Allvac Monroe
NC0045993
;08/05/2009
�
Belnnout N't WT P
S�CO021181
0�l16l2000
Pass
Cherryville WWTP
NCO044440
03/03/2010
07,13441999
Pass
CML D-Sugar Creak WWTP
NC0024937
06/20/2007
krx ,>100%
C.l A Hnldi s Ticona Facil
`wC.OtlO4952
n Data
Coxword Rocl.T PA °er 1'4AVTP (NVS CC)
NCO03626
x1l29l O06
%br4%>9p%
Conover NE WWTP
NC0024292
'02/11/2009
Invalid
Cramerton WWTP
NC0006033
l2/16/2009
11/17/2004
Pass
Crooked Creek'V WTP #2'
NC:O06984t
�n Data
Delta Apparel
NCO00619t
�o Data
Duke Power -Allen 002
NCO004979
(}4116%2009
Pass
Duke Power -Marshall 002
N004987
051131�04
Pass
Duke Power McGuire 001
�CI?024392 001
08/261200O
Pass
Duke Power McGuire 002
C002#92ffilfl2
£I8/19/2009
LC50 > 100
ETS (Pass)
Duke Power McGuire 005
NC0024392 t
q8 9/2009
Pass
ETS (Pass)
Duke Power -River Bend 002:..
NC000496I
06IO2 2004
Pass
Duke Power -Buck Stream
NC0004774
04/22/2009
Pass
Gastonia-Crowders Creek
fi)474268
10/09/2009
Pass
Gastonia -Long Creek WWTP.
NCt72414
08/06/2008
Pass
Hickory -Henry Fork WWTP <
NC0040797'
07/09/2008
Pass
HB ickory-�WWTP
NCO0204Q1 :..
10/29/2008
Pass
Killian Creek WWTP-(Pending construction)T0088722
Kings Mt. -Pilot Creek W NITI
WC0020737
02/03/2010
06/25/2008
Invalid (no 2° sample)
Lincolnton WWTP
N00025496
12/09/2009
02/21/2007
Pass
Pace (Pass)
ltbiwm Cori),
COp057T
06/03/1996
Pass
Maiden WWTP
NCO039591
02,%03,%2010
O1/24,%2001
Pass
Monroe WWTP
NCO024333
05/16/2007
Pass
Mooresville -Rocky River WWTP
NC004628
04/30/2008
Pass
Mt. Holly WWTP
NCO021156
02/04/2009
Pass
Pace (Pass)
Newton -Clark Creek WWTP
NCO.Q36196
11/19/2008
Pass
Portortuame b'lber NVISTA-Sabsb
S COOO4944
No Data
Pbarr yarns, Inca
NC0404812
' o Data
PPG Shelb 001'
NC:O004685
1012111998
Pass
Salisbury -Rowan Regional WWTP
NCO023884
03/10/2010
07/11/2007
Pass
Schneider Mills, Inc. 001
NCO034960
04/21/2010
05/09/2002
Invalid (ATU controls)
Shelby WWTP
NCO024538
05/12/2010
12/10/2008
Pass
Pace (Pass)
Statesville Fourth Creek WWTP
NCO031836
09/13/2009
Pass
Statesville Third Creek WWTP
NCO020591
07/18/2007
Invalid
Tyson Foods, Inc. -Harmony Division
NCO005126
04/14/2010
02/15/2006
Pass
Meritech (Pass)
Union County-12 Mile Creek WWTP
NCO085359
09/03/2008
Pass
*Ili ehliehted facilities have not been tested by ATU in the oast five vears. Undated 09/l/2010.
161 r 'v1a: S� rvice Ger�t�r, Ralei;h, fc:rth Crarolirra 2;%690-.1 n1 i'
Pharr, 919 07 �tC, ti FAX. , 8 ; 6492 1, C J.tuner ery c- 1 81 r7 >,'4S
Ir�rret VvvrnvrrV��.,rq�;e_, ri4
Ar•EQLelOp;;orur•ity', afrmntivegctioriEmplo,;er
On3
DEQ-CFW 00056444
Raleigh Region Mai or Permitted Facilities FFY 2010-2011
Facility
Permit #
Date of testing by
Date of prior
ATU test results
Split testing lab
ATU for
testing by; ATU
(Results)
9/2009-10/2010
Apex Water Recantation Facility
NCO064050
04/21/2004
Pass
Benson W WTP
NC0020389
1t8:2dJ2008
Fail
Big Buffalo wwrp
NCO024147
03121/2001'
Pass
Cary North WI1T
l CO048879
04/19/2006
Pass
Cary South WRF
PiC:0065102
03/03/1998
Pass
Clayton -Little Creek WMITP
NCO02545
1O108/2003
Pass
CT&L DR 4 Progress F.rie Harris/006'
NCO039586
O6/20/2001
P9Ss
CP&L Mayo Stream Electric Plant/002
NC0038377
04/24,%2008
1' s.
E,rS (Pass)
Dttrhari7- Vnrthside WWTP(North Durham
Pi'C oO238 ]'
10/2312002
Pass: ::.
Enfield WWTP
NCO025402
12/13/2000
Pass
Franklin Courity iWTP'
\'COO69311'
O4/30/2003
Pass
Fuquay-Varina WWTP (Terrible Creek)
NCO066516
08,125/2010
t3&J'/1994
Pass
C.tsld hest Pil ram's Pride) WNN,TP
NC 0072575
O9(0111993
I,C. o >90%
HendersonN tbush'CreekWNYU
NC0020559
11/15/1999
Club' 77.9
Hillsborough W'TT'COO26433
10/0912002
Pass
Holly Springs WWTP
NCO063096
05/12101 ..
12fQW2000
Pass
Meritech (Pass)
Central Johnston County Regional WWTF
NCO030716
03/17/201 ?
10/0 /204?2,.
Pass
Johnston County Water System WTP
IG00847353
17/2010
No Data
Pass
Louisburg"WTP
1SCOO2O231
O8/OSJ2OO1
Pass
Neuse Ricer WWTP
002903
08/16/2000
C brV >100
OWASA%Mason Farm W65%"fP
NC002524:1
0711 12009
Invalid,(Fail on 06/261%2009)
R & A Labs(Pass)
OxfordNN,WTF11
`w'[.0O25OSJ:
O6/O /2003
Pass
Progress Energy-Roxboro/O00000342:
06/17/200:3
Pass
ETS
Roanoke Rapids Mills WWTP
1C000f1752
04/07/2010
No Data
Pass
Meritech (Pass)
Roanoke Rapids Sanitary District MIWTP .
1 CO024201
No Data
Rocky Mount/Tar River Regional WW
VI?O£1317
07/08/2009
Pass
Roxboro WWTP
NC0O21024
09/10/2008
Pass
SGWASA (Butner WWTP) J6bn Umpstead
NC0026$2 ;;.
08/13/2009
Invalid(ATU controls);Pass
on 04/OS/2006
Siler City WWTP
N------------------------------------
TC0026441
04/14/2010
06/05/2002
Pass
Smith Creek WWTPCt0:30759
03/10/2010
No Data
Pass
South Durham «12F
`wt.00I7597
O5/16/2001'
Pass
Tarboro WWTP W
NC0020605
07/08,%2009
Fail
Triangle WWTP
PiC0026051'
0310812006
Pass
Warren County -Warrenton NNWTP
NCO020834
10/10/2001'
Fail
Weldon WWTP
NC0025721
02/25/2009
Pass
Wilson WWTP
G#}023906
08/20/2008
Pass
Zebulon-Little Creek WWTP1C0079316
03/10/2010
No Data
Pass
*Highlighted facilities have not been tested by ATU in the past five years.
Updated 09/01/2010
161 r Mo.::: Se rvco Carter, Raloi; h, N.'Ah Carolina ' %690-1617
l-,catior ) f, Salisbury SI 2ahu P J ita Car lira, )7 t4
Hicx,e 919 07 �tC, ti FAX.. a , 8 ; 6492 1 C a.tuner S ery c- 1 81- 62,74S
r�rret VvvnvrrV��.,rq�;e_, ri4
One
NorthCarolina
Ar•'Qual Gpportur•ity', Atf rrantive Actin Emplo,;er
DEQ-CFW 00056445
Natural Resources
Dee Freeman
Secretary
aShingtOn Region Major Permitted Facilities FFY 2010-2011
Facility
Permit #
Date of testing
Date of prior
ATU test results
Split testing
by ATU for
testing by
lab
9/2009-10/2010
,. ATU
(Results)
C ontentnea MSD WWTP
NCO032177
OG11512015
Pass
CP&L Progress Energy Lee Steam Plant
NC0003417l001
09105/2009
Pass
ETS(Pass)
C"P&L Progress Energy Lee Steam Plant/002
1NCO003=417/00
No Data
-----
-----
*No Flow*
Domtar Paper Co., LLC
NC0000680
03/07/2007
-----
-----
Elizabeth CityWWTP'
1"�TC0025}1111
03129120}6
Pass
Fairfield Harbor Subdivision *No Flow*
NCO033111
No Data
-----
-----.
Fitrmville WWTP
NC(lt}29
i2
06/22/2005
Pass
Goldsboro TP/001'
NCO023949�/001'
01104120111
Pass
Goldsboro WWTP/002
NC0023949/002
12/16/2009
No Data
Pass
Greenville WWTP'
NC0023931
0/27/20(i5
Pass
Havelock. WWTP
NC0021253
1112$120111
Fail
Kinston -Regional WRF
NC0024236
12/t6/2009
Na Data
Pass
Manteo WWTP, Town of
IIi0079057
05/201201€J <
08/2211996
Pass
ETS (Pass)
Mt. Olive WWTP
NCI}020575
08/05/2009
Pass
New Berea WWTP
NC0025348
0114/2007
Pass
PCS Phosphate Company, Inc. 1007
NCO003255/007
05/07/2009
LC90 >100%
Perdue, Inc. Lewiston
----------------------
NC0028$5
04/18/2007
Pass
Robersonw>ille WWTP'
CU026U42
05/03/2006
Pail
Unif-Kinston LLC
NCO€J03 760
09/17/2008
Pass
-----------------------------
USMC Cherry Pont
1wTC0003816
0f26f2001
Fast
Washington WWTP
NC0020�i4i3
02/t(1 2010
04/28/2005
Pass
Weyerhaeuser -New BernMill
IIIC0003191
03/24/2010
05/01/2002
ChrV = 36.77%
ETT (ChrV
= 36.77%)
Willianiston WWTP
N00020044
06/11/2008
Pass
Windsor WWTP
NCO0 6751
06/04/2008
Fail
*Highlighted facilities have not been tested by ATU in the past five years.
Updated 09/1/2011.
161 r Mo.::: Se rvco Camber, Raloi; h, N.'Ah Crarolirra ' %690-1617
l c,caiior,. Raleir h J ita Car lira, )7 '4
Phcx,e 919 07 �tC, ti FAX. a , 8 ; 64Gr? 1, C a.tuner S ery c- 1 6r 67 ,74S
Irorret VvvrnvrrV��.,rq�;e_, rr4
One
O1%thCarob a
Ar•'Qual Gpportur•ity', Alf rrnntive Acibn Emplo,;er
DEQ-CFW 00056446
Natural Resources
Dee Freeman
Secretary
Wilmington Region Major Permitted Facilities FFY 2010-2011
Facility
Permit #
Date of testing
Date of
ATU test results
Split
by ATU for
prior testing
testing lab
9/2009-10/2010
by ATU
(Results)
Archer Daniel's Midland-Southport/00I
NC0027065
Q9/16/2008
Pass
Beaufort WWTP
NCO021831
03/:05/2009
Pass
Carolina Beach WWTP
NCO023256
05/16/2007
Pass
Chadboum WWTP
NCO021865
04/22/2009
Pass
CP&L Sutton/001 Progress Energy
NC0001422
08/22�2007
LCso %100%
ETS
DAK Americas, LLC-Cape Fear Site
NCO000663
05/09/2007
Pass
Fortron Industriesl001
NC0082295
09/24/2008
Pass
Meritech
(Pass)
Global Nuclear Fuel -Americas, LLt;
NG0001228
09/20/2007
Pass
Guilford East 1v1i11 WWTP
NCtlt1€J2305
10/01/2008
Pass
Meritech
(Pass)
House of Raeford -Wallace Division
NCO0033;44
04i2f3i1987
LGO 53`,�0
International Paper Coanpany-Riegelwood
NC0003298
0/01/2007
Pass
Invista,S.A.R.LJ001
NC0001112
08/22/2007
Pass
Invista,S.A.R.L.100
NC0001112
:
to Data
Morehead City WWTP
NC0026611
0fa6/2007
Pass
NE Brunswick County WWTP
NC0086819
0 /09/2007
Pass
b1SMC Camp Lejeux e, Hadnot Pt, WWTf"
NCO063029
No Data
-----
-----
*requires 7 day Mysid test-ATU cannot test*'
Whiteville-Whitefnarsh W l P .,
NCY702190 ;
06l10l2009
Pass
Wilnungton Lau;l l€ (Cape Publ' WWT---------------------------------
P
NC00239 5
06/10/2009
Invalid ATU Qe);Pass
pace (Pass)
on 08/16/2006
Wilmington Southside WWTP-M'keau
NC0023973
08/17/2006
Fail
Pace
Wallace -Lake roc kClh:WWTP
NCtlOI}450
09l24l2008
1 Pass
*Highlig t .facilities haW bot been tested by ATU in the past five years.
L3pdated 091%1/2010.
161 r Mo.::: Service Center, Ralei; h, N.'Ah Crarolirra'%690-.1617
l-,catior )f�ali5k.arj�I 2ahuP J itaCar line)'.��
Phcx'e 919 07 �tC, ti FAX. a , 8 ; 6492 1, C a.tune.r S ery c- 1 81- 62>,'48
Ir�rret VvvrnvrrV��.,rq�;e_, ri4
One
Ar•'Qual Gpportur•ity', Atf rrantive Actin Emplo,;er
DEQ-CFW 00056447
Dee Freeman
Secretary
Winston-Salem Region Mai or Permitted Facilities FFY 2010-2011
Facility
Permit #
Date of testing
Date of prior
ATU test results
Split testing lab
by ATU for
testing by;ATU
(Results)
9/2009-10/2010
Asheboro WWTP
NCO02612
03/08/2006
Pass
Boone WWTP
NCO020621
06/1 /2009
Pass
Meritech(Pass)
Burlington Fast WWTP
NCO023868'
10/18/2006
Pass
Burlington South WWTP
l�TC0023867'
09/27/2006::
Pass
Cooleelmee WWTP-Town of
NCO024872
04/07/2010
No Data
Pass
Tritest(Pass)
Nlocksville
Duke Power-Belews Creek
NC00244061003
08/05/2009
Pas:
ETS(Pass)
Duke Power -Dan River
NC0003468/002
06/09/210,
No Data
ETS (?)
Eden WWTP/Mebane Bridge
NCO025071
07/25/2007
Pass
Elkin WWTP
NC002056?
06/09/2010
#l3/€J/1998
Pass
ETS (?)
Graham WWTP
NCO021211
09/17/200$
Invalid(saxnpletemp);Pass
Meritech(Pass)
on 02/14/2001
Greensboro North Buffalo Creep
I�TCM024325
04/06/2005
Invalid.
VtjVtjTF'
Greensboro o bourne WWTP'
�CO047384'
04/06/2005
valid'.
High Point Eastside WWTP
NC0 24210
07/21/2010
€J4/27/2005
Pass
High Point
-------------------------
(Pass)
High Point Westside WWTP
NC0024228
04l25/2f07
Pass
Interface Fabrics, True Elkin WWTP
NC0005312
02/03/20.10
No Data
Pass
Pace (Pass)
Lexington Regional WWTP
NC(7055786
02/04/2009
Pass
Meritech(Pass)
LP Corp -Roaring Rivex WTP VV,V,NCO005261
1/:93/2010
No Data
Pass
Pace (Pass)
>Vlavodan WWTP
NC(7f121873
09/23/2009
Pass
Mebane WWTP
%?C002147�k ;
07/14/2010
03/14/2001
Pass
Meritech(Pass)
Miller Brewing Co.
NC0029980
08/12/2009
Pass
Meritech(Pass)
Mt. Airy WWTP
NC0021121
06/06/2007
Pass
North Wilkesboro WWTP, Th carman
NC(1Q24761
06/20/2007
Pass
Str.
Randleman WWTP
NCO02"3445
07/15/2009
Invalid(ATUcontrols);Pass
on 03/10/1999
Reidsville WWTP'
NCO024881'
04/27/2005
Fail
Thomasville -Hamby Creek WWTP
NC0024112
08/08/2007
Pass
Pilot Mountain WWTP
N(.'0026646
07/21/2010
02/10/1999
Pass
Tritest(Pass)
Wilkesboro Cub Creek WWTP
NCO021717
03/10/2010
10/28/1987
Invalid (no 2nd sample)
Winston-Salem Archie Elledge
NCO03-1834
07/14/2010
11/14/1985
LC50>90%
Meritech(Pass)
WWTP
Winston-Salem Lower Muddy Creek
NCO050342
07/14/2010
10/26/1988
Pass
Meritech(Pass)
Yadkinville WWTP
NCO020338
07/14/2010
07/16/2003
Invalid
Pace (Pass)
*Highlighted facilities
have not been tested by
ATU in the past five years.
Updated 0/l/2010.
161 r Mo.::: Se rvice Carter, Raloi; h, N.'Ah Crarolirra ' %690-1617
l c,caiior 2 f Salisb:.Jr} SI Raleir h J ita Car lira, )7 '4
Phcx,e 919 07 �tC, ti FAX.. a , 8 ; 61921, C a.tuner S ery c- 1 6r 67 ,74S
Irorret VvvrnvrrV��.,rq�;e_, ri4
On3NorthCarofina
Ar•'Qual Gpportur•ity', Atf rrantive Action Emplo,;er
DEQ-CFW 00056448
s°°o�e°eoosa
NCDENR
North Carolina Department of Environment and natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Wlins
Governor Director
Toxicitv Test Schedule Restrictions for FFY 2009-2010
Week of: I Restrictions; comments:
Nov. 22, 2010
No tests
Dec. 20, 2010
No tests.
Dec. 27, 2010
No tests.
Jan. 10. 2011
No chronic tests.
Jan. 17, 2011
No compositesample tests.
April 18, 2011
No tests.
Mav 22, 2011
No chronic tests.
May 30, 2011
No composite sample tests.
July 4, 2011
No compaglt sample tests..
Aug. 29, 2011
No chronic tests,
Sept. 5, 2011
No composite sanpie tests.
Dee Freeman
Secretary
Sampling instructions
1. Please indicate split tests on the sample collect! , fornis and remember to include the identity of the lab receiving the split. This is
critical in order for ATU to identify and a valuate the split samples. Also ensure that the sample collection form submitted to ATU and the
chain of custody submitted to the contract dab has rnatchlutg sample type (composite vs. grab, type of composite), sampling times, and
sample collector infxrtttatiorr. ATU uses ory "true" splits for mortified laboratory evaluations. True splits originate from a single grab or
composite sampr:rle acid' are split into 2 representathv aliquots for analysis by ATU and the other laboratory. Regional office staff should
make every effort to;perform the sample frr lit themselves or, at the very least, be present when the sample is split by facility staff unless
extenuating circt iMt=r Ces (i.e. late sanip1 e0 ectio t times, etc...) would make it impractical. It should be noted on the sample collection
form if the regional office staff is not present .the time oftlte sample split.
2. Samples should not be crr ollected before to AM and prefei~ably 11 AM. Thus is to allow adequate time for sample delivery to ATU and
preparation of samples for test initiation. If a sample collection time earlier than 10 AM is unavoidable please notify ATU staff as soon as
possible. The maximum holding tide for samples. (prior to initiation of the toxicity test) is 36 hours for acute test samples and 72 hours
for chronic test samples. The holding time..for composite samples begins at the time of completion of the 24-hr composite.
3. If a facility representative is preserrt at the sample collection, note the name of the facility representative and identify them as a facility
representative on the sample collection forn Tt is advised that the facility representative also sign the form.
4. If the sample is a timed composite, mark" the number of samples collected per hour. If the sample is a flow proportional composite,
indicate this on the sheet.
5. In the comments section, indicate whether the sample was collected using the regional office staff equipment or the facility collection
equipment.
6. All samples should be iced during collection and transport. Be sure to completely fill the coolers with ice and use large coolers whenever
possible. This is particularly crucial for the second sample collected for chronic tests during warm weather months, as they will remain in
the cooler until delivery to ATU on Monday morning. Also, please notify ATU staff if samples are being mailed in multiple coolers.
161 r Mo.::: 6urvicu Curter, Ralui; h, N.'Ah Crarolirra 2;769 -1617
l c,caiior 2 f Salisb:.Jr} SI Raleigh, -N ita Car lira, )7 '4
Phcx'e 919 07 �tC, ti FAX. a , 8 ; 64921 C ..tuner S ery c- 1 6r 62 ,74S
Irurret VvvrnvrrV��.,rq�;e_, rr4
On3
Ar• Equal Gpportur•ity',/V nntiveAcibn Emplo,;er
DEQ-CFW 00056449