HomeMy WebLinkAbout20181671 Ver 1_401 Application_20181206MEMORANDUM
November 28, 2018
tv a uepartrrjent ur
Environmental Quality
Received
NOV 3 0 2018
Winston-Salem
Regional Of,
20181671
To: William Elliott, Regulatory Project Manager
U.S. Army Corps of Engineers, 151 Patton Avenue # 143, Asheville, North Carolina 28801
Sue Homewood, Division of Water Resources, 450 W. Hanes Mill Road, Suite 300,
Winston-Salem, NC 27105
Andrea Leslie, North Carolina Wildlife Resources Commission, Mountain Habitat
Conservation Coordinator, 645 Fish Hatchery Road, Bldg. B, Marion, NC 29752
From: Joe Mickey, 283 Timberbrook Trail. State Road, NC 28676, 336-366-2982,
jhmfish _sugy net
RE: Nationwide 13 permit application, Mitchell River, Surry County
As the agent for the Mr. Ned Eldridge, I have enclosed a permit application for a small
streambank stabilization project the Mitchell River, Surry County. The purpose of this project is
to stabilize approximately 100 linear feet of eroding streambank caused by Tropical Storm
Michael.
Thank you for your time and review of this project. If you have any concerns or q ions with
this application, as the applicant's agent, please do not hesitate to contact me. p12
4 Enclosures: Signed Agent Authorization Form DEC 0IR
USACE PCN Form, Sept 29, 2018 Ver 3DEQ-WgTER Project Plan 401 &BUFFER
Topo & Soil Maps
New Submission
Page 1 of 14
Ul.ision of AAtrr Rest) u(c rs
N. L),2 p a rt ro e n t L, T'
Environmental Quality
Received
NOV 3 0 2018
Winston-Salem
Regional Office
Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
September 29, 2018 Ver 3
Please note: fields marked with a red asterisk * below are required. You will not be able to submit the
form until all mandatory questions are answered.
Also, if at any point you wish to print a copy of the E -PCN, all you need to do is right -click on the
document and you can print a copy of the form.
Below is a link to the online help file.
hfps:Hedocs.deq. nc.gov/WaterResources/0/edocl6247041PCN%20Help%20File%202018-1-30.pdf
(hftps://edocs.deq.nc.gov/WaterResources/0/doc/60361 O/Page1. aspx)
A. Processing Information
County (or Counties) where the project is
located:*
/
Add additionalcounty
Is this project a public transportation project?*
Yes p No
This is any publicly funded by municipal,state or federal funds road, rail, airport transportation project.
1a. Type(s) of approval sought from the Corps:*
C9 Section 404 Permit (wetlands, streams and waters, Clean Water Act)
❑ Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
11/15/2018
New Submission Page 2 of 14
1 b. What type(s) of permit(s) do you wish to seek authorization?*
0 Nationwide Permit (NWP)
❑ Regional General Permit (RGP)
❑ Standard (IP)
This form may be used to initiate the standardfindividual permit process with the Corps. Please
contact your Corps representative concerning submittals for standard permits. All required items that
are not provided in the E -PCN can be added to the miscellaneous upload area located at the bottom
of this form.
1c. Has the NWP or GP number been verified by the Corps?*
• Yes 0 No
1 d. Type(s) of approval sought from the DWR: *
check all that apply
401 Water Quality Certification - ❑ 401 Water Quality Certification -
Regular Express
❑ Non -404 Jurisdictional General Permit ❑ Riparian Buffer Authorization
❑ Individual Permit
1e. Is this notification solely for the record because written approval is not required?
*
For the record only for DWR 401 Certification: O Yes 0 No
For the record only for Corps Permit: O Yes ® No
1f. is this an after -the -fact permit application?*
O Yes
0 No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of
Impacts?
If so, attach the acceptance letter from mitigation bank or in4ou fee program.
O Yes
Acceptance Letter Attachment
Click the upload button or drag and drop flies here to attach document
Upload
FILE TYPE MUST BE PDF
https://edocs.deq.nc.gov/Forms/Pre-COnstruction—Notification Form I JAJJ)V@fig
Notification Fonri
New Submission
1 h. Is the project located in any of NC's twenty coastal counties?*
0 Yes
0 No
1j. Is the project located in a designated trout watershed?*
4P Yes Q No
Page 3 of 14
Link to trout information: http://www.saw.usace.arTny.miUMissions/Regulatory-Permit
Program/Agency-Coordinationfrrout.aspx (http://www.saw.usace.army.mil/Missions/Regulatory-
Permit Program/Agency-Coordinationfrrout.aspx)
B. Applicant Information
1a. Who is the Primary Contact?*
Toe- e 01 i c.lcey
1 b. PrimaryContact Email:
/
1 d. Who is applying for the permit? *
O Owner
(Check all that apply)
1c. Primary Contact Phone:*
(xxx)xxx-xxxx
(3,`� 346 -.1 9tfz
® Applicant (other than owner)
1e. Is there an Agent/Consultant for this project?*
0Yes 0No
2. Owner Information
2a. Name(s) on recorded deed: *
A.►'eJ- r- C I aL" id & 4..4s G
2b. Deed book and page no.:
01366 0717 PI%A .Y%4 -,60066.19147S
2c. Responsible party:
(for Corporations)
https:/Iedocs.deq.nc.gov/Forms/Pre-Construction Notification Form 11/15/2018
ivew �iuvrmssion
2d. Address*
Street Address
Y0/ 6, Aue_xue✓
Address Line 2
city State / Province / Region
Ns� I°o�.vt /UG.
Postal /Zip Code
2e. Telephone Number*
(xxx)XXX xxxx
(_336) 38 SO ga_
2f. Fax Number:
0M)moc--XXXX
2g. Email Address:
Add another owner
Country
6c.A.1 i _(:C> �
Page 4 of 14
C. Project Information and Prior Project History
1. Project Information---
Ia.
nformation
1a. Name of project: *
Eldv,d>„� �irvp��v�r
1 b. Subdivision name:
Of appropriate)
1 c. Nearest municipality / town: *
n 0 10.5 0A)
New Submission
2. Project Identification
2a. Property Identification Number:
(tax PIN or parcel ID)
I?S-Zov'et,, 7O.r-
2c. Project Address
Street Address
q'1 IF At14�
Address Line 2
City
2b. Property size:
(in acres)
State / Province / Region
74 re�,tyaer A-)
Postal / Zip Code
2d. Site coordinates in decimal degrees
Page 5 of 14
Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a
survey -grade GPS device) after the decimal place as appropriate, based on how the location was
determined. (For example, most mobile phones with GPS provide locational precision in decimal
degrees to map coordinates to 5 or 6 digits after the decimal place.)
Latitude:'
Longitude: *
ex: 34.208504 -77.796371
3. Surface Waters
3a. Name of the nearest body of water to proposed project: *
M;-ke-AeI/ Ri0e.v-
3b. Water Resources Classification of nearest receiving water. *
Surface Water lookup (httpsJ/nodenr.maps.arcgis.conVapps/webappviewerfindex.htmi?
id=6el25ad7628f494694e259c80dd64265)
fit"°//t ..*,ragov/F'ormsMte-Construction Notification Form 11/15/2018
New Submission
3c. What river basin(s) is your project located in?*
yCO.d i,,�I
Add another river basin
3d. Please provide the 12 -digit HUC in which the project is located.*
O :3(7`O/0/0 -5'0`i
River Basin Lookup (http://ncdenr.maps.arcgis.com/apps/Publicinformation/index.htmi?
appid=ad3aS5aoc6d644a0b97cdo69db238ac3)
4. Project Description and History
Page 6 of 14
4a. Describe the existing conditions on the site and the general land use in the vicinity of the
project at the time of this application: *
C$e Le !3G -k f4old o.ii el iko 'Nei w,- 74,c -
Fwn11-1 f"Sk
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior
phases) in the past?*
O Yes ® No O Unknown
4d. Attach an 8112 X 11 excerpt from the most recent version of the USGS topographic map
indicating the location of the project site. (for DWR)
Click the upload button or drag and drop flies here to attach document
Upload A
File type must be pdf
4e. Attach an 8112 X 11 excerpt from the most recent version of the published County NRCS
Soil Survey map depicting the project site. (for DWR)
Click the upload button or drag and drop flies here to attach document
Upload A -9a,-
- ,
File type must be pdf
https://edocs.deq.nc.gov/Forms/Pre-Construction Notification Form 11/15/2018
New Submission
4f. List the total estimated acreage of all existing wetlands on the property:
D
4g. List the total estimated linear feet of all existing streams on the property:
(intermittent and perennial)
3s'v -'4
4h. Explain the purpose of the proposed project: *
% _sAz41-' /; ze- 0- vk -5 x*� w io .4-
Page 7 of 14
41. Describe the overall project in detail, including indirect impacts and the type of equipment
to be used: *
S A lI A � u syr_
Gt�tc. s �y, �l yb -vCL7 Y �L,�c f ' lea sh �s Cirv� ma i"l� a &A c(
4j. Please upload project drawings for the proposed project.
Cid* the upload button or drag and drop Was here to attach document
Upload A�
File type rust be pdf
S. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
Q Yes p No ® Unknown
Comments:
https://edocs.deq.nc.gov/Fonns/Pre-Construction Notification Form 11/15/2018
Nqw Submission
Page 8 of 14
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
O Preliminary O Approved O Not Verified O Unknown O N/A
Corps AID Number:
Example: SAW2017-99899
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant
Company:
Other.
SM. Jurisdictional determination upload
Click the upload button or drag and drop files here to attach document
Upload
File type must be PDF
6. Future Project Plans
6a. Is this a phased project?*
O Yes ® No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to
be used, to authorize any part of the proposed project or related activity? This includes other
separate and distant crossing for linear projects that require Department of the Army
authorization but don't require pre -construction notification.
No
D. Proposed Impacts Inventory
1. Impacts Summary
https://edocs.deq.nc.gov/Forms/Pre-Construction Notification Form 11/15/2018
New Submission Page 9 of 14
1a. Where are the impacts associated with your project? (check all that apply):
❑ Wetlands tK Streams -tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
E. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in
designing the project: *
✓� Tr'Pe�s+^ 1$µ 1n1 fZGY4Lt.t.z L,-."// A *t A op, #- ifp rr? LLY/NICi�✓Y I...
[,,IP Aeaati!G tx y sr v�-e-p"l, wlrrtw
i ...s �fi� s >fi'1��tJ++- lr.+��% % � 1[+rxy �` 9�► ca- s>tiJrtr �ttarta`+-.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through
construction techniques: *
See- a-44 CL, W- ,
2. Compensatory Mitigation for Impacts to Waters of the U.S. or
Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or
Waters of the State?
O Yes
® No
NC Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the
Wilmington District's RIBITS(https://ribits.usace.amiy.miVribits apexff?
p=107:27:2734709611497::NO:RP:P27_BUTTON_KEY:O) website.
F. Stormwater Management and Diffuse Flow Plan
(required by DWR)
**A Recent changes to the stormwater rules have required updates to this section .***
1. Diffuse Flow Plan
https://edoes.deq.nc.gov/FormS/PTe-Constriction Notification Form ul li r" I
—__ __.AHf1LIULAW11 1VVu1HiatluirrVLIII
New Submission
Page 10 of 14
1a. Does the project Include or is it adjacent to protected riparian buffers identified within one
of the NC Riparian Buffer Protection Rules?
O Yes ® No
For a list of options to meet the diffuse flow requirements, click here
(https:/tfiles.nc.gov/ncdegMater%20Quality/Surface%2OWater%2OProtection/401 /Buffer%
20Ciarification%20MemosfOptions%20for%20Meeting%20Diffuse%20FIow%20Provisions%20of%
20the%20Storwmater%20and%20Riparian%20Buffer%20Protection%20Programs.pdf).
2. Stormwater Management Plan
2a. is this a NCDOT project subject to compliance with NCDOrs Individual NPDES permit
NCS000250? *
OYes ®No
Comments:
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federaUstateAocal) funds or the use of
public (federal/state) land?*
O Yes ® No
2. Violations (DWR Requirement)
2a. is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500),
Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A HCAC 28.0200)? *
OYes 40No
https://edocs.deq.nc.gov/Forms/Pre-Construction—Notification Form 11/15/2018
Ne,w Submission Page 11 of 14
3. Cumulative Impacts (DWR Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in
additional development, which could impact nearby downstream water quality?*
O Yes
® No
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
OYes 0No®N/A
5. Endangered Species and Designated Critical Habitat
(Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
O Yes
�
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
O Yes
5d. is another Federal agency involved? *
O Yes
i No
5e. Is this a DOT project located within Division's 1-8? *
O Yes 0 No
O Unknown
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?*
0Yes allo
5g. Does this project involve bridge maintenance or removal?*
O Yes 0 No
Link to the NLEB SLOPES document: http://saw-reg.usace.army.miVNLEB/1-30-17-signed NLEB-
SLOPES&apps.pdf (http://saw-reg.usace.army.miVNLEB/1-30-17-signed_NLEB-SLOPES&apps.pctf)
5h. Does this project involve the constructioNinstallation of a wind turbine(s)?*
OYes ®No
https://edocs.deq.nc.gov/Fonns/Pre-Construction Notification Form 11/15/2018
NCw Submission
Page 12 of 14
51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be
conducted by machines, such as jackhammers, mechanized pile drivers, etc.?*
O Yes • No
5j. What data sources did you use to determine whether your site would impact Endangered
Species or Designated Critical Habitat?*
A'i6a+{i/
Consultation Documentation Upload
Click the upload button or drag and drop ties here to attach document
Upload
File type must be PDF
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
O Yes ® No
6b. What data sources did you use to determine whether your site would impact an Essential
Fish Habitat?*
S'sfv, -r* limb -d x* -C-Jsk
7. Historic or Prehistoric Cultural Resources (Corps
Requirement)
Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological
data: http://gis.ncdcr.gov/hpoweb/ (http://gis.ncdcr.gov/hpoweb/)
7a. Will this project occur in or near an area that the state, federal or tribal governments have
designated as having historic or cultural preservation status (e.g., National Historic Trust
designation or properties significant in North Carolina history and archaeology)?*
O Yes ® No
7b. What data sources did you use to determine whether your site would impact historic or
archeological resources?*
i eVt'4 iU&/ (tKt�s��iC{�sL f- !p✓c�f Svc_ ' wt1% hr-��� ie.+`rfv� i f�Si
-i ko-Ir. Irz7I is ,4- s Biu-.-!¢
https://edocs.deq.nc.gov/Forms/Pre-Construction Notification Form 11/15/2018
Ncw Submission
7c. Historic or Prehistoric information Upload
Cidc the upload button or drag and drop files here to attach document
Upload
File must be PDF
8. Flood Zone Designation (Corps Requirement
Link to the FEMA Floodplain Maps: haps://msc.fema.gov/portal/search
(https://msc.fema.gov/portaVsearch)
8a. Will this project occur In a FEMA -designated 100 -year floodplain? *
0 Yes O No
8c. What source(s) did you use to make the floodplain determination?*
X S ov top s ,r f= LSF Af A j�tivvd My
�C✓C91'c' � CP_w r Oje-A
Miscellaneous
Comments
Miscellaneous attachments not previously requested.
Cidc the upload button or drag and drop files here to attach document
Upload
File must be PDF or KMZ
Signature
Page 13 of 14
https://edms.deq.nc.gov/Fonns/Pre-Construction Notification Form 11/15/2018
0 , Now Submission Page 14 of 14
® By checking the box and signing below, I certify that:
■ I have given true, accurate, and complete information on this form;
■ 1 agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of
the NC General Statutes (the "Uniform Electronic Transactions Act");
■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the
NC General Statutes (the "Uniform Electronic Transactions Ad");
■ I understand that an electronic signature has the same legal effect and can be enforced in the
same way as a written signature; AND
■ 1 intend to electronically sign and submit the PCN form.
Full Name:*
zs'c' e
Signature
Sign
ate
Illa y le
Submit Save as Draft
https:Hedocs.deq.ne.gov/Forms/Pre-Construction Notification Form 11/15/201§
AGENT AUTHORIZATION LETTER
This agreement made and entered into by and between Joe H. Mickey, Jr., (Agent) and
A2e-4 ("Owner"). The Owner hereby grants the Agent
permission to act as the Owners' agent to obtain all needed permits from all units of
government including, but not limited to, the United States Army Corps of Engineers and
the State of North Carolina to accomplish a stream bank stabilization project on the
Owner's property.
The Owner agrees to pay any permit processing fees required for this project to stabilize
eroding stream banks on an unnamed tributary to South Fork Mitchell River (known
locally as Beaver Creek) on the Owner's property in Surry County, North Carolina.
Signed:
9/29/2017
AW It �� Date:
(Property 0%%krr's Signature or designate►
918 Devotion Rd.
( Address)
Thurmond, K 28683
(Town. state, zip code)
336-382-8082
(Phone number)
Joe Mickey. Jr.
River Bend Consulting
283 Timberbrook Trail
State Road, NC 28676
336-361-2982 jhmfisW- surry.net
Agent/date: /
Eldridge Streambank Stabilization project on the Mitchell River,
Surry County, North Carolina
Prepared By
Joe Mickey, State Road, North Carolina
For
Ned Eldridge, 401 East Farris Avenue, High Point North Carolina 27262
November 1, 2018
Introduction
Mr. Ned Eldridge proposes to stabilize approximately 100 linear feet (If) of eroding streambank along
the Mitchell River with rock toe protection and two small rock vanes to prevent further bank erosion that
occurred following Tropical Storm Michael on his property. The project site is located on the Mitchell
River, Surry County, North Carolina (Figure 1 and Figure 2). A site visit was conducted on November
22, 2018 by Joe Mickey to determine the type of measures needed to stabilize the eroding streambanks.
This plan identifies the stream issues and measures to correct the streambank erosion problem. Surry
County is a trout county and the Mitchell River is classified as C -Trout, Outstanding Resource Water by
the State of NC. It should be noted that several streambank stabilization projects have been completed in
the past on the Mitchell River upstream from this site.
Project Description and Methods
Bank Stabilization
The unprecedented flooding from Tropical Storm Michael caused the failure of the Kapps Mill Dam
0.4 mile upstream from this site. This flooding caused 501f feet of bank failure at one location (Figure 3)
and increased bank erosion along 501f at another location (Figure 4) on Mr. Eldridge's property. Where
the bank failed a rock toe structure with bank re -shaping (Figure 5) is proposed to restore the bank and
prevent future bank erosion. At the other location two short rock vanes (Figure 6) are proposed to
stabilize an eroding bank.
Natural stream restoration guidelines will be based upon principles developed by Dave Rosgen, 1996.
Less than 500 sq. ft. (0.011) of soil will be disturbed during construction. Once the structures are
installed, the bank will be re -sloped and seeded and protected with a straw ground cover. Live stakes of
silky willow, silky dogwood and elderberry will be installed to provide long term bank stability.
Conclusion
This streambank stabilization project will impact less than 0.011 acres of stream and streambanks.
Once completed, the project will eliminate bank erosion and failure along the Mitchell River on the
Eldridge property.
Literature Cited:
Rosgen, D. L. 1996. Applied river morphology. Printed Media Companies, Minneapolis,
Minnesota.
� e� n dad I�ai ps,mt am si4 Kapt�s Mill (load
,fir, � ' + � - t ,•��' ✓' ♦ '
f
FIGURE 2 Project site topographical and soil maps.
FIGURE 3. 50 linear feet of bank failure due to Tropical Storm Michael to be stabilized by rock toe and
bank re -shaping.
3
0 14
. �i-
FIGURE 3. 50 linear feet of bank failure due to Tropical Storm Michael to be stabilized by rock toe and
bank re -shaping.
3
FIGURE 4. Fifty feet of eroding streambank to be protected by two rock vanes.
FIGURE 5. Typical rock toe structure showing rock to protect the toe of the bank and bank re -shaping
above the rock toe.
4
FIGURE 6. Typical rock vane structure. The rock vane should have a 4% to 12% slope from top of
bankfull or inner berm bench to streambed. There should be no gaps between the rocks in the structure.
Note: This rock vane is in the Mitchell River approximately 1 mile upstream from the Eldridge project
site.
Topographical map for Eldridge site on the Mitchell River, Surry County, NC
Soil map for Eldridge site on the Mitchell River, Surry County, NC