Loading...
HomeMy WebLinkAbout20150124 Ver 2_Comments on Water Quality Monitoring Plan_20181220 n �@wnWy� NORTH CAROLINA ROY COOPER Environmental Quality Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Interim Director December 20, 2018 DWR#2015-0124 v2 Chatham County Andrew McMahan,President McMahan Hydroelectric,LLC 105 Durham Eubanks Rd. Pittsboro,North Carolina 27312 Subject: Comments on Bynum's Water Quality Monitoring Plan Bynum Hydro Project FERC P-4093 Dear Mr.McMahan: The Division of Water Resources(Division)recently reviewed the proposed Water Quality Monitoring Plan and FERC's Environmental Assessment(EA)for the Bynum Hydroelectric project.The comments resulting from this review are listed on the next page.Please modify the Water Quality Monitoring Plan (as necessary)and provide a response within 30 days of this letter. Once we have an approvable plan,we will issue the required Public Notice for this application. Please contact Chonticha McDaniel at(919)707-3634 or chonticha.mcdanieK0cdenngov if you have any questions or concerns regarding this matter. Sincerely, Karen Higgins, Supe " 401 &Buffer Permitting Branch cc: Fred Tarver—NC Department of Environmental Quality(via email) DWR 401 &Buffer Permitting Branch File D q� North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh,North Carolina 27699-1617 919.707.9000 Page 2 of 2 DWR#2015-0124 V2 Comments on the Water Quality Monitoring Plan 1. We recommend changing the monitoring location No.1 from the project reservoir(upstream of dam)to the secondary bypass reach instead(as shown in the picture below). We believe that collecting DO/Temp data from this location will be more beneficial and help us to determine impacts from the powerhouse operation since the reach has direct connection and is joined by the tailrace water. ..n III S d Eastern Riverbank 11 �Y Powerhouse xll cY jll mA Intake Canal xx Haw River a 9 3 a� P 11 Qh Haw River l u 11 so:: 11 Z Haw River A Proposed Monitoring Locations A �1 Bypass Reach 1 11 A O 2 Bypass Reach 1 11 Y N 11 / Q3 Powerhouse Tailrace 11 Y 2. Please modify the Sampling Procedure to specify that the field sampling for all 3 locations will be conducted on the same day and during the time when the powerhouse is in operation. 3. Please modify the frequency of monitoring from monthly to weekly. However, the weekly sampling is only required when the powerhouse is in operation during that one-week period. 1-1 A j�L Q5 North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh,North Carolina 27699-1617 919.707.9000