HomeMy WebLinkAbout20080737 Ver 10_Structure 5 & 6 Work Trestle Removal Meeting Minutes_20180321 (2)Carpenter,Kristi
From: Blackman, Troy J <TJBlackman@mbakerintl.com>
Sent: Wednesday, March 21, 2018 4:17 PM
To: Steenhuis, Joanne
Cc: Rerko, James J
Subject: Re: EXTERNAL: RE: [External] Structure 5& 6 Work Trestle Remova) Meeting Minutes
�.....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
II�'�'n����'���Illu'�"u��°«����,�,V„��;�0 � ��� ��I��I� I�'�' ��I��I�I � Ul�l��'� �' �'��� ��I�' � � ' '�"! '��,���
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
ThanksJoanne,
I'll address and resend tomorrow.
Justice
On Mar 21, 2018, at 2:54 PM, Steenhuis, Joanne <loanne.steenhuis@ncdenr.�ov> wrote:
Troy,
I looks good except for the part about filling in the residual holes from the removed piles. I made my comments
on the last sheet.
If you have any questions please feel free to call me.
Joanne (910) 796-7306
From: Blackman,TroyJ [mailto:TJBlackman@mbakerintl.com]
Sent: Wednesday, March 21, 2018 1:53 PM
To: Tim Kincaid Conti PM <tkincaid@conticorp.com>; Francis Spinola <fspinola@contienterprises.com>; Todd
Fancher <tfancher@conticorp.com>; Ambrose J. Cooper IV <ambrose.cooper@conticorp.com>; Lundberg,
Charles <Charles.Lundber�@mbakerintl.com>; Bennett, Allen W<Allen.Bennett@mbakerintl.com>; Davis, Cecil
<Cecil.Davis@mbakerintl.com>; Clifton, Thomas <Thomas.Clifton@mbakerintl.com>; Davis, Cecil
<Cecil.Davis@mbakerintl.com>; Gregson, Jonathan <Jonathan.Gre�son@mbakerintl.com>; Hall, Phillip
<Phillip.HallC�mbakerintl.com>
Cc: Ocasio, Vanessa I<viocasio@ncdot.�ov>; Sessoms, Libby L<Isessoms@ncdot.�ov>; Partin, John A
<ipartin@ncdot.�ov>; Huffines, Chad <CHuffines@mbakerintl.com>; Earwood, Aaron V
<aearwood@ncdot.�ov>; Ron.Coffey@RSandH.com; Steenhuis, Joanne <ioanne.steenhuis@ncdenr.�ov>
Subject: [External] Structure 5& 6 Work Trestle Removal Meeting Minutes
Ti m,
Please find the attached meeting minutes from our onsite review yesterday at Structures 5 and
6. Thanks for all of Conti's efforts towards keeping the wetland area clean and in compliance during
this operation.
Thanks,
T. Justice Blackman
Assistant Resident Engineer
Michael Baker International
Fayetteville Outer Loop Project
Cell; 910-591-9855
tiblackmanCa�mbakerintl.com
<FaOL Structures 5 and 6 meeting March 2018.pdf>