Loading...
HomeMy WebLinkAbout20061245 Ver 5_Minor Mod to CAMA Major 126-09_20181107Permit Class MODIFICATION/MINOR STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission t r m 1" t for x_ Major Development in an Area of Environmental Concern pursuantto NCGS 113A-118 __ Excavation and/or filling pursuant to NCGS 113-229 Permit Number 126-09 Issued to Yoepim Partners, LLC., c/o Joseph Stevens, 19421-A Liverpool Parkway, Cornelius, NC 28301 Authorizing development in __ —Chowan Count adi. to the Yoevim River. offDrummond's Point Rd, Riversound Subdivision , as requested in the permittee's letter dated 11/7/18, including the attached workplan drawings (1), dated "Revised 10/8/18". This permit, issued on November 7.2018 1 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation ofthese terms may be subject to rimes, imprisonment or civil action; or may cause the permit to be null ana void. 1) Unless specifically altered herein, this Minor Modification authorizes the modification of Condition No. 20 of the original Permit No. 126-09, which was issued as amended on 5/8/15, all as expressly and specifically set forth in the attached letter and workplan drawings. Any additional development activities may require a modification ofthis permit. (See attached sheet for additional conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days ofthe issuing date. This permit mist be accessible on-site b Department persormel wham the projects inspected for compliance. Any maintenance work or project modification not covered hereunder requires furdmer Division approval. All work n st cease when the permit expires cn December 31, 2019 In issuing this pemnit, the State of North Carolina agrees that your projects consistent with the Nordin Carolina Coastal Marmagement RWamm. Sig ned by the authority of the Secretary of MQ and the Charman of the Coastal Resources Commmission. Bra on C. Davis, Director Division of Coastal Management This permit and its conditions ate hereby accepted Signature ofPermittee Yoepim Partners LLC. c% Joseph Stevens Permit No. 126-09 Page 2 of2 ADDITIONAL CONDITIONS 2) In order to satisfy concerns ofthe resource agencies and in accordance with commitments made by the permittee, waterfront lots to the east ofthe community area boat ramp access, along Plantation Circle (lots 42-34), Windsong Point (lots 20-15), Mayfaire Drive (lots 51-49), and Flagship Drive and Flagship Court (lots 48-42), shall have the existing deed restriction modified to allow for the ability to apply for shoreline stabilization by way ofthe Division of Coastal Management's Major Permit application process only. Furthermore, the deed restrictions shall prohibit the ability for the lots to apply for shoreline stabilization by way ofthe Division's General Permit process. 3) Condition No. 20 ofthe original permit, which issued was amended on 5/8/15, remains in force for all remaining waterfront lots not detailed in Condition No. 2 ofthis Minor Modification. 4) This Minor Modification shall be attached to the original Permit No. 126-09, which was issued as amended on 5/8/15, as well as all subsequent modifications, refinements, and renewals, and copies of all documents must be readily available on site when Division personnel inspect the project for compliance. 5) All conditions and stipulations of the active permit remain in force unless specifically altered herein. NOTE: The U.S. Army Corps of Engineers assigned the proposed project COE Action Id. No. SAW - 2009 -01119. NOTE: The Division of Water Resources assigned the proposed project DWR Project No. 06-1245 V4. NOTE: A minor modification application processing fee of $100 was received by DCM for this project.