HomeMy WebLinkAbout20181566 Ver 1_More Info Received_20181219CenturyLink Webmail \" marineconl@embargmail.com
Fwd: DWR #18-1566 - McColley, Dream View Point Lot 61
From :Fiona McColley
<bikingx@gmail.com>
Subject: Fwd: DWR #18-1566 - McColley,
Dream View Point Lot 61
To: MARINE CONSTRUCTION OF HI
<marinecon 1@embarqmail.com>
Wed, Dec 05, 2018 04:00 PM
2 attachments
"all
J�
k
---------- Forwarded message ---------
From: Annino, Amy M <amy.annino@ncdenr.gov>
Date: Thu, Dec 6, 2018 at 7:57 AM
Subject: DWR #18-1566 - McColley, Dream View Point Lot 61
To: marineconl@embargmail.com <marineconl@embargmail.com>
Cc: bikingx@qmail.com <bikingx@gmail.com>
On November 14, 2018, the Division of Water Resources (Division)
received your application dated November 9, 2018, requesting a 401
Water Quality Certification from the Division for the subject project.
The Division has determined that your application is incomplete and
cannot be processed. The application is on hold until all of the
following items are addressed:
1. Please provide information regarding the linear feet of shoreline to
be stabilized. Provide the dimensions of the stabilization as in the
following example:
a. Stabilization above: 80'x 2'
b. Stabilization below: 80' x 3'
2. Provide the dimensions of the construction access corridor in both
zone 1 and zone 2 needed for the shoreline stabilization. Provide
information as to the size and number of trees required for
removal to construct the construction access corridor, including the
corridor parallel to the shoreline.
Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish
all of the above requested information for the proper consideration of
the application. Please provide a response by January 5, 2018.
Amy Annino
Environmental Specialist — Asheville Regional Office
Water Quality Regional Operations Section
NCDEQ — Division of Water Resources
828 296 4656 office
amy.annino@ncdenr.gov
2090 U.S. Hwy. 70
Swannanoa, N.C. 28711
NZ—Nothing Compares
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
_ 20181566 Ver 1—Shoreline Stabilization_20181114.pdf
1 MB
F - State of North Carolina
Department of Environrnent and Natural Resources
Division of Water Resources
Warer Resources 15A NCAC 02H .0500 – Water Quality Certification, Shoreline Stabilization
ENVIRONMENTAL OUALITY FORM: SSGP 02-2017
Shoreline Stabilization Application Form `L �; I 61 `' n 6
Three copies of the application (including attachments) and the application fee should be sent to:
If sending via US Postal Service Ijsending via delivery service (UPS, FedEr,
Karen Higgins Karen Higgins a
DWR-401 & Buffer Permitting Branch DWR-401 & Buffer Permitting Branch D
1617 Mail Service Center 512 N. Salisbury Street FNO
Raleigh, NC 27699-1617 Raleigh, NC 27604 4 20)8
A. Applicant Information [15A NCAC 02H .0502(a)]
1. Owner Information
Name: ��dV\105`� \C
Mailing Address:
Telephone Number: 9--X& 425 -JISL2
E-mail Address: \,a t
2. Agent/ Contact Person Information
Fax Number:
A signed and dated copy of the Agent Authorization letter must be attached if the Agent has
signed this application form. (A form can be downloaded here:
http•//www saw usace army mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORI
ZATION FORM.pdf) —�
Name: O�(`►-a. 4�.J�f�eS F
Company Affiliation: V MV1S-e- O
Mailing Address: 3 0.
Ic0\
Telephone Number: g Fax Number:
E-mail Address:
B. Project Information [15A NCAC 02H .0502(a) & (b)]
1. Attach a vicinity map (i.e. street map) clearly showing the location of the property
with respect to local landmarks such as towns, rivers, and roads.
2. Provide a detailed site plan showing property boundaries and proposed locations of
vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap,
excavation or dredging below Full Pond/ Normal Water Level elevations, and construction
access corridors. You may use the diagram provided at the end of this application form.
FORM: SSGP 02-2017 Page 1 of 3
r
3. pdftdt a Owtograph of the share&wj buffer proposed to be stabilized: (Include a
scale of some sort a yard stid4 shovd handir, etc-)
4. Location of the property (where work is to be conducted)
County._ n ��.>�►` Nearest Town:
Labe/ river/ ocean adjacent to property:
Property size (acres): .` ,
Subdivision name or site address (include phase/lot number):
Latitude rn de+dmol deyr+eesl 35•'l8 J 50a Lon&ude (decimal deg m) •4l. ` A:3Do
S. Describe the existing land use or condition of the sft at the time of this appticatian
(residential, undeveloped, etc.):
6. Describe proposed work (Include discussion as to how ftnlenat Of shorelere has
been avoided, or why it is necessaryj:
7. Will work be conducted from land? 9 From wafter? 0
8.
Tats amount of impacts below the normal pool latae level / Norval Water Level .
Permanent hTquK s
fleet: C I4L*:xnai
Temporary
walls, etc.) in square
& 1btal arrow t of knpacts abate the normal pool lake level / Normal Water Level and
50 fleet land Mrard
Perm impacts (Including back ft MMNatkn rip rap, rig walls. Or-) in mare
fleet: A *" 410 �� /.D. J� o S F
Temporary impacts
10. Please deso ibe the vegetation above the
and 50 feet landward to be impacted (rumba- of
%% %_ f'.. 1 I..\ - k r - -�
11. Signature
FORM: SSGP 02-2017
corridor) in square feet:
pool labs leve(/ Normal Water Level
Page 2 of 3
\t
Q \8
Owner/Agent's Sig ure' (15A C 02 502(f)J Date
Agent's signature is valid only if on authorization letter from the owner is provided.
12. Please approximately sketch the following information on this plan and provide
dimensions for each item:
a. All proposed vegetation clearing
b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Levet
elevation
C. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Levet
elevation
s such as buildings, retaining walls, docks, etc.
d. Location of any proposed structure
e. Location of any excavation or dredging below the Full Pond/ Normal Water Level
elevation
Full Pond/ No =l Water
Shoreline
Side View -
FORM: SSGP 02-2017
Lake
16 ao
W
O �` v
s
N
L'
C
FunPMW li a
.�
2h.*IWfL
�dluarhrit
•6�Y
Plan View
Lake
�faF-0 N --A VAM� U-4
on 0
AMPUE
Page 3 of 3
CATAWBA RIPARIAN BUFFER NOTIFICATION FORM
Project Name/address: ��,��A�— C�1gra�,s�1� �tb' CouMy:
PrintSignature
Contra/WM.-
trAuQ3�-W)J \�• /% —
•
Print
The approval is for the purpose and design described in your application. Impacts not indicated in the
application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC
02H.0506 and 15A NCAC 02B.0243(8)]
Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless
approved. Exception, those trees that are severely undermined along the immediate shoreline can be
removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B.0243(6)]
Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 026 .0243
(6)]
Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically
approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)]
Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The
work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction
material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B.0243 (4), (6), (8)]
Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater
discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or
sheet flow at non-erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)]
Acknowledgement of Motykation 'Sp�a�a. ,� /t & t k
I, ` � hereby'state that I have been informed of the Catawba
Riparian Buffer Rule. Any workcibducted in the buffer, not specifically stated in the application and approved
by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be
taken such that the construction will be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting
materials.
Signature (owner)• Date: 11 �_