Loading...
HomeMy WebLinkAbout20060414 Ver 1_COMPLETE FILE_20060315USDA United States Forest National Forests in North Carolina 160 ZII.LICOA ST STE A Department of Service Supervisor's Office ASHEVILLE NC 28801-1082 Agriculture 828-257-4200 File Code: 7720-3-2 Date: December 5, 2006 401/Wetlands Unit North Carolina Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699-1650 Dear Sir/Madam; Attached is a signed Certification of Completion for the Malonee Trail Bridge project (DWQ # 06-0414) in Jackson County, North Carolina. All work has been completed_ in accordance with project plans, project specifications, and permit terms and conditions. Sincerely, L. C , PE ngineering, Minerals, and Telecommunications Staff Officer Attachment xaus er+re u;ALfrv 0d g YQf? 'A ESN M L.___ i -- __.1_ 0 Certification of Completion DWQ Project No.: 0,( , - County: 1_rx6K. 5a1? Applicant: ??Ds ?' S?,ewiGc= Project Name: Date of Issuance of Isolated Wetland Permit: 4/f3, ?.2606 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any - subsequent modifications,-the applicant-is requi`redTc return tHis cei ificate to the 401 an s mt, ortl- Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification I LYAW ?, `?ll, 5 hereby state that, to the best of my abilities, due care and diligence was used in the observatio f the construction such that the construction was observed to be built within substantial compliance and inte . f the AOI W ter Quality Certification and Buffer Rules, the approved plans and specifications, an er s Anoaterials. Signature: ? 4'," o Date: If this project was designed by a Certified Professional I , as a duly registered Professional (i.e., Engineer; Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supp -ting materials. Signature: Date: n i /_ D LZ; 8 Z006 iri vv;?7?t? irY ?,a i ?f i?4 r`yt% 974n?!Ylt±T??t !?iIIMCH Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources April 18, 2006 Marisue Hilliard, Forest Supervisor National Forests in North Carolina Post Office Box 2750 Asheville, NC 28802-2750 Subject Property: Malonee Trail Bridge & Trail Pier Alan W. Klimek, P.E. Director Division of Water Quality DWQ Project # 06-0414 Jackson County ?D AP D R 2 4 2006 Qf TOR A I TER Approval of 401 Water Quality Certification with Additional Conditions Dear Mr. Hilliard: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact approximately 30 linear feet of streams for the purpose of stream stabilization and access repair / replacement at the subject property, as described within your application received by the N.C. Division of Water Quality (DWQ) on March 15, 2006. After reviewing your application, we have decided these impacts are covered by General Water Quality Certification Number(s) 3495 (GC3495). The Certification (s) allows you to use Nationwide Permit(s) 13 / 27 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge, and stormwater regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose that you described in your application. If you change your project beyond this approval, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet http://h2o.enr.state.nc.us/ncwetiands 91ILDEY I An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Wolf Creek Page 2 of 6 April 18, 2006 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Plan Location or Reference Ap roved Units Stream Approximately Wolf Creek 30 linear feet) 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. Wolf Creek Page 3 of 6 April 18, 2006 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/ Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 6. Construction in this creek and disturbance within a 25-foot trout buffer should be avoided during the October 15 to April 15 trout spawning period to avoid adverse effects of sediment on eggs and larvae. 7. Sediment and erosion control measures must be implemented prior to construction and maintained on the sites to minimize sediment in downstream areas. Seeding for a temporary cover of wheat, millet, or similar annual grain or permanent herbaceous cover should occur on all bare soil within five (5) days of ground disturbing activities to provide long-term erosion control. The projects should be accomplished in stages instead of leaving large tracts exposed to further storm events. Erosion control matting should be used in conjunction with appropriate seeding on disturbed soils in steep slope and riparian areas. Matting should be secured in place with staples, stakes, or, wherever possible, live stakes of native trees. Straw mulch and tall fescue should not be used in riparian areas. In addition, because of an anticipated difficulty in establishing ground cover during the winter, reseeding should be conducted, as necessary, in the spring-time with a native annual and perennial seed mix with a temporary nursery crop of wheat, millet or other grain. 8. Only clean, large, angular rock, large woody material, or other natural stream design materials and techniques should be used for bank stabilization. Rock should not be placed in the stream channel in a manner that constricts stream flow or that will impede aquatic life movements during low flow conditions. Filter cloth should be placed behind large rock that is used for bank stabilization. Properly designed rock vanes should be constructed wherever appropriate on bank stabilization and channel realignment stream reaches to improve channel stability and to improve aquatic habitat. Root wads should be installed low enough in the bank so that a significant portion (at least one-third) the root wad is inundated during normal flows. Should large, angular rock, large woody material, or other natural stream design materials and techniques not be sufficient for long term stability of the stream and adjacent roadway, and concrete be incorporated into the design, measures which would prevent surface waters from coming into contact with live concrete. Wolf Creek Page 4 of 6 April 18, 2006 9. The channel should be restored to a more stable condition. However, under no circumstances should river rock, sand or other materials be dredged from the stream channel under authorization of this permit except, if necessary, in the immediate vicinity of the eroding banks for the explicit purpose of anchoring stabilizing or flow/grade control structures or for reestablishing the natural and more stable stream channel dimensions. Stream bed materials are unstable in flowing- water situations and are unsuitable for bank stabilization. In stream dredging has catastrophic effects on aquatic life and disturbance of the natural form of the stream channel can cause downstream erosion problems. The natural dimension, pattern, and profile of the stream upstream and downstream of the permitted area should not be modified by widening the stream channel or changing its depth. No backfilling of stream bed materials is allowed under this authorization. 10. Stabilization measures should only be applied on or near existing erosion sites, leaving other stable stream bank areas in a natural condition. Grading and backfilling should be minimized and tree and shrub growth should be retained where possible to ensure long term availability of stream bank cover for aquatic life and wildlife. Backfill materials should be obtained from upland sites except in cases where excess stream bed materials are available. Berms should not be permitted because they block the floodplain, constrict and accelerate flood flows, and often fail and sometimes impede drainage during large flood events. 11. Repairs to eroded banks should be conducted in a dry work area. Sandbags or other clean diversion structures should be used to minimize excavation in flowing water. Channel realignments should be constructed by excavating the new channel from downstream to upstream before connecting it to the old channel. 12. Heavy equipment should be operated from the bank whenever possible. All mechanized equipment operated near surface waters should be inspected and maintained regularly to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids or other toxic materials. Equipment used in stream channel must be clean, new or low hour equipment. Exposure of equipment to surface waters must be minimized to the maximum extent possible. 13. Disturbed stream banks and a 30-foot vegetated zone (as required under the Water Supply regulations), or the widest width that is practical under the site conditions, must be restored along the construction sites to natural riparian conditions with native trees and shrubs (e.g., silky dogwood, rhododendron, dog hobble, red maple, silky willow, tag alder, black willow, sycamore) to provide long-term bank stability and stream shading. Note, silky dogwood, silky willow and black willow can be planted as live stakes collected during the dormant growing season. Cuttings should be randomly planted on four (4) foot centers from the waters edge to the top of the bank. Trees should be planted on ten (10) to twelve (12) foot centers. Stream banks in these areas should also be seeded with a native annual and perennial seed mix with a temporary nursery crop of wheat, millet or other grain. Replanting of vegetation within disturbed areas located within 30 feet of the streambank associated with any land disturbing activity, repair, replacement and/or maintenance must be done in a manner consistant with the Guidelines for Riparian Buffer Restoration immediately following construction. (Please see attached.) 14. If pasture along the stream is to be used for grazing, a fence must be constructed outside of the riparian zone and the stream to prevent livestock from entering these areas. Wolf Creek Page 5 of 6 April 18, 2006 15. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected riparian zones such that it will not re-concentrate before discharging into a stream. If this is not possible, it may be necessary to provide stormwater facilities that are considered to remove nitrogen. This may require additional approval from this Office. 16. Turbidity Standard The turbidity standard of 10 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 2B. .0200. Appropriate sediment and erosion control practices must be used to meet this standard. 17. No Sediment and Erosion Control Measures in Wetlands Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources or locally delegated program has released the project. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. Wolf Creek ' Page 6 of 6 April 18, 2006 This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Kevin Barnett in the DWQ Asheville Regional Office at 828-296-4657. Sincerely, CY z? ?. Alan W. Klimek, P.E., Director Division of Water Quality AW K/khb Enclosures: GC 3376 Certificate of Completion Guidelines for Riparian Buffer Restoration cc: Lynn Hicks, Forest Engineer US Forest Service Post Office Box 2750 Asheville, NC 28802-2750 USACE Asheville Regulatory Field Office DWQ 401 Central Office DLR Asheville Regional Office David McHenry, NC Wildlife Resources Commission File Copy Central Files Filename: 06-0414. USFS.WolfCreek.Approval -- find Wetland Project `Irrlpact&'MlUnatfons?Fees .Alations Events Inspections i Comniants?.History Detaflst F Aatail 2 ?_a.. ?e m H?yw ermlt ndC@ts -_? Crossfs 7 ProjectNumber. 20060414 Version 1 Status: LIasued Last ActionDesc: Project Issued *Project Name: r MaloneeTralVBridgeTrailrrPlerConstruction 'ProjectType. BridgeCOnstuction/Repair I_M_ . Project DBet: bridge& pier trail project 'Owner, .Hilliard Marisue I Details... J ..---- 'Received From iApplicant COE ID I 'Pnmary Countr Jackson DOTTIP: 'Admin Region: Asheville Received Dt X0311512006 - Reviewer. kevln.barnett - i Issued Dt 04il W2006 '_- "` _`Secontla Coun r- -- Statutory Dt 06I0312006 CAMA NEPAI SEPA Received 01 DCM Office: _ y SW Plan Received Dt j COE Office: levilie Regulatory Field OficeT J ! SW Plan _ Approved Dt Public Notice Published Dt Last Updated By it urle Jennison SW Plan Location: Public Notice Received Ot Last Updated Orr 103122!2006 1 Sewage Disposal: P.N. Comment Period Ends Dt i - <BacK v - f 1- Close E ,Ready Page 111 - _ _ SVD: WPD1 _ Triage Check List Date: 3/22/06 Project Name: Malonee Trail Bridge & Trail Pier DWQ #:06-0414 County: Jackson Kevin Barnett, Asheville Regional Office To: 60-day Processing Time: 3/15/06 to 5/13/06 From: Cyndi Karoly Telephone: (919) 733-9721 The file attached is being forwarded to you for your evaluation. Please call if you need assistance. ? Stream length impacted ? Stream determination Wetland determination and distance to blue-line surface waters on USFW topo maps ? Minimization/avoidance issues ? Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman) ? Pond fill Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy ? Is the application consistent with pre-application meetings? ? Cumulative impact concern Comments: As per our discussion regarding revision of the triage and delegation processes, please review the attached file. Note that you are the first reviewer, so this file will need to be reviewed for administrative as well as technical details. If you elect to place this project on hold, please ask the applicant to provide your requested information to both the Central Office in Raleigh as well as the Asheville Regional Office. As we discussed, this is an experimental, interim procedure as we slowly transition to electronic applications. Please apprise me of any complications you encounter, whether related to workload, processing times, or lack of a "second reviewer" as the triage process in Central had previously provided. Also, if you think of ways to improve this process, especially so that we can plan for the electronic applications, let me know. Thanks! O? QG William G. Ross Jr., Secretary ' r North Carolina Department of Environment and Natural Resources >_ I.VW? _; O lqii;?900141W '1;? March 17, 2006 CERTIFIED MAIL: RETURN RECEIPT REQUESTED US Forest Service Atttn: Lynn Hicks PO Box 2750 Asheville, NC 28802-2750 Subject Property: Alan W. Klimek, P.E. Director Division of Water Quality Malonee Trail-Bridge & Trail-Pier Project Impacts REQUEST FOR MORE INFORMATION Dear Mr./Ms. Hicks: DWQ Project # 06-0414 Jackson County On March 15, 2006, the-Division of Water'Quality (DWQ) received your application for the project site on Wolf Creek. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. This project has been placed on hold until the following criteria has been meet. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Impacts In reviewing your application, it failed to supply any impacts on page 6. We acknowledge receipt of a $200 fee; however, without any noted impacts we are returning the fee to you at this time until the requested information is supplied. Please contact the DWQ within three weeks of the date of this letter to verify that you have received this letter and that you remain interested in continuing to pursue permitting of your project and will be providing the DWQ the requested information at a later date. Please contact me in writing. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733- 1786 if you have any questions regarding or would like to set up a me W 0 nV v D APR 4 -,2006 DENR - WATER QUALITY WETLANDS AND STOMWATER BRANCH One Npttlt ly 401 Oversight/Express Review Permitting Unit Naturally 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.enr.state.nc.us/ncwetlands An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper Applicant: Page 2 of 2 Date: March 17, 2,006 Sinc ely, 4 Cyndi Karoly, Supervisor 401 Oversight/Express Review Permitting Unit CBKI jd Enclosure: Check #1733 for $200 cc: US Forest Service, Marisue Hilliard, PO Box 2750, Asheville, NC 28802-2750 File Copy + check copy Central Files + check copy Filename: 060414MaloneeTrail Bridge Pier(Jackson)_Hold Impacts USDA United States Forest National Forests in North Carolina 160A Z,illicoa street Department of Service Supervisor's Office P.O. Box 2750 Agriculture Asheville, NC 28802 828.257-4200 File code. 7720-3-2 Date: March 31, 2006 Cindi Karoly North Carolina Division of Water Quality 401/Wetlands Division 1650 Mail Service Center Raleigh, NC 27669-1650 Dear Ms. Karoly: Enclosed are five (5) copies of the revised Pre-construction Notification (PCN) for the Malonee Trail Bridge & Fishing Pier project. The revised PCN is in response to your March 17, 2006 letter requesting additional information related to impacts of the project. The requested information has been provided on pages 5, 6, and 7. We have labeled the enclosed drawing of the plan and profile in order to reference the information contained in the tables of the permit. Contrary to information in your letter, the $200 application fee was not returned. It has been deposited in your account based on information relayed to our finance personnel during a phone conversation today. If you have any additional questions or concerns, please contact me or my representative, Paul Cole, at the following numbers, Lynn Hicks (828) 257-4243, e-mail -11hicks@fs.fed.us Paul Cole (828) 257-4232, e-mail - pcole@fs.fed.us Sincerely, 1 L. HICKS Engineering, Minerals, and Telecommunications Staff Officer rqa !4 \ \`/? APR 4 _ 2006 OENR - WATER QUALITY OSANO ST0F WATT BRANCH R „ • V . r - 0 Q APR 4 -2006 Office Use Only: DENR-WAT MTU'+NDS AND STp?M ERQAU ion March 05 USACE Action ID No. DWQ No. O co - 0 q I q (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) I.. Processing Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification ? Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: #3 & 14 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information Owner/Applicant Information Name Marisue Hilliard (Forest Supervisor) Mailing Address: US Forest Service National Forests in North Carolina P.O. Box 2750 Asheville NC 28802-2750 Telephone Number: 828-257-4200 Fax Number: 828-257-4263 E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Lynn Hicks (Forest Engineer) Company Affiliation: Mailing Address: US Forest Service National Forests in North Carolina P.O. Box 2750 Asheville NC 28802-2750 Telephone Number: 828-257-4243 Fax Number: 828-257-4884 E-mail Address:,' lhicks@fs.fed.us Page 1 of 11 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1.. Name of project: Malonee Trail Bridge Construction and Trail/Pier Project (Both of these projects are on the same stream, Wolf Creek, approximately 700 feet apart.) 2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): N/A 4. Location County: Jackson Nearest Town: Tuckasegee, NC Subdivision name (include phase/lot number): N/A Directions to site (include road numbers/names, landmarks, etc.): From Tuckase eg e, NC, follow SR281 ESE for 12.8 miles, thence Easterly on SR1756 for 6.8 miles to the Balsam Lake Recreation Parking Area . The trailbridge site lies about 300 feet across the meadow on Wolf Creek. The Trail/Pier Project is about 700 feet upstream from the Trail Bridge. 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Trail Bridge Decimal Degrees (6 digits minimum): 35.2730 ON 82.9667 °W Pier/Trail Decimal Degrees (6 digits minimum): 35.5230 ON 82.9701 °W 6. Property size (acres): Roy Taylor Forest 39,000 Acres (part of the Highlands Ranger District) 7. Name of nearest receiving body of water: Balsam Lake 8. River Basin: Little Tennessee (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.ne.us/admin/maps/.) Page 2 of 11 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Bridge The project site is on Wolf Creek, just on the north end of Balsam Lake. The old trail bridge to be replaced is approximately 250 feet from the confluence of Wolf Creek into Balsam Lake. The north side of the stream at this point is a meadow area, parking lot, picnic area, and comfort station for recreationists and forest visitors. The trail from the parking area follows the edge of the meadow and the stream. The south side of the stream is forested with mixed hardwoods and confers with under brush of laurel and other species. The trail on the south side of the stream continues south around the lake. The soils are sandy silts in the meadow area and the north side of the stream. The south side soils are much the same adjacent to the creek but become more clayey to the south under the forest canopy. An old, squared treated timber wall of about 18 inches exists on the northerly approach to the old bridge, and a similar wall (made of different wood materials) is present on the south end as well. The abutment for the old bridge is concrete on the north end and the south end rests on the wood wall. The concrete abutment suffered erosion underneath its base during the 9/2004 flooding. Pier/Trail The trail runs 700ft northerly along Wolf Creek beginning at a point roughly 400ft upstream of the confluence of Wolf Creek and Balsam Lake. The trail is accessible and its primary use is recreational fishing. 10. Overall project description in detail including the type, of equipment to be used: Bridge This project consists of replacement of the old bridge (a span of 50 feet) with a new steel structure. While the new structure will have its planned abutment just a few feet west of the existing north abutment, the new bridge will be skewed in order to provide for better ingress/egress of the bridge. The new span will be about 70 feet. The old bridge and its north abutment will be removed. Only that portion of the north treated timber wall which interferes with riprap placement is planned for removal. None of the retaining wall on the south side of the creek is planned for removal. A large crane will be used on this project and with its use, it is planned that it will lift and set a small excavator to the south side of the stream in order to excavate the south abutment as well as place the riprap and build the southern approach to the new structure. A steel trail bridge of this size will most likely be set in two sections. This will require temporary shoring in the middle of the stream for a short period in order to support one end of the bridge while the remaining section is set and the attachments are made. The in-stream shoring is usually made of steel resembling oversized sawhorses. Its legs are adjustable in length, allowing it to conform to the stream bottom without very little stream disturbance. This temporary shoring will be placed and removed by crane. The abutments will be structural concrete and will be pumped from the north shore via use of the old bridge for supporting the concrete pump hose. The contractor will be required to encase the pump hose to prevent Page 3 of 11 spillage. Access from the parking area to the bridge site is via the existing trail. Aggregate will be placed of sufficient width to afford the equipment access along the trail without damage to the meadow. This material will be mixed with abutment's excavated soils in order to construct the new approaches. The aggregate will be narrowed from the west abutment to the parking area upon completion of the project. A small, existing 8 inch drain across the existing trail will be replaced with a 12 inch culvert at the time of construction. Erosion and sedimentation control will be maintained throughout this project primarily through proper water management, construction sequencing, proper staging and stockpiling material, and the maintenance at all times, of suitable channel capacity for expected flow events. No equipment, fuels, lubricants, or other potential sources of water pollution will be stored in areas that could be flooded during this project. Work within the wetted perimeter of the stream will not be allowed from October 15th - April 15`h- Pier/Trail The most upstream point is the proposed location for a 5'x10' fishing deck extending as far as five feet over the creek. The decking for the pier will be constructed from wood/plastic composite boards. The pier will have a concrete footing at the top of the creek bank and two timber piers anchored by concrete that will be located in the dry part of the creek bed, 5' from the top of the bank. Care will be taken that no concrete is spilled into the creek. No large equipment will be required to construct this proposed structure or even be able to access the site. Erosion and sedimentation control will be maintained throughout this project primarily through proper water management, construction sequencing, proper staging and stockpiling material, and the maintenance at all times, of suitable channel capacity for expected flow events. No equipment, fuels, lubricants, or other potential sources of water pollution will be stored in areas that could be flooded during this project. 11. Purpose of the proposed work: Bridge The replacement of the existing bridge is necessary in order to repair the eroded abutment. Further, the old bridge has steel girders of insufficient size for the minimum loading of 85 pounds per square foot required. The maintenance of the trail system around the lake is performed by equipment requiring a clear bridge width of 64 inches. The skewed proposal for the new span will allow for easy-on, easy-off access for this equipment. In the past, this same equipment was used for retrieval of an injured hiker, and access to the east side of the stream was nearly impossible via the old bridge. Placement of the designed riprap will prevent erosion similar to that which eroded the west abutment. Lastly, the new bridge will afford safe accessibility for the disabled recreationist as well our usual hikers, fisherman and forest visitors. Page 4 of 11 Pier/Trail At the site of the pier, there is an existing fishing pad which has become unusable due to the 9/2004 flooding that caused the stream to shift away from this fishing pad. Constructing the new proposed fishing pier will regain this lost recreational opportunity and provide it to those who wish to use it. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. N/A V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: Placing riprap - excavation at edge of stream in order to key rocks into the streambed. Temporary shoring for '/z bridge support while crane sets the two halves. Total area for riprap and shoring: 688 sq. ft. = 0.02AC. Page 5 of 11 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-year Floodplain ( es/no) Distance to Nearest Stream (linear feet) Area of Impact (acres) N/A None NA No NA 0 Total Wetland Impact (acres) 0 3. List the total acreage (estimated) of all existing wetlands on the property: 0 Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. Stream Impact Number (indicate on ma) Stream Name Type of Impact Perennial or Intermittent? Average Stream Width Before Impact Impact Length (linear feet) Area of Impact (acres) Abut. 1 Wolf Creek Placing Riprap P 31 ft. 40 ft. 0.01 Abut 2 Wolf Creek Placing Riprap P 32 ft. 32 ft. 0.01 Total Stream Impact (by length and acreage) 1 L 0.02 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dredging, flooding, drainage, bulkheads, etc. Page 6 of 11 Open Water Impact Site Number (indicate on ma) Name of Waterbody (if applicable) Type of Impact Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) Area of Impact (acres) N/A NA None NA 0 Total Open Water Impact (acres) 0 5. List the cumulative impact to all Waters of the U.S. resulting from the project: Stream Impact (acres): 0.02 Wetland Impact (acres): 0 Open Water Impact (acres): 0.02 Total Impact to Waters of the U.S. (acres) 0.03 Total Stream Impact (linear feet): 72 6. Isolated Waters Do any isolated waters exist on the property? ? Yes ® No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. 7. Pond Creation: No Pond Construction, 0 Acres. If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact Page 7 of 11 site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. (See III., 10, above.) VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetiands/strmgide.litm]. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at Page 8 of 11 (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ® No ? 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ® No ? 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ® No ? Please see attachment, Project Data Form, attached. X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify V Yes ? No Page 9 of 11 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet) Multiplier Required Mitigation 1 3 (2 for Catawba) 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0244, or .0260. N/A XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. N/A XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Contract requires portable sanitation facilities for employees. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Cumulative Impacts (required by DWQ) Page 10 of 11 XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ? No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwet]ands. If no, please provide a short narrative description: XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). (A cant/Agent's Signature Date 14 i' gnature is valid only if an authorization letter from the applicant is provided.) J J f ?4 Page 11 of 11 ATTACHMENTS FOR PERMITTING PROJECT NAME: Malonee Trail Bridge Construction & Fishing Access Trail Pier Delegation Letter: Forest Supervisor to Lynn Hicks, Engineering and Minerals Staff Officer Maps: Vicinity Map Quad Map Drawings: New Bridge Plan and Profile (11" x 17") Typical Detail for Riprap Placement (11" x 17") Pier Site Plan (8-1/2" x 11") Pier Site Profile (8-1/2" x 11 Other Documentation: NEPA Project Description Form United States Forest f °'+ National Forests in 160A Zillicoa Street Department of Service North Carolina P.O. Box 2750 r Agriculture Asheville, NC 28802 828-257-4200 File Code: 1230 Date: November 21, 2005 Route To: (7100) Subject: Delegation of Authority To: Lynn L. Hicks, Engineering and Minerals Staff Officer You are hereby delegated the authority to act as my Agent for all phases of the application process for permits required by Section 404 of the Clean Water Act, for road, bridge, culvert, and facilities projects on the National Forests in North Carolina. You are authorized to make formal application for all permits to the US Army Corps of Engineers, the North Carolina Division of Water Quality, and the North Carolina Wildlife Resources Commission, provide all necessary information, and sign all correspondence. Include this letter as part of all applications for Section 404 permits to the US Army Corps of Engineers, North Carolina Division of Water Quality, and North Carolina Wildlife Resources Commission. MARISUE HILLIARD Forest Supervisor U?!S f y Caring for the Land and Serving People Printed on Recycled Paper ?? Hrn 4 - Z006 DENR - WATER QUALITY %ERkZiAND STORWWATER BRVa J O -Gage Gap-, c ?r a-ld X54 0 / I NT! ? ? __ N A: N ' Tv? A Charley Bald `?- Buck Knob, I \ J I / A M ?r h MYO Bald N' Y %)SM WT z /Q ?'o -ail iCath4 Knob n ,o )I J-5- cala 1.75 Inches =11.75 Inches =1 N Oz t U br • o ? ca ? o Q? ?./ jnV`?Up??y ?+ 3y Q Ila 1,11,11,121,111- 111 o? ?? dgodgvqQOOVO 00 J .1 J J O C? 9 0 0 0 I w 7 r I I ? r , aI O a ! S ! r ! o / / s / ? i i i / M' 7 'WS i'ON "W 0 / / k /LI a y a / i? 1z 01 N / Q1 i f ? _u!o ? Q a o . _.F207 % n if ? d X?Q M ?1 S9'99+0 '-9,9 -L l '6N 4-"q qy 'b_ - SSZQfO 'WS .1 td N ,,``? W pbm Sp 5{" N?p U 111 KQ? 5 °?S O b? yb -2 n / Qm / MER g , 11? ? 1 ? I ? I y 1 I I c I U ; ? tD c Z r w a 0 gn g R 4 = ` z _ - H N n ? ? ? Q b Q 2 0 t ? ? ? ?? g ? '?' g yj p (, ? 3 C1 '0 2 ? ( s n ' K 4 g Z: It Y Y 1 i A I 1 1 A Y 1 A I Y % CN N N U- y? 333 A * ? ! ( AaK? i WW.M !'dl ?!lo!X? WiWV' 4 e ZO+L YIS .1 J1?OTk>f OKi I i g i ?o 'WS .1 L 'W! 7?YWY 'J 0 e E dt Q I W) s yaws ? ?8? '®r?i°? A t q'4p 7'3L 4A zI-,p* C i3 Y 1 6 R ?• o '- 3 n = z I U a 0 0 I O / , / y? vl N F n g / f N ? V._Q S s° b r b O Z nh N Ud ?CC Q ?o R4 CCCp ? ??4yy2 h mg } ?IN V1 2 ?a Ecg?- s,h r3s'? ? m'4 IM; !! sg, UkE E"N V H 1 L sv'sv" 'MS .ti vN P-ww 3 i ?J F Q C _ ; F?-l 0 52 X 0 n ?ggp ?S r n q w & ° +?? x ? ? +,? g ?i r , 0 °1 rQ i -_ N eY h h 3 g .S 9b„• ' e bid g = V=p EE E T6• E : E & x $a (&vVAMS 717 a,g.,o **OR) 0 0000+0 Ms a 113 ow 1 -H c 1 it ?F b ail l Q? c N Q z O 0 O z O ? v siz- O ? Z O z s ? V V G 0 O 65 gyr- Concrete Footing, See Sheet 5 For Details Extend Riprop 12" Above High Water, But No Higher Than 12" From Top Of Concrete Footing N High Water Elevation Existing Groundline i Low 5tceamb-e-d Elevation N I_ N Level 1 cc nal 'd, Dw IV-A Geotextile r Geocell And Fop Layer After ckfill Material -I N X T J VA '_??' RIPRAP/F00T1NG DETAIL -Place Type IV-A Geotextil 2D Fabric Under Geocell And 1155 D Wrap Over Top After Filling w/Bockfill Material APR 4 - 2006 DENR • WATER QUALITY WETLANDS AND STORMWATER BRANCH - Geocell Abutment Stabilization Elevation Per GENERAL LAYOUT Bottom Of Geocell Scale: %2" = 1'-0" PROJECT DESCRIPTION FORM RANGER DISTRICT: Highlands PROJECT NAME: Mallonee Trail Bridge #476-0.10 STORM DATABASE UID: 1736 Describe the condition of the site prior to the hurricane events. Trail bridge in good condition Describe the storm damage to this site. ,Flood waters damaged bridge. Betterment Justification: Repair damage and return trail bridge to original condition. Is the project in the Work Plan? X Yes No NA Has the IMT reviewed and approved the project? X Yes No NA What level of NEPA documentation was required? Maintenance CE (no additional documentation required) X Decision Memo EA Date completed: 1-26-2006 Has IMT received Proposed Action Form? X Yes No NA Did the project require a BE? X Yes No NA Does the project require a cultural survey? X Yes No NA Have required surveys been completed? X Yes No NA Was a design package required? X Yes No NA If yes, has the package been approved? X Yes No NA Prepared By: Jeffrey M. Magniez, NEPA Writer I have reviewed the information noted above and I recommend that this project be implemented. ?t'z? yy . l Is, /0(., ERIN M. BRONK Date District Ranger C:\DOCUME-1\ebronk\LOCALS-1\TemplnotesEl EF34\PDF Mallonee Tr Bridge.doc a USDA United States Forest National Forests in North Carolina ?- Department of Service Supervisor's Office Agriculture 160A Zillicoa Street P.O. Box 2750 Asheville, NC 28802 828-257-4200 File Code: 7720-3-2 Date: February 27, 2006 Cindi Karoly North Carolina Division of Water Quality 401/Wetlands Unit 1650 Mail Service Center Raleigh, NC 27669-1650 Dear Ms. Karoly; r a ..... # < ., ? .. r.. 20000414 Enclosed are seven (7) copies of a Pre-construction Notification (PCN) and a $200 application fee for the construction of a new trail bridge and accessible fishing pier over Wolf Creek, on the Highlands Ranger District of the Nantahala National Forest, in Jackson County, North Carolina. The purpose of the project is to replace an outdated trail bridge and fishing pier damaged by the remnants of Hurricanes Francis, Ivan, and Jeanne which impacted the area in September 2004. This project includes removal of an existing bridge, construction of new abutments, installation of a new prefabricated bridge, fishing pier, and trail reconstruction. Based on our review of the authorized Nationwide Permits (NWP) we believe this project is covered under NWP's 3 & 14. As required by General Condition #3404 and PCN instructions, we are requesting Section 401 water quality certification for this project. Concurrent with this application, the PCN has been submitted to the US Army Corps of Engineers for Section 404 permit approvaL If you have any questions, concerns, and/or require additional information, please contact me or my representative, Paul Cole, at the following numbers; Lynn Hicks (828) 257-4243, e-mail -1lhicks@fs.fed.us Paul Cole (828) 257-4232, e-mail - pcole@fs.fed.us Sincerely, ?N L. HICKS, PE Engineering, Minerals, and Telecommunications Staff Officer V_ vif Iii ^i 1 Office Use Only: Form Version March 05 USACE Action ID No. DWQ No. (it any particular item is not applicable to this project, please enter "Not Applicable" or 'N/A".) 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification ? Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: #3 & 14 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information 1. Owner/Applicant Information Name Marisue Hilliard (Forest Supervisor) Mailing Address: US Forest Service National Forests in North Carolina P.O. Box 2750 Asheville, NC 28802-2750 Telephone Number: 828-257-4200 Fax Number: 828-257-4263 E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Lynn Hicks (Forest Engineer) Company Affiliation: Mailing Address: US Forest Service National Forests in North Carolina P.O. Box 2750 Asheville NC 28802-2750 Telephone Number: 828-257-4243 Fax Number: 828-257-4884 E-mail Address: ]hicks@fs.fed.us Page 1 of 11 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and'NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Malonee Trail Bridge Construction and Trail/Pier Project (Both of these projects are on the same stream, Wolf Creek, approximately 700 feet apart.) 2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): N/A 4. Location County: Jackson Nearest Town: Tuckasegee, NC Subdivision name (include phase/lot number): N/A Directions to site (include road numbers/names, landmarks, etc.): From Tuckasegee, NC, follow SR281 ESE for 12.8 miles, thence Easterly on SR1756 for 6.8 miles to the Balsam Lake Recreation Parking _Area. The trailbridge site lies about 300 feet across the meadow on Wolf Creek. The Trail/Pier Project is about 700 feet upstream from the Trail Bridge. 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Trail Bridge Decimal Degrees (6 digits minimum): 35.2730 ON 82.9667 °W Pier/Trail Decimal Degrees (6 digits minimum): 35.5230 °N 82.9701 °W 6. Property size (acres): Roy Taylor Forest 39,000 Acres (part of the Highlands Ranger District) 7. Name of nearest receiving body of water: Balsam Lake 8. River Basin: Little Tennessee (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.ne.us/admin/maps/.) Page 2 of I 1 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Bridge The project site is on Wolf Creek, just on the north end of Balsam Lake. The old trail bridge to be replaced is approximately 250 feet from the confluence of Wolf Creek into Balsam Lake. The north side of the stream at this point is a meadow area, parking lot, picnic area, and comfort station for recreationists and forest visitors. The trail from the parking area follows the edge of the meadow and the stream. The south side of the stream is forested with mixed hardwoods and confers with under brush of laurel and other species. The trail on the south side of the stream continues south around the lake. The soils are sandy silts in the meadow area and the north side of the stream. The south side soils are much the same adjacent to the creek but become more clayey to the south under the forest canopy. An old, squared treated timber wall of about 18 inches exists on the northerly approach to the old bridge, and a similar wall (made of different wood materials) is present on the south end as well. The abutment for the old bridge is concrete on the north end and the south end rests on the wood wall. The concrete abutment suffered erosion underneath its base during the 9/2004 flooding. Pier/Trail The trail runs 700ft northerly along Wolf Creek beginning at a point roughly 400ft upstream of the confluence of Wolf Creek and Balsam Lake. The trail is accessible and its primary use is recreational fishing. 10. Overall project description in detail including the type of equipment to be used: Bridge This project consists of replacement of the old bridge (a span of 50 feet) with a new steel structure. While the new structure will have its planned abutment just a few feet west of the existing north abutment, the new bridge will be skewed in order to provide for better ingress/egress of the bridge. The new span will be about 70 feet. The old bridge and its north abutment will be removed. Only that portion of the north treated timber wall which interferes with riprap placement is planned for removal. None of the retaining wall on the south side of the creek is planned for removal. A large crane will be used on this project and with its use, it is planned that it will lift and set a small excavator to the south side of the stream in order to excavate the south abutment as well as place the riprap and build the southern approach to the new structure. A steel trail bridge of this size will most likely be set in two sections. This will require temporary shoring in the middle of the stream for a short period in order to support one end of the bridge while the remaining section is set and the attachments are made. The in-stream shoring is usually made of steel resembling oversized sawhorses. Its legs are adjustable in length, allowing it to conform to the stream bottom without very little stream disturbance. This temporary shoring will be placed and removed by crane. The abutments will be structural concrete and will be pumped from the north shore via use of the old bridge for supporting the concrete pump hose. The contractor will be required to encase the pump hose to prevent Page 3 of 11 spillage. Access from the parking area to the bridge site is via the existing trail. Aggregate will be placed of sufficient width to afford the equipment access along the trail without damage to the meadow. This material will be mixed with abutment's excavated soils in order to construct the new approaches. The aggregate will be narrowed from the west abutment to the parking area upon completion of the project. A small, existing 8 inch drain across the existing trail will be replaced with a 12 inch culvert at the time of construction. Erosion and sedimentation control will be maintained throughout this project primarily through proper water management, construction sequencing, proper staging and stockpiling material, and the maintenance at all times, of suitable channel capacity for expected flow events. No equipment, fuels, lubricants, or other potential sources of water pollution will be stored in areas that could be flooded during this project. Work within the wetted perimeter of the stream will not be allowed from October 15th - Apri l 15th. Pier/Trail The most upstream point is the proposed location for a 5'x10' fishing deck extending as far as five feet over the creek. The decking for the pier will be constructed from wood/plastic composite boards. The pier will have a concrete footing at the top of the creek bank and two timber piers anchored by concrete that will be located in the dry part of the creek bed, 5' from the top of the bank. Care will be taken that no concrete is spilled into the creek. No large equipment will be required to construct this proposed structure or even be able to access the site. Erosion and sedimentation control will be maintained throughout this project primarily through proper water management, construction sequencing, proper staging and stockpiling material, and the maintenance at all times, of suitable channel capacity for expected flow events. No equipment, fuels, lubricants, or other potential sources of water pollution will be stored in areas that could be flooded during this project. 11. Purpose of the proposed work: Bridge The replacement of the existing bridge is necessary in order to repair the eroded abutment. Further, the old bridge has steel girders of insufficient size for the minimum loading of 85 pounds per square foot required. The maintenance of the trail system around the lake is performed by equipment requiring a clear bridge width of 64 inches. The skewed proposal for the new span will allow for easy-on, easy-off access for this equipment. In the past, this same equipment was used for retrieval of an injured hiker, and access to the east side of the stream was nearly impossible via the old bridge. Placement of the designed riprap will prevent erosion similar to that which eroded the west abutment. Lastly, the new bridge will afford safe accessibility for the disabled recreationist as well our usual hikers, fisherman and forest visitors. Page 4 of 11 Pier/Trail At the site of the pier, there is an existing fishing pad which has become unusable due to the 9/2004 flooding that caused the stream to shift away from this fishing pad. Constructing the new proposed fishing pier will regain this lost recreational opportunity and provide it to those who wish to use it. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. N/A V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: Page 5 of 1 I 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. N/A Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-year Floodplain ( es/no) Distance to Nearest Stream (linear feet) Area of Impact (acres) Total Wetland Impact (acres) 3. List the total acreage (estimated) of all existing wetlands on the property: N/A Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabi6ns, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. Stream Impact Number (indicate on ma) Stream Name Type of Impact Perennial or Intermittent? Average Stream Width Before Impact Impact Length (linear feet) Area of Impact (acres) N/A Total Stream Impact (by length and acreage) Page 6 of 11 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dredging, flooding, drainage, bulkheads, etc. Open Water Impact Site Number (indicate on ma) Name of Waterbody (if applicable) Type of Impact Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) Area of Impact (acres) N/A Total Open Water Impact (acres) 5. List ti he cumulative impact to all Waters of the U.S. resulting trom the project Stream Impact (acres): Wetland Impact (acres): Open Water Impact (acres): Total Impact to Waters of the U.S. (acres) Total Stream Impact (linear feet): 6. Isolated Waters Do any isolated waters exist on the property? ? Yes ® No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. 7. Pond Creation N/A If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: Expected pond surface area: Page 7 of I I VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. (See III., 10, above.) VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/newetlands/strmp-ide.html. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. NIA Page 8 of 11 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ® No ? 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ® No ? 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ® No ? Please see attachment, Project Data Form, attached. X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1.. Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233 (Neuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC Page 9 of 11 XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ? No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). (Agent ?,cant/Agent's Signature Date ature is valid only if an authorization letter from the applicant is provided.) r51 A`? Page 11 of 11 United States Forest National Forests in 160A Zillicoa Street l v? Department of Service North Carolina P.O. Box 2750 Agriculture Asheville, NC 28802 828-2574200 File Code: 1230 Date: November 21, 2005 Route To: (7100) Subject: Delegation of Authority To: Lynn L. Hicks, Engineering and Minerals Staff Officer You are hereby delegated the authority to act as my Agent for all phases of the application process for permits required by Section 404 of the Clean Water Act, for road, bridge, culvert, and facilities projects on the National Forests in North Carolina. You are authorized to make formal application for all permits to the US Army Corps of Engineers, the North Carolina Division of Water Quality, and the North Carolina Wildlife Resources Commission, provide all necessary information, and sign all correspondence. Include this letter as part of all applications for Section 404 permits to the US Army Corps of Engineers, North Carolina Division of Water Quality, and North Carolina Wildlife Resources Commission. MARISUE HILLIARD Forest Supervisor Caring for the Land and Serving People Printed on Recycled Paper ATTACHMENTS FOR PERMITTING PROJECT NAME: Malonee Trail Bridge Construction & Fishing Access Trail Pier Delegation Letter: Forest Supervisor to Lynn Hicks, Engineering and Minerals Staff Officer Maps: Vicinity Map Quad Map Drawings: New Bridge Plan and Profile (11" x 17") Typical Detail for Riprap Placement (11" x 17") Pier Site Plan (8-1/2" x 11") Pier Site Profile (8-1/2" x 11") Other Documentation: NEPA Project Description Form o" United States Forest National Forests in Department of Service North C li 160A Zillicoa Street aro na Agriculture P.O. Box 2750 Asheville, NC 28802 828-2574200 File Code: 1230 Date: November 21 2005 Route To: (7100) , Subject: Delegation of Authority To: Lynn L. Hicks, Engineering and Minerals Staff Officer You are hereby delegated the authority to act as my Agent for all phases of the application process for permits required by Section 404 of the Clean Water Act, for road, bridge, culvert, and facilities projects on the National Forests in North Carolina. You are authorized to make formal application for all permits to the US Army Corps of Engineers, the North Carolina Division of Water Quality, and the North Carolina Wildlife Resources Commission, provide all necessary information, and sign all correspondence. Include this letter as part of all applications for Section 404 permits to the US Army Corps of Engineers, North Carolina Division of Water Quality, and North Carolina Wildlife Resources Commission. MARISUE HILLIARD Forest Supervisor Caring for the Land and Serving People Printed on Recycled Paper NIBbi7t£?D r ? l cn Y , ? J? I F I- FRONC '' _ , " PISGAH a ?Ry? ! s m Knt Ilk CY?".+ i ? Little S 1 . am Krrob a r s ?t Gage Bald o Gage Gap- 1 1 c_sc\? " ?N- A- N,l T A . j •. Charley Bald BM LHt 17 Buck Knob 'i- o d{" \„ _ 1 wN ?u?i2 ELd? V ? ? i i /- ->< A ( .' ?? 1 b, 3761 ) ? Knob/ -N _A-/----' r ,s r? ?!•' Rocky Knob c C 6"' 'l. qtr C 11-uu Ige f / Cathey Kroh L? Scale: 1.75 Inches= 1 I 5 ,. -. w L r;3-? a- Q c N d D O G? rn Q? ; td Wtd 0 N ? ? m C1 333Z C r rn m rl z 3 n -u =O ZZ Z d t=$ /ZJ „ D D D ?-+ . M rr-I n { ;o;o ? m? rn D -- - MMN0 ?. v v M Z D ?=?. _ .. ?' N N Z o p _` OW o P;o z i . ? U1Wo°2 D kD m Noo> z \ N°O-I O C) 4C-) 0 z -4m W ?3 D z 70 X a - O 'm ?' r- , - rn d r; ?twz 1 1 w _ V ' i frl D ' Si O) L C- i t.C+ -um --+ bd ZM ?n Jy IV R ?5 Q `1' rn ? 00 CD F rnO Orn O U' y i\ Z N C? to > X = 71 co A? CII? Oz _ rn co_ r y? n ?? r m ?x A N O u ?r?1 ?pD Z ?? ?r cr7C O mD Z OX D N r ?a r.N o o Vl N N? rn sfDo-? ti ??p ? o ?X - >> cDio X. ?Z ?D?x om z ? D mood ?o U3 V) N C) y ?"'O L ?VVV J U) z O 3r _ D 0 00 -TI m o In O 7 I- 4' MIN. ?6dzxz z rn0 _ .4 0N 40., ro rn - . m m ? ?$ n A m X D fn N Z I 00 M 0 0 c D n W PROJECT DESCRIPTION FORM RANGER DISTRICT: Highlands PROJECT NAME: Mallonee Trail Bridge #476-0.10 STORM DATABASE UID: 1736 Describe the condition of the site prior to the hurricane events. Trail bridge in good condition Describe the storm damage to this site. Flood waters damaged bridge. Betterment Justification: Repair damage and return trail bridge to original condition. Is the project in the Work Plan? X Yes No NA Has the IMT reviewed and approved the project? X Yes No NA What level of NEPA documentation was required? Maintenance CE (no additional documentation required) X Decision Memo EA Date completed: 1-26-2006 Has IMT received Proposed Action Form? X Yes No NA Did the project require a BE? X Yes No NA Does the project require a cultural survey? X Yes No NA Have required surveys been completed? X Yes No NA Was a design package required? X Yes No NA If yes, has the package been approved? X Yes No NA Prepared By: Jeffrey M. Magniez, NEPA Writer I have reviewed the information noted above and I recommend that this project be implemented. 4?? Y-,/ - l 31 /06, ERIN M. BRONK Date District Ranger C:\DOCUME-1\ebronk\LOCALS-1\Temp\notesE1EF34\PDF Mallonee Tr Bridge.doc APR 4 - 2006 Office Use Only: wt'TtAt?ps t , USACE Action ID No. DWQ No. _ !_} (If any particular item is not applicable to this project, please enter "Not Applicable" or "NIA".) I.. Processing 1. Check all of the approval(s) requested for this project: ® Section 404*Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification ? Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: #3 & 14 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information 1. Owner/Applicant Information Name Marisue Hilliard (Forest Supervisor Mailing Address: US Forest Service National Forests in North Carolina P.O. Box 2750 Asheville NC 28802-2750 Telephone Number: 828-257-4200 Fax Number: 828-257-4263 E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Lynn Hicks (Forest Engineer) Company Affiliation: Mailing Address: US Forest Service National Forests in North Carolina P.O. Box 2750 Asheville, NC 28802-2750 Telephone Number: 828-257-4243 Fax Number: 828-257-4884 E-mail Address: ]hicks@fs.fed.us Page 1 of 11 4 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets' no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1.. Name of project: Malonee Trail Bridge Construction and Trail/Pier Project (Both of these projects are on the same stream, Wolf Creek, approximately 700 feet apart.) 2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): N/A 4. Location County: Jackson Nearest Town: Tuckasegee, NC Subdivision name (include phase/lot number): N/A Directions to site (include road numbers/names, landmarks, etc.): From Tuckasegee, NC, follow SR281 ESE for 12.8 miles, thence Easterly on SR1756 for 6.8 miles to the :Balsam Lake Recreation Parking Area. The trailbridge site lies about 300 feet across the meadow on Wolf Creek. The Trail/Pier Project is about 700 feet upstream from the Trail Bridge. 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Trail Bridge Decimal Degrees (6 digits minimum): 35.2730 ON 82.9667 °W Pier/Trail Decimal Degrees (6 digits minimum): 35.5230 ON 82.9701 °W 6. Property size (acres): Roy Taylor Forest 39,000 Acres (part of the Highlands Ranger District) 7. Name of nearest receiving body of water: Balsam Lake 8. River Basin: Little Tennessee (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) Page 2 of 11 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Bridge The project site is on Wolf Creek, just on the north end of Balsam Lake. The old trail bridge to be replaced is approximately 250 feet from the confluence of Wolf Creek into Balsam Lake. The north side of the stream at this point is a meadow area, parking lot, picnic area, and comfort station for recreationists and forest visitors. The trail from the parking area follows the edge of the meadow and the stream. The south side of the stream is forested with mixed hardwoods and confers with under brush of laurel and other species. The trail on the south side of the stream continues south around the lake. The soils are sandy silts in the meadow area and the north side of the stream. The south side soils are much the same adjacent to the creek but become more clayey to the south under the forest canopy. An old, squared treated timber wall of about 18. inches exists on the northerly approach to the old bridge, and a similar wall (made of different wood materials) is present on the south end as well. The abutment for the old bridge is concrete on the north end and the south end rests on the wood wall. The concrete abutment suffered erosion underneath its base during the 9/2004 flooding. Pier/Trail The trail runs 700ft northerly along Wolf Creek beginning at a point roughly 400ft upstream of the confluence of Wolf Creek and Balsam Lake. The trail is accessible and its primary use is recreational fishing. 10. Overall project description in detail including the type of equipment to be used: Bridge This project consists of replacement of the old bridge (a span of 50 feet) with a new steel structure. While the new structure will have its planned abutment just a few feet west of the existing north abutment, the new bridge will be skewed in order to provide for better ingress/egress of the bridge. The new span will be about 70 feet. The old bridge and its north abutment will be removed. Only that portion of the north treated timber wall which interferes with riprap placement is planned for removal. None of the retaining wall on the south side of the creek is planned for removal. A large crane will be used on this project and with its use, it is planned that it will lift and set a small excavator to the south side of the stream in order to excavate the south abutment as well as place the riprap and build the southern approach to the new structure. A steel trail bridge of this size will most likely be set in two sections. This will require temporary shoring in the middle of the stream for a short period in order to support one end of the bridge while the remaining section is set and the attachments are made. The in-stream shoring is usually made of steel resembling oversized sawhorses. Its legs are adjustable in length, allowing it to conform to the stream bottom without very little stream disturbance. This temporary shoring will be placed and removed by crane. The abutments will be structural concrete and will be pumped from the north shore via use of the old bridge for supporting the concrete pump hose. The contractor will be required to encase the pump hose to prevent Page 3 of 11 spillage. Access from the parking area to the bridge site is via the existing trail. Aggregate will be placed of sufficient width to afford the equipment access along the trail without damage to the meadow. This material will be mixed with abutment's excavated soils in order to construct the new approaches. The aggregate will be narrowed from the west abutment to the parking area upon completion of the project. A small, existing 8 inch drain across the existing trail will be replaced with a 12 inch culvert at the time of construction. Erosion and sedimentation control will be maintained throughout this project primarily through proper water management, construction sequencing, proper staging and stockpiling material, and the maintenance at all times, of suitable channel capacity for expected flow events. No equipment, fuels, lubricants, or other potential sources of water pollution will be stored in areas that could be flooded during this project. Work within the wetted perimeter of the stream will not be allowed from October 15`h - April 15`t'- Pier/Trail The most upstream point is the proposed location for a 5'x10' fishing deck extending as far as five feet over the creek. The decking for the pier will be constructed from wood/plastic composite boards. The pier will have a concrete footing at the top of the creek bank and two timber piers anchored by concrete that will be located in the dry part of the creek bed, 5' from the top of the bank. Care will be taken that no concrete is spilled into the creek. No large equipment will be required to construct this proposed structure or even be able to access the site. Erosion and sedimentation control will be maintained throughout this project primarily through proper water management, construction sequencing, proper staging and stockpiling material, and the maintenance at all times, of suitable channel capacity for expected flow events. No equipment, fuels, lubricants, or other potential sources of water pollution will be stored in areas that could be flooded during this project. 11. Purpose of the proposed work: Bridge The replacement of the existing bridge is necessary in order to repair the eroded abutment. Further, the old bridge has steel girders of insufficient size for the minimum loading of 85 pounds per square foot required. The maintenance of the trail system around the lake is performed by equipment requiring a clear bridge width of 64 inches. The skewed proposal for the new span will allow for easy-on, easy-off access for this equipment. In the past, this same equipment was used for retrieval of an injured hiker, and access to the east side of the stream was nearly impossible via the old bridge. Placement of the designed riprap will prevent erosion similar to that which eroded the west abutment. Lastly, the new bridge will afford safe accessibility for the disabled recreationist as well our usual hikers, fisherman and forest visitors. Page 4 of 11 Pier/Trail At the site of the pier, there is an existing fishing pad which has become unusable due to the 9/2004 flooding that caused the stream to shift away from this fishing pad. Constructing the new proposed fishing pier will regain this lost recreational opportunity and provide it to those who wish to use it. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior- segments of the same T.I.P. project, along with construction schedules. N/A V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to. wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: Placing riprap - excavation at edge of stream in order to key rocks into the streambed. Temporary shoring for '/2 bridge support while crane sets the two halves. Total area for riprap and shoring: 688 sq. ft. = 0.02AC. Page 5 of 11 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-year Floodplain ( es/no) Distance to Nearest Stream (linear feet) Area of Impact (acres) N/A None NA No NA 0 Total Wetland Impact (acres) 0 3. List the total acreage (estimated) of all existing wetlands on the property: 0 Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. Stream Impact Number (indicate on ma) Stream Name Type of Impact Perennial or Intermittent? Average Stream Width Before Impact Impact Length (linear feet) Area of Impact (acres) Abut. 1 Wolf Creek Placing Riprap P 31 ft. 40 ft. 0.01 Abut 2 Wolf Creek Placing Riprap P 32 ft. 32 ft. 0.01 Total Stream Impact (by length and acreage) 0.02 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dredging, flooding, drainage, bulkheads, etc. Page 6 of 11 Open Water Impact Site Number (indicate on ma) Name of Water ody (if applicable) Type of Impact Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) Area of Impact (acres) N/A NA None NA 0 Total Open Water Impact (acres) 0 5. List the cumulative impact to all Waters of the U.S. resulting from the project: Stream Impact (acres): 0.02 Wetland Impact (acres): 0 Open Water Impact (acres): 0.02 Total Impact to Waters of the U.S. (acres) 0.03 Total Stream Impact (linear feet): 72 6. Isolated Waters Do any isolated waters exist on the property? ? Yes ® No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet), Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. 7. Pond Creation: No Pond Construction, 0 Acres. If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact Page 7 of 1 I site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. (See III., 10, above.) VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed. on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strmgide.htm]. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. NIA 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at Page 8 of 11 (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://h2o.enr.state.ne.us/wm/index.litm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): NIA IX. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ® No ? 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ® No ? 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ® No ? Please see attachment, Project Data Form, attached. X. . Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify V Yes ? No Page 9 of 1 I 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet) Multiplier Required Mitigation 1 3 (2 for Catawba) 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel, Zone 2 extends an additional 20 feet from the edge of Zone 1. 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0244, or .0260. N/A XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. NIA XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Contract requires portable sanitation facilities for employees. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Cumulative Impacts (required by DWQ) Page 10 of 11 XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ? No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). (Agent p icant/Agent's Signature Date ignature is valid only if an authorization letter from the applicant is provided.) Page I1 of 1 I ATTACHMENTS FOR PERMITTING PROJECT NAME: Malonee Trail Bridge Construction & Fishing Access Trail Pier Delegation Letter: Forest Supervisor to Lynn Hicks, Engineering and Minerals Staff Officer Maps: Vicinity Map Quad Map Drawings: New Bridge Plan and Profile (11" x 17") Typical Detail for Riprap Placement (11" x 17") Pier Site Plan (8-1/2" x 11 ") Pier Site Profile (8-1/2" x 11") Other Documentation: NEPA Project Description Form ' United States Forest 3 5 National Forests in 160A Zillicoa Street oj. Department of Service North Carolina P.O. Box 2750 Agriculture Asheville, NC 28802 828-257-4200 File Code: 1230 Date: November 21, 2005 Route To: (7100) Subject: Delegation of Authority To: Lynn L. Hicks, Engineering and Minerals Staff Officer You are hereby delegated the authority to act as my Agent for all phases of the application process for permits required by Section 404 of the Clean Water Act, for road, bridge, culvert, and facilities projects on the National Forests in North Carolina. You are authorized to make formal application for all permits to the US Army Corps of Engineers, the North Carolina Division of Water Quality, and the North Carolina Wildlife Resources Commission, provide all necessary information, and sign all correspondence. Include this letter as part of all applications for Section 404 permits to the US Army Corps of Engineers, North Carolina Division of Water Quality, and North Carolina Wildlife Resources Commission. MARISUE HILLIARD Forest Supervisor U?S Caring for the Land and Serving People Printed on Recycled Paper ?? u APR 4 .-.2006 au°S.wosrr,?Jn? W t et Catii6c?i ? Gage Gap. t n ' Charley Bald/T Eluck Knob -zz aM Lwr 17 Mtn n L r6M tNT ' 17 ?' ' V ))) ? , ann 1 761 (Z _ i` i - n X14 Scale: 1.75 Inches =1 \?l o Rocky Knob %? Q r 311 ?o s ??Cathey Knob U APR 4 -,2006 r+F;L.ANDJ vo WATER TERO g? > e N k t I 1 1 3 Y I I 1 r I e I i a ; l ' /l !!ry - O?' 1 'W S J 1` 'g A . y : LL- m '"1` ti ; ' ooti ? ? a ? le a W? r ?i SJ y? b ? h N N am? ?J G i ? ? s /d z ° J W a ? o o N ?? Q ?sc n? E 3 z p-1 V Q ac ?'S ? l w Q , _.9ZYOOt ?a[3 Mild *n-_ ° d*1 S9'SB+O 'WS .Z 1 'ON iwu9?4V ?_ - _ 9.9717+0 'WS .7. M w nm ?aJ e *?A / -2 n / m / / t z a o? Q O? d J O 0' 0 0 0 4 O' D CO B O O O C U ? B r ? . ?t s ? t a i r=fit ? ? a ? '? g v p? h N w v u U u ti A A 1 A A 1 1 1 A 1 1 M A M W ? ° $ ! m tttggg3nnn ??{{ U ? 5 EsR -? ,?° a V L? ? ? ? ? ?W-. a' 0 3 to m ? ? a & ? R? E I ? aR 0 p A O ?z 6p n i ?i ?j rn 1 ?11 16- f m YQJ T!?Ad? t j-? UBr w? 8 '» o ??yy w Aa /. 1 /' n 3 c 1 _ t o a t utif' t ? m n J 9? I xY N ? Vwtl z s tl 0 z I n° w 1 ,9 6 BS n IBS n n °° ` x g r O o ti ? $ $ t :? . . p? l^ •- N N N h h c a;- lad _ ss'se+o 'ws .Z i ? v?+w/wr 3 t- a ?1 F 0 ? o I! X13 M+IOld +1?•O p ?1 ` 'WS .Z z 'w ;-",w J t? 0 ? 2? ay E * Qy? all n 61 11 CKB was E = 3 10J RIM ?g C p nF.. U? N 3-. 15C 0 IY 3? I z° • £ a OOVM YZ A "All /t! ii e b N O zo e ? H w a? '^y? 8yrd 1 it ?lF N Q Z v? 0 1 Q O z V 0 ^^ z ? ,11 .1.1_.1 ? z z s ? U e m O O 1L o ?? ?m N APR 4 - 2006 DENR - WATER QUALITY Wfi1,ANDS AND STOftMWATER/ BRgt?G 1 W J PO W_ c)C W Q <z 3N z? O F- j ` ' i ` W= LLJ cv? 0 j ; W H i ' ?l i L? < U 1 D- W Z? N LL d z CY) M? < u <o< u- -J p~C Z < /O O Z ~ Z W Q Q --' LL. Z O z 1, •l z N? W V I Z V O C/ Q N n?N t I •F, Z) 0 C 0 0 Z N Q W < m QU LLJ O m LO ? ? ry ?Q N p? ?V) X O <m o? 52 - r M z ? z i : 'k ll s° O ar 0 < N U 00 I o? < ?o? ? W to Q? F a X?W x V) V) N • • " N N 0 0 t X 0 <m O of e ? U w ?z WO? x? 1 00 O m? LZ N ,,3 Z CD Q ? = x m \< N N 0 0 0 0 rn rn rn rn rn rn NIN b e o 7t . LZ Q? m J <fl pp Z ryu00?QX?0 F) N cb\ 0q 0 Lf) # V ! 1? W V Q z w z 1LJ LLJ LL _z J I- LU LW ° < Lf- C? << 0 ZN z 0-j z i- < z ?- tfl r < = '1O J LL- < Z O z z W W? N Z w0 w O? Q Qn PROJECT DESCRIPTION FORM RANGER DISTRICT: Highlands PROJECT NAME: Mallonee Trail Bridge #476-0.10 STORM DATABASE UID: 1736 Describe the condition of the site prior to the hurricane events. Trail bridge in good condition Describe the storm damage to this site. .Flood waters damaged bridge. Betterment Justification: Repair damage and return trail bridge to original condition. Is the project in the Work Plan? X Yes No NA Has the IMT reviewed and approved the project? X Yes No NA What level of NEPA documentation was required? Maintenance CE (no additional documentation required) X Decision Memo EA Date completed: 1-26-2006 Has IMT received Proposed Action Form? X Yes No NA Did the project require a BE? X Yes No NA Does the project require a cultural survey? X Yes No NA Have required surveys been completed? X Yes No NA Was a design package required? X Yes No NA If yes, has the package been approved? X Yes No NA Prepared By: Jeffrey M. Magniez, NEPA Writer I have reviewed the information noted above and I recommend that this project be implemented. l 3l D tv ERIN M. BRONK Date District Ranger C:\DOCUME-1\ebronk\LOCALS-1\Temp\notesE I EF34\PDF Mallonee Tr Bridge.doc Q' i l Office Use Only: Form Version March 05 20000414 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification ? Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: #3 & 14 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information 1. Owner/Applicant Information Name Marisue Hilliard (Forest Supervisor) Mailing Address: US Forest Service National Forests in North Carolina P.O. Box 2750 Asheville NC 28802-2750 Telephone Number: 828-257-4200 Fax Number: 828-257-4263 E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: - Lynn Hicks (Forest Engineer) Company Affiliation: Mailing Address: US Forest Service National Forests in North Carolina P.O. Box 2750 Asheville NC 28802-2750 Telephone Number: 828-257-4243 Fax Number: 828-257-4884 E-mail Address: lhicks@fs.fed.us Page 1 of I I III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Malonee Trail Bridge Construction and Trail/Pier Project (Both of these projects are on the same stream, Wolf Creek, approximately 700 feet apart.) 2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): N/A 4. Location County: Jackson Nearest Town: Tuckasegee, NC Subdivision name (include phase/lot number): N/A Directions to site (include road numbers/names, landmarks, etc.): From Tuckase eg e, NC, follow SR281 ESE for 12.8 miles, thence Easterly on SR1756 for 6.8 miles to the Balsam Lake Recreation Parking Area. The trailbridge site lies about 300 feet across the meadow on Wolf Creek. The Trail/Pier Project is about 700 feet upstream from the Trail Bridge. 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Trail Bridge Decimal Degrees (6 digits minimum): 35.2730 ON 82.9667 °W Pier/Trail Decimal Degrees (6 digits minimum): 35.5230 ON 82.9701 °W 6. Property size (acres): Roy Taylor Forest 39,000 Acres (part of the Highlands Ranger District) 7. Name of nearest receiving body of water: Balsam Lake 8. River Basin: Little Tennessee (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.ne.us/admin/maps/.) Page 2 of I 1 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Bridge The project site is on Wolf Creek, just on the north end of Balsam Lake. The old trail bridge to be replaced is approximately 250 feet from the confluence of Wolf Creek into Balsam Lake. The north side of the stream at this point is a meadow area, parking lot, picnic area, and comfort station for recreationists and forest visitors. The trail from the parking area follows the edge of the meadow and the stream. The south side of the stream is forested with mixed hardwoods and confers with under brush of laurel and other species. The trail on the south side of the stream continues south around the lake. The soils are sandy silts in the meadow area and the north side of the stream. The south side soils are much the same adjacent to the creek but become more clayey to the south under the forest canopy. An old, squared treated timber wall of about 18 inches exists on the northerly approach to the old bridge, and a similar wall (made of different wood materials) is present on the south end as well. The abutment for the old bridge is concrete on the north end and the south end rests on the wood wall. The concrete abutment suffered erosion underneath its base during the 9/2004 flooding. Pier/Trail The trail runs 700ft northerly along Wolf Creek beginning at a point roughly 400ft upstream of the confluence of Wolf Creek and Balsam Lake. The trail is accessible and its primary use is recreational fishing. 10. Overall project description in detail including the type of equipment to be used: Bridge This project consists of replacement of the old bridge (a span of 50 feet) with a new steel structure. While the new structure will have its planned abutment just a few feet west of the existing north abutment, the new bridge will be skewed in order to provide for better ingress/egress of the bridge. The new span will be about 70 feet. The old bridge and its north abutment will be removed. Only that portion of the north treated timber wall which interferes with riprap placement is planned for removal. None of the retaining wall on the south side of the creek is planned for removal. A large crane will be used on this project and with its use, it is planned that it will lift and set a small excavator to the south side of the stream in order to excavate the south abutment as well as place the riprap and build the southern approach to the new structure. A steel trail bridge of this size will most likely be set in two sections. This will require temporary shoring in the middle of the stream for a short period in order to support one end of the bridge while the remaining section is set and the attachments are made. The in-stream shoring is usually made of steel resembling oversized sawhorses. Its legs are adjustable in length, allowing it to conform to the stream bottom without very little stream disturbance. This temporary shoring will be placed and removed by crane. The abutments will be structural concrete and will be pumped from the north shore via use of the old bridge for supporting the concrete pump hose. The contractor will be required to encase the pump hose to prevent Page 3 of 11 spillage. Access from the parking area to the bridge site is via the existing trail. Aggregate will be placed of sufficient width to afford the equipment access along the trail without damage to the meadow. This material will be mixed with abutment's excavated soils in order to construct the new approaches. The aggregate will be narrowed from the west abutment to the parking area upon completion of the project. A small, existing 8 inch drain across the existing trail will be replaced with a 12 inch culvert at the time of construction. Erosion and sedimentation control will be maintained throughout this project primarily through proper water management, construction sequencing, proper staging and stockpiling material, and the maintenance at all times, of suitable channel capacity for expected flow events. No equipment, fuels, lubricants, or other potential sources of water pollution will be stored in areas that could be flooded during this project. Work within the wetted perimeter of the stream will not be allowed from October 15ch - April 15th. Pier/Trail The most upstream point is the proposed location for a 5'x10' fishing deck extending as far as five feet over the creek. The decking for the pier will be constructed from wood/plastic composite boards. The pier will have a concrete footing at the top of the creek bank and two timber piers anchored by concrete that will be located in the dry part of the creek bed, 5' from the top of the bank. Care will be taken that no concrete is spilled into the creek. No large equipment will be required to construct this proposed structure or even be able to access the site. Erosion and sedimentation control will be maintained throughout this project primarily through proper water management, construction sequencing, proper staging and stockpiling material, and the maintenance at all times, of suitable channel capacity for expected flow events. No equipment, fuels, lubricants, or other potential sources of water pollution will be stored in areas that could be flooded during this project. 11. Purpose of the proposed work: Bridge The replacement of the existing bridge is necessary in order to repair the eroded abutment. Further, the old bridge has steel girders of insufficient size for the minimum loading of 85 pounds per square foot required. The maintenance of the trail system around the lake is performed by equipment requiring a clear bridge width of 64 inches. The skewed proposal for the new span will allow for easy-on, easy-off access for this equipment. In the past, this same equipment was used for retrieval of an injured hiker, and access to the east side of the stream was nearly impossible via the old bridge. Placement of the designed riprap will prevent erosion similar to that which eroded the west abutment. Lastly, the new bridge will afford safe accessibility for the disabled recreationist as well our usual hikers, fisherman and forest visitors. Page 4 of 11 Pier/Trail At the site of the pier, there is an existing fishing pad which has become unusable due to the 9/2004 flooding that caused the stream to shift away from this fishing pad. Constructing the new proposed fishing pier will regain this lost recreational opportunity and provide it to those who wish to use it. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. N/A V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: Page 5 of I 1 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. N/A Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-year Floodplain (yes/no ) Distance to Nearest Stream (linear feet) Area of Impact (acres) Total Wetland Impact (acres) 3. List the total acreage (estimated) of all existing wetlands on the property: N/A Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. Stream Impact Number (indicate on ma) Stream Name Type of Impact Perennial Intermittent? ? Average Stream Width Before Impact Impact Length (linear feet) Area of Impact (acres) N/A Total Stream Impact (by length and acreage) Page 6 of 11 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dredging, flooding, drainage, bulkheads, etc. Open Water Impact Site Number (indicate on map) Name of Waterbody (if applicable) Type of Impact Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) Area of Impact (acres) N/A Total Open Water Impact (acres) 5. List tl ze cumulative impact to all Waters of the U.N. resultina trom the project Stream Impact (acres): Wetland Impact (acres): Open Water Impact (acres): Total Impact to Waters of the U.S. (acres) Total Stream Impact (linear feet): 6. Isolated Waters Do any isolated waters exist on the property? ? Yes ® No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. 7. Pond Creation N/A If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands . ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: Expected pond surface area: Page 7 of 11 VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. (See III., 10, above.) VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/newetlands/strmgide.htm]. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A Page 8 of 1 I 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://h2o.enr.state.ne.us/wrp/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/ Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (required by DWQ) L. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ® No ? 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ® No ? 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ® No El Please see attachment, Project Data Form, attached. X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1.. Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233 . (Neuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC Page 9 of 11 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet) Multiplier Required Mitigation 1 3 (2 for Catawba) 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0244, or .0260. N/A XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. N/A XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Contract requires portable sanitation facilities for employees XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No Page 10 of 11 XIV. Cumulative Impacts (required by DWQ) Wili this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ? No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwetiands. If no, please provide a short narrative description: XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). i /Agent's Signature Date is valid only if an authorization letter from the applicant is provided.) Page 11 of 11 o? United States Forest National Forests in 160A Zillicoa Street s Department of Service North Carolina P.O. Box 2750 Agriculture Asheville, NC 28802 828-257-4200 File Code: 1230 Date: November 21, 2005 Route To: (7100) Subject: Delegation of Authority To: Lynn L. Hicks, Engineering and Minerals Staff Officer You are hereby delegated the authority to act as my Agent for all phases of the application process for permits required by Section 404 of the Clean Water Act, for road, bridge, culvert, and facilities projects on the National Forests in North Carolina. You are authorized to make formal application for all permits to the US Army Corps of Engineers, the North Carolina Division of Water Quality, and the North Carolina Wildlife Resources Commission, provide all necessary information, and sign all correspondence. Include this letter as part of all applications for Section 404 permits to the US Army Corps of Engineers, North Carolina Division of Water Quality, and North Carolina Wildlife Resources Commission. MARISUE HILLIARD Forest Supervisor u?is W Caring for the Land and Serving People Printed on Recyded Paper ATTACHMENTS FOR PERMITTING PROJECT NAME: Malonee Trail Bridge Construction & Fishing Access Trail Pier Delegation Letter: Forest Supervisor to Lynn Hicks, Engineering and Minerals Staff Officer Maps: Vicinity Map Quad Map Drawings: New Bridge Plan and Profile (11" x 17") Typical Detail for Riprap Placement (11" x 17") Pier Site Plan (8-1/2" x 11") Pier Site Profile (8-1/2" x 11 Other Documentation: NEPA Project Description Form United States Forest National Forests in 160A Zillicoa Street r Department of Service North Carolina P.O. Box 2750 Agriculture Asheville, NC 28802 010 1c? I- File Code: 1230 Date: November 21, 2005 Route To: (7100) Subject: Delegation of Authority To: Lynn L. Hicks, Engineering and Minerals Staff Officer You are hereby delegated the authority to act as my Agent for all phases of the application process for permits required by Section 404 of-the Clean Water Act, for road, bridge, culvert, and facilities projects on the National Forests in North Carolina. You are authorized to make formal application for all permits to the US Army Corps of Engineers, the North Carolina Division of Water Quality, and the North Carolina Wildlife Resources Commission, provide all necessary information, and sign all correspondence. Include this letter as part of all applications for Section 404 permits to the US Army Corps of Engineers, North Carolina Division of Water Quality, and North Carolina Wildlife Resources Commission. MARISUE HILLIARD Forest Supervisor s ? Caring for the Land and Serving People Printed on Recycled Paper ?1? xcf o - .It E53? j? MIDDLE PRONG :?,. PISGAH :.? '- i` -Gap 1 sa,. GaSe.Bald 1 i? J r r- i Gage Gap J_J .: H73 Q9 ' , ? ? 9 vl - ? L15' N? A' N1 T\' Charley Bald o `? S 6M LHT 17 r /? o C Sul kKnob 1444}}}0 ?- '/ A x C;roo _%' ap BM U(T 1739 \ / ?? ?? ` 1 \ ?? \ •'?` m 3761 S- E / ?A 1 nob - ------ \= i, c\CGar P Knob ABM W1 1760 i Trail/Pier 3579- ev ' Project ;\ • ; .?V ?Qr ,\\< ,\ ?C iv Malonee Trail o% rH ?? Bridge ?= T ` ? _ .1905 ? ??80033 r'? - •E" ?/ ` \ 1? ? ' D?i3p ?eQ Knot e;? s Ar. r? r ." = = Balsdny take ?? Cathey o \ ,?j 7' i s? J Charley?l' \\CatheyGap r ?,a Knob _-? ? l e Balsam Lake Project Site: Malone Trail Bridge #470-0.1 & TraiMer Project << ` FScale: 1.75 Inches =1 4'+fi tit v ._y._ 1 r'fl?'' j `" II 4l ) W -i Z LU o i- W W? Lli CL U1 U L7 ¢Z /?31 ¢ W W 1 !v / L7 z Oz W 4/ ' J zp F- -i _ Q < po o i Q g UJ J t11 N ! i J 0 o l / O ¢COOcv O O < r r < z zQ =? ? p z ?ooo, - og°? ` z N N .. ION - C3 Y W W .,¢WW F-??Q• W '` rJr ?Jr H P Z Z Z D V W f E OPUPOW U W O W O p/ Q N M,,a KF6 U a LL. N ? O Z O K U = ? I Z V) N # X m W m V Q( ?-. I L.j % ?s$ ?-- Ln _ 11 N f 1-U ?N T- W Q_ 0 x LL am oC ? -- \V O 'mil Z= U, NINI ,-0 O W LW -4 ??(R) 10 0 Q U G • t •.., C ,Y < Q C; C; Z N • ' O O < 00 a-Q_ - L~ip X Q?- Q ?pppp? ?. zf-- X ?0? LLJ NU?Q?U N - x?o 1Q_J 04 V) z L ?+ N < z m z xo ¢m . 7 ?D? \U? III Z Q"' wo._ mm O x? w Ll1 ?J V ?< (N I Via, v cY II ~ x N m } tY d) D o < XQ my ? z NQ OW fj? LL Q M 00 r- (D LO 0 0 o rn rn rn rn rn rn RANGER DISTRICT: PROJECT NAME: STORM DATABASE UID: PROJECT DESCRIPTION FORM Highlands Mallonee Trail Bridge #476-0.10 1736 Describe the condition of the site prior to the hurricane events. Trail bridge in good condition Describe the storm damage to this site. Flood waters damaged bridge. Betterment Justification: Repair damage and return trail bridge to original condition. Is the project in the Work Plan? X Yes No NA Has the IMT reviewed and approved the project? X Yes No NA What level of NEPA documentation was required? Maintenance CE (no additional documentation required) X Decision Memo EA Date completed: 1-26-2006 Has IMT received Proposed Action Form? X Yes No NA Did the project require a BE? X Yes No NA Does the project require a cultural survey? X Yes No NA Have required surveys been completed? X Yes No NA Was a design package required? X Yes No NA If yes, has the package been approved? X Yes No NA Prepared By: Jeffrey M. Magniez, NEPA Writer I have reviewed the information noted above and I recommend that this project be implemented. 1 YC. ! /3/ D(o ERIN M. BRONK Date District Ranger C:\DOCUME-1\ebronk\LOCALS-1\TemplnotesEl EF34\PDF Mallonee Tr Bridge.doc r° r Cv O ? o J N a??m Q) Q) a O U?Q p ?Q? I ? O o ?' O• ? ° N? ca o aoi?"- p no °' L o-a D ?? N W J(n • , Y Q I ? / ./ \ \\ O (n .rZl J \\ ?O ?\ \\ \ Li Cl N \ ca L. - \/' o U N \ /\ c a? / \ '' ? U U (10 / A \ i? N O) ` = C O / / ?• N app ,Zl ? ' / ' ivy ao W w 3 f ? N k?w Q N O J - N _ O N p N'O ? m O EL «S III. r-rr g- `mot N O ^II O U O rTO h"?"i -V s O O FIR n S Z S 7 Z o / V V '1 O (z V V O V O Z r N ss' 3 .RCS i? lit a= 3? 5tti 3?9 3s? URI w ?C xy r f..l °z ?t o ° ? s as r N r r M M r r r r r r r r p $ y S ? • "5 ? p?o O H ti a? 4 A i<n i ; a 4 Q R H vd i ?z L ? l t?7 1 to N ? ?+ II g $ v w L O # b 4 -Y Y 7 -I 1 1 I i i o , _ \1 A Y I i IM Z 0 ?Q ! _• S t 31 1 n A o \ elltd ?s ?n N 1 / le / rpA rrtl s 1(5?? t ? r o r 1 y 1 I R I ? l O ; s? R N $ e N p p p p p p p N y~i ?a y ?'i 0 0 p ,O ° O O LJ D O° Yv ffm / r /• a .e rrt m AN !2 N Pr t" sta. o4azss Mu6v_wtt No. i V Sto. 0485.65 Top Of Vwk PJw-* EJw. 100 MT T. No. V Sta. 1 .40 / / / o 1 ti I ? I 1 ?r 1 1 I "r ?' Iv pC Z• ? NO ?°' '"aaa6 A I b ,y C ? 9 7d o r t >1r s A? Y? 0 0 N ill N °a g i