Loading...
HomeMy WebLinkAboutNCS000315 Review DocumentLast update: 111512018 NC Division of Energy, Mineral and Land Resources Review for Permit Renewal — NCS000315 Nexeo Solutions, LLC Charlotte, NC Facility Activities and Process - SIC 5169 - Chemical Distribution. Haz. Waste Treatment/disposal. Facility stores, blends, repackages and distributes hazardous materials, flammables, caustics, solvents, etc. Monitoring — The facility has been monitoring for TSS, O&G, COD, Toluene, Xylenes and pH. Previous permit did have tier system. o Data from 2010 — 2017 (in renewal app and DMRs) shows no benchmark exceedances. o Propose to remove 0&G, Toluene and Xylene. o Parameters remaining in the permit —TSS, COD, and pH. o Tier structure adjusted to have the three levels as in current permits. o Parameter codes added to permit. Discussions with Facility — 8/28/2018 email to Ed Graves, Mike Trull and Amy Bauer to try and set up call to discuss renewal. Response back from Chris Byerman on 8/28/18 — set up call for 9/4/18. Chris provided contact update information to get database up to date. 9/4/18 Call with Chris Byerman and Amy Bauer (Consultant). Facility has not had any changes in process or materials that could change the stormwater permit. There have been some contact changes and they will provide information on the changes. We discussed the changes to expect in the permit including removal of some parameters from monitoring and the other general changes along with the permit issuance for a short cycle (through 2021). Asked facility reps to review the changes to the site plan that have removed outfalls 007 and 008 and verify what happened there. Also asked for information on the containment basin, how it is set up, when it discharges, etc. Followed up with email on these issues on 9/5/2018 (see email on second page). Chris also noted that facility is inspected monthly by DWM staff and that information on possible pollutant sources can be found in the Toxic Release Inventory (TRI) reports. Surface Water Information - Facility drains to Stewart Creek in the Catawba River Basin, 11-137-1-2 , a class C stream. 2016 Integrated Report does not list Stewart Creek as impaired. Does ultimately flow to Irwin Creek which has some impairment issues for turbidity and lead. Current permit does note the Irwin Creek impairment. NC National Heritage review — NHP report shows no aquatic resources within project area or within one mile of the project boundary. Regional Office Information - MRO — Draft to region and to CMSWS on 09/19/2018 by email. MRO approval through email on 10/22/18, site visit done on 10/17/18. Talked with James on 11/5 about outfalls at the site and he verified outfalls and that they were sampling 001 as approved in the previous permit (by settlement agreement) and that this location captured the industrial area sufficiently. This will be changed in the final permit and noted in the cover letter that they only need to sample 001 as before. Had waited on this pending information on some outfall locations. James indicated that the pipes that were previously noted as outfalls 007 and 008 drained to a grass area and sheet flowed. Last update: 111512018 Bennett, Bradley From: Bennett, Bradley Sent: Wednesday, September 05, 2018 10:56 AM To: 'Byerman, Christopher'; Amy Bauer Subject: RE: [External] RE: NCS000315 Stormwater Permit Renewal Chris and Amy, Thanks for talking with me yesterday about the Nexeo facility in Charlotte and the renewal process. I just wanted to send an email as a reminder about the two items we discussed at the end that you guys were going to get us more information on. • Outfalls 007 and 008 that appear on the site plan in the renewal application but are not on the site plan that Chris forwarded recently? • Containment Basin - It would be helpful to get a little more information on the function of this basin. Thanks again for all your help.