Loading...
HomeMy WebLinkAboutNC0003298_Worksheets_20181105 (3)International Paper Company - Riegelwood, Pulp and Paper Facility Bleach plant 1 and bleach plant 2 have a combined sewer system calculations are based on 355 days of operatrion per year Bleached Kraft Air Dried Tons (short tons) Average per year Average (tons/day) Average (pounds/day) Average (kg/day) Bleach Plants 2016 Bleach plant 1+ 2 3701212 3701212 11042.90 210851800.00 9461102.90 Bleach plant 3 2521272 2521272 710.60 114211200.00 6441645.4 Total 6221484 6221484 11753.5 315071000.0 115901748.3 Limits for chloroform for each bleach plant are calculated in accordance with Subpart B effluent guidelines (430.24) Bleach plant 1 + Bleach plant 2 Chloroform daily max = 6.92 g/kkg * 946.1 kkg = 6.55 kg/day =14.4 Ib/day Chloroform monthly average = 4.14 g/kkg * 946.1 kkg = 3.92 kg/day = 8.62 Ib/day Bleach plant 3 Chloroform daily max = 6.92 g/kkg * 644.6 kkg = 4.46 kg/day = 9.81 Ib/day Chloroform monthly average = 4.14 g/kkg * 644.6 kkg = 2.66 kg/day = 5.84 Ib/day Effluent limits for external outfall are calculated in accordance with Subpart B effluent guidelines (430.24) AOX daily max = 0.951 kg/kkg * 1590.1 kkg =1512.2 kg/day = 3326.8 Ib/day AOX monthly average = 0.623 kg/kkg * 1590.1 kkg = 990.6 kg/day = 2179.4 Ib/day Pentachlorophenol daily max = 0.0014 kg/kkg * 1590.1 kkg = 2.23 kg/day =4.89 Ib/day Trichlorophenol daily max = 0.0088 kg/kkg * 1590.1 kkg = 13.99 kg/day = 30.8 Ib/day TSS daily max = 22.15 kg/kkg * 1590.1 kkg = 35220.7 kg/day = 77485.6 Ib/day TSS monthly average = 11.9 kg/kkg * 1590.1 kkg = 18,922.2 kg/day = 41628.8 Ib/day As summaried 10/21/2005 NC0003298_Worksheets_20181105 (3).xls As summarized by Diane Hardison