Loading...
HomeMy WebLinkAboutDEQ-CFW_00008343DIVISION OF WATER QUALITY SURFACE WATER PROTECTION SECTION Fayetteville Regional Office October 1, 2012 TO: Dale Lopez Danny Strickland Hughie White Mark Brantley Paul Rawls Trent Allen SUBJECT: NPDES Inspections, Collections & Pretreatment 2012-2013 Attached is the following assignments for inspections that are required to be completed by September 30, 2013. All inspection reports should be mailed to the permittee within 30 calendar days and should be placed in my box for review. For these inspections add me as the reviewer or secondary inspector in the BIMS report. Mark (NPDES), Hughie (Collections), Dale (Pretreatment) will continue tracking these inspections and submit updates to me monthly. W1 DEQ-CFW-00008343