Loading...
HomeMy WebLinkAbout20080737 Ver 10_Structure 5 & 6 Work Trestle Removal Meeting Minutes_20180321 (2)Carpenter,Kristi From: Blackman, Troy J <TJBlackman@mbakerintl.com> Sent: Wednesday, March 21, 2018 4:17 PM To: Steenhuis, Joanne Cc: Rerko, James J Subject: Re: EXTERNAL: RE: [External] Structure 5& 6 Work Trestle Remova) Meeting Minutes �..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... II�'�'n����'���Illu'�"u��°«����,�,V„��;�0 � ��� ��I��I� I�'�' ��I��I�I � Ul�l��'� �' �'��� ��I�' � � ' '�"! '��,��� ......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... ThanksJoanne, I'll address and resend tomorrow. Justice On Mar 21, 2018, at 2:54 PM, Steenhuis, Joanne <loanne.steenhuis@ncdenr.�ov> wrote: Troy, I looks good except for the part about filling in the residual holes from the removed piles. I made my comments on the last sheet. If you have any questions please feel free to call me. Joanne (910) 796-7306 From: Blackman,TroyJ [mailto:TJBlackman@mbakerintl.com] Sent: Wednesday, March 21, 2018 1:53 PM To: Tim Kincaid Conti PM <tkincaid@conticorp.com>; Francis Spinola <fspinola@contienterprises.com>; Todd Fancher <tfancher@conticorp.com>; Ambrose J. Cooper IV <ambrose.cooper@conticorp.com>; Lundberg, Charles <Charles.Lundber�@mbakerintl.com>; Bennett, Allen W<Allen.Bennett@mbakerintl.com>; Davis, Cecil <Cecil.Davis@mbakerintl.com>; Clifton, Thomas <Thomas.Clifton@mbakerintl.com>; Davis, Cecil <Cecil.Davis@mbakerintl.com>; Gregson, Jonathan <Jonathan.Gre�son@mbakerintl.com>; Hall, Phillip <Phillip.HallC�mbakerintl.com> Cc: Ocasio, Vanessa I<viocasio@ncdot.�ov>; Sessoms, Libby L<Isessoms@ncdot.�ov>; Partin, John A <ipartin@ncdot.�ov>; Huffines, Chad <CHuffines@mbakerintl.com>; Earwood, Aaron V <aearwood@ncdot.�ov>; Ron.Coffey@RSandH.com; Steenhuis, Joanne <ioanne.steenhuis@ncdenr.�ov> Subject: [External] Structure 5& 6 Work Trestle Removal Meeting Minutes Ti m, Please find the attached meeting minutes from our onsite review yesterday at Structures 5 and 6. Thanks for all of Conti's efforts towards keeping the wetland area clean and in compliance during this operation. Thanks, T. Justice Blackman Assistant Resident Engineer Michael Baker International Fayetteville Outer Loop Project Cell; 910-591-9855 tiblackmanCa�mbakerintl.com <FaOL Structures 5 and 6 meeting March 2018.pdf>