Loading...
HomeMy WebLinkAboutDEQ-CFW_00002848Grzyb, Julie From: Sent: To: Subject: Hi Julie. I know this is quite confusing. JOHNSON, MICHAEL E <MICHAEL.E.JOHNSON@chemours.com> Friday, June 16, 2017 11:14 AM Grzyb, Julie RE: questions The Vinyl Ethers Process in question makes three (3) different vinyl ethers: • PPVE perfluoropropyl vinyl ether CAS No. 1623-05-8 • PSEPVE perfluoro(4-methyl-3,6-dioxaoct-7-ene) sulfonyl fluoride CAS No. 16090-14-5 • EVE 3-[1-[difluoro[(1,2,2-trifluoroethenyl)oxy]methyl]-1,2,2,2-tetrafluoroethoxy]-2,2,3,3-tetrafluoro-, methyl ester propanoic acid CAS No. 63863-43-4 The HFPO Dimer Acid is associated with PPVE. PPVE runs on average about six (6) months per year in several shorter campaigns. In between the PPVE campaign the production area will make PSEPVE and EVE. I hope this helps. Mike Michael E. Johnson, PE Environmental Manager Chemours Company — Fayetteville Works (910) 678-1155 Chemours- The Chemours Company FC, LLC 22828 NC Highway 87 W Fayetteville, NC 28306-7332 DEQ-CFW 00002848 From: Grzyb, Julie [mailto:julie.grzyb@ncdenr.gov] Sent: Thursday, June 15, 2017 9:29 AM To: JOHNSON, MICHAEL E <MICHAEL.E.JOHNSON@chemours.com> Subject: RE: questions Thanks Michael. Of course as I learn more about this I only have more questions. I'll try to make a list and ask them all at once but one quick one — Is Chemours just shutting down the PPVE manufacturing in 3 weeks or both the Vinyl Ethers Process and the PPVE? Are you going to the meeting in New Hanover today? Julie From: JOHNSON, MICHAEL E [mailto:MICHAEL.E.JOHNSON@chemours.com] Sent: Thursday, June 15, 2017 7:07 AM To: Grzyb, Julie <iulie.grzvb@ncdenr.Fov> Subject: RE: questions---------------------------------------------------------------- Hi Julie. See my answers below in bold Mike Michael E. Johnson, PE Environmental Manager Chemours Company — Fayetteville Works (910) 678-1155 Chemours The Chemours Company FC, LLC 22828 NC Highway 87 W Fayetteville, NC 28306-7332 Redacted From: Grzyb, Julie f mailto:iulie.grzyb@ncdenr.gov] Sent: Wednesday, June 14, 2017 5:26 PM To: JOHNSON, MICHAEL E <MICHAEL.E.JOHNSON@chemours.com> Subject: questions Michael, Are statements A and C correct ? And can you answer B and D? A. The GenX manufacturing area for FRD 902 "GenX" and FRD 905 "GenX" referred to as PPA is closed loop and does not have a discharge. All process wastewaters generated in this area are shipped to AR or OH for incineration. Yes z DEQ-CFW 00002849