October 29, 2018
CERTIFIED MAIL # 7016 1370 0000 2596 0238
RETURN RECEIPT REQUESTED
Mr. George Altice, Director of Corporate Engineering
Pharr Yarns, LLC
P.O. Box 1939
McAdenville,NC 28101
Subject: Notice of Deficiency
Compliance Evaluation Inspection
NOD-2018-PC-0306
Pharr Yarns WWTP
NPDES Permit No. NC0004812
Gaston County
Dear Mr. Altice:
Enclosed is a copy of the Compliance Evaluation Inspection for the inspection conducted at the subject
facility on October 9, 2018 by Ori Tuvia. The cooperation of James Davis during the site visit was much
appreciated. Please advise the staff involved with this NPDES Permit by forwarding a copy of the enclosed
report.
The following areas of concern were observed during the inspection:
1) No application has been sent for the subject NPDES permit that is due to expire on January 31, 2019. The
facility is expecting to rescind its permit in the next couple of months,but the expected time for the permit
recession will be after the permit expiration date. The facility must submit a permit renewal application to
the NPDES Permitting Unit.
2) The flow meter is past due for calibration. The flow meter was due for calibration on December 14, 2017.
If the contracted company is unable to calibrate the flow meter, please ask them to provide written
documentation to you(email or a letter) indicating such.
State of North Carolina I Environmental Quality I Water Resources I Water Quality Regional Operations
Mooresville Regional Office 1 610 East Center Avenue,Suite 3011 Mooresville,North Carolina 28115
704 663 1699
The report should be self-explanatory; however, should you have any questions concerning this report,
please do not hesitate to contact Ori Tuvia at (704) 235-2190, or at ori.tuvia(ancdenr.gov.
Sincerely,
DocuSigned by:
A14CC681 AF27425...
W. Corey Basinger
Regional Supervisor
Mooresville Regional Office
Division of Water Resources
cc: NPDES, MRO files (Laserfiche)
Jaime Davis (E-Copy)
United States Environmental Protection Agency
Form Approved.
EPA Washington,D.C.20460 OMB No.2040-0057
Water Compliance Inspection Report Approval expires 8-31-98
Section A: National Data System Coding(i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 2 15 1 3 I NC0004812 111 12 I 18/10/09 I17 18 I S i 19 i G i 201 I
21I111II IIIIIIIIIII III IIII I IIIIII IIIIIIIII1 f6
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
67 1.0 70 71 [„ I 72 n 73 L_LJ74 751
I I I I I I I80
Section B: Facility Data u
Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date
POTW name and NPDES oermit Number) 09:55AM 18/10/09 14/08/01
Pharr Yarns Industrial WWTP
147 Willow Dr Exit Time/Date Permit Expiration Date
Mc Adenville NC 28101 11:05AM 18/10/09 19/01/31
Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data
James Lester Davis/ORC/704-813-9342/
Name,Address of Responsible Official/Title/Phone and Fax Number
Contacted
George Altice,PO Box 1939 Mc Adenville NC 2 81 01 1 93 9//704-8 2 3-2 39 7/
No
Section C:Areas Evaluated During Inspection(Check only those areas evaluated)
Permit 0 Flow Measurement Operations&Maintenance Records/Reports
Self-Monitoring Program 0 Facility Site Review Effluent/Receiving Waters Laboratory
Section D:Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date
DocuSigned by:
Ori A Tuvia MRO WQ//704-663-1699/
10/29/2018
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
W. Corey Basinger Division of Water Quality//704-2,
EPA Form 3560-3(Rev 9-94)Previous editions are obsolete.
DocuSigned by:
e� 10/29/2018
AtaccsatAFvazs... Page# 1
NPDES yr/mo/day Inspection Type 1
31 NC0004812 I11 121 18/10/09 117 18 JCJ
Section D:Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
Page# 2
Permit: NC0004812 Owner-Facility: Pharr Yarns Industrial WWTP
Inspection Date: 10/09/2018 Inspection Type: Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ 0 ❑ ❑
application?
Is the facility as described in the permit? 0 ❑ ❑ ❑
#Are there any special conditions for the permit? 0 ❑ ❑ ❑
Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑
Is the inspector granted access to all areas for inspection? 0 ❑ ❑ ❑
Comment: The subject permit expires on 1/31/2019. The facility is expecting to rescind its permit in the
next couple of months, but the expected time will be after the permit expiration date. The
facility will send application to the permitting unit. The facility has rescinded its land
application permit.
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit? 0 ❑ ❑ ❑
Is all required information readily available, complete and current? 0 ❑ ❑ ❑
Are all records maintained for 3 years(lab. reg. required 5 years)? 0 ❑ ❑ ❑
Are analytical results consistent with data reported on DMRs? ❑ ❑ ❑
Is the chain-of-custody complete? ❑ ❑ ❑
Dates,times and location of sampling ❑
Name of individual performing the sampling ❑
Results of analysis and calibration ❑
Dates of analysis ❑
Name of person performing analyses ❑
Transported COCs ❑
Are DMRs complete: do they include all permit parameters? 0 ❑ ❑ ❑
Has the facility submitted its annual compliance report to users and DWQ? ❑ ❑ ❑
(If the facility is=or>5 MGD permitted flow) Do they operate 24/7 with a certified operator ❑ ❑ ❑
on each shift?
Is the ORC visitation log available and current? ❑ ❑ ❑
Is the ORC certified at grade equal to or higher than the facility classification? ❑ ❑ ❑
Is the backup operator certified at one grade less or greater than the facility classification? ❑ ❑ ❑
Is a copy of the current NPDES permit available on site? ❑ ❑ ❑
Facility has copy of previous year's Annual Report on file for review? ❑ ❑ ❑
Comment: During previous inspection (April 11, 2018) it was noted ORC logs fail to include
maintenance work done. During the inspection ORC logs were much better and included
maintenance work, including the date equipment was taken offline and date the equipment
was repaired and returned to service
Page# 3
Permit: NC0004812 Owner-Facility: Pharr Yarns Industrial WWTP
Inspection Date: 10/09/2018 Inspection Type: Compliance Evaluation
Record Keeping Yes No NA NE
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional? 0 ❑ ❑ ❑
Is sample collected below all treatment units? 0 ❑ ❑ ❑
Is proper volume collected? 0 ❑ ❑ ❑
Is the tubing clean? 0 ❑ ❑ ❑
#Is proper temperature set for sample storage(kept at less than or equal to 6.0 degrees ❑ ❑ ❑
Celsius)?
Is the facility sampling performed as required by the permit(frequency, sampling type 0 ❑ ❑ ❑
representative)?
Comment: The subject permit requires effluent composite and grab samples.
Upstream / Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit(frequency, sampling type, and 0 ❑ ❑ ❑
sampling location)?
Comment:
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters,for ex: MLSS, MCRT, Settleable ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: At the time of the inspection the facility looked much better than previous inspection, with
less foam and secondary clarifier in much better condition.
Process control measurements were being documented and maintained on-site.
Aeration Basins Yes No NA NE
Mode of operation Ext.Air
Type of aeration system Surface
Is the basin free of dead spots? 0 ❑ ❑ ❑
Are surface aerators and mixers operational? N ❑ ❑ ❑
Are the diffusers operational? ❑ ❑ 0 ❑
Is the foam the proper color for the treatment process? ❑ 0 ❑ ❑
Does the foam cover less than 25%of the basin's surface? ❑ 0 ❑ ❑
Is the DO level acceptable? ❑ ❑ ❑
Is the DO level acceptable?(1.0 to 3.0 mg/I) ❑ ❑ ❑
Page# 4
Permit: NC0004812 Owner-Facility: Pharr Yarns Industrial WWTP
Inspection Date: 10/09/2018 Inspection Type: Compliance Evaluation
Aeration Basins Yes No NA NE
Comment: The aeration basin is equipped with three aerators and a mixer. Excessive amount of foam
was observed.
Bar Screens Yes No NA NE
Type of bar screen
a.Manual
b.Mechanical ❑
Are the bars adequately screening debris? 0 ❑ ❑ ❑
Is the screen free of excessive debris? 0 ❑ ❑ ❑
Is disposal of screening in compliance? 0 ❑ ❑ ❑
Is the unit in good condition? 0 ❑ ❑ ❑
Comment:
Secondary Clarifier Yes No NA NE
Is the clarifier free of black and odorous wastewater? M ❑ ❑ ❑
Is the site free of excessive buildup of solids in center well of circular clarifier? 0 ❑ ❑ ❑
Are weirs level? 0 ❑ ❑ ❑
Is the site free of weir blockage? M ❑ ❑ ❑
Is the site free of evidence of short-circuiting? 0 ❑ ❑ ❑
Is scum removal adequate? 0 ❑ ❑ ❑
Is the site free of excessive floating sludge? 0 ❑ ❑ ❑
Is the drive unit operational? 0 ❑ ❑ ❑
Is the return rate acceptable (low turbulence)? 0 ❑ ❑ ❑
Is the overflow clear of excessive solids/pin floc? 0 ❑ ❑ ❑
Is the sludge blanket level acceptable? (Approximately'/of the sidewall depth) 0 ❑ ❑ ❑
Comment: The facility is equipped with two secondary clarifiers (one operational). At the time of the
inspection the secondary clarifier appeared to be in much better condition than the last
inspection.
Filtration (High Rate Tertiary) Yes No NA NE
Type of operation: Down flow
Is the filter media present? ❑ ❑ ❑
Is the filter surface free of clogging? ❑ ❑ ❑
Is the filter free of growth? ❑ ❑ ❑
Is the air scour operational? ❑ ❑ ❑
Page# 5
Permit: NC0004812 Owner-Facility: Pharr Yarns Industrial WWTP
Inspection Date: 10/09/2018 Inspection Type: Compliance Evaluation
Filtration (High Rate Tertiary) Yes No NA NE
Is the scouring acceptable? 0 ❑ ❑ ❑
Is the clear well free of excessive solids and filter media? M ❑ ❑ ❑
Comment: All three tertiary filters were operational and in service. The filter backwash is returned to the
head of the plant (aeration basin).
Flow Measurement- Effluent Yes No NA NE
#Is flow meter used for reporting? 0 ❑ ❑ ❑
Is flow meter calibrated annually? ❑ 0 ❑ ❑
Is the flow meter operational? ❑ ❑ ❑
(If units are separated) Does the chart recorder match the flow meter? 0 ❑ ❑ ❑
Comment: The flow meter is past due for calibration. The flow meter was due for calibration on
December 14, 2017. If lab can not calibrate the flow meter please ask them write a letter that
indicates that.
Disinfection-Liquid Yes No NA NE
Is there adequate reserve supply of disinfectant? 0 ❑ ❑ ❑
(Sodium Hypochlorite) Is pump feed system operational? 0 ❑ ❑ ❑
Is bulk storage tank containment area adequate? (free of leaks/open drains) 0 ❑ ❑ ❑
Is the level of chlorine residual acceptable? 0 ❑ ❑ ❑
Is the contact chamber free of growth, or sludge buildup? 0 ❑ ❑ ❑
Is there chlorine residual prior to de-chlorination? 0 ❑ ❑ ❑
Comment: Chlorine levels (total and free)are periodically monitored (process control) in the chlorine
contact chamber. Only one train of the chlorine contact chamber was being used due to low
influent flows.
De-chlorination Yes No NA NE
Type of system ? Tablet
Is the feed ratio proportional to chlorine amount(1 to 1)? ❑ ❑ ❑
Is storage appropriate for cylinders? 0 ❑ ❑ ❑
#Is de-chlorination substance stored away from chlorine containers? ❑ ❑ 0 ❑
Are the tablets the proper size and type? 0 ❑ ❑ ❑
Comment: Dechlor tablets are used.
Are tablet de-chlorinators operational? 0 ❑ ❑ ❑
Number of tubes in use? 1
Page# 6
Permit: NC0004812 Owner-Facility: Pharr Yarns Industrial WWTP
Inspection Date: 10/09/2018 Inspection Type: Compliance Evaluation
De-chlorination Yes No NA NE
Comment: Tablets are put in above surface tube. Chlorinated discharge is circulated into the tube.
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained? 0 ❑ ❑ ❑
Are the receiving water free of foam other than trace amounts and other debris? 0 ❑ ❑ ❑
If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ ❑
Comment:
Page# 7