HomeMy WebLinkAbout20181389 Ver 1_More Info Received_20181127Goss, Stephanie
From:
Jeff Harbour <jharbour@ESINC.CC>
Sent:
Tuesday, November 27, 2018 4:12 PM
To:
Goss, Stephanie
Subject:
RE: [External] DWR 20181389 Vert
Attachments:
Environmental agent form.pdf
Agent authorization from the applicant is attached
tatt
ENVIRONMENTAL
t . SERVICES, INC,
Jeff Harbour, PWS
Technical Director / VP
4901 Trademark Drive, Raleigh, NC 27610
Office 919-212-1760 Cell 919-805-4208
f in
Confidentiality Notice: The information and all attachments contained in this electronic communication are privileged and confidential information, and intended only for the
use of the intended recipient(s). If the reader of this message is not an intended recipient, you are hereby notified that any review, use, dissemination, distribution, or copying
of this communication is strictly prohibited. If you have received this communication in error, please notify me immediately of the error by return e-mail and please
permanently remove any copies of this message from your system and do not retain any copies, whether in electronic or physical form or otherwise. Thank you.
From: Goss, Stephanie <stephanie.goss@ncdenr.gov>
Sent: Tuesday, November 27, 2018 11:43 AM
To: Jeff Harbour<jharbour@ESINC.CC>
Subject: RE: [External] DWR 20181389 Verl
Great! Thanks!!
Stephanie Z. Goss
Environmental Senior Specialist
Division of Water Resources
Raleigh Regional Office
3800 Barrett Drive
Raleigh, NC 276o9
919-791-4256
E-mail correspondence to and from this address may be subject to the
North Carolina Public Records Law and may be disclosed to third parties
From: Jeff Harbour <jharbour@ESINC.CC>
Sent: Tuesday, November 27, 2018 11:39 AM
To: Goss, Stephanie <steohanie.aoss(@ncdenr.eov>
Subject: RE: [External] DWR 20181389 Vert
Yes, 2,295 SF of temporary impact on that sheet is correct. My mistake, sorry about that. I am getting the signed agent
authorization form also.
FNNI N'N I VNIAL
RV I CV S.I N, C
Jeff Harbour, PWS
Technical Director / VP
4901 Trademark Drive, Raleigh, NC 27610
Office 919-212-1760 Cell 919-805-4208
601
Confidentiality Notice: The information and all attachments contained in this electronic communication are privileged and confidential information, and intended only for the
use of the intended recipient(s). If the reader of this message is not an intended recipient, you are hereby notified that any review, use, dissemination, distribution, or copying
of this communication is strictly prohibited. If you have received this communication in error, please notify me immediately of the error by return e-mail and please
permanently remove any copies of this message from your system and do not retain any copies, whether in electronic or physical form or otherwise. Thank you.
From: Goss, Stephanie <stephanie.goss@ncdenr.gov>
Sent: Tuesday, November 27, 2018 11:32 AM
To: Jeff Harbour <iharbour@ESINC.CC>
Subject: RE: [External] DWR 20181389 Vert
Jeff,
Also, I just noticed on the wetland impact maps the following impact not listed on the PCN:
1St Impact map -2295 sf = 0.05 acres. This impact is not listed on PCN
2nd Impact map -538 sf = 0.01 acres
1663 sf = 0.04 acres
308 sf = 0.01 acres
Also, I will include the 0.12 acres permanent impacts that was provided on 11/19/18
Can you please verify the 152 impact. Thanks in advance.
Stephanie Z. Goss
Environmental Senior Specialist
Division of Water Resources
Raleigh Regional Office
3800 Barrett Drive
Raleigh, NC 27609
919-791-4256
E-mail correspondence to and from this address may be subject to the
North Carolina Public Records Law and may be disclosed to third parties
From: Goss, Stephanie
Sent: Tuesday, November 27, 2018 11:02 AM
To: 'Jeff Harbour' <iharbour@ESINC.CC>
Subject: RE: [External] DWR 20181389 Vert
Jeff,
I have started reviewing the above referenced project. The agent authorization form that was submitted was not signed.
Can you please e-mail me a signed copy. Thanks!
Stephanie Z. Goss
Environmental Senior Specialist
Division of Water Resources
Raleigh Regional Office
3800 Barrett Drive
Raleigh, NC 276o9
919-791-4256
E-mail correspondence to and from this address may be subject to the
North Carolina Public Records Law and may be disclosed to third parties
From: Jeff Harbour <iharbour@ESINC.CC>
Sent: Monday, November 19, 2018 2:25 PM
To: Goss, Stephanie <steohanie.zoss(ancdenr.eov>
Subject: [External] DWR 20181389 Vert
Stephanie,
The above referenced project has been slightly revised to include an impact that will occur on the Freedom Square
parcel. This was requested by the Corps and I have supplied James with the requested information. The entirety of the
email exchange is attached including the updated plan showing the added impact. I see that the WQC has not been
issued yet so I am hoping that the final WQC can include this new information. We are going to be providing
compensatory mitigation per the Corps requirements. Please let me know if you have any questions.
Thankyou
ENVIRONMENTAL
SERVICES, INC.
Jeff Harbour, PWS
Technical Director/ VP
4901 Trademark Drive, Raleigh, NC 27610
Office 919-212-1760 Cell 919-805-4208
3 f
Confidentiality Notice: The information and all attachments contained in this electronic communication are privileged and confidential information, and intended only for the
use of the intended recipient(s). If the reader of this message is not an intended recipient, you are hereby notified that any review, use, dissemination, distribution, or copying
of this communication is strictly prohibited. If you have received this communication in error, please notify me immediately of the error by return e-mail and please
permanently remove any copies of this message from your system and do not retain any copies, whether in electronic or physical form or otherwise. Thank you.
ye-cy ; ( , ` ►'t
AGENT AUTHORIZATION FORM
PROPERTY LEGAL DESCRIPTION:
LOT NO. NA PLAN NO. NA PARCEL NO.
Project: Freedom Square Offsite Waterline Extension, Green Level West Road, Apex, NC
Applicant: Sameer Dave representing Shree Girirajgoverdhan Properties, LLC
304 Ruthwin Drive, ,Morrisville, NC 27560
The undersigned, registered property owners of the above noted property, do hereby authorize
—.Jeff Harbour , of _Environmental Services, Inc
(Contractor / Agent) (Name of consulting firm)
to act on my behalf and take all actions necessary for the processing, issuance and acceptance of
this permit or certification and any and all standard and special conditions attached.
i
Property Owner's Address (if different than property above):
We hereby certify the above information submitted in this application is true and accurate to the
best of our knowledge.
i
Autho ¢ Signature Authorized Signature
Date: I I l27 i S Date:
Goss, Stephanie
From: Jeff Harbour <jharbour@ESINC.CC>
'Sent: Monday, November 19, 2018 2:16 PM
To: Lastinger,,James C CIV USARMY CESAW (US)
Cc: Michael Kane
Subject: RE: Freedom Square water line, SAW -2016-00457
Attachments: 004 C100 Site Plan.pdf; exh-wetlands.pdf
Importance: High . '
James,
Attached is the site plan for the Freedom Square site. Permanent wetland impacts are 0.12 acre. I am in the. process of
securing 0.24 acre of wetland mitigation credit for this permanent wetland impact assuming a 2:1 ratio will be required..
Also included is the plan for the Goddard School; which does not have any impacts.
In'summary the project has the following:
0.12 acre'permanent wetland impacts
0.06 acre'oftemporary impacts from waterline installation
I Please let me know if you require additional information to continue processing this PCN. Thank you.
Jeff Harbour, PWS
Technical Director/ VP
4901Trademark Drive, Raleigh, NC 27610
Offi'ce1,919-212-1760 Cell 919-805-4208
Confidentiality Notice: The information and all attachments contained in this electronic communication are privileged
and confidential information, and intended only for the use of the intended recipient(s). If the reader of this message is
not an intended -recipient, you are hereby'notified that any review, use, dissemination, distribution, or copying of this
communication is strictly prohibited. If you'have received this communication in error, please notify me immediately of
the error by return e-mail and please permanently remove any copies of this message from your system and do not
retain any copies, whether in electronic or physical form or otherwise. Thank you.
----LOrigirial Message -----
From 1a5tinger, James C CIV USARMY CESAW (US) <James.C.Lastinger@usace.army.mil>
Sent: Thursday, October 25, 2018 12:59 PM
To: Jeff Harbour<jharbour@ESINC.CC>
Subject: Freedom Square water line, SAW -2016-00457
Jeff,
I have received a PCN for.the Freedom Square'water line project. Upon review the PCN has been,considered
incomplete. Please'provide the following information in order to consider the application complete:
1. The water line appears to be associated and necessary for the development of a parcel of land in the in the
southwest quadrant of the Green Level West and Green' Level Church Rd intersection. At this time the Corps is unable to
determine if a single and complete project has been submitted for our review, and therefore cannot verify if the project-
qualifies for NWP verification. Please submit construction plans for the parcel in question. AID for the project is SAW -
2016 -00457. A PJD was issued in 2016 and is attached for your review.
Should there be proposed impacts to the site they should be permitted in association with the waterline as one single
and complete project. Please let me know if you have any questions.
Please submit the requested information with 30 days of the receipt of this notification or we will consider the PCN
withdrawn due to lack of applicant response and close the file.
James Lastinger
Regulatory Project Manager
Raleigh Regulatory Field Office
US Army Corps of Engineers, Wilmington District
ADDRESS: 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587
Tel: (919) 554-4884, x32
Cell: (919) 428-0806
Fax: (919) 562-0421
1 I 1
(,RACING NOTES
GF PER[n NOTtt:..�., «ew .......�. ••
GRADING PLAN
1 cwniw
PLW
SITE
300
I
II GODDARD SCHOOL SITE PLAN
NO IMPACTS RESULT FROM PROSECT
I
I'
I
J .
`�u
—
I I s_
----�
IEIrcP., ,LTniuT�,,.
SwE TOWN OF APEX NOTES:
1.
01ywoG
I bAc wcixA¢eE:i. c„ - yuJ�le ie-+r-z.�s-Ies 1 1 E[xING OF—BG-1Ra N.BERSON-GEBIG
k nrE-AN.P—W uarsb oumooR smRacE,MEouNI¢u
8 1 I I I I •i }CCEE v EOVIPMFNi,AN04MRM FHCIUTIEGON THE ROOF,ON THE
W I ENce eaE -,'
EASEMENT EMEM s GooME�501w1i HE BU DINGS$IIAIBMFFTLHE PE¢dREMFn13
\ m6F s I 1 1 EDflvA R • 380E THE UBO. i>FOnCALLY,XREFNINGMUSi ' -- --
I GAT{ i i t i t i F i T�lN � �I TOINEOIE LDENGNTHEMEB TlH PAVEMENT DETAILS
•. " .Plt .s I , i i OO 1 i I _ I j s M e E.NN.—w-.ENoi wHERExI moMOxINFEwoPIT—
"A.
ITa mE C X�ym
-` vises rovAxbP tRyO p I MATEIUuBOFTNEB W GOGIANGEOIPE,ANDANE
eow 1. I I, I I I I c �I ITITNTEMEANEdl oF�w`ATROMAdA[FNIRN TES AvO
j i wBucs N EE aNDarDlAura ¢uE aE xISAOB V D.
,A ow ..B Axo°r u�eox to c AN �WEiruEanwGxMwE`MirsiD�E �xao T,
` 36vb I ^., fA I. ;—_ ___ __ _y_l ` e. WMP�EN¢ONREBMUB MEETTHEa ER00UIv1MFN18PFUS O RCA l
CE j je'AOOFSS OAE h I`' ----1:`. :. I; I 1"INAPITBEATlEASTEXIINEFTTNLONTNEXflGHTOF mE
A \ — M .,ST.. WIRCNEVFN IBGRFAIFR:ANDBEBURTOFMABONRY
�. A sseoH-zees I_.� •,.I: "" I, ' _ -.., I a RCA REQUIREMENTS:
. _ `. `. a'�,q•4. `...�� \ . EEMENrSExowNwRlviNAPARnCUWIPHPX °ca ..oioo 1 11 INS APEX
:i"+FxE mF N
I - ----- G EAS
Iusre�`a LIIBEFOREAFIrvAIaRT'll rT Focavarvc Mar EAI Cl)
BDIIdNGvnmIN TPAT PHAEE. EwnN udo sBcnoH ezlF1111
_ 10. SITE ITEMS SUCH ABUT NOT UMITFO T¢UGHnNG, IAN—NG
1111
TEX
a
. `.-. SCM BAssw<M �v'� G-UOINGMUI ),—ENING PF.wMvSERs(mABH.1EXANTNED—INTHE "
I_ • _ .. • . • . -. • _ • ..... • . • ... • . • _-_______ AN TENLmMAM„O ECA
MU EI BEroMRE ED Rutin To—LING u000R
\ I M// NII D
1" as N ,s oust SIGNsau NOpArvRWEBaS°aai OFTxESIrEvun PARKING
O / PROCESS A SEXA-1 SIGN P—T MVABEOBTr. O[slc
- \ I MINT TuunON OF TNG VGN.MUInRFUEw-%
v 80ROwL I
_.�• +ms s \ I II AGTEASIGNPIlANFORAAPPEGINLIEIFNAMI0RMU8f
. - . _ , \ �� ar,;�rAM a NOTES:
_ _
���--------�--is I�,,a E BUILDING SETBACKS: PARKING: zj°.iwc°AICRdDxoswHsixAllRE:RxoLESS mlou°r eus.o�%°o'R
.1 . • - _ • • +'��-5 :.o. _ `1 / eEssowooi0`w HE�'w.vM:Enscx GRAE
jfl - .-.' `_":-� _ Z` ` _ _ T pvuMu eouDwG c"PacrtYORle01 0, v nAeeouxD Eau wcwD yewE. RED.
1-_-"3`T-_i_ •��p�-� `�'� \ s c m I11 IAI xANDic.r Axo ivAN s°ACE 'I �AIGROUNO—MRrt. xsA nloNAI wFORMAnoxON
`ExiE`nj M.lemne�lml
I. . . . .
.....: .. .........`.`.-.-.•..._ `. •. .-.-_-_-. •a __ --- \ \ ` Fw"dliww eF
___ - • ;�� `� GREEN LEVEL WEST NOTES:
\ u A
• -. • _ `.'. - �mEHRst CFRnS_NAL".-HOYICOI Foo u,T,o •.-e osi— .s.. x>,... c.. v,w=•, vo—
TICOMPNET11"'FlIERE0 11 IIE1411 PLAN
` • •'� :_. • -•'�_� = J/- • RwuwEMDas wrtHRFI°ecnoxc o"p%I1N."A'.....EmF R
= 'Z0N ': -
../ '� - -. .:` I SITE PLAN
1. . • .:':`_`: : :.:-:. .`•`" ` ` . - ---.�C.:. :.:. clop waca5n ......
u. P. ...D.N...,
,____-____ _______A�
0 1.
111-0
6b
UJ
S/
m -W
P.ol R
I>osoa
d.X:
July 2, 2018
a.R Ox a Dy
JE SJR
cwcl'
-39'
C100
—"W� _AEsxi IS, sai Rw`
AlE
STANDARD DUTYASPHALT DETAIL ccAce aEosu�
a
Alt
PsiRReswsIEARH
SEI^{<1.
— — AGG �,E
A.EDsu�
HEAVY DUTY ASPHALT DETAIL cRABE
1-11A OAC
U
_ 1-111110ACED
B
—
HEAVY DUTY CONCRETE DETAIL
I bAc wcixA¢eE:i. c„ - yuJ�le ie-+r-z.�s-Ies 1 1 E[xING OF—BG-1Ra N.BERSON-GEBIG
k nrE-AN.P—W uarsb oumooR smRacE,MEouNI¢u
8 1 I I I I •i }CCEE v EOVIPMFNi,AN04MRM FHCIUTIEGON THE ROOF,ON THE
W I ENce eaE -,'
EASEMENT EMEM s GooME�501w1i HE BU DINGS$IIAIBMFFTLHE PE¢dREMFn13
\ m6F s I 1 1 EDflvA R • 380E THE UBO. i>FOnCALLY,XREFNINGMUSi ' -- --
I GAT{ i i t i t i F i T�lN � �I TOINEOIE LDENGNTHEMEB TlH PAVEMENT DETAILS
•. " .Plt .s I , i i OO 1 i I _ I j s M e E.NN.—w-.ENoi wHERExI moMOxINFEwoPIT—
"A.
ITa mE C X�ym
-` vises rovAxbP tRyO p I MATEIUuBOFTNEB W GOGIANGEOIPE,ANDANE
eow 1. I I, I I I I c �I ITITNTEMEANEdl oF�w`ATROMAdA[FNIRN TES AvO
j i wBucs N EE aNDarDlAura ¢uE aE xISAOB V D.
,A ow ..B Axo°r u�eox to c AN �WEiruEanwGxMwE`MirsiD�E �xao T,
` 36vb I ^., fA I. ;—_ ___ __ _y_l ` e. WMP�EN¢ONREBMUB MEETTHEa ER00UIv1MFN18PFUS O RCA l
CE j je'AOOFSS OAE h I`' ----1:`. :. I; I 1"INAPITBEATlEASTEXIINEFTTNLONTNEXflGHTOF mE
A \ — M .,ST.. WIRCNEVFN IBGRFAIFR:ANDBEBURTOFMABONRY
�. A sseoH-zees I_.� •,.I: "" I, ' _ -.., I a RCA REQUIREMENTS:
. _ `. `. a'�,q•4. `...�� \ . EEMENrSExowNwRlviNAPARnCUWIPHPX °ca ..oioo 1 11 INS APEX
:i"+FxE mF N
I - ----- G EAS
Iusre�`a LIIBEFOREAFIrvAIaRT'll rT Focavarvc Mar EAI Cl)
BDIIdNGvnmIN TPAT PHAEE. EwnN udo sBcnoH ezlF1111
_ 10. SITE ITEMS SUCH ABUT NOT UMITFO T¢UGHnNG, IAN—NG
1111
TEX
a
. `.-. SCM BAssw<M �v'� G-UOINGMUI ),—ENING PF.wMvSERs(mABH.1EXANTNED—INTHE "
I_ • _ .. • . • . -. • _ • ..... • . • ... • . • _-_______ AN TENLmMAM„O ECA
MU EI BEroMRE ED Rutin To—LING u000R
\ I M// NII D
1" as N ,s oust SIGNsau NOpArvRWEBaS°aai OFTxESIrEvun PARKING
O / PROCESS A SEXA-1 SIGN P—T MVABEOBTr. O[slc
- \ I MINT TuunON OF TNG VGN.MUInRFUEw-%
v 80ROwL I
_.�• +ms s \ I II AGTEASIGNPIlANFORAAPPEGINLIEIFNAMI0RMU8f
. - . _ , \ �� ar,;�rAM a NOTES:
_ _
���--------�--is I�,,a E BUILDING SETBACKS: PARKING: zj°.iwc°AICRdDxoswHsixAllRE:RxoLESS mlou°r eus.o�%°o'R
.1 . • - _ • • +'��-5 :.o. _ `1 / eEssowooi0`w HE�'w.vM:Enscx GRAE
jfl - .-.' `_":-� _ Z` ` _ _ T pvuMu eouDwG c"PacrtYORle01 0, v nAeeouxD Eau wcwD yewE. RED.
1-_-"3`T-_i_ •��p�-� `�'� \ s c m I11 IAI xANDic.r Axo ivAN s°ACE 'I �AIGROUNO—MRrt. xsA nloNAI wFORMAnoxON
`ExiE`nj M.lemne�lml
I. . . . .
.....: .. .........`.`.-.-.•..._ `. •. .-.-_-_-. •a __ --- \ \ ` Fw"dliww eF
___ - • ;�� `� GREEN LEVEL WEST NOTES:
\ u A
• -. • _ `.'. - �mEHRst CFRnS_NAL".-HOYICOI Foo u,T,o •.-e osi— .s.. x>,... c.. v,w=•, vo—
TICOMPNET11"'FlIERE0 11 IIE1411 PLAN
` • •'� :_. • -•'�_� = J/- • RwuwEMDas wrtHRFI°ecnoxc o"p%I1N."A'.....EmF R
= 'Z0N ': -
../ '� - -. .:` I SITE PLAN
1. . • .:':`_`: : :.:-:. .`•`" ` ` . - ---.�C.:. :.:. clop waca5n ......
u. P. ...D.N...,
,____-____ _______A�
0 1.
111-0
6b
UJ
S/
m -W
P.ol R
I>osoa
d.X:
July 2, 2018
a.R Ox a Dy
JE SJR
cwcl'
-39'
C100