HomeMy WebLinkAbout19900042 Ver 1_COMPLETE FILE_19900101
DIVISION OF ENVIRONMENTAL MANAGEMENT
WATER QUALITY SECTION
Comments concerning an application for State Federal CAMA Permit(s) from
A. PERMIT:
This office cannot comment on this project until after the close of the Section
401 Certification Public Comments Period.
yhis office has no objection to the issuance of the permit(s) for the proposed
project with the following conditions:
That the activity be conducted in such a manner as to prevent significant
increases in turbidity outside the area of construction or construction-
related discharge (increases of 25 NTU's or less are not considered
significant).
That the instream turbidity not be increased by more than 50 NTU's as a
result of the proposed activity after a reasonable opportunity for dilu-
tion and mixture.
That turbidity levels in shall not be increased
by more than 10 NTU's as a result of the proposed activity after a reason-
able opportunity for dilution and mixture.
B. CERTIFICATION STATUS:
Certification is not required
for this project.
Certification is required for
this project. Such action to
process the certification has
been initiated. Proposed
Certification will be acted on
or after
The proposed project is certified
under General Certification
A) No. 1179 issued on January 25, D) No. 1431 issued on October 16,
1977, for sewer line construction 1980, for boat ramp construction.
B) No. 1272 issued on November 10, E) No. 1664 issued on September 8,
1978, for bulkhead construction. 1983, for Rip-Rap Placement.
C) No. 1273 issued on November 10, F) No. 1665 issued on September 19,
1978, for discharges of liquid 1983, for incidental bridge
effluent from diked upland disposal construct ion.
areas. ?
r
-, 1
WATER QUALITY SECTION
DIVISION OF ENVIRONMENTAL MANAGEMENT
T0: BILL MILL
DIVISION OF ENVIRONMENTAL MANAGEMENT
CAMA MAJOR PERMIT APPLICATION REVIEW
Project Name: Mike Bell
County: Carteret
Stream or Adjacent Water Body:
Class: SA
Open or Closed: Closed
Stormwater Plan Req'd: No
If yes, Date Approved:
Project Description:
Project: 9007-E
Bogue Sound/Spooners Creek
(for shellfishing waters)
(Y or N)
Date App. Recd: 90/07/10 (YY/MM/DD) Recommendation: Issue
Initial Report: (YY/MM/DD) (Issue/Deny/Other)
Final Report: 90/07/16
Water Oualitv Cert. (401
Cert. Req'd: No (Y or N)
If yes: General Cert: (Y or N)
Type Gen: Individual Cert:
(Bulkhead, Boat Ramp, etc.) (Y or N)
Sewage Disposal
Type of Disposal Proposed: N/A
(existing, proposed, septic tank, etc.)
To Be Permitted By: N/A
(DEM, DHS, County)
If by DEM, Is Site Available and Permit Issuance Probable: N/A
(Y or N)
Water/Wetland Fill
Area of Fill: Water: N/A
Wetland: N/A
Is Fill Eliminating a Significant use: N/A (Y or N)
Dredging
Is Dredging Activity Expected to Cause a Significant Loss
of Resource: N/A (Y or N)
Is Spoil Disposal Adequately Addressed: N/A (Y or
N)
Marina
Are the Following Adequately Addressed
Sewage Disposal:
Marina services:
Oxygen in Basin:
Closure of Shellf
(attach a marina use attainability
N/A
N/A
N/A
ishing Water: N/A
eval.)
9007-E.JUL
Page Two
Recommended Conditions or Permit Restrictions: That the project
not cause turbidity to exceed 25 NTU outside the immediate
construction area.
JHG:9007-E.JUL
cc: CF, WiRO
Jim Gregson
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1.
APPLICANT'S NAME Mike Bel]
2. LOCATION OF PROJECT SITE on Edwards Drive, Lot 23, Spooners_Creek
North subdivision, near Morehead City, Carteret County. *SEE 1989
PHOTO INDEX 89:154-32 L-18. 84:33-1197 R-21.
3.
4.
INVESTIGATION TYPE: DREDGE & FILL_
INVESTIGATIVE PROCEDURE:
(A) DATES OF SITE VISIT 6-26-90
(B) WAS APPLICANT PRESENT NO
Lat:34°43'34"N
Long:76146109"W
CAMA X (ONLY)
5. PROCESSING PROCEDURE: APPLICATION RECEIVED June 22, 1990
OFFICE Morehead City
6. SITE DESCRIPTION:
(A) LOCAL LAND USE PLAN Carteret Count
LAND CLASSIFICATION FROM LUP Transitional-Residential/Conserv.
DEVELOPMENT CONSTRAINTS IDENTIFIED IN LUP NONE
(B) AEC(S) INVOLVED: OCEAN HAZARD ESTUARINE SHORELINE
COASTAL WETLANDS PUBLIC TRUST WATERS X
ESTUARINE WATERS X OTHER
(C) WATER DEPENDENT: YES X NO
(D) INTENDED USE: PUBLIC PRIVATE X COMMERCIAL
(E) TYPE OF WASTE WATER TREATMENT:
PLANNED connection to existing
EXISTING
ommunitv wastewater treatment
(F) TYPE OF STRUCTURES: EXISTING
PLANNED residential structure in the future
(G) ESTIMATED ANNUAL RATE OF EROSION N/A SOURCE
7. HABITAT DESCRIPTION:
(A) VEGETATED WETLANDS
NONE
(B) NON-VEGETATED WETLANDS: 736 sq.ft.
pier footprint
(C) OTHER :
NONE
(D) TOTAL AREA DISTURBED:
AREA
DREDGED FILLED OTHER
8. PROJECT SUtiMARY: The applicant is proposing to construct a 65'
long x 8-10' wide residential pier at Lot 23 on Edwards Drive
SDooners Creek North Subdivision, Carteret County.
FIELD INVESTIGATION REPORT - MIKE BELL, CARTERET COUNTY
PAGE #2
9. NARRATIVE DESCRIPTION: The applicant's property consists of
an approximately one-half acre tract of land located off
Edwards Drive, Lot 23, in the Spooners Creek North
Subdivision, near the Town of Morehead City, Carteret
County. State Permits #194-84 and #43-88 authorized the
construction of roadways, shoreline bulkheading, maintenance
excavation, a 30 slip residential marina and boat ramp
facilities for this subdivision. Today, all activities
authorized by these permits have been completed. Several
houses have been constructed in the subdivision and several
private residential piers have been placed in Spooners
Creek. Spooners Creek is a tidal tributary of Bogue Sound
and is classified as 'SA' waters and closed to the
harvesting of shellfish.
The property, which is the subject of this permit
application, is undeveloped and consists of a thick
vegetation cover primarily comprised of pine trees and
myrtle. It is anticipated that a residential structure will
be built on this lot in the future. This house will be
serviced by an existing community wastewater treatment
facility. The shoreline is bulkheaded and is void of any
wetlands vegetation. The applicant is requesting a permit
to construct an approximately 30' long x 8' wide pier with a
40' long x 10' wide 'L' platform at the waterward end. On
the eastern side of the pier, an 8' wide x 12' long floating
dock is proposed and approximately 15' waterward of the 'L'
platform, 3 mooring pilings are to be placed. Landward of
the 'L', a 4' wide x 20' long dock is proposed which will
accommodate access to a proposed boat lift. This pier
facility will extend a maximum distance of 65' into Spooners
Creek and will be in a water depth up to -7' MLW.
10. ANTICIPATED IMPACTS: The project as proposed will result in
the placement of the pier over approximately 736 sq. ft. of
estuarine and public trust waters. This pier would not
extend beyond one-third the width of the waterbody and
appears to be the same length as the adjacent pier located
immediately east of this lot. A general permit could not be
issued for this project since the width of the pier exceeds
6'.
PREPARED BY: CHARLES S. JONES
DATE: JUNE 28, 1990
Please type or print. Carefully describe all anticipated
development activities, including construction, excava-
tion, filling, paving, land clearing, and stormwater con-
trol. If the requested information is not relevant to your
project, write N/A (not applicable). Items 1-4 and 8-9
must be completed for all projects.
1 APPLICANT
a. Name Al /,eZ?_
Address l /Aid- t??4?.t k
City State A/C-
zip Day phone -9 )-_?
Landowner or Authorized agent
b. Project name (if any)
c. If the applicant is not the landowner, also give the
owner's name and address.
2 LOCATION OF PROPOSED
PROJECT
a. Street address or secondary road number
Lo.. 1;A3 F__6t-jAe hS I v
b. City, town, community, or landmark
S pOrI fi t-7 S c62 ? ?? No 2~-r1
c. County C-A e_ 4L_
d. Is proposed work within city limits or planning
jurisdiction? M D
e. Name of body of water nearest project
?POcD Al
3 DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
a. Describe all development activities you propose (for
example, building a home, motel, marina, bulkhead,
or pier). ? oM? P?F--?-
JUIr' u 2 12 -0 0 '
If you plan to build a marina, also complete and
attach Form DCM-MP-2.
b. Is the proposed activity maintenance of an
existing project, new work, or both?
Ai F,-u% µJ U E e
c. Will the project be for community, private, or
commercial use?
P f-K , d y4-,,-F-7
d. Describe the planned use of the project.
't 6 i /t4 A 'Q/ Q 1 2 E-4, i A-" ?
RR f,,4=
4 LAND AND WATER
CHARACTERISTICS
a. Size of entire tract
b. Size of individual lot(s)
c. Elevation of tract above mean sea level or
National Geodetic Vertical Datum
?-
d. Soil type(s) and texture(s) of tract
SAtiZ?)
e. Vegetation on tract woo Df-_-:D
f. Man-made features now on tract ?cz k
g. What is the CAMA Land Use Plan Classification of
the site? (Consult the local land use plan.)
Conservation Transitional
Developed ? Community
Rural Other
h. How is the tract zoned by local government?
::? C>
i. How are adjacent waters classified?
.5
j. Hasa professional archaeological survey been
carried out for the tract? L! If so, by whom?
5 UPLAND DEVELOPMENT
Complete this section if the project includes an}, land
development.
a. Type and number of buildings, facilities, or
structures proposed ?IA
b. Number of lots or parcels
c. Density (Give the number of residential units and the
units per acre.)
d. Size of area to be graded or disturbed
e
f. Give the percentage of the tract within 75 feet of
mean high water to be covered by impermeable
surfaces, such as pavement, buildings, rooftops.
g. List the materials, such as marl, paver stone, asphalt,
or concrete, to be used for paved surfaces.
h. If applicable, has a stormwater management plan
been submitted to the Division of Environmental
Management?
i. Describe proposed sewage disposal and/or waste
water treatment facilities.
j. Have these facilities received state or local approval?
k. Describe existing treatment facilities.
1. Describe location and type of discharges to waters of
the state (for example, surface runoff, sanitary
wastewater, industrial/commercial effluent, "wash
down").
m. Water supply source
n. If the project is oceanfront development, describe
the steps that will be taken to maintain established
public beach accessways or provide new access.
o. If the project is on the oceanfront, what will be the
elevation above mean sea level of the first habitable
floor?
6 EXCAVATION AND FILL
INFORMATION
a. Describe below the purpose of proposed excavation
or fill activities (excluding bulkheads, which are
covered in Section 7).
Access channel
(MLW) or (NWL)
Boat basin
Other (break-
wate ier
boat ramp,
rock jetty) ?-?
Fill placed in
wetland or below
MHW
Upland fill
areas
Length • Width Depth
4r, io ?
b. Amount of material to be excavated from below
water level in cubic yards NO N S
c. Typeofmaterial
d. Does the area to be excavated include marshland,
swamps, or other wetlands?
e. High ground excavation, in cubic yards
2
If the proposed project will disturb more than one
acre of land, the Division of Land Resources must
receive an erosion and sedimentation control plan at
least 30 days before land disturbing activity begins.
If applicable, has a sedimentation and erosion
control plan been submitted to the Division of Land
Resources? _
9/89
i
Dimensions of spoil disposal JL
g. Location of spoil disposal area
h. Do you claim title to the disposal area?
If not, attach a letter granting permission from the
owner.
i. Will a disposal area be available for future
maintenance?
If so, where?
j. Does the disposal area include any marshland,
swamps, or water areas?
k. Will the fill material be placed below mean high
water?
1. Amount of fill in cubic yards
m. Type of fill material
n. Source of fill material
0
will fill material be placed on marsh or other
wetlands?
p. Dimensions of the wetland to be filled
q. How will excavated or fill material be kept on site
and erosion controlled?
r. What type of construction equipment will be used
(for example, dragline, backhoe, or hydraulic
dredge)?
s. Will wetlands be crossed in transporting equipment
to project site? If yes, explain steps that will
be taken to lessen environmental impacts.
Shoreline erosion during preceding 12 months, in
feet
d. Type of bulkhead material
e. Amount of fill, in cubic yards, to be placed below
mean high water
f. Type of fill material
8 ADDITIONAL INFORMATION
In addition to the completed application form, the follow-
ing items must be submitted:
?A copy of the deed (with state application only) or other
instrument under which the applicant claims title to the
affected property. If the applicant is not claiming to be
the owner of said property, then forward a copy of the
deed or other instrument under which the owner claims
title, plus written permission from the owner to carry out
the project.
An accurate work plat (including plan view and cross
sectional drawings) drawn to scale in black ink on an 8
1/2 x 11 white paper. (Refer to Coastal Resources
Commission Rule 7J.0203 for a detailed description.)
7 SHORELINE STABILIZATION
a. Length of bulkhead or riprap 4 x L5-i/Z?,C
b. Average distance waterward of mean high water or
normal water level
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if 18 high
quality copies are provided by applicant. (Contact the
U.S. Army Corps of Engineers regarding that agency's
use of larger drawings.) A site or location map is a part
of plat requirements and it must be sufficiently detailed
to guide agency personnel unfamiliar with the area to the
site. Include county road (SR) numbers, landmarks, and
the like.
A stormwater management plan, if applicable, that
may have been developed in consultation with the
Division of Environmental Management.
A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners. These
individuals have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management and should be advised by the applicant of
that opportunity. S i c_. N r ,t> S7-A-I i`Ist jLe4r/S
? CG 338
Name
Address
Name
Address
Name
Address
A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
pcrmittee, and issuing dates.
A check for $100 made payable to the Department of
Health, Environment & Natural Resources to cover the
costs of processing the application.
A signed AEC hazard notice for projects in oceanfront
and inlet areas.
A statement on the use of public funds. If the project
involves the expenditure of public funds, attach a state-
ment documenting compliance with the North Carolina
Environmental Policy Act (N.C.G.S. 113A-1 to 10).
.9 CERTIFICATION AND PERMISSIOI
TO ENTER ON LAND
Any permit issued in response to this application will
allow only the development described in the application.
The project will be subject to conditions and restrictions
contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's ap-
proved Coastal Management Program and will be con-
ducted in a manner consistent with such program.
I further certify that I am authorized to grant, and do in
fact, grant permission to representatives of state and
federal review agencies to enter on the aforementioned
lands in connection with evaluating information related
to this permit application and follow-up monitoring of
project.
This is the ;2"._ day of
X r?
Landowner Authorized age
9/89
I G ?. GGG? ?, I??1i `
U
d
C7
.l
i
r?
RJ --- ----
a
-C ?
/OQt?? S? ;?rN?
t
J c
Chi a `f
fi 1.Ql
'?-7b?9 a? '&d
r.
r?
`c
?1 3
? u
v
0
a
n
W
G 4,
L
Q
w
z
------ ------ - - ---- ---
? ? oss? ? ? f?nr
„»yJ u?J c?J
.....
Atlantic ocean
..............•_
m?u
N
N
N -
n
a N
- m
N
a
..
n
........
-10 1
? J
3
<
(fi
4%-
F'l_I-}
• J j S 4\,
VICINITY MAP
D WA - 60r
` =z RDS DR IVE
EIR-PC
0 38, TEL
LIGHT POLE
EI P I P$
cLEc
. t.l, ., 0,.•41,.4 - I i? _ .U:•ii
Jr.l'• '?LI_tlUN . 5 I is .1... ,..?n(
3p'MBL
• r:1.r113.1
rl Irrir.l
LL r, i.plr,ATE
N
Ch
a
1 m 023 w ?24?
. i U 0 .1
W
F.IR - E:X;STINt. ;!;t;;Lill AREA = 24,790 S.F,
II'S
- IRON PIPE SisI w
EIP - EXISTING Ihllti PIPJ' a w
PC - POINT OF CI. KvI.
F,/L1 - RIGIiT-OF-tJt;1 K,
MBL - MINIMUM Bl'; I.1J1,"?G 1.1.NE 0
SF - SQUARE: FEET n
I
r
SEA WALL
U
yp r
?0 E I - f--?
0
W
?N3
0
4 40 14 22
,
4
5
?- 3G"w t4 5
9
CAHT?R c.?..rr
.
'
• rout
P
t•tIC o. tr
ce
n 2'<+,TQ ?r"Q ¢ =
?? 50 25 •0 r
?"?0 100
a?,
•
r
,.
u
tT
r
. ?
s•t• .......... ....l (r tnr?
r•• 4'
A
-
aT?tEM_P_Onv?N'?5.. r.pl•LLf?na
i
i rU:
r
/'? ?w - •A>!•s+.. _
?
.n.t et. p.t.ar
..r •PP••rtd D. (efa N ? ?V
?? ?? ???
tn1• c.r end •. Lnar i. JV nJ L?• .••CrttOn
or ln• I•r rV•Int In•lr. ?•nt. MI Ln.a. ?
r
?
13
? ? '?•\
r
n•nd .nC (; Ie 1.1 tt•y of ...1. tnla •
d.7 orrt?,If,Q. as, •
tee. •..•.+?' If 1
GRAPHIC SCALE 1 = 50
4p
.- r
REFERENCE DB 535 PG, 301
1 MB 23 PG. 5A
,sttt?u?tf,,st
• f
> SEAL
N.HT4 cAHOLI?? ; r 1.2994 a
CAHTENrT COUNTY
ryso SUf?? Q?,?
I LT rtt[/ that und•c ¦r elreeuon 57,11/ ., '""••'• '?.
t..perrtslan this MAP was 0,402 Icon An acf45 /;t [¦t Q??s?`'
;tL4?
e1C and svrvrf, that the error of C1osor .:, its
as Ca1CVldted Dy latitude ?nd departures is
10,0w? Plotted from information found
?acc•• :a!crenced, that FonVA•nts have been
p;sced a? 2ho.n that this map was prepared in
a^corda,ce .4th GS 47-30 •s amtnded.
w''''est hand and sea: 1:1d
I-and sur•-ernr
4rgta:t.t:.,• L :954
LOT SURVEY
SPOONERS CREEK NORTH
LOT 23
MOREHEAD CITY TWP, CARTERET CO.,NC
DATE; ?- -90 SCALE? 1 " -, 501 SURVEYED' GN
OWNER: MICHAEL A.BELL a WIFE DRAWN;DMF
JENNIFER L. BELL
ADDRESS••1514 GARDEN TERRACE CHECKEDSOP
APT 502
CH A R LOTTE, N C 219203 APPRC/?EDriDP
STROUD ENGINEERING, P.A.
H£STR N PLAZ ONE SUIT£ f02
MORE
ST EN D. POWERS R. L. S.?
PM - 352