HomeMy WebLinkAbout19890030 Ver 1_Complete File_19890101I. -
DIVISION OF ENVIRONMENTAL MANAGEMENT
WATER QUALITY SECTION
Comments concerning an application for State Federal CAMA Permit(s) from
A. PERMIT:
This office cannot comment on this project until after the close of the Section
401 Certification Public Comments Period.
?,?This office has no objection to the issuance of the permit(s) for the proposed
')roject with the following conditions:
That the activity be conducted in such a manner as to prevent significant
increases in turbidity outside the area of construction or construction-
related discharge (increases of 25 NTU's or less are not considered
significant).
_ That the instream turbidity not be increased by more than 50 NTU's as a
result of the proposed activity after a reasonable opportunity for dilu-
tion and mixture.
That turbidity levels in shall not be increased
by more than 10 NTU's as a result of the proposed activity after a reason-
able o ortut?it fob sluu,t on nd ixtu e
PP c fl%c%}tU??Q%t? tCu -( Cv?
B. CERTIFICATION STATUS:
_ A Certification is not required
for this project.
Certification is required for
this project. Such action to
process the certification has
been initiated. Proposed
Certification will be acted on
or after
The proposed project is certified
under General Certification
A) No. 1179 issued on January 25, D) No. 1431 issued on October 16,
1977, for sewer line construction 1980, for boat ramp construction.
B) No. 1272 issued on November 10, E) No. 1664 issued on September 8,
1978, for bulkhead construction. 1983, for Rip-Rap Placement.
C) No. 1273 issued on November 10, F) No. 1665 issued on September 19,
1978, for discharges of liquid 1983, for incidental bridge
effluent from diked upland disposal construct ion.
areas.
WATER QUALITY SECTION
DIVISION OF ENVIRONME NTAL MANAGEMENT
DIVISION OF ENVIRONMENTAL 14ANAGEI-ENT
MEMORANDUM
Date: March 22, 1989
To: Bill Mills
Operations Branch
From: James H. Gregson
Wilmington Re ional Office
Through: Donald Safri
Wilmington Reg onal Office
-CEIVED
MAR 2 0 i 89
VA', ER ` IALITY SECTION'
Subject: Regional Office Review and Recommendations
Application for Permit for Excavation and/or Fill
Project # 8903-I
Boathouse Marina
New Hanover County
PROJECT DESCRIPTION: The applicant is proposing to construct,a
dry stack storage building and a new dock.
ADJACENT WATER BODY: Bradley Creek
CLASSIFICATION: SC
STATUS: Closed
The project has been reviewed to determine impacts to water
quality. The following comments have been provided.
1. The project will not require a 401 Water Quality
Certification.
2. The proposed project should be done in such a way as to not
cause the turbidity outside the immediate construction are
to exceed 25 NTU.
3. Additional stormwater information has been requested. No
problems concerning stormwater management are foreseen.
This office has no objection to the project as proposed.
JHG:trw
cc: DCM - Marc Botbol
WiRO, CF
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. Applicant's name Boathouse Marina Inc.
2.
3.
4.
5.
6.
7
Location of project site 6334 Oleander Drive along Bradley Creek - New photo
18-226 Grids G-4. G-5
this project.
(B) AEC(s) involved: Ocean Hazard Estuarine Shoreline X
Coastal Wetlands Public Trust Waters X
Estuarine Waters Other
Investigation type: Dredge & Fill X CAMA X
Investigative procedure: (A) Dates of site visit 2/27/89
(B) Was applicant present yes
Processing procedure: Application received 3/1/89 Office Wilmington
Site description: (A) Local Land Use Plan Wilmington - New Hanover County
Land Classification from LUP Resource Protection
Development constraints identified in LUP None for
(C) Water dependent: Yes X No Other
(D) Intended use: Public _ Private Commercial X
(E) Type of waste water treatment: Existing New Hanover County service
Planned N/A
(F) Type of structures: Existing Dry stack storage, docks - office - shop
Planned Dry stack storage - dock
(G) Estimated annual rate of erosion N/A Source
Habitat description:
AREA
8.
Dredged Filled Other
(A) Vegetated wetlands:
N/A
(B) Non-vegetated wetlands:
Open water Approx. 275 s.f.
(C) Other:
Highground developed Approx. 3645J s.f.
(D) Total Area Disturbed: Approx. 275 s.f. Approx. 36450 s.f.
Project Summary The applicant proposes to construct a dry stack storage
building, and a new dock as part of phase II of this project
Boathouse Marina Inc.
Page two
9. PROJECT DESCRIPTION
The project site is located on the south bank of Bradley Creek just downstream
of the Bradley Creek Marina. It is the site of the Boathouse Marina which was
permitted in 1985 - permit 11178-85. This permit was renewed on 1/24/89.
At the northeastern side of the property, there is a fringe of Smooth Cordgrass
(Spartina alternaflora) and landward of the fringe at the extreme east is mixed
"404" type wetland. A 30' right-of-way divides the applicant's property from
the neighbor to the east. A 15' x 60' strip of property extends along the
shoreline from the applicant's property to the west. This extends the
applicant's riparian access more or less in front of a portion of the Marina
property. Structures now existing on the shoreline consist of a bulkhead that
extends from east to west approximately 165'. A travel lift is'located on the
east side. There are presently three floating docks. The westernmost one is
approximately 150' long x 8' wide. The middle dock is 85' long x 8' wide and
the eastern dock is 153' long x 8' wide. The highground property consists of a
dry storage facility measuring approximately 190' x 130'. There is also a 42'
x 50' shop with an attached 15' x 35'supply area.
The applicant proposes to construct phase II of the project. This will consist
of the construction of a dry stack storage measuring approximately 110' x 270'
long. This structure will be located approximately 280' from the mhw and will
provide storage for approximately 233 boats ranging from 12' to 33' in size.
Also proposed is the relocation of the middle floating dock closer to the
eastern dock and the construction of a new dock measuring approximately 34' x
8' to be located next to the western dock (see plan). Repairs of the existing
concrete slabs is also proposed.
10. ANTICIPATED IMPACTS
Based on the plans submitted with the- application, the majority of the
highground will be impervious. Innovative designs are proposed to compensate
which according to D.E.M. are acceptable. While minimal impact is to be
expected from the modification of the dock system, the addition of 233 dry
storage slips (which will bring the boating facility to a grand total of 425
boat slips) is causing some concerns from the public as well as staff. This
permit application is being contested by the riparian neighbor, Mr. John
Tinney.
Submitted by: Marc Botbol
Office: Wilmington
Date: March 9, 1989
Please type or print. Carefully describe all anticipated
development activities, including; construction, excava-
tion, filling;, paving;, land clearing, and storm water con-
trol. If the requested information is not relevant to your
project, write N/A (not applicable). Items 1-4 and 8-9
must be completed for all projects.
1 Applicant
If you plan to build a marina, also complete and
attach Form DCM-MP-2.
b. Is the proposed activity maintenance of an
existing project, new work, or both?
S ofk
c. Will the project be for community, private, or
commercial use?
a. Name. Z oz ?lo u ae, a T.
O lea ? -- r'?. ? d.
Address 33 4
City State tJ c
Zip Z 8 ¢ 03 Day phone 9 s"3se
Landowner or ? Authorized agent
b. Project name (if any) o a u s e
. P'/ , " 2
c. If the applicant is not the landowner, also give the
owner's name and address.
J a L_e- _P4c 7,,,S, / 'l? O • Eox -7-7(,
yv.'," hf ?/c zero
2 Location of Proposed Project
a. Street address or secondary road number
- 3,3 4 0 /'.. , d' , T" , V t
b. City, town, community. or landmark
c. County_ 1Je cJ //.,
d. Is proposed work within city limits or planning
jurisdiction? IJo
Describe the planned usepf the roject.
-Llc._??i 4St ac<Q f1c? Of t"'C< S l t 4,
4 Land and Water Characteristics
a. Size of entire tract 4 G A"
b. Size of individual lot(s) N/g
c. Elevation of tract above mean sea level or
National Geodetic Vertical Datum
C" o -i- 0 2 7-
d. Soil type(s) and texture sJ1 of tract /
KenCi•tlv,'??r - /VcY rc J cti,I S ?L
e. Vegetation on tract_ Cl4.c_ f.
Man-made features now on tract ?h ar< l
What is the CAMA Land Use Plan Classification of
the site? (Consult the local land use plan.)
9.
Conservation Transitional
Developed Community
Rural ( Other -k
How is the tract zoned by local government?
'2-'L
e. Name of body of water nearest project h.
r4,14 Y Cry e- K
3 Description and Planned Use
of Proposed Project
a. Describe all development activities you propose (for
example, building a home, motel marina, bulkhead,
or pier). I,' 1 fr v J, .
, o.
?• rl C_O'k JGf /. -2 ?/ eh/ laT<
11 T l rs c 1 S2 0 u+I J< ? ` r?,'
i. How are adjacent waters classified?
'5- c
j. Has a professional archaeological survey been
carried out for the tract? M- If so, by whom?
-K?;?•-tip; ??`- "`:.'?'?. ?',,,,?
._ ,i
5 Upland Development
Complete this section if the project includes any land
development.
a. Type and number of buildinggs, facilities, or
structures proposed 1 str? ?4
b. Number of lots or parcels 1
c. Density (Give the number of residential units and the
units per acre.) t.t //+
d. Size of area to be graded or disturbed
2.S 4,
e. If the proposed project will disturb more than one
acre of land, the Division of Land Resources must
receive an erosion and sedimentation control plan at
least 30 days before land disturbing activity begins.
If applicable, has a sedimentation and erosion
control plan been submitted to the Division of Land
Resources? _ `/e r - 4o t\(c v,, (f f. Give the percentage of the tract within 75 feet of
mean high water to be covered by impermeable
surfaces, such as pavement, buildings, rooftops.
8o go
g. List the materials, such as marl, paver stone, asphalt,
or concrete, to be used for paved surfaces.
h. If applicable, has a stormwater management plan
been submitted to the Division of Environmental
Management? ve r
Describe proposed sewage disposal and/or waste
water treatment facilities.
10un v 1' A?cCJ /?1?? cVr'
j. Have these facilities received state or local approval?
,-/C s
k. Describe existing treatment facilities.
1. Describe location and type of discharges to waters of
the state (for example,'surface runoff, sanitary
wastewater, indust•n` al/commercial effluent, " /wIash
down"). C7uWh we f?- 61
QUc, ICS tr'C C IC d S?p to l•lc['' 1sa l.... 1 4)"
m. Water supply source -P, ? /, ?_ , 4,' /,'l,
n. If the project is oceanfront development, describe
the steps that will be taken to maintain established
public beach accessways or provide new access.
t.r A
o. If the project is on the oceanfront, what will be the
elevation above mean sea level of the first habitable
floor? t,t/,-+
6 Excavation And Fill Information
a. Describe below the purpose of proposed excavation
or fill activities (excluding bulkheads, which are
covered in Section 7).
Access channel
(MLW) or (N_WL)
Boat basin
Other (break-
water, pier,
boat ramp,
rock jetty)
Fill placed in
wetland or below
MHW
Upland fill
areas
Length -Width Depth
K q
hl ?
uA
N A
N A
b. Amount of material to be excavated from below
water level in cubic yards t?J/A
c. Type of material r_4 6 -'"
d. Does the area to be excavated includiuafshiatid,`'t'
swamps, or other wetlands? ;-'
(J o
c. High ground excavation, in cubic yards
4ouo cY t
f. Dimensions of spoil disposal area
/A
g. Location of spoil disposal area
h. Do you claim title to the disposal area? 4
If not, attach a letter granting permission from the
owner.
i. Will a disposal area be available for future
maintenance? tiA
If so, where?
j. Does the disposal area include any marshland,
swamps, o water areas?
k. Will the fill material be placed below mean high
water? d
1. Amount of fill in cubic yards _ nr1A
m. Type of fill materi al ,j /4
n. Source of fill material uXF
o. Will fill material be placed on marsh or otlier
wetlands? n(o
p. Dimensions f the wetland to be filled
q. How will excavated or fill material be kept on site
and erosion controlled? 1
r. What type of construction equipment will be used
(for example, dragline, backhoe, or hydraulic
dredge)? A* C 4 o.f oa s
s. Will wetlands be crossed in transporting equipment
to project site? t4b If yes, explain steps that will
be taken to lessen environmental impacts.
7 Shoreline Stabilization
a. Length of bulkhead or riprap F X,'_, f
c. Shoreline erosion during preceding 12 momlis, in
feet ni 1A
d. Type of bulkhead material nr /A
e. Amount of fill, in cubic yards, to be placed below
mean high water
f. Type of fill material u A
8 Additional Information
In addition to the completed application form, the follow-
ing items must be submitted:
A copy of the deed (with state application only) or other
instrument under which the applicant claims title to the
affected property. If the applicant is not claiming to be
the owner of said property, then forward a copy of the
deed or other instrument under which the owner claims
title, plus written permission from the owner to carry out
the project.
An accurate work plat (including plan view and cross
sectional drawings) drawn to scale in black ink on an 8
1/2 x 11 white paper. (Refer to Coastal Resources
Commission Rule 7J.0203 for a detailed description.)
Please note that ori ginal drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if 16 high
quality copies are provided by applicant. (Contact the
U.S. Army Corps of Engineers regarding that agency's
use of larger drawings.) A site or location map is a part
of plat requirements and it must be sufficiently detailed
to guide agency personnel unfamiliar with the area to the
site. Include county road (SR) numbers, landmarks, and
the like.
A stormwater management plan, if applicable, that
may have been developed in consultation with the
Division of Environmental Management.
A list of the names and complete addresses of the ad-
jacent waterfront (riparian) landowners. These in=
dividuals have 30 days in which to submit comments on
the proposed project to the Diyi?ion;,oF,Coast'1?Ivlanage-
ment and should be advised b'y. ft'applicant?,of t111t op-
portunity.
b. Average distance watenvard of mean high water or
normal water level 1.1,Q
Name
Address 3a3 ?R r,7 /Cv
Name 3rcd ? ? C, -Js
Address 7? a. -ig 8 6 7
V.C 20¢06
Name
Address
A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
permittee, and issuing dates.
C ?< f -a /7e- q s- -f w, '/1,
?. 3-> so-, , /6//9/8f GJ rcv,zrl _-
A check for $100 made payable to the Department of
Natural Resources and Community Development to
cover the costs of processing the application.
A signed AEC hazard notice for projects in oceanfront
and inlet areas.
A statement on the use of public funds. If the project
involves the expenditure of public funds, attach a state-
ment documenting compliance with the North Carolina
Environmental Policy Act (N.C.G.S. 113A-1 to 10).
9 Certification and Permission
to Enter on Land
Any permit issued in response to this application will
allow only the development described in the application.
The project will be subject to conditions and restrictions
contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's ap-
proved Coastal Management Program and will be con-
ducted in a manner consistent with such program.
I further certify that I am authorized to grant, and do in
fact, grant permission to representatives of state and
federal review agencies to enter on the aforementioned
lands in connection with evaluating information related
to this permit application and follow-up monitoring of
project.
This is the 7 day of TeZ/? k ci,< . 19 .
41,
X?
Landowner or Authorized agent
r
Form DCM-MP-2
h. Maximum boat length
33
MARINA i. Are any floating buildings planned? -lo
If so
describe.
,
DEVELOPMENT
2 Marina Operations
Attach this form to Joint Application for CANIA Major
Permit. Be sure to complete all other sections of the a. Check each of the following sanitary facilities which
Joint Application which relate to this proposed project, will be included in the proposed project.
including upland areas, even if duplicative. All shore- ? Office toilets
based facilities must be included in application and work ? Toilets for patrons
plats. Number S
Location o ,< <
Showers
1 Marina Characteristics ?? Boat holding tank pumpout
Type and location r'or fi4 6 ??
a. Check below the type of marina proposed.
? Commercial Public Residential
b. Describe treatment type and location for all sanitary
b. Will the marina be open to the general public? wastewater. 10 p4 /
C. If there is residential development associated with
the marina, how many units or lots are planned? C. Describe solid waste, fish offal, and trash disposal.
d. Check all of the types of service to be provided.
Full service, including travel lift and/or rail
? Dockage, fuel, and marine supplies d. How will overboard discharge of sewage from boats
Dockage ("wet slips") only be controlled?
Number of slips
o?,,, ?.? o r l
S, s n S ?? gIJ
?Dry storage
Number of boats 43-.5" cx,,S->':
Boat ramp(s)
Other (describe)
C. Give the location and number of "No Sewage
Discharge" signs proposed.
C. Check below the proposed type of siting. 2 _ oh o,, 1a1/ r, o
Land cut and access channel /o o ?h S rQ n2r-
Open water with dredging for basin
and/or channel
Open water, no dredging required
f? h c
? Other (describe) EK f. Describe the special design, if applicable, for
i s
?J qn i1 containing industrial type pollutants, such as paint,
sandblasting; waste, and petroleum products.
f. Describe the typical boats to be served (for example, o,, s 1„ •// k I
o1yen runabout, charter boats, sail boats, mixed _
r e v
C -r a n t a u?? r? -r?
I
W.? puel
types). 12-C 1
5. ,. // a Slor, tea/ - r? r/
r
_LL_
--
L? ?L 4, rr c c/ f-Q
Typical boat length _ z o - 2 S___
g. Where will residue be disposed of? K. What will be the marin7. licy on ovemioht and
o? nr, IV< ?o.' d.r' o <i h r• f•- live board dockage`? . C ?? , f
h. Give the number of channel markers and "No Wake"
signs proposed. r\( a,,
Note: Regulatory signs such as these require additional
approval by the N.C. Wildlife Resources Commission.
Is the proposed marina located near any shellfish
leases? ,(o If so, give the name and address of
theleaseholder.
i. Give the location of fuel handling facilities and
describe the safety measures planned to protect area
water uality.
d,//? c i /0 1c,.?rcr .'cl..
Orro '
e r bv!/C hccrl aoct 7'0 S/cyc? ?lr?
If this project is an expansion of an existing marina,
what types of ser,Ices re currently provided?
VrY S7orgS, "j'?c' /r,oi,gC SVP U)tJ
j. Describe design measures that promote boat basin
flushing or circulation and reduce water quality
impacts. n. How many slips are now available? !so
1a?2 {n C r ,LIL.),«f f. 11 ac7,'a,
••a
'•s
NdLY
wKr's ?+•,
w?i'u eo1
1Y 3S J
?T
?:,'?^stif,o
s
S
{ ?m
N
G)m
o X
b ?
C3
O
v {
2 sO
c
n
m m
m
9n
9m
Kz
?z
- s?ota.•
5'10 m
W11
31WS ON
C.1 'u '•r?il
-inp.?7r-
(/601 ?
lY 3i?S)
. 4 ?-•1411 ;.u {
J '"q
?O
a N
a)
O
D
7 p o
?Cmi
?m?
:scn
n
z
v
's W
0m
Kzi
O
:z(nn
nm
3
F
s'
Y
a
3lVOS Ol ION
NOIlVdISSIa AOFi3N3
lll??? l
_IIV1?V ?pN1
lIVI30IN10V!nU: NO _5 QE)
' wa rm" .?n/wu?nss
? •?? ? ?Aa/? YUImTI
v?r u?i v?4 a.*J?i
JA '
;rl?a--?r?aa-aas se8
a
'`11
:j4
?fI913?Q93AN?Tti?$73?$V111 ?
71tl13a LNM3Atld 313H3N03 s'
ilIV130 1N3W3Atld snONIWf1us
lu
C`
li
??srm+su.•uxo
1HM .O11xHV? T+?Sll1'1C1
i'• ,^fi :; ,h'_ 1IV13a 1(lONV313 ltlOldAl
B l_ 1
wr. -n
l0'-0
R]
µ
4 :JD'S ll:t
x. .?,•??-C?.6:4 id41.V ^"SM lt1/st)cpr? -
r a r s-5 J
L aax0 : m
=fir ,1 ? c`II
mllr?
Ir
L
L•
Y
Sl1WJ'H'M j?Ar^?y/
' M Iar1e?) ?-
??Ola
?- 5 3-IVOS Ol ION
.?
+.Ctti Sv
wu'u 'vvf
7= ?,. ;1
77
tit 4a?,\} \ r
?VJnw
Cf)
OW ??
0
imp
77
z
b
o >0
n{
K`no
?ZYn
0m
{- Ili
^ ? r
e $ i
41,1Y
I3SVHd ----- -
3SVHd -.. ,
=.l
NO - 3S GN0i NOUN3lB-de
xs
??NL .I .CeM ugS,f?
v n snu?+C.`in wcw bh ? v ? woeo
'1 R7T'TTY"ITT)s't7c.c. ?1 .. ..
I 1
? q
?l'r??
111 d 1?
.
aril
nru-m.a a / C?.
.....r «. n.u y J/
rar?3 31VOS Ol ION
?+vL
vrwns sv •„
6cu'u cal
O Z =.l
NV'ld LIM2d
.; dWVd ONV N000
,ltl 3S
e.>vwa n a wu>.»?
o cf)
:co
Nm ?Z / ?'' i l rl t?? L111L
mz>
D }>?PM> r?LW J>R l>.?/?
'(7j?a?[j?-
C ; M%O rf3h pC?9a ?aouvi,
e ? O -- m u uwu aw a.
H D C: me..ai.a a+n wawa ???
m
' I
i FF ti
F
e
,.o. ....,,,.,. , u n -- - I'll
_s so = UsIsad piempue7 /
/' A?>oN tkkY/'A i vnd 4y-?
. b :.(q paiedaad /
w.?nr, sa /
6J1
a?cx"aa znry or . w
•
I? NI
r z-
• ...
--VHd
?
3S ....... ........... ...........................
N
Ayl
$ bin ,/11
N a a \ v,
m m m
Z Z v\\I/ ??/
\? V
f ?
v A om
no :13
o"m Z -I
?xn=
a z C
(7 m a
JI I I II I ,I ? I I ? ? ? ?
a.+n Tel-?'lbn,0 /
ovvas ?rrrfJ• ?
C azal mrruvd c•svy7?
C 'Y._
k-Y? Y gg
10
\L ?rlN •i?a,,a
1 I''
f ,
h.
_ "?a++c-baeim
Nnl?l'1'ti ?4-?
J \\
---------------
= I '?4-.hsan
? ; t<2MA >ra«t7'f
'*? ? I ?kr•nc?vd scr
?,, X411 11
} I ?
rl '?