Loading...
HomeMy WebLinkAboutDEQ-CFW_00003806From: Fond.Gina4pepamuiiepa.gov[Fonzi.Gina4pepamuiiepa.gov Sent: 10/18/20102:01:26PIW To: 8ryan_CoUins@Pdeq.state. mcus; ]ohn.VVoodburn@pdep.statejlus;Elsa. Potts@Pdep.state]Duq DEBES3 P@dhec.sc.gmv; e|s@adem.stote.a|uq SigiStee|e@pdnr.stote.Xa.us;jory.becker@ky.Xwv; Tom.Be|nick@ncmai|oet;vickie.prather@ky.gov;VNinJanjic@ptn.gov; 6ary.K8u||ins@tn.gov; montebnV@dhecscgov;rippycd@dhec.sc.Xov CC: Nuhfer.Mark@Pepamaiiepa.gov Subject: 1, %, snap, 3 Attachments AL Individual Permits Backlog EOY FY10.x1s; FIL Individual Permits Backlog EOY FY10.xls; GA Individual Permits Backlog EOYFY10.x|s; KY Individual Permits Backlog [OYFYl0.x|s; NC Individual Permits Backlog EQYFYlO.x|s; IVIS|ndividua| Permits Backlog EOYFY10.x|s; NC Individual Permits Backlog EOY FY10.xls; SC Individual Permits Backlog EOY FY10.x1s;TN Individual Permits Backlog EOYFY10.x|s Dear PMOS contacts: Oh my! it looks like EPA ml took the backlog snapshot of Region 4 States precisely on September 30, ZOlO. with the year end rush, some of you may not have finished entering last minute issued individual permits into Iczs/Pcs at that time. Since z want each state to look their best in this end -of -year snapshot' please skim through the attached list of individual permits which ml has deemed to be backlogged. If you see any permits which were issued on or before September 50, 20I0' please let me know. z have an opportunity this week to photoshop any excess backlog weight from our picture. � } If you'll get back to me by coo on Wednesday, October 20' I'll make the changes with HQ. {see attached file: AL Individual Permits Backlog sov pvIO.x]s)(see attached file: FL Individual permits Backlog cov pvI0.xls)(see attached file: mx Individual Permits Backlog soY pYlO.xls){see attached file: KY Individual permits Backlog sov pYI0.xls}(see attached file: mc Individual permits Backlog eoY pYIO.xls)(see attached file: ms Individual Permits Backlog coY pvIO.xls)(see attached file: wc Individual Permits Backlog coY pvI0.xls) (see attached file: sc Individual permits Backlog soY rvlO.xls)(see attached file: TN Individual Permits Backlog EOY FY10.xls) Thanks again! Gina ponzi, P.E. Environmental Engineer | municipal and Industrial mross section cnx Region 4 | Gl Forsyth street | Atlanta GA 30305-9960 p 404.562.9301 | f 404.562.8692 To: Austine prawley/nl/ossPA/usNepA, Michelle 30silo/m2/usspx/usNspx' Brian Trulear/n]/oscpx/us@sPx' Gina ponri/n4/usePA/us@epA, sreedevi vedavalli/nS/osePA/us@epA, nilty easkin/n6/usspA/osNcpA, Kimberly william xill/n7/usspA/os@spA, sunny wellesl scpx/us@sPx' Laura aose/x9/usspA/os@spA, Erin xennedy/n8/ossPA/usNePA, syed shahriyar/a6/userA/os@sPA Cc: Claudia *nsch/a6/userA/os@spA, Richard wuoster/n6/osspx/us@spx' Brent Larsen/Rh/osspA/us@EPA' Larry oiglio/n6/uscPx/us@spx Date: 10/I4/20I0 02:09 pm subject: EOY FY10 Backlog Reports xello, Please find attached the first draft Permit status Reports for Tribal and monrribal Backlog, as well as the list of total permits counted as part of this universe and backlogged permits from that list. I'll also be sending the individual state data to nl' n8, and nIO states. Please let me know if you'd like your states added to this list. These % current numbers will be loaded into xcs tomorrow, but there is still plenty of time to change them if any major corrections/updates are needed. The lists were created using data pulled from zczs/pcs and pmos at the end of the day on 9/30/2010. Please look at the summary Report tab for % current numbers to be loaded into Acs ' then the major Report, minor Report, and apcp Report for more detail if desired. Please contact me with any changes before coo 10/21/10. Let me know if you have questions or comments. Thanks, 3ackie zacqueline M. Carroll Clark U.S. Environmental Protection Agency Water permits Division 202-564-5582 clark.jackie@epa.gnv