HomeMy WebLinkAboutDEQ-CFW_00008216From: Henson, Belinda [/O=NCMA|L/OU=EXCHANGEADMINISTRATIVE GROUP
(FYD|BOHF23SPDLT)/CN=REOP|ENTS/CN=BEL|N0A.H[NSON]
Sent: 5/25/I0I24:00:43PW1
To: dale |opezWa|e]opez@ncdenr.gov; belindahenson[be|inda.henson@ncdenr.gov;chadtudington
[chad.tudinXton@ncdencgov;dannystrick|and[danny.sthck|and@Pncdenr.gmv];hughiewhite
[hughie.white@ncdencgm4; markbrant|ey [mark.brandey@ncdencXov]; mike lawyer [mike]awyer@ncdencgov];
pau|raw|s[pauiraw|s@ncdenr.gov];terry mason herndon[mason.herndon@pncdenr.Xov];trenta||en
[trent.a||en@pncdenr.Xov]
Subject: FVV:Inspections Conducted ByRegion
Attachments: Inspections Conducted 8yRegiun.XiS
---original message ---
prom: vanessa.manuel0ncdenr.gnv [mailto:vanessa.manuel0ncdenr.gov]
Sent: Friday, may 25, 20I2 10:0I »m
To: Cranford, chuck; Henson, Belinda; Krebs, mob; smith' Danny; Hodge, Al; Gregson, zim; Basinger, Corey;
Poupart, 3eff; Hennessy, 3ohn; Manuel, Vanessa; karen.higgins@
Cc: surampudy, radmini; rolletta' Lou
subject: Inspections Conducted By Region
Attached is the quarterly report showing the mposs ww and sw inspections conducted during the previous
calendar quarter (see schedule below). please review the report and take action as needed to ensure the
]O-day timeliness goal for inspection completion is achieved and ozMs is properly updated.
Inspection report transmitted to regions: may 25th {3an. I — march ]l); August 25th (April I — 3une 50);
November 25th (3uly I — Sept. 50); and February 25th (Oct. I — Dec. ]l).
OEQ-CFVV_00008216