Action Id. SAW-2017-00657 County: Guilford U.S.G.S. Quad: NC-Guilford
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee: Citv of Greensboro
Attn• Eric Tart
Address: P.O. Box 3136
Greensboro, NC 27402-3136
Size (acres) �20 Nearest Town Greensboro
Nearest Waterway Horsepen Creek River Basin Cape Fear
USGS HUC 03030002 Coordinates 36.100872 N, -79.908003 W
Location description: The proiect area 8-5553) is located at Bridge 98 on Ballinger Road over an unnamed tributarv to
Horseqen Creek (King George Branch) in Greensboro, Guilford Countv, North Carolina.
Description of projects area and activity: This verification authorizes the discharge of clean fill material associated with
reqlacing an existing bridge, known as B-5553. The proiect includes permanent impacts to 1871inear feet (0.02 acre) of stream
channel for road shoulder improvements and sidewalk installation (1201inear feet) and rip raA bank stabilization (671inear
feet), and temporarv impacts to 441inear feet (<0.01 acre) of stream channel for construction access and dewatering and tie-in
of relocated stream channel.
Applicable Law(s): � Section 404 (Clean Water Act, 33 USC 1344)
❑ Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: NWP 14. Linear Transportation Projects
SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed
Conditions, your application signed and dated 10/17/2018, and the enclosed plans Sheets 1 through 5(of 6) and those entitled
`Ballinger Rd (SR 2181) over King Geor�e Branch Channel Change Exhibit" Sheets 1 through 3. Any violation of the attached
conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class
I administrative penalty, and/or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended
or revoked. If, prior to the expiration date identified below, the narionwide permit authorizarion is reissued and/ar modified, this
verification will remain valid until the expirarion date identified below, provided it complies with all requirements of the modified
nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would
no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction)
or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed
within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has
been exercised on a case-by-case basis to modify, suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You
should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements.
For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), priar
to beginning work you must contact the N.C. Division of Coastal Management.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State
or local approvals/permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program,
please contact David E. Bailev at 919-554-4884 extension 30 or David.E.Bailev2(a�usace.armv.mil.
Digitally signed by BAILEY.DAVID.E.1379283736
DN: c=US, o=U.S. Government, ou=DoD, ou=PKl, ou=USA,
rn=6AI LEY.DAV I D.E.1379283736 p
Corps Regulatory Official: f � Date:2018.11.13 1520:41 -OS'00' Date. 11/13�ZO10
Expiration Date of Verification: 03/18/2022
SAW-2017-00657
Determination of Jurisdiction:
A. � There are waters including wetlands, on the above described project area that may be subject to Section 404 of the
Clean Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This
preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process
(Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting
the Corps district for further instruction. Please note, if work is authorized by either a general or nationwide permit, and
you wish to request an appeal of an approved JD, the appeal must be received by the Corps and the appeal process
concluded prior to the commencement of any work in waters of the United States and prior to any work that could alter
the hydrology of waters of the United States.
B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of
Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC §
1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to
exceed five years from the date of this notification.
C. ❑ There are waters including wetlands, within the above described project area that are subject to the permit requirements of
Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations,
this determination may be relied upon for a period not to exceed five years from the date of this notification.
D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action. Please reference
jurisdictional determination issued DATE. Action ID: FILE NUMBER.
Basis For Determination: See the Preliminarv Jurisdictional Determination form dated 11/13/2018.
Remarks: None.
E. Attention USDA Program Participants
This delineation/deternunation has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site
identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security
Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request
a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work.
F. AppCa1S InfOPmatlOn (This information applies only to approved jurisdiction determinations as indicated in B and C
above).
This correspondence constitutes an approved jurisdiction determination for the above described site. If you object to this
deternunation, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a
Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you
must submit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Jason Steele, Review Officer
60 Farsyth Street SW, Room 1OM15
Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal
under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you
decide to submit an RFA form, it must be received at the above address by Not auplicable .
**It is not necessary to submit an RFA form to the Division Office if you do not ob�ject to the deternunation in this correspondence.**
�/ . � / Digitally signed by BAILEY.DAVID. .1379283736
J`"/ — � �7 // DN: r—US, o=U.S. Government, ou=DoD, ou=PKl,
� ou=USA,cn=6AILEY.DAVID.E.1379283736
Corps Regulatory Official: oace:zo,a.,,.,s,s:zz:se-os�oo�
David E. Bailev
Date of JD: 11/13/2018 Expiration Date of JD: Not apqlicable
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so,
please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_ape�f?p=136:4:0
Copy furnished:
April Norton, NCDEQ-DWR, 1617 Mail Service Center, Raleigh, NC 27699
Brandon Phillips, CHMM, STV Engineers, Inc. � 900 West Trade Street, Suite 715 � Charlotte, NC 28202-1144
NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND
REQUEST FOR APPEAL
A licant Cil of Greensboro Attn: Eric Tart File Nuinber: SAW-2017-00657 Date: 11/13/2018
Attached is: See Section below
❑ INITIAL PROFFERED PERMIT (Standard Permit or Letter of ern�ission) A
❑ PROFFERED PERMIT (Standard Permit or Letter of ermission) B
❑ PERMIT DENIAL C
❑ APPROVED JURISDICTIONAL DETERMINATION D
� PRELIMINARY JURISDICTIONAL D�TERMINATION �
SECTION I- The following identifies yow� rights and options regarding an administrative appeal of the aUove decision.
Additioual information may be fotmd at or l�ttp://www.usace.army.Ynil/Missions/CivilWorks/RegulatorvPrograu�andPei711its.as��
or the Co s re ulations at 33 CFR Part 331.
A: INITIAL PROFFERED PERMIT: You may accept or object to the permit.
• ACCEPT: If you received a Standard Pernut, you may sign the permit document and rehun it to the district engineer for final
authorization. If you received a Letter of Pern�ission (LOP), you may accept the LOP and yom� work is authorized. Your
signature on the Standard Periliit or acceptailce of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the perinit, including its terms and conditions, and approved jurisdictional detenninations associated with the
perir�it.
• OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request
that the permit be modified accardingly. You miist complete Section II of this fornl and rehirn the form to the district
engineer. Your objections must be received by the district engineer within 60 days of tl�e date of iliis notice, or you will
forfeit your right to appeal the pennit in the fnture. Upon receipt of your letter, the district engineer will evaluate your
objections and inay: (a) modify the permit to address all of your concerns, (b) modify the permit to �ddress some of your
objections, or (c) not modify the permit haviilg detei-�nined that the pennit should be issued as previously written. After
evaluating your objections, the district engineer will send you a proffered pennit for your reconsideration, as indicated in
Section B below.
B: PROFFERED PERMIT: You may accept or appeal the permit
• ACCEPT: If you received a Standard Permit, you may sign the permit docuinent and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your worlc is authorized. Your
signature on the Standard Permit or acceptance of the LOP ineans that you accept the pennit in its entirety, and waive all
rights to appeal the pennit, including its ternls and conditions, and approved jurisdictional detei7ninations associated with the
permit.
• APPEAL: If you choose to decline the proffered perinit (Standard or LOP) because of certain terms and conditioils therein,
you may appeal tl�e declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of
this form and sending the form to the division engineer. This fonn must be received by the division engineer within 60 days
of the date of this notice.
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by
completing Section II of this form and sending the fonu to the division engineer. This fonn mtist be received by the division
en�ineer within 60 days of the date of this ��otice.
D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new
information.
• ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to ��otify the Corps within 60 days of the
date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD.
• APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers
Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form
must be received by the division engineer within 60 days of the date of this notice.
E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the
preliminary JD. The Prelinlinary JD is not appealable. If you wisl�, you may request an approved JD (wl�ich may be appealed),
by contacting tlle Corps district for further instruction. Also you may provide new information for fiirtl�er consideration by tl7e
Corps to reevaluate the JD.
SECTION II - REQUCST FOR APPEAL or OQJECTIONS TO AN INITIAL PROFFERCD PERMIT
REASONS FOR APPEAL OR OBJECTIONS: (Describc; your reasons for �ppealing the, decision or your objections to an initial
proffered pernut in clear concise statements. You may attach additional information to this form to clarify where your reasons or
objections are addressed ii1 the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the adminishative record, the Corps iuemorandum for the
record of the appeal conference or meeting, and any supplemental information that the review officer has detennined is needed to
clarify the administrative record. Neither the appellant nor the Coips may add new infornlation or analyses to the record.
Howeve�r, you niay provide additional information to clarify the location of infoi7nation tl�at is already in the adini��istrative
record.
PO1NT OF CONTACT FOR QUESTIONS OR INFORMATION:
If you hav�; questions regarding this decision and/or the If you only have qiiestions regarding the app�;al process you may
appeal process you inay contact: also contact:
District Engineer, Wilmington Regulatory Division Mr. Jason Steele, Administrative Appeal Review Officer
Attn: David E. Bailey CESAD-PDO
Raleigh Regulatory Office U.S. Army Corps of Engineers, South Atlantic Division
U.S Army Corps of Engineers 60 Forsyth Sh-eet, Room 1 OM 15
3331 Heritage Trade Drive, Suite 105 Atlanta, Georgia 30303-8801
Wake Forest, North Carolina 27587 Phone: (404) 562-5137
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government
consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day
notice of any site investigation, and will have the opportunity to participate in all site investigations.
Date: Telephone numUer:
Signature of appellant or agent.
For appenls on liiitial Proffered Pern��its send this form to:
District Engineer, Wilmington Regulatory Division, Attn: David E. Bailey, 69 Darlington Avenue, Wilmington, North Carolina
28403
For Pernzit deizials, Proffered Permits aizd Approved Jurisdictional Deternzi�zatiorzs se�zd this forrn to:
Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal
Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
SAW-2017-00657
SPECIAL CONDITIONS
1. The stream in the northeast quadrant of the project area must be realigned according to the
attached plans entitled "Ballinger Rd (SR 2181) over King George Branch Channel Change
Exhibit" Sheets 1 through 3.
2. The applicant must provide a monitoring report to the Corps of Engineers every six months, for a
period of no more than five years (or until considered successful in writing by the Corps of
Engineers), beginning once stream realignment work is completed according to the plans
referenced in item # 1 above. The monitoring report must include photographs showing the
entirety of the stream realignment reach from both upstream and downstream angles, as well as
each structure, and any areas showing signs of instability.
3. If greater than 10% of the streambank area within the stream realignment reach is unstable (i.e.
shows signs of erosion) at the end of the monitoring period, the permittee will be required to
submit a contingency plan to correct the instability or compensate for the loss of stream function
associated with the authorized stream channel fill, subject to the approval of the Corps of
Engineers.
Digitally signed by
BAILEY.DAVID.E.1379263736
�/ G �+ fI DN:r-US,o=U.S.Government,
97�/iL/;'�� ou=DOD,ou=PKl,ou=USA,
(� �-� � rn=6AILEV.DAVID.E.13]9283]36
C��S Regulat�� OfllCl•dl. Date:2018.11.131523:13-OS'00'
Date: 11/13/2018
... . _ F,"`� / \
l{pRSEPEN i:Hc�r:�
�
\ � �
I � �r
s
��d�'�
ti
\� S1=U.T.TO KING GEORGE BRANCH
� TEMPORARY IMPACT
�'' a (11 LF, 22 SF, 0.001 AC)
_ ---_° _----,• , COFFER DAM
_ _ � --- --
ROCK CHECK DAM -
30" TEMP -, & PUMP AROUND
\� STREAM � ��T�FENCE
� �, :
`� BYPASS ` '
. . „ ..
F � � � /' � �;�+
��
, -_----__ ' �1: � �- �� � p `• ' \+
� ,;,,. . _ � .
-- _-__—_--_-_- �-.
_-`_ . ' . _ �, - _.
- _ _ . - _. . . _ - _ . . . - _ . ---
- �_:__. �_ -✓ /�� � +
-�-�-� --..' _ _ .. - �-- ' - '�.
� �
`� �a
_ _ —_ � r � • �v
— �- �.. sq,�� � ,�/ �� �F� �>A
_----=_---- --- _ = _ _- - � �� -
_ _ _ ,
- -L- � - - _
- - _- - 6ALUN�,FR RO.lSR 2/8/1 �� - --- --- "
-- —
--- - _, _.� ---
__---- -- -- - - - _ —�� =_ - _��-`
- - _ -
, — _ -_
_ _ -_, �------ F _ - 'r'�
- -- -- -� _ / ---�`��F
-- --- ,= � M��b -- =-- - -- - �
F- _ - - --_
TEMP. -I BLOCK & GRAVEL DROP INLET J r—
SEDIMENT FILTER � �
SILT FENCE _ ROCK OUTLET
FOR SILT FENCE
*TEMP. SKIMMER BASINS TO BE REMOVED
AFTER PROJECT COMPLETION AND GROUND
RETURNED TO EXISTING CONDITIONS.
LEGEND STREAM PERMIT IMPACT
SENSITIV6INFORMATION ^aE^ �Ac� �E��T� ��
� � "�� �ENOTES TEMPORARY
N01TOIlCCO�11C(IOfdISIllIlllYEd ���� JS/ IMPACTS IN SURFACE WATEN PFRMqNENT 0_Ol3 18)
wit�hou� thc express writtcn
SW IMPACTS
�1CII111SS1011 UfCh2 �/ OENOTCS IMPACT$ IN TEMPORARY 0-001 11
,/i� � �'. Sl1RFACE WATEN SW IMPARS
Crcy of Grecnsboro
vvE caNlaacr coNrancroa ri onrE
STV -) 1OO sn. �=��n,`o<��'�'n,Ly� �.
1 sio.wvnix I
RIpEINC�OT[�PLGaE PLANSAs
DOCUMENT NOT CONSIOERED FINAL
UNLESS ALl51GNATURES COMPLETED
-` -=♦x m �'7_ <i�= i� -_ '
-� -- -�
, --
�� � S ��� / �F_
w�:, eS � I ��--r-
I
� J� TEMP. EARTH
� BERM
� � �� � �
i
: /,
. TEMP. SKIMMER BASIN* —' '
�4�1�
IPERMIT ORAWING
SHEEf 1 OF b
CITY OF GREENSBORO
� I a 5 F• ENGWEERING DIVISION
� er ,� IIALL(NGFR RU (SR 2181) FT a�
�' er ..� OVER KING GEORGE BIUINCN
- Noaz xvEari TEA7P027R}� IMPu4C.T�5 hw. . eY,a...,�.1�..�..��w...«
—` _ �, E����EEa � E��,��EA
� _ d � �� � � p � INC�N[PLE� E PLANS
r'`� _ _- .. _ - - j . , �°r
s
- - �' ��d�'�
`� � �r�` - - � � s ti
�� - �" - � H04�tPEA� CREf� .
�'"z �`�.� . , �, �� k�j� �, S1 =U.T. TO KING GEORGE BNINCH — DOCUMENTNOTCONSIOEREDFINAL
� ��- v � �� j�!� - � � 3�5 '� �� TEMPORARY IMPACT UNLESSALl51GNATURE3COMPLETED
�'`'Y=.,�-, � �
-_--_ ��,r (11 LF, 22 SF, 0.001 AC) \
� -= � ' � �
��= = COFFER DAM —
- _ -_'-_�:- _.._ _ `
__
& PUMP AROUND ` �'
-- ROCK CHECK DAM - S�RETAM P � FENCE \
� � � BYPASS �' �+ � �
_ � U� T , � � � � . � . 1�. �+\_ +� '� ���V�+ � .
� �" .. .: � 'r . �- ' �
��-N� >
__—
___------ _-_____ ///���
-_- �' �-
- .. . . __- .. . _ _. _ . _. . . _ . � --_- � � '�
- � .. - _ . . - _ _ • _ _-' -- ' _
� �� �,,,
,. . _.... .. , �. -__ ..�:��� � � - �� .�� � �/�_
` �
_— .. ... ---�- , � . �
_ - . --_ � -___-- � __-
- - v
- -- _ - -- - �
ti -
� �� ���� /�
_-_ _ � �'�-� �r. � /
� �
---- -- -- — — - _ -___ r t , ; - . \ �.
_ - . . _ r'-- -�-� ., _ � � .�r�y� k� 7
p � +�
_ � `�
-- ���-
� _� �� — — — — -- ---- �� — 9 — � _— __'�� r���
— — — -- _ — --__ __ —_
- � ea�uN ;F�� s�r r � - i r �� � �_ ,"� - ��,� _r� �
-- � - �- � — - - - '
_ - -- a -- ,, .,� - — -
:
i �- ��
--_ - _ -- - - ; — — _� - - --- -- - - --
-- -_� - . `;�l Y ��, � �u � � -
_- - _ _ --- - � r1 � �l � � - -- -- __
_ �--- � -- - -- - -
- - - F � - - -- - - _ -- _ - --
-------------- -�
= � - � - - — -
`�—
_ - } - - - � -- �-�-R-�- - - —
------- -- �, ' �<"s�� - �} 1}��� �_
� ,
� � �� �
F - -- -_ - -
- - -- - - - �- � � ' � -�- �
'�� t
` _� BLOCK & GRAVEL DROP INLET � - � " �1� � . � _� '
Y
���- , l _ _ �_T
. _. - -
—
TEMP. SEDIMENT FILTER � — �-�t , �� �r�. 'N � _�_
SILT FENCE _ ROCK OUTLET __ __r� "� � —_
FOR SILT FENCE _'-
�- - _=
, f S � � ��=
. � � � � wraaos ' k �� I{� I - '
" _ _ _ - � I� ��`��� � �
� � %` " � '���� � ��� � =�� TEMP. EARTH
� BERM
*TEMP. SKIMMER BASINS TO BE REMOVED
AFTER PROJECT COMPLETION AND GROUND
RETURNED TO EXISTING CONDITIONS.
LEGEND STREAM PERMIT IMPACT
SENSITIV6INFORMATION ^aE^ �Ac� �E��T� ��
� � "�� �ENOTES TEMPORARY
N01TOIlCCO�11C(IOfdISIllIlllYEd ���� JS/ IMPACTS IN SURFACE WATEN PFRMqNENT 0_Ol3 18)
wit�hou� the express written
SW IMPACTS
�1CII111SS1011 UfCh2 �/ OENOTCS IMPACT$ IN TEMPORARY 0-001 11
,/i� � �'. Sl1RFACE WATEN SW IMPARS
Crcy of Grecnsboro
vvE caNlaacr coNrancroa ri onrE
STV -) 1OO sn. �=��n,`o<��'�'n,Ly� �.
1 sio.wvnix I
� � '�
�
. . �./ �\, . F ..
- TEMP. SKIMMER BASIN* —'
,
�� iii � ���
� ��,i'iiii i i x
I �- ��
� �.r,'i�:- . ,�,
IPERMIT ORAWING
SHEET 2 OF 6
CITY OF GREENSBORO
� I a 5 F• ENGWEERING DIVISION
� er ,� IIALL(NGFR RU (SR 2181) s F� a.
�' er ..� OVER KING GEORGE BIUINCN
- Noaz xvEari TEA7P027R}� IM17Pu4C.T�5 hw. . eY,a...,�.2�..�..��w...«
S2 = U.T. TO KING -
_ _ _ GEORGE BRANCH �,,,
FILL IMPACT
(120 LF, 299 SF, 0.007 AC) %� ���°r
ms
..._ - -- ''� �pdf'�
� � � - *� a
,�ti � �,�1,. ''� �1 _� �� �`
"z ,,f� _ ' �.
� ti-- _ �-
U.T. TO KING GEORGE BRANCH -, .
-= STREAM RELOCATION COFFER DAM -�
° _- �
_ � - .-,
� - (ADDED APPROX. 162 LF 30" TEMP -, & PUMP AROUND
ROCK CHECK DAM � �
vOF NEW CHANNEL) .\� BYPA,e,M � � +�FENCE
��
,u� ��;j
. - -. . � \ �
F r �-a^c�� � � ��
,�
�
- -------- ----- s � r �I ..> ,
�
_- ----------�__ �
� �� � � � �
- - _ , ; ✓ , +
�� ��
�- -_ � - - � ��-� -., . - - - — � _ � .���� � �� �� `�
� � � --_ � � � � � � '� " �� .
� ' -�--- � �
4 � >
� x i�_l,�_ � _ F���
--=_ --- --= -_ = _ _ _-_ -
t, � �=�
_--- ---- ._� , , � �l �, Ea � � � � � �
-L- �� - - --- - - - -
_ — 6ALUN;FR RO.I�K 2/Pl1 �� ----- " — – _ � � — `--
--
-- — � . _ __!�—`�- - . ��r�,
,-
i � �
-- — � — t ,�
-- - �
_ - � „� -
-- ----- ��-`_ .
- — - �
- - - -_ — _- _ �
''�� " � � `� a � --- i1� --
_ _ -_, _------ F ��� - - _ _ --�� s= �}� �
- - -- -- / �
-- ---- �- } ��.� -b — - -- _ � _ -- � _ ;
F- — � -_- _ _ — - --- � ; ���
- - �TEMP � BLOCK & GRAVEL DROP INLET � � j��� —� _ �1 = _ �
�
RIpEINC�OT[�PLGaE PLANSAs
DOCUMENT NOT CONSIOERED FINAL
UNLESS ALl51GNATURES COMPLETED
–�
�
SILT FENCE SEDIMENT FILTER -: �-�1 'r ----�, m�r� �r--
ROCK OUTLET ,-_ -_ --�=
FOR SILT FENCE ' - -_ --`� �=�� ---
' r� - - -_ �
S3=KING GEORGE BRANCH
FILL IMPACT
67 LF, 241 SF, 0.006 AC)
*TEMP. SKIMMER BASINS TO BE REMOVED
AFTER PROJECT COMPLETION AND GROUND
RETURNED TO EXISTING CONDITIONS.
LEGEND STREAM PERMIT IMPACT
SENSITIV6INFORMATION ^aE^ �Ac� �E��T� ��
� � "�� �ENOTES TEMPORARY
N01TOIlCCO�11C(IOfdISIllIlllYEd ���� JS/ IMPACTS IN SURFACE WATEN PFRMqNENT 0_Ol3 18)
wit�hou� thc express writtcn
SW IMPACTS
�1CII111SS1011 UfCh2 �/ OENOTCS IMPACT$ IN TEMPORARY 0-001 11
,/i� � �'. Sl1RFACE WATEN SW IMPARS
Crcy of Grecnsboro
vvE caNlaacr coNrancroa ri onrE
STV -) 1OO sn. �=��n,`o<��'�'n,Ly� �.
1 sio.wvnix I
' Wp,���5 'I �'. i ��-I�I�L�� — _ / _
� �� � � � � TEMP. EARTH
� BERM
i '�
,/
TEMP. SKIMMER BASIN* -' '
�4�1�
IPERMIT ORAWING
SHEET 3 OF 6
CITY OF GREENSBORO
� I a 5 F• ENGWEERING DIVISION
� er ,� IIALL(NGFR RU (SR 218I) s F� a.
�' er ..� OVER KING GEORGE BIUINCN . 3 HE�F N 6
- Noaz xvEari PERMAN&NT IMPACT�S h�.J��^.,�W `WV��
S2 = U.T. TO KING —
_, __ _ _ GEORGE BRANCH �,,,
FILL IMPACT
�
(120 LF, 299 SF, 0.007 AC) /' � ,\z��°or
�� � � � � ��� � �°titi
'� z �,��, 3�-�/ ' - � k f^'�'`� � \ \�
�
` - \
--- -''a"�`-"�`"'�/ , _ �-
-- U.T. TO KING GEORGE BRANCH
, ��= _ _ - STREAM RELOCATION COFFER DAM
- _ ;,-�. _,_.._
(ADDED APPROX. 162 LF 30" TEMP —, & PUMP AROUND
-- ROCK CHECK DAM �� OF NEW CHANNEL \ ��+\
� STREAM FENCE -
� u� ,� ASS
�;I
� �� �
� _ _ F ��� �-� r ��✓// ��\+
- -- � � , ' -�>
--- ---- �� � � _ �_ , _
- ---- � ---- �` �
--- - - � � - -- - �+
- - - - -_ ; ��� � � ��
_ .. . � -�;,
� -_ ,,��� � � � �_`�� � �
�� '. � -� --
v _ �� a ��>>�r� _ � � , �,
-- - -- � �
- _ -- - - - =_ _ -- - -
- -- --- - ---- -
_----- - „ ,
_
- � � --�., _-��� � —
� _ �� �. , �
�� ,
- - � , . _
�-- -- - -
RIpEINC�OT[�PLG E PLANSAs
�, R..
DOCUMENT NOT CONSIOERED FINAL
UNLESS ALl51GNATURES COMPLETED
— ��- � - 6a�uN _,F�� s�r r r? - i i: �� _- -- � - .�� _ - _ �
-- �
— s �` - _ � � — '
-- - _ _ - - ,, ,.� - � � — __
— - - — _- - -- -- - ---
�_L
-__-- --- - -- - -
. � _
: _ �� , _
` - --- --- — _
-- ---- � � _� � -
- - -
�
- _ F ��-- - ----�--- � \ J�ar1 � � 1��. � � - _ ��' __
---- -- -
� --- __ - ��� - - " --- � - -- � " --�-�-s-�- �rt� i ��� -
-- --
--- ; ,� -� -
F - — � � r . --y. _ � :''-�--- � --
— _ — -- _ _ �� „ - : —= —�
_� BLOCK & GRAVEL DROP INLET � - _ '
�_
I'���---�' � � � r � __� ---__
SILTPFENCE SEDIMENT FILTER � ' — �-�t , —�_ r�.
ROCK OUTLET , _ _ _ __ �_� _ =_
FOR SILT FENCE ; -- �— -- _�
-- -- � � ����� � �_--
w .es .c,- �. �[�—i_ � .
{.1 '
�
�� ��� � ��� TEMP. EARTH
BERM
� /� - '� ��` ��
S3=KING GEORGE BRANCH J' : TEMP. SKIMMER BASIN* —'
FILL IMPACT �
67 LF, 241 SF, 0.006 AC)
*TEMP. SKIMMER BASINS TO BE REMOVED �';
AFTER PROJECT COMPLETION AND GROUND � i'i<<i'� ��� Ii i � ���
RETURNED TO EXISTING CONDITIONS. �i � �� � i � _ \
LEGEND STREAM PERMIT IMPACT �� � � \
SENSITIV6INFORMATION ^aE^ �Ac� �E��T� �� `��ry' �
� � "�� �ENOTES TEMPORARY i . �
N01TOIlCCO�11C(IOfdISIllIlllYEd ���� JS/ IMPACTS IN SURFACE WATEN PFRMqNENT 0_Ol3 18)
SW IMPACTS
N'IPI1�Ul IIIC laPl'L'SS WCIILIII '
�1GI I111SSi011 ()f L�1C / ,�/ OENOTCS IMPACT$ IN TEMPORARY 0.001 11 I PERM�T ��2AW�1`I(�i
'/3;�' /'% suxFncE wnrEx Sw iMrncrs SHEET 4 OF 6
Crcy of G�ecnsboro
nvE caNraacr coNrancroa ni onrE CITY OF GREENSBORO
sNe„eineus,m��. � I ENGWEERINGDIVISION
STV.� ���°.�a"'^ 'F"' ! I IIALL(NGFR RU (SR 218I)
-:�"' x� u..��,. �i��,m�� v-rue� � �� OVER KING GEORGE BIUINCN
- NoazxvEali PERNL9N&NT IMPACTS 4 oF 6
� � � � � � � � �
��� .�.'�� I � �:: �,:: �-r��-rr��-t�: � :�:: I ::.: � �i ��I t:�'�� �I::t :::i �,�::� �'�,�:�� � :��' � ��� I '�, �
� T-1 . Y����r�IT�r-IT:l—l7 - "" IT�I-1�.—C1�r-1 I� .. "� . .
.��Y��Tr ���-1T-I1�r:Y��T�ITflTr7�TT-1,-17���fT
. _. .:..._!. ,. _._.:.'_ L_, _.:._.:_ ._...'__:_._....,. .i_. _. .L. _'__. _. _�_ �I-., _ .�_..:.:.1 _. .:.::._ 1....._.:_. ., 1.._._. _L_. _ �.
sio ii I 1 I I : ,I i;: ' 1:- I:I I i ! i I. I I:;'; I:i r::l. I I I - I i -
_::,_ .:_ , ,_ _,- - - - - - - — -
�. - ,_ _.. -
� �� �� i � ��a �—��� � u-w ��� �u—u—i �� ��� �i—���
�: I I :: I 11 I::: I
1 � �� I� �� r � I ji :r � � j:� jI ij � hI�:� r �- �I ' i � r:I �
�. .__.. _ �...._. ._� � _. :�._.— :_ _....� .:_ _. L. _. .� � L1:
I._.�-. 1. ._..��Fi L..._. :�r L.� J.�::C L. .I �::.:._ ...� L:�.._. .5 L_.. _. C-i.. . .F. _L 1_..
l- I- -
�. `- � � � � --� � � �-_ r�� i � r � ��. �--f -i_-�. I-��= l . n(_1 .
� NO DECK DRAINS REQUIRED FL = aqi0' 1� �
� i�� k� la �i =1- I� I -I .:� � � �::i kl �1: � u �3_ ,� � �I - �' _ ,
sos � _ _ __ __
l ' l j' �: �:: �': � �:'I , _
� i i :tI I+ �i :� I I � .�u � _ �.
� �P � � � -�- - - Gl7 = _ Po-IPN
� ,..; -$ i� -; - � -�r - �� i
fi I � :�.. _ T� f_i.r,C� �
� �I- ELtI '9i',9°;"
Fl = 1� � l� U r k7517Ni b`�i'l(;�i;F /
Fl �� � r i�� �- r-r- I EL =-�i �
�
OOCUMENT NOT CONSIUERED i1NAL I
UNlE55 ALL SIGNATURES COMPLETEO
805 I
EL = 7'�J.TT' �n .�/ TO 8� ��PofOVEl'� - 3�� �
800 k= r", ��i . IV��, _,� i I FFi:/,V Fny�;[ _ -. ! 800
6 L = l�t�' i Dr = l� hr1 �H I � � �
�1
TA. I ill�i� I __ -. � .
D__ _ � + � MFH �� _ _ ELEV �i.3 � I �
, _.�._.__ � -' ,- '�`��
�� „
� i � _ _ - ----� F�i i �� - � � �; � _
j1 i9 -J I � --
�+�, +-3�;: �-: _ — - - - 1- - ---- —PROPOSED BRIDGE i.-� � �.�_ �
� - -- -'"� I j ` . I-, ,
���=+-<<, -' - I - I ' _ Y' I I
� / -
� r � �k ��� � E�
795 � - i+lL'�J�ni � i �= b � � � � � ����� - 795
�-.U. � ',_-� i� � )�l�T1NL ��Fi��/JNI> - — --- � - r--i �i �- r-i� i - - _ ..�..I�- Gl..lr_� - -
��� �
�i � u t� u _� u � �_ { � �_ji � ii
� - � � �.- c -.
. . . . . __. _::i ::i- � �—PROPOSED y���7-r�r-r���r-r7���—rr-
� 790
I 785
� � BRIDGE ABUTMENT ;� -; I�' •- I I I�-=, � I,-_.=�
PROPOSED — � ' ' � �
�-� BRIDGE ABUTMENT ` . � .� t � � �j �-t � I .�.� �. I ��.�.�:.� ii
I ;: .I ..i I: I:: i 790
r- �'�I ��-1�7—rr-1,.. rrrrr�-rt7�,�T—fr-
, ' , — PROPOSED _,_�._"_;_ �.__...
.. ' RIPRAP � ..._. i ...._ r- i i i ��.
' i! i_ i+. ._ � I.r_, � i Ii=�
�- .. PROPOSED �--.. � y -� �� -�-
- - i .
r�.� RIPRAP ���� . � i i i ra � r: i i.-- i : r:-.
� � � /� � � � � � ' I �_� ��. I
rj': ._i iI � I� I �� j i.. r� �1 _� h � � 1 r � ��.1 f�
C.��.._ �� i �:L� ��. L � � _I � i �-. � d _i n I I_�-' t I �i�._� _
.'. . _ : . � _ . . �. - � -' i i � -�'i ���_ � i � r i � �- �
�. I _. ._ _�...__. .- �- q i.. i � � i �� _ 785
PERMANENT IMPACTS —►I;-= I � " �,; I: I �; ',
�t: _� �_i � � i_ �� �t::__� u �_� � i:_�,_� i�
- - _ : � - I - I 1. - �, -.
r ' I� PERMANENT IMPACT$ T��T��7��'�r��r��'��?
I-
- = i � , _ � , _ - _ - - -
� KWG GEORGE BRANCH F'— : � � I I�-�I a.
' JURISDICTIONAL AREA '
� 'I'.:: ' 1. ' - :" � TI��-��7 rr.-� 780
i I_Ci � i L..._. _ ;. -: -
1
- �-� SENSITIVE [NP'ORMATION
'1 1--' � � � i...
-- -- -- � --- - � � � Not to 6c cnpicd oi distriL uted
u�ithout thc cxprcis writtc�
PERMIT DRAWING �)21'111Iti�1Un UI (ItC
SHEET 5 OF b CiN ��f Gfeen56Un�
� ����» ���. North Carolina Department of Transportation
:�il[)riI7�Y;iIDTPT' Highway Stormwater Program ^���
STORMWATER MANAGEMENT PLAN
Version 2.08; Released A ril 2018 FOR NCDOT PROJECTS
WBS Element: 46311.1 F1 TIP No.: B-5553 County(ies): Guilford Page 1 of 1
General Pro'ect information
WBS Element: 46311.1 F1 TIP Number: B-5553 Project Type: Bridge Replacement Date: 10/9/2018
NCDOT Contact: Donald Huffines Contrector / Designer. STV Engineers, Inc. / Shirshant Sharma
Address: 1584 Yanceyville Street Address: 900 West Trade Street, Ste. 715
Greensboro, NC 27415 Charlotte, NC 28202
Phone: 336-487-0075 Phone: (704) 816-2556
Email: dhuffines@ncdot.qov Email: Shirshant.Sharma@stvinacom
City/Town: Greensboro County(ies): Guilford
River Basin(s): Cape Fear CAMA County? No
Wetlands within Pro'ect Limits? No
Project Description
Project Length (lin. miles or feet): 0.28 Surrounding Land Use: Suburban Mixed Use
Proposed Project Existing Site
Project Built-Upon Area (ac.) 1.4 ac. 1.0 ac.
Typical Cross Section Description: Roadway: Two 12' lanes, 5' paved shoulders Bridge: Two 10' lanes, no shoulders
Approach: Two 9' lanes, 0-1' shoulders
Annual Avg Daily Traffic (veh/hr/day): Design/Future: 5000 Year: 2040 Existing: 3800 Year: 2016
General Project Narrative: STV Engineers is providing engineering services for the bridge replacement project on SR 2181 (Ballinger Road) over King George Branch, a tributary to Horsepen Creek. The
(Description of Minimization of Water existing bridge is a 33'-6"(1 @16'-1 ", 1@16'-5") two-span bridge with a timber floor on I-beams and timber caps/timber piles abutments and interior bents. The proposed
Quality Impacts) structure will be a 70' long, 24" cored slab bridge with 3' vertical abutments. The proposed roadway alignment over the bridge is the same as the existing bridge alignment.
Overall drainage patterns will be maintained. A small section of jurisdictional stream will be relocated on downstream, east side of the bridge. The drainage from the bridge is
being discharged into a scour hole near the channel relocation.
Waterbody Information
Surtace Water Body (1): King George Branch, a tributary to Horsepen Creek NCDWR Stream Index No.: 16-11-5-(0.5)
NCDWR Surface Water Classification for Water Body Primary Classification: Water Supply II (WS-II)
Supplemental Classification: Nutrient Sensitive Waters (NSW)
Other Stream Classification: None
Impairments: None
Aquatic T&E Species? No Comments:
NRTR Stream ID: RPW Stream B Buffer Rules in Effect: Jordan Lake
Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? N/A
Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
If es, rovide 'ustification in the General Pro'ect Narrative General Project Narrative)
�-�� � " � �
����.� �
��\ � `� � �
� � � ���'' �
V� �� � � � i � ��r u� i
�� \
� \ � \ \ \ 2 \I -.
\ \ �,O \ .
� \ \ � � ' i � . ig ' i
� 'N
� , .
� m iy r1
� 94 / ��\� � j / 1^i- ,
�'6�CP 15�� � i � ��� �`7�,�\
- � ��—i �._' c � �) . ..,-. .
_ p!40
\
600
795
790
785
ti � /, , � f` � y, ' —
.' 01, . � ,. ��,- : � p .� :
�
4� /�
�iO�LD�R 0�' \ � z�€ ^� I / ��� %
� ETM�p9T � � , i� � �
�� a� � ROC1K 4S= ,pNF/ � �
I � �L'fJER � � .
� fIEWET T � � �
/ l � � / y� � �\
/
.� � ci� � � �,q b. I 4'0�'_
\i`l � �i i Q `'�1 tm£r � ��. / �
� i l � � 7 � p P,�-` �_
�.�a5_. RCP.IN� / /�. r- �_'.
_ _ _ y*� �"y�, � ��'/ _�� d � f�J�
- . ��FN
PLAN VIEW
CHANNEL PROFILE
Applythe foilo�.v9ng seed rnix as sho�.vn on the P'�anT3ng P!an or as dire�ted bythe
Shadv Seed M11'.x
Eiumus virg;nic�s U�.ir�insa LW'iid Rye
i]rchontbellumdnnd�estVnum C�eerTengue
AgrosPrsoerennuns autuerr�Henr9rass
Elymvs nystrrx Bott�e6rush Grass
Cinnaarundinaeeo Wo�edP.ezdgrass
7�Qnieumrtgldulurm Redto�:�Panic,rass
Ponic�ma�ceps &eaked Pan-��c Grass
Au'en.o snli�.+a orHvrieurn v�ufqore Commen Oat or Graln Har��y
7
7
0
DETAIL A
CHANNEL CHANGE
( Noi ro Scole)
b � 1 No��ral
P oposed Gro�nd
Natu�Ol — __ FIISIope __1--
Groun� �` 7.� p •y� � 1„iFt .
d -�
eeorezrae — B Mm. D 2 Ff. — e.�s�. a,o��ei
Type of Liner Coir F ber Matting B°x. d 1.6 Ft.
Co r F'ber Man�ng 320 SY 6= va Fes
DDE - 195 CY
FROM STA.17+50 TO STA.18+92 LT.
CHANNEL CROSS-SECTION
THROUGH ROCK CRO55 VANE
GROUND
BOULDEI
EL
CHANNEL CRO55-SECTION
THROUGH BOULDER REVEfMENT
EXISTING GROUND
CHANNEL
MElW STA�lL{TA710N 71ME�€RAMEa'
r[n..w. rw. i»�n
SItE ARE0. DESCfl�FiWH $TABLLII.4TqN TI�EiRAttE ERCE9tONS
�,. � PenmMer Alkec, vweles. Walvea�, sYepes '/Eays Ndrc
�� M�pnGualnywatx�MOv412onati iWys Nan�
11WPNa1+<JbfW�na:i Tayp�f tt�GMarotO'orll6tln�MWll�an0afs
� noe sroeper man x. �. t� enys nre eibxee
� Siopn 3�: ur fIINMr 1I dayc 7 dayc 10. slopes qrnaro+' anon 50' m bngXn
._=L wi ae�ux nroax.�mn s�epna�eurr rnan �:t ta nayc Nana excEp� rw pe��meiess ana Now zemes.
ur,.� � o�rv .�r�A��„�—���—� ,�
�w
�—�P,��� �.
=;x-� � E�E�Ana� r � ..,0.-�1, . �rF
,
1 `� � � �„��,-� �� ,-
„E ,�� ;�� ' � � � «
-, �,���,�� ,� , '�> ,
, � �,
�1� FAAF� Paa ��E
a���KN��� � �� �� �ao�um,s��orzs
, / ��
, \„��i%
..�� ��. �.�_�
� ,; smE,MeEo Poo.
�j
2E .o�»r. � ��%✓.
BOULDER CROSS VANE
�s�"'oE�
�
�
�
BOULDER REVETMENT
��
�
��
��
a
�o
��
0
Action ID Number: SAW-2017-00657 County: Guilford
Permittee: Citv of Greensboro (Attn: Eric Tart)
Project Name: Citv of Greensboro / B5553 / Bridge 98 / Ballinger Road / Horsepen Creek / Guilford
County / municipal
Date Verification Issued: 11/13/2018
Project Manager: David E. Bailey
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn: David E. Bailey
Raleigh Regulatory Office
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
or
David.E.Bailey2 @usace.army.mil
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may
result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I
administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Signature of Permittee Date