HomeMy WebLinkAbout19890136 Ver 1_Complete File_19890101....1+.4
DIVISION OF ENVIRONMENTAL MANAGEMENT
WATER QUALITY SECTION
zts ?oncernYng an application for State Federal CAMA Permit(s) from
A. PERMIT:
This office cannot comment on this project until after the close of the Section
401 Certification Public Comments Period.
This office has no objection to the issuance of the permit(s) for the proposed
\project with the following conditions:
That the activity be conducted in such a manner as to prevent significant
increases in turbidity outside the area of construction or construction-
related discharge (increases of 25 NTU's or less are not considered
significant).
That the instream turbidity not be increased by more than 50 NTU's as a
result of the proposed activity.after a reasonable opportunity for dilu-
tion and mixture.
That turbidity levels in shall not be increased
by more than 10 NTU's as a result of the proposed activity after a reason-
able opportunity for dilution and mixture.
B. CERTIFICATION STATUS:
Certification is not required
for this project.
Certification is required for
this project. Such action to
process the certification has
been initiated. Proposed
Certification will be acted on
or after
The proposed project is certified
under General Certification
A) No. 1179 issued on January 25, D) No. 1431 issued on October 16,
1977, for sewer line construction 1980, for boat ramp construction.
B) No. 1272 issued on November 10, E) No. 1664 issued on September 8,
1978, for bulkhead construction. 1983, for Rip-Rap Placement.
C) No. 1273 issued on November 10, F) No. 1665 issued on September 19,
1978, for discharges of liquid 1983, for incidental bridge
effluent from diked upland disposal construction.
areas.
f
WATER_QUALITY SECTION
DIVISION OF ENVIRONMENTAL MANAGEMENT
DIVISION OF ENVIRONMENTAL MANAGEMENT
MEMORANDUM
DATE : /- 3 /- Y7
TO: Bill Mills
Operations Branch
FROM: James H. Gregson S""-
Wilmington Re. nal Office
THROUGH: Donald Safri
Wilmington Regional Office
FFR 0 l`89
QUALITY SECTION
SUBJECT: Regional Office Review & Recommendations
Application for Permit for Excavation and/or Fill
?`?oP? Cap " /Q"c? 7i' /°(Q
PROJECT DESCRIPTION: ?D a?C
ADJACENT WATER BODY: yCd C'l- ?? /f/ 2 A(-t4
CLASSIFICATION: S-c Status: P 1015 0
The project. has been reviewed to determine impacts to water
quality. The appropriate comments below have been checked:
0() The project will/ ill n require a 401 Water Quality
Certification.
( ) The project complies with the General 401 Water Quality
Certification # for
(?() The proposed project should be done in such a way as to
not cause the turbidity outside the immediate
construction area to exceed as-- NTU.
This office has no objection to the project as proposed.
JHG:
cc: DCM - w. 0-&V10 ti03 e
CF, WiRO
A
DIVISION OF COASTAL MANAGEMENT Lat:34042129"
FIELD INVESTIGATION REPORT Long:76°37101"
*
1. APPLICANT'S NAME Seth Hiller
2. LOCATION OF PROJECT SITE Lot #5, Smithwick Subdivision, end of
Lennoxville Road,, Taylor's Creek & North River, Carteret County;
* SEE 1984 AERIAL PHOTO #33-1206 (V-3)
3.
4.
INVESTIGATION TYPE: DREDGE & FILL_
INVESTIGATIVE PROCEDURE:
(A) DATES OF SITE VISIT 11/88
(B) WAS APPLICANT PRESENT NO
CAMA X (ONLY)
12/88
YES
5. PROCESSING PROCEDURE: APPLICATION RECEIVED December 12, 1988
OFFICE Morehead City
6. SITE DESCRIPTION: (A) LOCAL LAND USE PLAN Town of Beaufort
LAND CLASSIFICATION FROM LUP Rural
DEVELOPMENT CONSTRAINTS IDENTIFIED IN LUP NONE
(B) AEC(S) INVOLVED: OCEAN HAZARD ESTUARINE SHORELINE
COASTAL WETLANDS PUBLIC TRUST WATERS X
ESTUARINE WATERS X OTHER
(C) WATER DEPENDENT: YES X NO
(D) INTENDED USE: PUBLIC PRIVATE X COMMERCIAL
(E) TYPE OF WASTE WATER TREATMENT: EXISTING NONE
PLANNED septic tanks
(F) TYPE OF STRUCTURES: EXISTING bulkhead
PLANNED two (2) homes & docks
(G) ESTIMATED ANNUAL RATE OF EROSION -0- SOURCE bulkheaded
7. HABITAT DESCRIPTION:
(A) VEGETATED WETLANDS
NONE
AREA
DREDGED FILLED OTHER
(B) NON-VEGETATED WETLANDS:
public trust waters pier
(C) OTHER:
NONE
(D) TOTAL AREA DISTURBED:
8. PROJECT SUMMARY:
docking for 2 indiv
2735 sq. ft.
t a pier to Drovide
s. Each lot will have a single-familN
tend 95' into Tavlor's Creek and 110'
2735 sq.ft
into North River.
A
FIELD INVESTIGATION REPORT - SETH HILLER, CARTERET COUNTY
PAGE #2
9. NARRATIVE DESCRIPTION: The property consists of one (1) 2
acre tract (Lot #5) in Smithwick Subdivision which has been
subdivided into two (2) 1 acre lots. The lots are located
at Lennoxville Point, at North River and Taylors Creek,
Beaufort, Carteret County, NC. The property is at the end
of SR 1310. The lots are sandy loam and are vegetated by
large live oak trees and various grasses. The only existing
man-made feature on the tract is a wooden bulkhead.
The applicant's proposed project is to build a common dock
for the two (2) lots. As proposed, the project consists of
an 875 sq. ft. deck in the landward center of a 75' x 6'
pier and a 135' x 6' pier. The 75' pier is proposed with
two (2) tie pilings 20' out from the pier, thus, the total
distance offshore will be 95' into Taylors Creek. The 135'
x 6' pier is on the North River side of the property, and
actually will extend only about 110' offshore since it runs
from the shoreline at an angle.
The applicant is also proposing to construct two (2)
single-family homes on the highground, each about 2,300 sq.
ft. These will later be permitted as minor development, or
as a permit modification.
10. ANTICIPATED IMPACTS: The 95' pier (includes tie pilings) on
Taylors Creek may cause some navigational problems. Also,
the pier located 110' out into North River may cause some
navigational interference. There is a small boat channel
here which is constantly changing due to shoaling in North
River.
The project, as proposed, would occupy 2735 sq. ft. of
public trust waters.
The waters of Taylors Creek and North River, at this project
site, are closed to shellfishing by the Division of Health
Services and classified as 'SC' by the Division of
Environmental Management.
PREPARED BY: W. DAVID NOBLE
DATE: JANUARY 24, 1989
.? s
Please type or print. Carefully describe all an-
ticipated development activities, including construc-
tion, excavation, filling, paving, land clearing, and
stormwater control. If the requested information is
not relevant to your project, write N/A (not ap-
plicable). Items 1-4 and 8-9 must be completed for
all projects.
d. Describe the plann(ld use of the project.
a. Size of entire tract QC'
b. Size of individual lot(s) a G
a. Name G c. Elevation of tract above mean sea level 7r Na-
Address tional Geodetic Vertical Datum
City State No C,
4n±l d. Soil type(s) and texture(s) of tract QA
Day phoneq
Zip
Landowner or ?Autho;izelage?i
7 9?tsz{ e. Vegetation on tract
b. Project name (if any)
f. Man-made features now o tract
c. If the applicant is not the landowner, also give ?- (?
th44 owner's a and address.
n4m
t?Jtll
tam a iG Sys o
4
g? What is the CAMA Land Use Plan Classifica-
a??
.
G of /
T tion of the site? (Consult the local land use
o plan.)
Crliiae.l,ti lV. C. 2?rj_Ih Conservation Transitional
Developed Community
Rural Other
h. How is the tract zoned by local government?
T
a. Street address Qtr s condary road numper Lv+5
S11L1 ?/"?/ ?'Jb?j?? ? 1?1 L?NaeYN1IIG
b. City, t wn Comm ity, r landin k
c. County 1 G? • 1-89'1 to,
d. Is proposed work within city limits or planning
jurisdiction?
e. Name of body of waterNnearest project
0 =ect
i. How are adjacent waters classified? SA
j. Has a professional archaeological survey been
carried out for the tract? NO
If so, by whom?
W'i
Complete this section if the project includes any
upland development.
a. Type and number of buildings, facilities, or
structures proposed
b. Number of lots or parcels o
a. Describe all development activities you propose c. Density (Give the number of residential units
(for example, building a home, motel, marina, and the units per acre.) o
bulkh ad, or pier).
• d. Size of a e to be raded or disturbed kokL
2 '? CKwb r .h1_
e. If the proposed project wi disturb more than
one acre of land, the Division of Land
If you plan to build a marina, also complete Resources must receive an erosion and sedimen-
and attach Form DCM-MP-2. tation control plan at least 30 days before land
b. Is the proposed activity maintenance of an ex- disturbing activity begins. If applicable, has a
isting project, new work, or both? sedimentation and erosion control plan been
submitted to the Division of Land Resources?
C. Will the project be for community, private, or
?•
commercial use? y? f. Give the percentage of the tract within 75 feet
t' of mean high water to be covered by im-
permeable surfaces, such as pavement, p/
S
buildings, or rooftops.
`o
HD AW.0- Okly 2610 'JrV';iJ
g. "List the materials, such as marl, paver stone,
asphalt, or concrete, to b us for paved
y?
surfaces. ltila el - S 1 , ? 121 Me .
h. If applicable, has a stormwater management
plan been submitted to the Division of En-
vironmental Management? ?+o ?I -,-- - L 6.
i. Describe proposed sewage dis osal and/or waste
water treatment facilities. 40,414,
b. Ambdnyt AAAmateVa'l toA e e_xecavated .from
below water level in cubic yards 0
c. Type of material
d. Does the area to be excavated include marsh-
land, swamps, or other wetlands?
e. High ground excavation, in cubic yards
f. Dimensions of spoil disposal area
g. Location of spoil disposal area
h. Do you claim title to the disposal area?
If not, attach a letter granting permission from
the owner.
Will a disposal area be available for future
maintenance? 1.
If so, where?
Does the disposal area include any marshland,
swamplland,!or water areas?
Will the fill material be placed below mean
high water?
Amount of fill 'In cW yards
Type of fill material
Source of fill matI 1
Will fill mate?*al%be placed on marsh or other
wetlands?, "
Dimensigg, o e wetland to be filled
How wi41''ecavated or fill material be kept on
sitVnd erosion controlled?
.ti
j. Have these facilities received state or local
approval? ? " b ? di-Ll,
-
k. Describe existi
ng treatment facilities.
& i.
j.
1. Describe location and type of discharges to
waters of the state (for example;, surface runoff, k.
sanitary wastewater, industrial/commercial
effluent, or "wash down"). 1.
1,(e h?N dL.?S m.
n.
m. Water supply source nWYd 00 o.
n. If the project is oce ont development,
describe the steps that will be taken to main- p.
tain established public beach accessways or pro- q•
vide new access.
m»,bo. If the project is on the oceanfront, what will
be the elevation above mean sea level of tl e
first habitable floor?- 4-0 bl ike `(A
"JYf
,EXCAVATION -ANDt FILi? ?:
4JNFORMATION -7 ?z;
a. Describe below the purpose of proposed excava-
tion or fill activities (excluding bulkheads,
which are covered in Section ?).
r. What type of construction equipment will be
used (for example, dragline, backhoe, or
hydraulic dredge)?
s. Will wetlands be crossed in transporting equip-
ment to the project site? If yes, explain
the steps that will be taken to lessen en-
vironmental impacts.
Length Width Depth
Access channel
(MLW) or (NWL)
Boat basin
Other reak-
water, i
boat ramp,
rock jetty)V,
v
Fill placein
wetland or below
MHW
Upland fill
areas
a.
\ b.
C.
d.
+. e.
D 988 r_.?
1 JD -, ig
' SHORELINE -ST L IZ 'PION`
Length of bulkhead oralprap
Average distance 1,#rward of mean high water
or normal wate evel
Shoreline eroabO ring preceding 12 months,
in feet 1101% .
Type of Wead material
AmotjpLo fill, in cubic yards, to be placed
below r1liean high water
Type of fill material
2
W,_ r
` W ;?9 r
v4
A list of previous state or federal permits issued
for work on the project tract. Include permit
numbers, permittee, and issuing dates.
In addition to the completed application form, the
following items must be submitted:
A copy of the deed (with state application only) or
other instrument under which the applicant claims
title to the affected property. If the applicant is not
claiming to be the owner of said property, then for-
ward a copy of the deed or other instrument under
which the owner claims title, plus written permis-
sion from the owner to carry out the project.
A check for $100 made payable to the Depart-
ment of Natural Resources and Community
Development to cover the costs of processing the
application.
A signed AEC hazard notice for projects in ocean-
front and inlet areas.
An accurate work plat (including plan view and
cross sectional drawings) drawn to scale in black
ink on 8 V2 x 11 white paper. (Refer to Coastal
Resources Commission Rule 71.0203 for a detailed
description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if 16
high quality copies are provided by the applicant.
(Contact the U.S. Army Corps of Engineers regard-
ing that agency's use of larger drawings.) A site or
location map is a part of plat requirements and it
must be sufficiently detailed to guide agency per-
sonnel unfamiliar with the area to the site. Include
county road (SR) numbers, landmarks, and the like.
A stormwater management plan, if applicable, that
may have been developed in consultation with the
Division of Environmental Management.
A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners. These
individuals have 30 days in which to submit com-
ments on the proposed project to the Division of
Coastal Management. The applicant must advise
the adjacent landowners of this opportunity by sen-
ding a copy of the permit application to them by
registered cic„certified mail. This notification is re-
quired by G.S. 113-229(d).
Name Vi - v
Address
EA)Enzdua W2,
Name
Address
Name 1WW W4LJ:W
Address 16 Z WULAPto CC PM
?3pt,t:1?W N.C. 27G1'K
A statement on the use of public funds. If the
project involves the expenditure of public funds, at-
tach a statement documenting compliance with the
North Carolina Environmental Policy Act
(N.C.G.S. 113A-1 to 10).
?SION Tp ENTER' ±ON L ?IyD k t?
Any permit issued in response to this application
will allow only the development described in the
application. The project will be subject to condi-
tions and restrictions contained in the permit.
I certify that to the best of my knowledge, the pro-
posed activity complies with the State of North
Carolina's approved Coastal Management Program
and will be conducted in a manner consistent with
such program.
I further certify that I am authorized to grant, and
do in fact, grant permission to representatives of
state and federal review agencies to enter on the
aforementioned lands in connection with
evaluating information related to this permit ap-
plication and follow-up monitoring of project.
This is the b+ day of 17FGEMP.?EP, ,
1?'G.? ?RC?I tT6CT.
Landowner or Authorized agent
Send the completed application materials to the
Division of Coastal Management Office nearest you
and the U.S. Army Corps of Engineers. See the
map on the inside front cover for the appropriate
DCM office and addresses and phone number.
Q FMF7
DEC 1 2 1988
L u
'?A-Oj
r-4 lld??t*vlq 00,
t
_______ _________ ___-_
i
VERT °IRT L SMITH ? 1 B.. ORT ue 151?"'M'%) U' ", • \ t ?!' 3 6.
sue D
ITE / 0 HEAD
RU SELL c117 R B PIER I a 1" f 6, 2 C4 73 0 2 335 a 4 1 a?3y/ qM 3 2 5 I, a 2
L flAllW i (? r 4 3 S14 Goose Bay o
LANE' 0 l 70 is 0 134 Do n a }
2 1PO r h \ s I01 A.. 0 3 14 it ?. I GQ?
:HE DCI MO EADSP 1 y,? I allen0lThEee) \ 2 133 a 1343 3 o y t
CL t t 0 t BEMY-QRT Its is 6 t11)m f
???? a ? / T A UL Wry TpTd , B« 4 0. ? 9 l;a GIOU ster a 2 r Piles ells Pt 0 - 2
_N Cr as Fr _ Ctrab - _
__ = ao T 0 R C lad 2 di 1W Ca¢I 3 PA 4 37"FIG 2'/ ac 4M j
- Radio Towe Y 6 ¢ I 3 ?i 4 p e g
4M _ rate vor yy k j 1400 kHz (WB0 0 k II I I Glouceste? I ne of orsep
t ?' ' •• Termi 1 4? 1 1"" P Oh 6 ` 4 M + 3
!.' 61 „men I a?B C?? 2 r 9 sc Z%aseC 4 F I? 4see 114h
y 'oltNr
.' - xville v 4 THE $ 3M
1 ??`S?Otae°2i 5k F 3 ?A 9? 0~FI i 4FI F6lt - ` - rea 3 4s? ^FI R If
f 4 14 4 IB" 4see 15h 4M
I 2« ZC1 1°Ok t OQ 4 le -- - 3 FT Grs t ?owpenis/? ?Q
INE LAB' 0 HD PWR estmouth `oe R 12" ! Q
e 4 0." ED H& s TN CL 7 R ?y eb ar 4
y? 4s \r IF 5 ' ss5 I A IS s/r y?n O?Fl R 4wc 15h 311111 ? AGO M ? 2? e1 !?+ ii TIDAL DIFFERENCE
m_ E P R ? To D ISLA Spires 4 o R HAMPTON ROA
FIR 2 Haz 2??b a Shell Point + 8 „ ??O
itik, I
?? FI T I ftt6 t Rta o. K 20AEY e"4P"6"0 FIR15h3M
a 2 3 F h t MOTE4 rs 94d/?` sr ?Q
K1KS AQID S - F1 ?` 14 I P I PA Md 3 28 II esee 2 s a°` y 5 ° GJ
9YS .lvvr x _5 ID JA « E, ?,? 1 15h "el3 2 h 1 Shell 4?`,r R4 Bt 1 24
RN-16- 26 Ine S 22 s 13 9 5'Oi G ?Ir ?' I I 13 5 I I IGO Pt 7 R R 4seeM tsh?is V° `g c
42 h 9 1Y "F 15h 31111
Rush O (\
42 24 15 t c ;; 5 tittle un Ori 3 rIP?°° Littl Dee Iogpen P hd l
3 21 0 151 5 3 cCockle Ma Mar h Is? gQy O 12144 b,h i1h TIJAL DIFFERENCES 35R.64hIM yq « ,,',
44K 'scontin d "7 IG 2'? I R Grs r
Wr ck Ds saI Are 10 rY B pp „t< . ?1 1 IS
Mc HAMPTON ROADS 35 2n Is 3 10 4 1B 1 ` 15 5 3 5 3 J, U) 11111-34 3 J? 31 28
:) is
3 Gunnin 0 -6 4
gyS 36 I9 2! 2T \ at) a ? 22 NOTE: S
50 48 14 I 20 22 \ Fi?`?R 27 foe S Grs 2 as It 4see14h3M Is O (? VARIOU 29 i
Ob truction 1 4seo 2\ :- AUT N " ?pp R"30" no IS 0 37 SUIONS
r0 L
1
%
Fi h Haven W S 43 I 1 t 29YS 37 4 \ p B DEN INLET ATIONS
uth mi depth 23 hl 97 39 \? ?.Q `' c he clitnne Is su to Conti Moisgan x311 1!1.75,71 A 6sa,? P 25 31
Pump Site (dredged mate ia0 I 33 S \ e1
fromsurve 1 25 / 40 !1 s_ Bouysa beacons at eg 11 14113M V 39 42
Depths
51 Y? K1aa 1 I I 44 42 32 eFause they are frequ nu
dated 1977.78 \ ) -, ad
5 42
2 ?sition. Berg
50 5 ? e?, 10 9YS 41 32 SjD 4 p ` 7 : OraSS S s 5h p Is S, R ?p 4s
24
60's 524032 09 50 3feeTrRT/nee 46 9 \ 0 5 e s D 2 ?Great30Vblte? c hrd
47 33 ?? bd 35 26 \ Marsh urst IS 0 34
52 fauth min depth 23 ft) 1 41 46 46 - 41 o d0 Is -aIp 2 21 "
S 51 39 i4 50 Yne S 36 25 \ I d7 ? R 70 0 '?
50 ! AdS SA K Zit 3 u, ui 11u11n11nu /q
35 21 \ k is ? 22b \ sda„ r'?ir
---- ---45---- - -- 04P
47 SSG. BFLL APR-NO a 33 8
36 29 49 \
brS 46 ONSLOW45 43 BA Y t?O35Mf' z9 2? x `tJ`` SO 3p0 puau, Will., hu'I'014"'?nr/,, q
APR- r
47 48 49 51 51 BI 41 43 dn"M.- ??GJ 6 ,\` `"v s s 1' I I?? 1 I s f r?Q' / 0
4 IQ
51 49 48 MAY-AU AYS 39. 8rG' 11-4"R 6 re I oc`4c , 10 ; 1? pGN TIC I %
51 52 51 51 7 0 26 b c °!
4B 2• FIR N d I} o 0 36 43'
brS ties des 50 48 46 428?kw?atFir sec 2 M IOaTH US 0OS 37 52?
1 f4 ,
\ c
51 49 50 47 ,, ?KIsK?a ,? I Issec N 31
51 51 bis SSh `IM X45 WAR Fl ° R h 2 ? Ant ?I 26 43
51 So 51 so. 51 MAY-JUNE 41 3*
y 'W EISE911
52 SEP-NO V 44 rec (? REAS
VAR 7 4 3 N ° cl ANNUAL +C
50 6
52 4
9YS MOREHEAD CITY HARBOR CHAN EL DEPTHS 52 OCT-NO V 16 hrd 21 O
t j - ® 46
a
53 CORPS OF ENGINEERS REPORT OF OCT. 1978 A D SURVEYS TO SEPT. 1918 =}, 44 43
. { wee- E':'-ID n
OOKOU N
J?I?IE- G CA 0 KOUT 25' 40
b' S Control mp depths from seaward in leer an Mean Low W er MLW P I 55 52 4 0
I I roect Dimensions 47 5 ` ARD STATION
[Ou'Left
left Right Right 51 40 ryry,, AR 29 length Depth APR-NOV C$„ 'N 21-'-:&-
49 0-sO Oaf ?. %/ \?
side Inside Insidedutsldel Width )Haut. MlW I - SPANISH '/ne 5^?
Name of C annel Ouanel Ouaner Quarter0uaner l to of Survey (Feet) Mites) (Feet) I 46 ?M ?4 1 Dunes Y, ..?'`,