Pre -Construction Notification (PCN) Form
September 29,2018 Ver 3
21nitial Review
Has this project met the requirements for acceptance in to the review process?*
r Yes
r No
Is this project a public transportation project?*
C Yes r No
Change mly if needed.
BIMS # Assigned Version#*
20181609 1
Is a payment required for this project?
* No payment required What amout is owed?*
* Fee received r $240.00
* Fee needed - send electronic notification r $570.00
Reviewing Office*
Winston-Salem Regional Office - (336) 776- Select Project Reviewer
9800 Sue Hornewood:eads\s1hornewood
Information for Initial Review
la. Name of project:
SoVA Mega Site at Berry Hill - Phase I NC Water
la. Who is the Primary Contact?
Terry Shelton
I b. Primary Contact Email:
TShelton@edennc.us
Date Submitted
11121/2018
Nearest Body of Water
Cascade Creek
Basin
Roanoke
Water Classification
C
Site Coordinates
Latitude:
36.533341
A. Processing Information
County (or Counties) where the project is located:
Rockingham
Is this project a public transportation project?
r Yes r No
Longitude:
-79.673004
la. Type(s) of approval sought from the Corps:
W Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r- Section 10 Permit (navigable Aoters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?
W Nationwide Permit (NWP)
F Regional General Permit (RGP)
F Standard (P)
1c. Primary Contact Phone:*
(336)623-2110
1c. Has the NWP or GP number been verified by the Corps?
r Yes r No
Nationwide Permit (NWP) Number:
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
F- 401 Water Quality Certification - Regular
P Non -404 Jurisdictional General Permit
F Individual Permit
12 - Utility Lines
1e. Is this notification solelyfor the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
r 401 Water Quality Certification - Express
r Riparian Buffer Authorization
1f. Is this an after -the -fact permit application?*
f Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
f Yes r No
Acceptance Letter Attachment
1h. Is the project located in any of NC's twenty coastal counties?
r Yes r No
1j. Is the project located in a designated trout watershed?
O Yes r No
B. Applicant Information
1d. Who is applying for the permit?
W Owner r Applicant (other than owner)
1e. Is there an Agent/Consultant for this project?
r Yes r No
2. Owner Information
2a. Name(s) on recorded deed:
NCDOT
2b. Deed book and page no.:
2c. Responsible party:
2d. Address
Street Address
1226 N. Scales Street
Address Line 2
city
Reidsville
Postal / Zip Code
27320
2e. Telephone Number:
(336)520-6060
2g. Email Address:*
jjulian@ncdot.gov
State / F rmince / Fbgim
NC
Cbuntry
United States
2f. Fax Number:
r Yes r No
r Yes r No
C. Project Information and Prior Project History v
1. Project Information
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality / town:
City of Eden
F
2. Project Identification
2a. Property Identification Number:
2c. Project Address
Street Address
US Highway 311
Address line 2
Qty
Eden
Fbstal / Zip Cade
27288
3. Surface Waters
3a. Name of the nearest body of water to proposed project:*
Cascade Creek
3b. Water Resources Classification of nearest receiving water:*
C
3c. What river basin(s) is your project located in?*
Roanoke
3d. Please provide the 12 -digit HUC in which the project is located.
030101030902
4. Project Description and History
2b. Property size:
11
State / Rovince / Fiegion
NC
Country
USA
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
This project consists of installation of new20" waterline within the NCDOT right-of-way, from the City of Eden limits to the NCNA state line along US 311.
The project site is located in Rockingham County, North Carolina. The southern section of the project begins at the Dry Creek crossing located along US-311/NC-770 (36.523503°N, -
79.686749°W), and parallels US-311/NC-770 to the north-northeast to the North Carolina - Virginia border (36.541536°N, -79.629052°W).
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
r Yes r No r Unknown
4c. If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW -0000-00000).
NAO-2010-0423/15-V1114 - Norfolk District Permit
Project History Upload
NAO-2010-0423 Berry Hill SPGP Special Conditions.pdf
WP4-15-1114 Berry Hill DEQ Permit.pdf
116.11 KB
259.5KB
4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR)
USGS Map.pdf 16AMB
4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR)
20161102_15243803925_212_Soil_Map.pdf 832.09KB
4f. List the total estimated acreage of all existing wetlands on the property:
49. List the total estimated linear feet of all existing streams on the property:
4h. Explain the purpose of the proposed project:*
The City of Eden will provide water to serve the SoVA Mega Site at Berry Hill, located approximately 2 miles north of the VA/NC state line.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:*
The contractor will use an excavator to dig down approximately 5' deep and 4' wide to install 20" waterline.
4j. Please upload project drawings for the proposed project.
2018.09.18 - NC WL issued for Approval.pdf 21.28MB
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
r Yes r No C Unknown
Comments:
Submitted on 8/24/18, USACE has not confirmed the JD.
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
r Preliminary r Approved r Not Verified r Unknown r NIA
Corps AID Number:
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known): Briana Bill and Troy Shelton
Agency/Consultant Company: Dewberry
Other:
5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR
JD was submitted on 8/24/18 and USACE has not confirmed to date.
5d1. Jurisdictional determination upload
2018.8.24 So VA Mega Site Phase I Water PJD Request.pdf 20.05MB
6. Future Project Plans
6a. Is this a phased project?*
r Yes r No
7b. If yes, explain.
The other phases have been in Virginia for build out of the So VA Mega Site at Berry Hill.
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
W Wetlands W Streams -tributaries r Buffers
F Open Waters r Pond Construction
2. Wetland Impacts
2g. Total Temporary Wetland Impact
0.067
2g. Total Wetland Impact
0.067
2h. Comments:
3. Stream Impacts
2g. Total Permanent Wetland Impact
0.000
3a. Reason for Impact(?) 3b.lmpact type* 3c. Type of Impact* 3d. S. name* 3e. Stream Type * 3f. Type of 3g. S. width" 3h. Impact
(?) Jurisdiction* length*
gt
2a1 Reason M
2b. Impact type * (?)
2c. Type of W.
2d. W. name *
2e. Forested*
2f. Type of
2g. Impact
10
(linear feet)
S2
Waterline
Tem orar
P Y
Excavation
Cascade Creek
Jurisdicition*(?)
area*
WG1
Waterline
T
Unknown
WD
No
Corps
0.004
WG2
Waterline
T
Unknown
WC
No
Corps
0.003
(acres)
ff�A
Waterline
T
Unknown
WB
No
Corps
0.060
(acres)
2g. Total Temporary Wetland Impact
0.067
2g. Total Wetland Impact
0.067
2h. Comments:
3. Stream Impacts
2g. Total Permanent Wetland Impact
0.000
3a. Reason for Impact(?) 3b.lmpact type* 3c. Type of Impact* 3d. S. name* 3e. Stream Type * 3f. Type of 3g. S. width" 3h. Impact
(?) Jurisdiction* length*
gt
Waterline
Temporary
Excavation
Tributary of Cascade Creek
Intermittent
Corps
5
Average (fee[)
10
(linear feet)
S2
Waterline
Tem orar
P Y
Excavation
Cascade Creek
Perennial
Cors
P
41
Average (feet)
20
(linear feet)
S3
Waterline
Temporary
Excavation
Tributary of Cascade Creek
Intermittent
Corps
4
10
Average (feet)
(linearfed)
S4
Waterline
Tem ora
P rY
Excavation
Tributary of Cascade Creek
rY
Intermittent
Cors
P
5
5
Averar7e (feet)
(linear fed)
SS
Waterline
Temporary
Excavation
Tributary of Cascade Creek
Jurisdictional Ditch
Corps
5
5
Average (fed)
(linear fed)
S6
Waterline
Temporary
Excavation
Tributary of Cascade Creek
Intermittent
Corps
5
10
Average (feet)
(linear fed)
3i. Total jurisdictional ditch impact in square feet:
25
31. Total permanent stream impacts:
0
3i. Total stream and ditch impacts:
60
3j. Comments:
E. Impact Justification and Mitigation
1. Avoidance and Minimization
3i. Total temporary stream impacts:
60
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Where possible within the NCDOT right-of-way, wetlands are avoided during constructions. In order to avoid wetlands and streams to the greatest
extent possible, some easements were obtained by the City to jog around these areas to minimize temporary impacts.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
Temporary pump around or piping will be implemented to allowfor water to continue to flowthrough the stream during construction. Otherwise, a dam
will be installed to prevent siltation in the stream bottom while the pipe is being installed.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
r^ Yes r No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
Pre- and post- conditions will be unchanged.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
r' Yes r No
If no, explain why:
This is a linear utility project. Pre- and Post- conditions will be unchanged.
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
r Yes r No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
r Yes r No
Comments:
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
r Yes r No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environmental Policy Act (NEPA/SEPA)?*
r Yes
Comments:*
r No
EDA required an Environmental Review, and NCDENR required a Environmental Review/environmental Information Document. Both of these
documents are available if needed.
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)?*
r Yes r No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?*
r Yes s No
3b. If you answered "no," provide a short narrative description.
Pre- and post- conditions will be equal. This project consists of just installing waterline in the ground.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
r Yes r Nor N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?
r Yes r No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
r Yes r No
5c. If yes, indicate the USFWS Field Office you have contacted.
Raleigh
5d. Is another Federal agency involved?*
r Yes r No
Se. Is this a DOT project located within Division's 1-8?
r Yes r No
5f. Will you cut anytrees in order to conduct the work in waters of the U.S.?
r Yes r No
5g. Does this project involve bridge maintenance or removal?
r Yes r No
Sh. Does this project involve the construction/installation of a wind turbine(s)?*
r Yes r No
C Unknown
51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
r Yes r No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
USFWS online 8 step review process and iPAC report.
Ref. attached ER/EID for documentation.
Consultation Documentation Upload
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
f Yes r No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
NOAA Essential Fish Habitat Mapper
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
r Yes r No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
The above link. This information was also researched as a part of the environmental documents for EDA and NCDENR.
Ref. attached ER/EID for documentation.
7c. Historic or Prehistoric Information Upload
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA -designated 100 -year floodplain?*
r Yes r No
8b. If yes, explain how project meets FEMA requirements:
This is a waterline utility project and will be underground.
8c. What source(s) did you use to make the floodplain determination?*
FEMA Floodplain Maps
Miscellaneous
Comments
The attached ER/EID was completed and approved by NCDENR for funding. The appendix includes correspondence and research for all environmental items regarding this project.
Miscellaneous attachments not previously requested.
2018.5.25 - Eden ER-EID - Revised for 20 inch WL (reduced).pdf
12.19MB
Signature u
W By checking the box and signing below, I certify that:
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a 'transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Leslie A. Barksdale, EIT
Signature
Sign
Date
11/21/2018