Has this project met the requirements for acceptance into the review process?*
r Yes
r No
Is this project a public transportation project?*
r Yes r No
Change only if needed.
BIMS # Assigned *
Version#*
20181715
1
Is a payment required for this project?*
r No payment required
• Fee received
Reviewing Office*
• Fee needed - send electronic notification
Central Office - (919) 707-9000
Select Project Reviewer*
Paul Wojoski:EADS\pawojoski
Information for Initial Review
1a. Name of project:
Bank Stabilization on Richland Creek
1a. Who is the Primary Contact?*
Mark P. Boone
1b. Primary Contact Email:*
mark@markusltd.com
Date Submitted
12/16/2018
Nearest Body of Water
Richland Cree.
Basin
Neuse
Water Classification
27-33-11
Site Coordinates
Latitude:
35.834810
A. Processing Information
County (or Counties) where the project is located:
Wake
Is this project a public transportation project?*
r Yes r No
Longitude:
-78.719850
1a. Type(s) of approval sought from the Corps:
F Section 404 Permit (wetlands, streams and waters, Clean Water Act)
rJ Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1 b. What type(s) of permit(s) do you wish to seek authorization?
F Nationwide Permit (NWP)
F- Regional General Permit (RGP)
P Standard (IP)
1c. Primary Contact Phone:*
(919)422-2525
1c. Has the NWP or GP number been verified by the Corps?
r Yes r No
1d. Type(s) of approval sought from the DWR:
F_ 401 Water Quality Certification - Regular r 401 Water Quality Certification - Express
F Non -404 Jurisdictional General Permit V Riparian Buffer Authorization
V Individual Permit
1e. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification: f• Yes f No
For the record only for Corps Permit: r Yes r No
1f. Is this an after -the -fact permit application?*
r Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r No
Acceptance Letter Attachment
1h. lathe project located in any of NC's twenty coastal counties?
r Yes r No
1j. Is the project located in a designated trout watershed?
r Yes r No
B. Applicant Information
1d. Who is applying for the permit?
rJ Owner r Applicant (other than owner)
1e. Is there an Age nVConsultant for this project?
r Yes (- No
2. Owner Information
2a. Name(s) on recorded deed:
Mark Boone
2b. Deed book and page no.:
2c. Responsible party:
2d. Address
Street Address
4401 Dewees Ct
Address Line 2
CRY
Raleigh
Fbstal / Zip Aide
27612
2e. Telephone Number:
(919)422-2525
2g. Email Address:*
mark@markusltd.com
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(if appropriate)
1 c. Ne arest mu n icipal ity / town:
Raleigh
2. Project Identification
State / Province / legion
NC
Q�untry
Wake
2f. Fax Number:
(919)571-7480
2a. Property Identification Number:
0785380819
2c. Project Address
Street Address
4401 Dewees Ct
Address Line 2
City
Raleigh
Fbstal / Zip Code
27612-3501
3. Surface Waters
3a. Name of the nearest body of water to proposed project:*
Richland Cree.
3b. Water Resources Classification of nearest receiving water:*
27-33-11
3c. What river basin(s) is your project located in?*
Neuse
3d. Please provide the 12 -digit HUC in which the project is located.
030202010803
4. Project Description and History
2b. Property size:
7
State / Rovinoe / Region
NC
Country
Wake
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
Significant bank erosion has occured in an approximate 50 foot section of Richland Creek near the intersection of Ebenezer Church road. Over 5 feet of bank has been eroded
threatening the root structure of several 24" diameter trees. The land is within 10' of a City of Raleigh sewer easement.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
r Yes r No r Unknown
4d. Attach an 8 1/2 X11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR)
NC Raleigh West_ 163047_ 2002_24000.pdf 4.64MB
4e. Attach an 8 1/2 X11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR)
Soil Map copy 2.pdf 9.14MB
4f. List the total estimated acreage of all existing wetlands on the property:
.2
4g. List the total estimated linear feet of all existing streams on the property:
350
4h. Explain the purpose of the proposed project:*
Stabilize the bank in area where there is significant erosion
41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:*
Install large rocks along the edge of the creek bank for approximately a 50' section. A mini excavator with a thumb will be used to place the rocks.
4j. Please upload project drawings for the proposed project.
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
r Yes r No
Comments:
Stream is clearly shown on maps
5b. If the Corps made a jurisdictional determination, what type of determination was made?
r Preliminary r Approved r Not Verified r Unknown r N/A
Corps AID Number:
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
r Unknown
5d1. Jurisdictional determination upload
6. Future Project Plans
6a. Is this a phased project?*
r Yes r No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
D. Proposed Impacts Inventory kn
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
❑ Wetlands r Streams -tributaries r- Buffers
❑ Open Waters ❑ Pond Construction
E. Impact Justification and Mitigation .^
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Designated Boulders will be sufficient in size to prevent them from washing away during flood events.
tb. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
The use of a mini excavator with a thumb will minimize the impact to the creek bank
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
r Yes r No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
there will be no significant impact to the stream
F. Stormwater Management and Diffuse Flow Plan (required by DWR) ^�
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
r Yes r No
What type of SCM are you providing?
r- Level Spreader
r- Vegetated Conveyance (lower SHWT)
r- Wetland Swale (higher SHWT)
r- Other SCM that removes minimum 30% nitrogen
rJ Proposed project will not create concentrated stormwater flowthrough the buffer
Diffuse Flow Documentation
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?
r Yes r No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
r Yes r No
Comments:
G. Supplementary Information �'
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
r Yes r No
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 214 .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B.0200)?*
C Yes r No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?*
f Yes r No
3b. If you answered "no," provide a short narrative description.
This project is anticipated to improved water quality by reducing the amount of bank material being eroded by the stream
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
C Yes r No r WA
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?
C Yes r No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
r Yes r No
5d. Is another Federal agency involved?*
r.^• Yes r No r Unknown
5e. Is this a DOT project located within Division's 1-8?
r Yes r No
5f. Will you cut anytrees in order to conduct the work in waters of the U.S.?
r Yes r No
5g. Does this project involve bridge maintenance or removal?
r Yes r No
Sh. Does this project involve the construction/installation of a wind turbine(s)?*
C Yes r No
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
C Yes r No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
An Internet search did not reveal the presence of any endangered species associated with the remediation area.
Consultation Documentation Upload
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
r Yes r No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
Conversation with State Forest Service
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
r- Yes r No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
City of Raleigh historical commission
7c. Historic or Prehistoric Information Upload
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA -designated 100 -year floodplain?*
r Yes C No
8b. If yes, explain how project meets FEMA requirements:
FEMA allows bank stabilization
8c. What source(s) did you use to make the floodplain determination?*
State Flood plain map
M csi ellaneous
Comments
Miscellaneous attachments not previously requested.
Signature
m By checking the box and signing below, I certify that:
• I have given true, accurate, and complete information on this form;
. I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
. I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act');
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
. I intend to electronically sign and submit the PCN form.
Full Name:
Mark Boone
Signature
Sign
Date
12/16/2018
V
Soil Map—Wake County, North Carolina
35° 50' 2" N
70559W 705M 70599D 705830 70M 706010 706020 706030 7XVO
3
Map Scale: 1:670 if prirted on A landscape (11" x 8.5') sheet.
NMete s
0 5 10 20 30
A f
Map projection: Web Mercabx Comer coordinates: WGS84 Edge UTM Zone 17N WGS84
USDA Natural Resources Web Soil Survey
Conservation Service National Cooperative Soil Survey
706050 7060M 706070 70WW 70M ?OMW
3
fn
0
7/15/2018
Page 1 of 3
35" WYN