Loading...
HomeMy WebLinkAbout20181350 Ver 1_Riparian Buffer Authorization_20181004 (2)DWR State of North Carolina Department of Environmental Quality Division of Water Resources Division of Water Resources 15A NCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) - Buffer Authorization FORM: BA 10-2013 Riparian Buffer Authorization Form A. Applicant Information 1. Project Information la. Name of project: Rocky Mount Mills 1 b. County: Nash 1 c. Nearest municipality: Rocky Mount 1 d. Subdivision name: Rocky Mount Mills - Main Mill Building 1e. Is the project located in any of North Carolina's twenty coastal counties? If yes, answer 1f below. ED] Yes ® No 1f. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Owner Information 2a. Name on Recorded Deed: Rocky Mount Mill LLC 2b. Deed Book and Page No. Deed Book 2319 Page 222 2c. Map Book and Page No. (include a copy of the recorded map that indicates when the lot was created): Plat Book 33, Page 160 (does not show current parcels) 2d. Responsible Party for Corporations): Rocky Mount Mill LLC (Peter Mahood) 2e. Street address: 1151 Falls Road 2f. City, state, zip: Rocky Mount, North Carolina 2g. Telephone no.: (919) 433-1569 2h. Fax no.: 2i. Email address: pmahood@cbc-raleigh.com 3. Applicant Information (if different from owner) 3a. Applicant is: ❑ Agent ❑ Other, specify: 3b. Name: 3c. Business name if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: 4. Agent/Consultant Information (if applicable) 4a. Name: Cheryl Moody 4b. Business name if applicable): Atlantic Shores Environmental Services, Ltd. 4c. Street address: 154 Backhoe Road 4d. City, state, zip: Leland, North Carolina 28451 4e. Telephone no.: 910-371-5980 4f. Fax no.: 4g. Email address: Cmoody@atlanticshoresenv.com FORM: BA 10-2013 Page 1 of 4 B. Project Information and Prior Project History 1. Property Identification 1 a. Property identification no. (tax PIN or parcel ID): PIN: 385010461330 PARID: 003373 1 b. Site coordinates (in decimal degrees): Latitude: 35.960111 Longitude: -77.801489 1 c. Property size: 4.08 acres for the site parcel 2. Surface Waters 2a. Name of nearest body of water to proposed project: Rocky Mount Mills Tail Race of Tar River 2b. Water Quality Classification of nearest receiving water: B; NSW for Tar River 2c. River basin: Tar -Pamlico 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site is developed with the National Historic Rocky Mount Mills building, which is being renovated for mixed residential and commercial use. 3b. Attach an 8'/2 x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site 3c. Attach an 8'/2 x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site 3d. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 440 feet of the Tar River and 1,100 linear feet of the Tail Race 3e. Explain the purpose of the proposed project: This authorization form is required to relocate a 24" stormwater pipe and replace it with a 18" stormwater pipe. The pipes discharge into the Tail Race. The pipe is located within the crawl space of a building that is on the National Historic Registry and discharges directly to the ground into the race. 3f. Describe the overall project in detail, including the type of equipment to be used: The project includes relocated a stormwater pipe within the crawlspace of the historical mill building. The 24" stormwater pipe is currently deteriorated and requires replacement. Due to the condition of the pipe and debris within the pipe location, a new location is required for the replacement. In addition, as part of the renovation/replacement, and the storwater plan for the overall site redevelopment, the stormwater flow through the pipe will be greatly reduced, thus allowing for the pipe size to be reduced to 18". 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by ❑ Yes ❑ No ❑ Unknown the Corps or State been requested or obtained for this Comments: property/ project(including all priorphases) in thepast? 4b. If yes, who delineated the jurisdictional areas? Agency/ Consultant Company: SEGi Name (if known): David Scibetta Other: 4c. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. October 17, 2014 5. Project History 5a. Have permits or certifications been requested or obtained ® Yes ❑ No ❑ Unknown for this project(including all priorphases) in thepast? 5b. If yes, explain and detail according to "help file" instructions. See attached details 6. Future Project Plans 6a. Is this a phased project? ® Yes ❑ No 6b. If yes, explain. See attached details FORM: BA 10-2013 Page 2 of 4 C. Proposed Impacts Inventory 1. Buffer Impacts 1a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Jordan ❑ Goose Creek 1 b. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Buffer impact number — Permanent (P) or Temporary T Reason for impact Type of impact (exempt, allowable, allowable w/ mitigation) Stream name Buffer mitigation required? Zone 1 impact (sq ft) Zone 2 impact (sq ft) 131 ® P ❑ T Existing SW outfall Exempt Tail Race of Tar El Yes ® No 40 0 new impact B2 ❑ P ❑ T 2f. Comments: The bank of the race is not pristine with brick, rock and debris from the mill building. Renovation of the mill structure will attempt to restore this area. ❑ Yes ❑ No B3 ❑ P ❑ T ❑ Yes ❑ No B4 ❑ P ❑ T ❑ Yes ❑ No B5 ❑ P ❑ T ❑ Yes ❑ No B6 ❑ P ❑ T ❑ Yes ❑ No Total buffer impacts 40 1c. Comments: See attached D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. We are reducing the volume of stormwater through the pipe by redirecting it to other BMPs on the site. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. The discharge pipe will be buried and the temporary impacts will be restored. 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. Zone Reason for impact Total impact Multiplier (square feet Required mitigation square feet Zone 1 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 2c. If buffer mitigation is required, is payment to a mitigation bank or NC DMS proposed? ❑ Yes ❑ No 2d. If yes, attach the acceptance letter from the mitigation bank or NC DMS. 2e. If no, then discuss what type of mitigation is proposed. 2f. Comments: The bank of the race is not pristine with brick, rock and debris from the mill building. Renovation of the mill structure will attempt to restore this area. FORM: BA 10-2013 Page 3 of 4 E. ._.... ..... Diffuse Flow Plan All buffer impacts and high ground impacts require diffuse flow or other form of Diffuse flow stormwater treatment. Include a plan that fully documents how diffuse flow will be ❑ Other BMP maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form. If due to site constraints, a BMP other than a level spreader is proposed, please provide a plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP l Manual and attach a BMP Sui)plement Form. F. Supplementary Information 1. Environmental Documentation 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the Yes No use of public (federal/state i land? 1 b. If you answered "yes" to the above, does the project require preparation of an ❑ Yes ❑ No environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy. Act i NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document been finalized by the State ❑ Yes El No Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: 2. Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated j _Yes® No Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Ri arian Buffer Rules 15A NCAC 02B .0200)? 2b. Is this an after -the -fact permit application? _ _ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): Peter Mahood 07/19/18 Applicant/Agent's Printed Name Applicant/ Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Send 3 complete sets of this form and accompanying documents to the following: For government transportation projects sent by First Gass Mail via the US Postal Service: NC DWR, Transportation Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 - 1617 For all other projects sent by First Class Mail via the US Postal Service For government transportation projects sent by delivery service (UPS, FedEx, etc.): OR NC DWR, Transportation Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 For all other projects sent by delivery service (UPS, FedEx, etc.): Karen Higgins Karen Higgins NCDWR — 401 & Buffer Permitting Branch OR NCDWR — 401 & Buffer Permitting Branch 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699 - 1617 Raleigh, NC 27604 FORM: BA 10-2013 Page 4 of 4 ■ ti �� fr OEM a Site '- Lm 48 f— F r �� rr Approximate Scale: FIGURE 1: SITE LOCATION MAP �' Soo N Source: USGS Rocky Mount, North Carolina Quadrangle, 1977. Contour interval 10 Feet Stormwater Pipe Relocation Rocky Mount Mills S ASE Project No. 1209 Rocky Mount, Nash County, North Carolina April 2018 Environmental Services, Ltd. L rR h �I i i i Site 5• F Lk a I ";I iii ins � a: I„�-� Ilci .il -1�i, �,i ,�Ik.. •xx nip sdeo 10,710 ifp wlEd uiAbilimpe (u" Y &T) 4imL o as M iff]a ===========Fea a tm M 411 aa r&P w"MVM[Ur ChMErMW6 Vimm akJoam un Amlm,+ Approximate Scale: Not to Scale FIGURE 2: SOILS MAP MAP Source: USDA Stormwater Pipe Relocation Rocky Mount Mills Rocky Mount, Nash County, North Carolina �S Environmental Services, Ltd. ASE Project No. 1209 April 2018 IN )>Z -a nk .1 IN le, N our vcp= J, m Z12r'. brld, wall W.- 5" block Ymll N, ex. tre h drainex 12" hole In cone. wallex- -Ox- water-wul INV -=93.02' goft ex- cone. du. A oampactor olu rrhri I rolkirrins ax- brick murtmtiwy ex. 15- conc-L wall Approximate Scale: Not to Scale FIGURE 3: RIPARIAN BUFFER MAP N Source: Site Plan I Stormwater Pipe Relocation Rocky Mount Mills ASE Project No. 1209 Rocky Mount, Nash County, North Carolina April 2018 Environmental Services, Ltd. UV_ rY I p— 4. Ss w;pex. 10' WCP M V-92-10' INV,--X9,14'Cr r Wr N ex repiner NX84- ate e ff 7 A 5' dip L W C95 _ wall 8 (61ok wall wv ax. ballardfin (go under b�ulldl - r. INV. E3-43' :F 77- 7- ramp/dDck t1 14' 1 ,rollN, wL 12' brick wull Eris k am- 4" brrlrk wall )>Z -a nk .1 IN le, N our vcp= J, m Z12r'. brld, wall W.- 5" block Ymll N, ex. tre h drainex 12" hole In cone. wallex- -Ox- water-wul INV -=93.02' goft ex- cone. du. A oampactor olu rrhri I rolkirrins ax- brick murtmtiwy ex. 15- conc-L wall Approximate Scale: Not to Scale FIGURE 3: RIPARIAN BUFFER MAP N Source: Site Plan I Stormwater Pipe Relocation Rocky Mount Mills ASE Project No. 1209 Rocky Mount, Nash County, North Carolina April 2018 Environmental Services, Ltd. b.s1111 _ ____��� __ — - _ _� � — _ ��� T� )(/�" � // / j `�•`` �; �` Il``` ``,+'` I +\ -------- _ _`—_ Y - - '00 V l 111 ^ 1\ `\1 r 1 j i___-----'144 65.4rr 118 I ti Hwy — •\��>`, \``.`it. `. 1111,E Rpo re \ �oFCQI�,,°(� - � � - i t \,,tt♦ 1 I 11 �`'W II \\ L I � t 41 l7 1 1 + J 1�. f 02 .65 .<.%.4 .. .1,., ♦ _ •� �� � ' - � / PflOPQ5ED SPOT 103,x6/'Or\ 7O2.8a - - Ano spar N / / In f \ / < Rf:-ROt TE EK WMPSTER mkIN ti T YIE TO PROPOSED SERVICE TW 06. + ! �1t1 LAT . EX � LINE DOWNSTREAM 03.60 t MIL E }�. / 1 1111 SHALL BE ABANDONED i MILL ASE 2A t `I' PROPOSED TRENCH DRAIN 11 1 I� AND OUTLET 11 , Approximate Scale: Not to Scale FIGURE 4• EXISTING DRAIN LINE MAP IN Source: Site Plan Stormwater Pipe Relocation Rocky Mount Mills S ASE Project No. 1209 Rocky Mount, Nash County, North Carolina April 2018 Environmental Services, Ltd. Md BMW �7— INEED, 1 1 1 J � f � � � � Y J r f_ 50' Riparian Buffer INSTALL 1F RESTIiAINE1}JOINT QIP UNDER WLNNG, PIER $MPORT$ $HALL BE INSTALLED UNDER FIFE. WHERE STORM DRAIN GOES UNDER WALM CONTRACTOR OR WALL RETAINING MAL ESIGNER SHAILLAIDJUST FDOTINGS TO {DESIGNED BY BE 6ELGW STORM DRAM EWASEMEW PIPE 8H LL BE INSTALLED IN WALL (TM II � OL Approximate Scale: FIGURE 5: PROPOSED DRAIN LINE MAP N 10 13 no $p Source: Grading Drainage Plan Stormwater Pipe Relocation Rocky Mount Mills Rocky Mount, Nash County, North Carolina �S Environmental Services, Ltd. ASE Project No. 1209 April 2018 WATER LINE LTAIL RACE STORM PIPE ROUTING 08 77 --- _ _--------------- ------------------ --- - - _--_ \ ----- U O ��_i------_-__-_------- ------=-_--___------- - ----- - - - ` ---- IL LU --- _ _ I 1I _ _ (A -- -=��m= - _- __ =-i= - - / / I I 1 I ----- j i���/ -_ I W -- co w 0 I r�� ! ' U LUZ) Ip I Ipnlll ,--� N cn �I 111111 1 Il llllllll I / U) 1 II Illllphl 11/111111 IIIIIIIII I I Z e- Ill�liJ W Cou Mari g1l�7jiliiiiiii -- IIiVbIIN li,11111in z ulll i U z Jewd Illllfllllll 6' X 15' CLASS B Z W G unlllii 18" DEEP RIP RAP APRON Zrr J O LL sThamesp& n,e ti., q,llllll tl lllllllll, I - ----- low ♦ Zry 111 West Main Street ♦ ♦ �� r ; '' '1 ; %----=___ __ ,_= F_ %',;' 1 x wo Durham, N.C. 27701 on ow IWAM ,Ann _w ° p 919.682.0368 MANN _ -_ Z 0 f 919.688.5646 ___ ,, r ; •rel 1 w z www.cjtpa.com J - --- _--------- -- - 1 1 1 1 1 1 1 1 1 1 1 1 INSTALL 18" RESTRAINED JOINT DIP UNDER BUILDING. PIER c SUPPORTS SHALL BE INSTALLED UNDER PIPE 1 1 1 1 1 1 1 SEE DETAIL 1 1 1 1 RE: 1 /C301 -13 1 1 1 1 1 1 1 FFE 1 1 91.10 1 Project: ex. 91.08 I ROCKY I - _ YI 16 - Yi 9080 -- MOUNT 91.30 r -- Y117 DI 1 BW X. 91.70 " TW 93.50 ' \\ ', MI L L S YI 16A 9 0 '-- 95 // _ --- ', ■ BW 95.50 I � - ---� _ \ I j I I _ - _ 8g 111 -------- __�Y ]�_} __� /-i--n- _------ - d o r _l � j1 --- -- i -- _ -` � _I -I' � 3$ 99 // , �,; \��, I YI 18B ��� - ---= --- -- __-- - 1 11 8A THE MILL W 99.5a-/ I i _ / 1.65 -- / \ �1 II �11�5o------ ', ---- PHASE 28 ' 94.30 /' \ / j 96.50 0-= '92.00 94.4 \ 92.00'119 I I I 1,24 / I - 11 `ex. 98.13 sex. 97.79 ; --' ,' \ \\\ \\ \ `�' `a , \ \ � � 1107 1121 1 TW 98.20 135 & 1145 � \\ � \\ % %/ \\ \\ YI2�' '"BW 96.70 \ \ I j/_ _ Falls Drive ' RIM = 95.50 TW,98.40 101.65 97.86 B(/V 96.90 �. 1 _ \\ �� Rocky Mount -Nash Coun ty 97.00 A . �'^` 1 RIM 101.45 • a � TW , 3� � / �� 97. 12 102.80 � ' North Carolina 99.0 i I 1103. x. 101.68 FFE ex. 101.88\ 103.30 03.25 , _ 9• PIN: 385010456534 `\ 103.20 102.80 "---- /- ' 385010467009 .83 103.1 , - � �\� 03.10 ' - - _�-- i J ----" i 1 .,••„. 3 BW 99.131 - = 103.20 X03.20 _ _ TW 10 .00 `103:00- 103.1 - - / 3.00 - - \ r BW 10 .40 � 101. /' / BW 0 -- _ � I 3 / // JII `\ T 106.00 1 .80 W 100.13 / \ W 103.50 / 99.10 101.0 102.00 ' � \\I - _ / / ll1 a • . , • _-' 105.00 -- -- _ 03.50 103.2¢ - - � I - - - - CI 8A TW 1 .0 \\ BW 105.1 YI 30 12 \\ \\ 28 - \ 9 \ �I D 10 .75 0 TW 104.00 NQ) rT� _- N�� -_---- -� - BW 104.50 / TW 106.0 ---_- NOT FOR CONSTRUCTION 38 v - MILL PHASE 2A �� v`v ]ob Number. 1445 1 107. \I Drawn DAJ, JSA, MTC I Checked DAJ, JSA, PBR \ \ \ 10 0 Date 03-03-2017 SP SUB _ \ Revisions 06-06-2017 SP SUB#2 / �6.70I \\ I' r 07-18-2017 SP SUB#3 i / = \ , r- 08-28-2017 SP SUB#4 }` `\ = 2 09-18-2017 SP SUB#5 W 106.60 D D ' 'Au / BW 106.10 , I CJ 01-29-2018 NCDOT & , rn M STORM DRAIN REV ROPOSED PHASE TOURQ �� a vv N bi i PHASE 1 GRA/DING CONTOUR �Q♦ ♦ _ ,�0�' (FOLLOWIN/G BUILDING DEMO) � `� � II XIS,7 -CONTOUR ,----1 Q% \ 107.85 FFE General Plan Level II 107 108.30 X0.97' ��--- � 108 0 8 28 Sheet Title: x,11 0 108. x108.28 1. I F - GRADING / DRAINAGE w 108.0-108.25 - MILL NORTH GRADING / DRAINAGE PLAN - MILL NORTH Sheet Number _ I NTS C301 -B 1" = 20'-0" 0 15 30 60 C301 - B Riparian Buffer Authorization Form April 2018 Rocky Mount Mills Rocky Mount, Nash County, North Carolina, 27804 ASE Project No. 1209 Riparian Buffer Authorization Form Attachment Due to the limited space and formatting provided in the Buffer Authorization Form, ASE is providing answers for the following questions as an attachment. Section B. Project Information and Prior Project History 5a. The project includes the current phase and additional phases of Rocky Mount Mill complex. The following includes approved and/or permitted activities through the NCDEQ Division of Water Quality or the USACE. • Action ID Number SAW -2014-01156 dated October 17, 2014 and March 28, 2016 o PCN dated March 3, 2016 for a dry retention pond located along River Road. o USACE General Permit Verification - NWP 18 Minor Discharges, dated March 28, 2016 o PCN Form dated January 16, 2017 for riprap installation within a drainage feature located east of the main mill building. o PCN dated December 12, 2017 to rework an existing stormwater outfall west of the main mill at the Cotton Warehouse. • Action ID Number SAW -2016-01498 dated October 28, 2016 o PCN dated December 15, 2017 for a new stormwater pond located south of the main mill, south of East Elm Street. 6b. The Mill Phase 2B project (current phase) is a re -development project that involves the renovation of an existing mill building and the associated infrastructure upgrades. Additional phases include the renovation and construction of single- family residence within the historic mill village. However, this authorization affects only Phase 2B. Section C. Proposed impacts Inventory 1c. A new 18" ductile stormwater pipe will be installed underneath the existing historic mill building to replace a corroded 24" corrugated pipe. The old pipe will be removed and the new pipe will be installed in a different location and exit the building at a new location. The pipe is unable to be installed in the existing location due to the renovation activities and existing structures. The new pipe will continue to discharge stormwater from the site. However, the stormwater drainage area for the new pipe will be reduced, thus reducing the volume of water. The new pipe will collect stormwater runoff from landscape and hardscaped areas in the northeastern Riparian Buffer Authorization Form Rocky Mount Mills Rocky Mount, Nash County, North Carolina, 27804 ASE Project No. 1209 April 2018 corner on the southern side of the building only. Therefore, a smaller diameter pipe is being used due to the reduced volume that will be present though the pipe. The majority of the pipe will be located within the crawlspace of the existing mill building. Zone 2 of the Riparian Buffer is located within the crawlspace of the existing mill. Approximately one to two feet of pipe will exit the building approximately ten feet above ground surface. The pipe will extend down the building and will be buried approximate 0-12 inches below ground, and elbow towards the tail race. The buried pipe will extend approximately 8 feet before existing into a diffuse flow device consisting of an 8 -foot -wide Class B 18 inches deep riprap apron which will extend approximate 15 feet from the pipe exit. Section D. Impact justification and Mitigation 1a. The building is located I Zone 2. The majority of the pipe will be located within the crawlspace. Therefore, the pipe will be located in areas already disturbed and covered. The majority of impact from the pipe would be due to surface runoff and erosion over time. As the water exists the pipe, the flow will be diffused using riprap to minimize erosion. 1b. The majority of the pipe will be located within the crawlspace with only one or two feet exiting the building. Based on the accessibility and clearance of the crawlspace, large excavation and ground disturbing equipment will not be used. The work will occur with hand tools. These methods minimize erosion and ground disturbance in areas outside of the new pipe location. Nutrient Calculations ASE has attached the following report " Rocky Mount Mills - The Mill Phase 2B Stormwater Impact Analysis" dated March 3, 2017. The report includes a peak flow analysis and nutrient calculations for the project. STA 71"i DO 'V'A 5 V Agent: Cheryl J. Moody Atlantic Shores Environmental Services Ltd. ,,,Aetdress: 1554 Backhoe Road Leland, NC 28451 Phone-, (910) 371-5980 Mp 17 MUNUM Indicate Which oft e Following Apply-. A. Preliminary Determination Based on preliminary information, there may be wetlands on the above described property. We strongly suggest you have this property inspected to determine the extent of Department of the Army (DA) jurisdiction. To be considered final, a jurisdictional determination must be verified by the Corps. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 33 1). If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also, you may provide new information for further consideration by the Corps to reevaluate the J. B. Approved Determination There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. X There are waters of the U.S. including wetlands on the above described property subject to the permit requirements of Section 404 of the Clean Water Act (C a)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. — We strongly suggest you have the wetlands on your property delineated. Due to the size of your property and/or our present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation must be verified by the Corps. — The waters of the U.S. including wetlands on your project area have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. X The waters of the U.S. including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on October 17 Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. 104 There are no waters of the U. S. , to include wetlands, present on the above described proj ect area which are subj ect to th permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date oft is F notification. The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to determine their requirements. Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). If you have any questions regarding this determination and/or the Corps regulatory program, please contact CraigBrown at 919-554-48 84 x35 or Craig.J.Brownk sace.army.mil. C. Basis For Determination: The wetlands on the property exhi bit the reg .• 7` three parameters of wetland pjants, hydric soils and wetland hydrolo2v outlined in the 1987 Army Corps of Engineers Wetlands Delineation Manual and the Atlantic and Gulf Coastal Plain Region Supplement. The wetlands on the property drain to the Tar River traditional navig ble water. D. Remarks: This Approved Jurisdictional Determination is only for the,areas shown on the attached Wetlands Map, siLyned by the USACE on October 17, 2014. There may be other jurisdictional waters on the properties that are not shown on the Wetlands Map. This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the [�;articular site identified in this request. The delineation/determination may not be valid for the wetland conservation [irovisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved Jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 33 1. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room Atlanta, Georgia 30303-8801 Fn order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for ?,ppeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP— Should you decide to submit an RFA form, it must be received at the above address by December 16, 2014. * *It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence. Corps Regulatory Official: Craig Brown Date: October I Expiration Date: October I The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at lett v -. Hregu latory. usaes ry y. com/. Property Owner: Charles W. Penny City of Rocky Mount Address: PO Box 1180 Rocky Mount, NC 27802 Phone: Property caner® Michael J. Goodman Rocky Mount Dam, Inc. Address: 2619 Western Ave. Raleigh, NC 27606 For, appealS on Initial Proffered Permits send this form to: Ftistrict Engineer, Wilmington Regulatory Division, Attn: Craig Brown, 69 Darlington Avenue, Wilmington, North Carolina 28403 AL A I 11IM11 .1 It Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10MI5, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 WILAND ARE&I AREA I = 0.04 AC AREA 2 = &79 AC AMA a = ON #C TOTAL WEXAND AREA = 1.81 AC I -------- Lines rfm zurvewo Ep Existing iron Pipe EIS Existing iron Stake EIA --- Existing Iron Axle N --- No kan Set or found ECM --- Existing Concree Monument (VM UM an Nlom) CP Computed Pointt(No Iron Set or found) EDGE OF 04TER 0 bulicates; iron PrqWty corners set unless otherwIse noted R/W --- Right-at-111by Cyt --- Centediae .................... ... . . . . . . . . . . . . . . . . . . . AREA I 11*11ond log Number CW --- F LINE TABLE . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . M7,7177MI WETLAWS ASS A57 A56 NON-INE-TLAWS . . . . - - - - - A61 A60 A59 . . . . - . . - WILAND - - - - W WATER A62 --- Wetlands sham hereon awe delineated by ........ AW 84 ...... Atlantic es Environmental Services. Ltd - 154 Bockhoe Rd. . . . . . ... B5 LelorwL HC 28451 --- Latitude - $1 35r57'l4- A66 A65 Longitude = W 7748*03" (Approximate center of subject property) 06 WILAND ARE&I AREA I = 0.04 AC AREA 2 = &79 AC AMA a = ON #C TOTAL WEXAND AREA = 1.81 AC I -------- Lines rfm zurvewo Ep Existing iron Pipe EIS Existing iron Stake EIA --- Existing Iron Axle N --- No kan Set or found ECM --- Existing Concree Monument (VM UM an Nlom) CP Computed Pointt(No Iron Set or found) EDGE OF 04TER 0 bulicates; iron PrqWty corners set unless otherwIse noted R/W --- Right-at-111by Cyt --- Centediae .................... ... . . . . . . . . . . . . . . . . . . . 11*11ond log Number CW --- F . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . WETLAWS ASS A57 A56 NON-INE-TLAWS . . . . - - - - - A61 A60 A59 . . . . - . . - WILAND - - - - W WATER A62 --- Wetlands sham hereon awe delineated by ........ AW 84 ...... Atlantic es Environmental Services. Ltd - 154 Bockhoe Rd. . . . . . ... B5 LelorwL HC 28451 --- Latitude - $1 35r57'l4- A66 A65 Longitude = W 7748*03" (Approximate center of subject property) 06 M Right-of-ways am 'PubW unless noted otherwise. . . . 87 --- Area computed by coordinate method. --- AN distances are ground horizontal distances ;n U.S. Survey feet_ --- Surveyor did not visibly we any cemeteries in any open EDGE or *ATER A: areas unless otherwise noted, faCH WAIER B9 --- Joyner Keeny. PLLC can only Wole atilities VxA are above A71 ground of the rane of field survey. UWerground fines LAW shown hereon ore appraxwtote at as reported by vanous responsible parties. A72 2&o, 89 89 --- Surveyor daft NOT quorardwe Owl underground structures such as utilities. tonks and pqm am located hereon. A73 --- Area of *ellorwds for the Wand is from wellond fine, 810 delineated to the edge of water a" Tor River and Rocky Mount Mift Tail Race A74 MO A75 FLAG CMSMW lef3 EDGE Of MTER A76 . . . . . CITY Or ROCKY MOVIVI HIGH MYER VW 8 12 •. 77 EUVUVft MAW PAP01 . . . . . . . . . . AdU DEED ON RECORD 913 ABI A79 A78 ... . .•. . WETLAND &EA 3 LINE ..... ........... 914 ..... . ........... AI& 915 LILAND D5 tz� LAW ED" or V;r MIER t484'31'16'E 52115 -11E 10 E5 ROCKY WAINT A&L, ILC 08 2319, PC 222 pe 33.PG 160 LOT i. HLK A PV 3650104613.30 PAR10,4 00-0373 0 r� kar - -ML.,. . - E4 - E2 E5 L&WIE C1 SEGW AREA 2 AREA 2 PROPERTY LAW AREA LINE TABLE W ie to 827 VAUVWMANUM..1 pz C49 40W C56 leo C49 : C57 C57 FLAGS C55 TfM C58 EWE or M\WETLANO C58 C48 LINE PROPERTY SERE NOT ON •LNYE SUBACT PROPERTY C4 M AREA 2 .... .......... . . . . . . . . . . . . . .. : . . . . . . . . C46 JA4 C . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CLEO P O'CONNELL N� . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C7 . . . . . . . . . . . . . . ..... . . . . . . . . . . . . [M 2540, PC 406 ESSi,-, . . . . . . . . . . . Q�4, . -. -r . . . . . .• .. . . . . . . PIN# 385CM563264 . . . . . .•. . . . . . . .... C45 PAR01 028028 Z" C20 FLAGS C44 UM C46 SEAL . . . . . . . . . . . . . . RE . . . . . . . . . . . . . . . . . . . . WENOT 014 CB. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44 L SU"CT PRMRTY -4827 .... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. C9 C22 . ... . . . . . . . . . . . . . . . . . . . C43 CUF eS . . . . . . . . . . . . . . . . . . . WETLAAN) C23 VV) . ...... LAW C24 C24 2ta C9 0 __,PROPERTY 't Jeremy . A certify that this project was 2ea C2744V C25 LINE C9 . . . completed under my direct and responsibte charge from an actual ground survey nude under my . . . cis supervision; that the survey was completed on August C2 C3 4. 17 AREA 2 Cm C" 2014. C" CIO "*'C55 JA+ . . . C36 2JO ROCKY MOUNT VIA- LLC4ugg W.wy 6ATE D8 213 19. PG 222 C" C1 t16 PB 33. PC 160 LAND SURVEYOR NO. L - 4827 LOT 2. SM PW1,395OU0467009 PAR01 0496.32 C12 C' 3 14 C30 w nAG j< EEN & L A ND 4. 1051 N. WINSTEAD AVE. P.O. BOX 7533 ROCKY UOUNL NORTH CAROLINA 27804 OFFI I CE:1 (252)- 977-3124 0 Coulter Jewell Thames, PA ROCKY MOUNT MILLS - THE MILL PHASE 211 STORMWATER IMPACT ANALYSIS Calculations By: Tiffany R. McCormack, EI Checked By: Preston B. Royster, PE Coulter Jewell Thames, P.A. 111 West Main Street Durham, NC27701 Ph: 919-682-0368 Fax: 919-688-5646 Project # 1445 March 3, 2017 Revised: June 6, 2017 Revised: June 29, 2017 Revised: August 28, 2017 A % i .�� o� • ' S,s i SEAL _ 35003 T6 . ... RCy�`�� $�Z'��I 7 Proiect Describtion and Summar The Mill Phase 2B project is a re -development project that involves the renovation of an existing mill building and the associated infrastructure upgrades. The site is located along the east side of Falls Road, north of its intersection with Elm Street in Rocky Mount. The site is comprised of `D' soils. The site is located adjacent to the Tar River, classified as C, NSW, within the Tar - Pamlico Basin. Per the City of Rocky Mount stormwater management plan, pre -development and post - development peak flow rates for the 1-, 10-, and 25 -year storms must be calculated at discharge points from the site. If post -development flow rates exceed pre -development rates by more than 10%, on-site detention must be provided. If on-site detention is provided, it shall attenuate the post -development peak flows from the 1-, 10-, and 25 -year storms back to the pre -development rates. Projects located in the Tar -Pamlico Basin are required to limit the nutrient export from the site to remain below allowable thresholds. If the post -development nutrient unit -area mass loads exceed the allowable limit, stormwater management controls must be designed and/or nutrient offset payments must be made to reduce the nutrient export. Nitrogen and phosphorus export calculations for pre -development and post -development conditions using the Piedmont of the Tar -Pamlico River Basin Total Nitrogen and Total Phosphorus Loading Calculation Worksheet have been developed and submitted as required by the City of Rocky Mount. Per the City of Rocky Mount's Land Development Code, water quality treatment is required for this site. Water quality treatment includes attenuation of the 1 -year design storm and nutrient export limits. The calculations for this study are based on an analysis of the site re -development and the contributing drainage basin. Pre -development conditions have been taken as the site exists currently. Post -development drainage patterns are based on the proposed grading and development. Summary tables are included that detail pre -development and post -development peak flow rates from the site, along with the percentage increase or decrease, and nutrient calculations. Methodology • HydroCAD software is used to calculate the time of concentration for each sub -basin. HydroCAD uses the SCS segmental approach to estimate the time of concentration. • HydroCAD software is used to calculate the composite curve number for each sub -basin. HydroCAD uses the NRCS TR -55 method for calculation composite curve numbers. • HydroCAD software is used to calculate pre- and post -development peak flow rates for each sub - basin. HydroCAD uses the SCS TR -20 method to develop hydrographs. • The USDA Web Soil Survey is used to identify the soil types located on the site. • The Piedmont of the Tar -Pamlico River Basin Total Nitrogen and Total Phosphorus Loading Calculation Worksheet is used to calculate Nutrient Loading for Pre- and Post -Development conditions. • The Kirpich Equation is used to calculate the time of concentration (Tc) for each drainage area. A conservative estimate of 5 minutes was used as the Tc for each drainage area. Discussion of Results Peak Flow Anal As this project is part of a much larger overall master plan, the entire project area has been analyzed for peak flow. In total, there are five drainage basins that contain properties owned by the developer. Four basins discharge into the Tar River and eventually contribute to the peak flow at one analysis point, noted as River Analysis Point. Basins 1 and 2 contain areas offsite of the masterplan. These on- and off-site areas are denoted on the Peak Flow Analysis maps. Any upstream drainage areas into the river are not considered as part of this analysis. There is a portion of the masterplan area that does not contribute runoff to the river analysis point. This area will remain unchanged with this and any anticipated future development. It is noted in the analysis are Area to Bypass River Analysis Point. In order to evaluate the peak flow and correctly size the pond, future development was considered in this analysis. Assumptions for the future development are noted on the Post - Development Peak Flow Analysis Map. Future development will be compared to the assumptions made in this analysis. It is noted in the Peak Flow Analysis Summary that Drainage Basins 1 and 4 will have an increase in flows with the proposed and future development. Basin 1 contains most of the development for the site and will contain the Wet Pond. Basin 4 will increase in size due to the proposed storm drainage improvements. However, there is no increase in flow at the combined River Analysis Point after the proposed and anticipated future development. Proposed work for the Phase 2B project occurs within Basin 1. Analysis of the proposed wet pond divides Basin 1 into two sub -basins. A portion of Basin 1 will drain to the pond and a portion of basin will bypass the pond. Proposed work for Phase 2B will not drain directly to the proposed wet pond. Both sub -basins drain to one analysis point along the northwest property boundary, directly to the Tar River. This area is denoted as Basin I Analysis Point. See drainage area maps in calculations. Analysis of the 1-, 10-, and 25 -year storm events results in an increase in peak flow following development at the downstream analysis point. A wet pond is proposed to attenuate the flows back to existing condition rates. See table Peak Flow Analysis Summary in calculations for changes in peak flow for each basin as well as the river analysis point. Stormwater Pollutant Analysis Nutrient Export Load Limits: This site is located within the Tar -Pamlico Basin and the net built -upon area is increasing, therefore nutrient analysis is required. In the nutrient export analysis, future development was not considered in the nutrient reduction calculations. However, the pond was sized based on peak flow needs of the assumed future development. These assumptions will need to be evaluated in the future to ensure that the pond is still adequately sized. As such, the nutrient reduction provided by the pond will be calculated for each proposed project. For this analysis, the nutrient export from the Phase 2B site was compared to the nutrient reduction provided by the proposed wet pond. Since the Phase 2B site is considered to be redevelopment, the target export loadings are based on the pre -development export loading rate. The maximum permissible export of nitrogen is a 30% reduction of the pre -development value, and the maximum permissible export of phosphorus is the pre -development phosphorus loading. Post development Total Nitrogen and Total Phosphorus exports for the proposed development are above the allowable thresholds. The proposed wet pond will provide a 30% reduction of Nitrogen and a 30% reduction of Phosphorous, for its contributing drainage area that is owned by the same entity as the proposed project. No credit will be granted for nutrient reductions to properties within the contributing drainage area that are not owned by Rocky Mount Mill LLC and are not a part of the overall master plan. Based on the drainage area to the pond, the nutrient reduction provided by the pond is less than the required nitrogen and greater than the required phosphorus reduction associated with Phase 2B development. Since the nitrogen export is below 10 lb/ac/yr, this site is also eligible to utilize the offsite purchase and credit options for nutrient removal. The nitrogen export will be further reduced to allowable standards with the purchase of nutrient mitigation credits. Since the phosphorus reduction provided by the pond is greater than the required reduction, no offset payment is required. The additional reduction provided can be used to offset export loadings for future development. The contributing drainage area to the proposed wet pond does not include the proposed work in the Phase 2B site (See maps Nutrient Analysis Post -Development and Wet Pond Drainage Area Map). The pond is treating an equivalent area of impervious surfaces within the overall master plan that is owned by Rocky Mount Mill LLC. Based on the required reductions from the pre - development export loading rate to meet redevelopment target rates, the post development export needs to be reduced by 91.35 lb/yr and 4.57 lb/yr of Nitrogen and Phosphorus respectively. The proposed wet pond removes 88.21 lb/yr and 11.18 lb/yr of Nitrogen and Phosphorus respectively. As noted above, the nitrogen export is below 10 lb/ac/yr, and this site is eligible to utilize the offsite purchase and credit options for nutrient removal. The remaining nitrogen to be reduced with mitigation credits is 3.13 lb/yr. See table Nutrient Analysis Summary in calculations. Results Based on the Rocky Mount Stormwater Management Plan and Land Development Code, re- development of this site requires detention and nutrient reduction. These requirements are met with the installation of a wet pond and a nutrient mitigation payment. All applicable calculations and maps follow in this report. MISCELLANEOUS MAPS O 0 O) « N N C j N O O N C M Co « — N F- E. v o E LLJ WLf) O U L ll O LL O N « O N C o m C cc O N N? A t0 �a0n0 m N CL m v 00 E N o 0 m = N��s CD r E LL L!') 0 N 0 O ccs W Z II O J U LL 3 0 c m 0 y Q r IL L Q 0 = N a V W o oEvt LL r N m y Q N 0 CL 0 O U 3yE N IL pll0 Q O C N'EpY F C 0 a C O E 0 N d N N 0 W 0 a LLI s z A oy LU v n w p -p 10 � fiy,ip UIL � W O V CQ Q N nom m C N � Q o a m m 3Em ZN Y Q rr x c azo a�.o a! N � o Z C M fn xo�er cC bq W z o c— c � v O U Mmm SEW W � Q o ;t� z Z a � M �7P" o ami d G Z �+ �enc fn N.�a � OO Uj o E� W W ii O � W Z o E-2 p Z °_ w �, $aa= az b J LL � Z Q O Z aN's � i O, � U �w�°� c P E =ahs Q N e ®e a a ®®® e ® a e e Z 0628868 M.,6b.L6 ILL 0 N r N n N I N co C 2 m U 4-7 O Z N 7 O L co co icO N G O v N M..9T.8b oU 062886'8 z �i F Z N 4) G I�f OBLZ966 fl- Cl) O O N M.,61?.L61LL N � N � o M O N N (6 a 066£86£ OLO£96£ 000£86£ 0£6686£ 098286£ n N 4) U) N N U) > _ 2 U) Q N O U o 0 Z QC N En c x 0 N U � E Q O p Q CL Q� V M S� C w > N i fq C V) d N •O L N N Z� R O Z U 1� 5 M.91.8b aLL QI z N �lol ns c O U) Z LU 0 LU J Ca C m c O — c m N (A V) E2 cc U 0 E O U °U U U co 0 aO O U co N m Q N 4 ma asp 0 E a) f0 N fn E a> 'Q m m �a=as -a N E 3 m > .� O t >i —(00 CO 0 co 0 °c O T a c TQya amcc i 0. m o m > m E - E t 0 0 cF In m U o� Emm c ma E t f0 = U y _y Lu EaN O O o rn C 0 v, m � �? O w O cn a7 O O m O O W ca it a Z Cd U 0 O a co ca E In V1 O u! E m O 0 6 N :L- LO rn N N ° i ce N C 00 M m m M O O N O_ U W C .r -m m0 O 7 OL O m -a a' _ �O U3w Gln a . ?- a) L N O 0 N Ww U j 7 Q 0 �'.0m T f60WM C 'o m -0 `6 `o_ � CL 0 0 CL o U) to mca � 0 v t a) o w a u) a ZEN = .� g Q m U W O U t c N O T m 0 O Nam �`o w3 �� m R a`Di E o �a�0 r m a 'a °� 6 = 0 m m U o U (` m (n m m a O _2 a i a' U30 aa))m c m m m `m J m� Z u) N° U aQ O c- 0 m w Z> m Z) E m a ai in c N y aa) T 0 � �a 3 rnu> N a7 � aa) fn ami c cu 0 m o.o -.u3 CO o o o �Q c N Lca 0 a 3: CO) �0E-ii PEAK FLOW ANALYSIS N ®® 40 Ah c p� a '.• o fy ,...��� VIII� �� mm g -t s Allol wa.w.w.w i Aim �� "� °iiiii II IIIIIIII III I I I .I' P 1 � II 1 � — Illllllj�llll�l� I � �'� V liil��l� �I ♦ _�. 1 ��,�r♦♦ * � � .aha : _� . � �� � •� 'U :�. ' ti -� .�.>�e^a'r�' r asta�'� � ,. • � � I II �� i!IINpu WA ♦�®♦�'`9 ♦,tea. 1 ♦ T 1_ y III • .`♦ ♦ ►; ✓ �„ ` K- T ♦11u til II♦♦♦♦♦4r♦♦♦�G♦♦t\ ♦.>fO♦� � ter, ►'@aq !� , .., '�`h� - � ,'W,d' - �� '� , •� - _ \ �� ;� ►♦1♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦t�\•�♦�♦; o ���w♦ � /!� obi♦!:�♦� � � 0 )' - • o _ •aG- -''�, �- ► . � ` - - _ - - , �� � � � h F., � ��♦♦�►♦�♦�♦♦ . �j�♦9 � �♦�tv ?�� �, x'11 �: � �' � s! 6 ♦ v ? d O �. •! ♦ � ♦ ♦ g -A o s w � ���a .. t as �♦.� .e♦YY ��♦Asad \ ,� fla ►�♦♦♦�♦♦j♦♦♦♦ ��O♦♦♦ � t -♦♦ �1♦-»,'�:`° � � s' a. . � ' . �► wY Y• 4 Y A Q @ v i ♦®�s`f♦'�'j♦t+♦!0♦�+0`-" � ' �!� �♦ fi'1►!♦! r Sim♦♦@s� �,�. ,,►A�♦♦♦♦♦♦♦♦♦♦♦♦♦���A♦1t♦�� � ,��� �_� � ��♦ ���♦t .f• si,►♦4►`�'A♦♦�G♦ir♦♦sem♦♦!®♦♦♦!!♦t♦♦i♦♦!♦t:V♦♦♦♦�♦ `• ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦t♦<�♦♦f ►v t. �� 4♦♦A♦a1 > Via'♦�I ��1t� a. �y0►Y�♦�mp♦®♦YAYO@<j�j@♦a♦♦►♦♦♦♦@j♦♦♦♦♦A♦♦r♦♦♦�°i'�i y. �• ♦♦♦�U♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦��Q� ♦�N♦1 A,O AVC�� • �� *U�Q ► ►'4, ,. ♦404 Rol♦A!<•�O♦!� 1O♦♦i♦♦<'j♦j�♦�j♦♦1'1`♦♦♦j♦<♦>�>�N♦t �1 p, 1 1 1 1 v a 1. n A �� i� ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦<�! � � ♦`►♦♦c - �♦O<t� '.,r♦y>e� i�r a► ►� ♦� 0�11� ►Q�•.�, ®@♦U14,p;. !i,►A♦♦♦�A, fwd♦♦�.♦Q ♦�♦�♦♦!♦!A♦♦♦♦C� ♦i♦��` � \ .♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦j� �■i� ♦♦1'Ot• ♦1p �� A ►� ►11� k�'i� ♦♦A N�!►'1♦�N►�jG♦'�♦1►♦�O �t♦♦♦♦♦♦♦♦♦♦t` ♦♦♦♦♦♦�♦@♦�♦♦♦®♦r♦<>�♦ �� �III� ►♦♦♦1�♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦� 1 iii ■• ♦O�I ��a♦♦♦�' a :� �ay�1M►Mi %s ®♦►t�►a:►♦� �1% �`"�4"►♦♦@AlYrA�@®♦♦♦♦♦♦?♦o♦♦!✓♦♦♦t'� �i♦i♦♦C� t :DEQ. III ►♦.►♦♦♦♦♦♦♦♦♦.♦!��■f■i � .♦♦ � ►♦♦�, f�,<i1rs♦ .r<♦♦<` ♦♦ �@aQ♦A.♦♦i♦♦♦♦♦♦♦♦�t♦♦♦•S. =♦�.. t'��y" �. . •. �♦v`�♦♦♦♦♦♦♦♦♦♦' ♦�iiii c♦♦♦4."`, �♦�A��f♦O,IU�►►♦�► ��i���10t1A�8�Ii�:� �, ♦"♦♦A1 ♦®Gv♦OsA♦Yi.♦�6;� � i ♦`� �' '� ♦I►.♦♦♦♦♦♦♦♦♦♦li■nm► ♦♦, ►.06♦@, s�♦Ir♦♦♦♦�sr♦ nrtA♦�►Ad►A♦� G♦♦♦A♦♦♦A♦♦AA♦♦♦A♦!!♦t ♦J� ID ,w III ,il� 14 �" A�♦+♦1♦♦♦♦♦� i♦♦A♦♦♦♦♦♦♦♦♦�1 �■ un► ♦ ♦ � ♦ A ♦ ^ Y ♦ moi• ♦ • n ♦ ♦ � D r r a �� ♦ ♦ ♦ br�p �, - . �1 .�_ �, a ,r .< .. � 1 1 1 Irl ><!i �►\♦♦;♦!! ♦♦O` 0♦♦♦w♦�♦ �1 p .- ■r � 4 ►♦i►�t; �♦♦♦i� �t♦♦♦♦♦♦♦♦♦♦♦♦♦Ii �■�ii� tA1►♦t' ��♦ �♦At.� ��✓�i♦i♦♦♦♦♦►♦♦)►A1 �1 �►1 � � �� i►A'.�♦♦♦�qtA♦♦♦A♦♦♦!� �� ♦ ♦ �A��♦® . Cs+♦ " " iso ►♦♦1 ♦s♦♦♦♦♦ ■■. ♦. ♦ �♦A '� ♦ .♦♦ ♦1,� N M► ►es _ .. s♦A♦A♦♦�►♦♦♦ ! _,, �_ ♦ 1 > �♦♦♦� �♦♦♦♦♦♦♦♦�♦♦♦♦♦♦♦♦♦♦�1� � �! I `tt � a ♦ Y @ ♦ ♦ ♦ ♦ O ♦ ♦� r 4o i• @ .rO ♦ ♦.� � At: \a♦♦! • �a*♦r+ r. +►r♦ • - .� . ►� i♦♦♦►♦♦♦♦♦ .♦♦♦♦♦♦sar�o !♦� rev i II�IIII ♦♦ ♦♦♦♦♦A♦♦♦♦�� ♦1\ !►.�♦1�♦♦♦♦♦♦ ♦1♦♦♦♦�♦Osie ♦♦`♦ y' ..• V �♦ t♦♦1 " ►�♦��♦�♦�A�I►�♦�♦�♦♦♦♦♦� � �� - e'<�♦♦► ♦�iA? � �'♦♦Yt� �♦@♦♦A�♦®♦♦♦♦*i� ;���lt�c�A�A�A� � �A.* �7♦vA♦'e ♦:.®♦♦ � � s "ti s♦ ♦ +@♦ ♦♦ A O . ♦A.. o , 6 111 W ♦ .s i III�II'�I�;;lli� FIN � i0♦ iV,��.►►♦vvr ♦♦♦r♦ r♦♦♦Pv �0♦t •i00♦♦♦♦�v�wi=♦,�..w�' i 4♦® ��Ii.�i/"�i/' _ � � ♦♦�►J♦♦ �♦♦♦♦♦t♦♦♦♦♦♦♦♦♦♦'►♦♦♦O�YYI` .i ♦♦♦A@♦♦♦ ,y♦♦? � O ♦ :�� ►i @ ♦ ` ♦ ♦ ♦ ♦ ♦ ♦ v♦ �i♦ o v .y♦. ♦ ♦' as • ' 4 '• � ♦. ♦l e♦IGI.OIr( `,♦♦♦@" i♦♦t♦t '�,> be+t►♦♦ ♦♦♦♦!^ ♦ riY♦ va♦♦ ♦���_ . �. �r. I►r g ✓s►;►i♦ ♦♦A� �c� Y♦♦♦ ' >®♦@Ot�♦®♦♦�m"a"♦♦�1';: �r♦♦4♦' . � �' • ►♦✓4►�1nr1rU�'1►d/v ►A � � ♦♦ � ♦♦' ?♦�i'c ir' ✓ s \ ♦♦ a IIII ♦♦♦♦♦sNY ♦1 �♦ �♦♦ ♦♦r ♦L♦•►s♦ ®aeA' � / II Il�llllli � i� r @♦w♦♦ ♦g .�♦ Ipu ♦! I ilii � . . I �/ V .,♦ � III pl ��� .♦`�i , �� a ♦@ p,. t♦0� •r � >A♦r♦♦♦® �t� ►♦, ,�►G♦moi i���� i ♦r ♦ ♦♦♦ ae3.v `"G tri♦'♦ w♦♦ r� - I I _ ��_ T�� 1 � \ / ?�1' �' tt7�♦� � ti�1�♦�1♦dt�����j�Q� ♦'• r �I� � - � � aY"€.� ... y�ij . ♦� i♦�♦1♦moi �U♦�` t ♦ ♦1 .err ��' ♦��� r / � ♦� MAN WN SO 001.100, -� _ � -� � ♦ 1`Vty > -♦ ♦ � i ♦ ♦' � i �♦ v ♦ �. • /t 1'! � � ♦. :� Gi ♦ a♦ e' i♦t� • c IA�A< `G .� . ♦♦� s � � � 7� v♦Y♦3 t . ♦♦iY♦♦♦♦♦♦♦`'" ♦r� ♦ �rli♦�� 1 . v O�♦♦i ♦Yi`� �♦♦c♦♦♦ i ♦♦♦�i � ♦ ♦�?q ✓' �a♦j'♦ � v � t �♦♦\ � A ♦i♦1' ♦ �♦'C, >i.♦ ♦ \�►• °' ♦; ♦'- tC \ ♦♦ rift, �♦♦��� _ � \ � _ y A r ., ♦♦♦♦t� ♦♦♦j �♦ ♦♦♦♦♦♦ \♦ i1 �♦ Vii♦ `1�i�� •� • ��♦i♦ . ♦+r �1 � r I + � ♦ ♦♦t ♦♦,! . ? �♦�" ♦' tom,. ♦� ♦♦♦ r♦? �\�� �r' o i ���►♦i ►. ♦♦♦♦ ♦ ♦♦ ♦ \E,Ni7♦a ♦•�♦' 1�� � �♦moi v��♦♦♦t a�♦��♦1 •.v � � I � i � �► ��./�.. � � �;♦�♦�♦:�� it♦` ♦ '�i°ads'►♦ �♦ r t it r♦♦♦♦!' .�♦♦♦` ✓♦ i"�♦�♦c ai♦t�` , � ! �% ♦�♦♦��0a♦♦t `O. ♦sr♦ �a♦`a♦ � �♦i' ♦ ♦♦ " ♦@♦iii ♦♦♦♦ ♦♦i `v I i�w � �'' �� � � � ♦ _ � ♦rte♦�♦�r � ��♦�♦♦ ��� ♦r � �♦� V� V♦�♦w � • / �♦ ♦�♦�t� t♦♦<t �♦♦� ♦'.♦ `� �� ' � .�,.Yr .�� �� �' _ -hY i � I♦♦' ♦♦ tit ♦' � �« i♦ •• �% � � _. '1 a ♦ � � `♦♦ i ♦� t IIII �♦ ♦.. .♦' ♦♦ n, 1 ® .Ft i♦1r � >j - i�♦�♦ i♦@ t♦♦t� �z „riar$►l,A. ` �♦` i♦ir♦ ♦t♦ ♦. t � ` "� ♦ � •%��' � ♦♦♦�♦♦ - ♦re ��i♦♦ ��♦♦♦♦♦♦♦♦♦ ♦Y! ivy �-r e�♦♦♦ ♦.�f♦ ♦♦y � ♦y . 351two, " )7 A���'i p , ♦♦�r♦ ♦♦♦♦♦♦♦1 ♦♦♦1 ♦t♦♦tet♦♦♦i ♦G♦i♦♦♦�♦♦!at♦♦♦t i!♦G�♦c 4 ®�Y♦♦ ♦ t♦ ' ,• •\, (.. �, �..- 3 @♦♦ �m1►♦♦♦♦♦♦♦♦i.. �♦r♦♦moi••♦♦♦♦t@ ♦♦t♦♦♦ `.♦ >♦ ♦ �, �� C �� a i! i ♦♦♦� r �♦♦♦O♦y►♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦� �♦♦♦♦♦♦♦♦♦♦♦♦ii ♦♦♦♦♦♦♦♦♦♦♦♦C►♦, t♦♦O♦i♦♦♦�! � .i ♦�'. �♦♦♦�, Rr►♦♦ III � �� ♦♦♦♦' ♦♦♦ ♦♦♦?♦9t ♦♦ v♦ •r- - 1 ' ♦; tI/ . ° � 1.♦�♦ 4 y♦!�@♦t:�c♦-ii�0! 1-.. � � t♦t�t'i♦♦� �t"t♦♦♦h♦♦♦� �♦♦ • row - r ,,, ♦♦♦ , t♦♦t�; • • � \� 1. "C ♦♦♦t. ♦i♦♦ ♦ O!♦♦♦♦i♦♦ �♦♦Cc♦t♦♦♦♦♦ ♦ ♦ ► ♦ r ♦ ♦ ♦ \ i ♦ ♦ ♦moi \ ♦, �i ♦►♦ ♦ �. ` � ♦ 1,..♦♦� a► , •.:�♦@♦♦ ♦!♦♦♦w♦moo t•_• _ v � ��i�i♦i♦I�i� �♦A^'i♦i♦•;!♦CA♦•♦@♦�.!1♦♦� •♦♦♦�0 4� � . �♦i�i♦i♦i♦tom , \ ♦ i h . c � � �♦ ♦ ♦♦♦ ♦♦♦♦A♦ � ��♦i♦ ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦ ♦♦♦♦♦�1 Ari ♦♦♦�iS '♦�' a `i � ♦♦I �G � i►� ♦♦O \ ♦♦♦♦♦♦r , I. i �• . `♦♦ ;♦, by♦♦♦♦ ♦�♦rw♦!� ��►♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦1 ♦®♦trj" ♦r♦moi ♦♦♦�@ �` �♦�G � fes. �. 1♦♦♦ ♦ � �, , T �, c, a♦♦t 1 �4♦< i t�1�♦♦ i!@I �♦�♦�♦i♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦� '♦♦ . ♦♦♦�►�O♦i �i♦� r, \�Qj � j � �a��i♦ �� ' ' . �` t� � , � •i � III �,.al �_ - '+!'♦ �i;��♦i� •;♦\'.♦.♦Ai♦i♦i♦i♦i♦i♦i♦i♦i♦i♦i♦i♦i♦i♦i♦i♦i♦!♦i♦i♦i♦i♦i♦i♦i♦i♦i♦i♦i♦1• v'G's` O.!♦c�'''i♦i � ♦• �I�I r a \♦4` ♦', •' �♦♦♦ i�♦�♦iwi��>�♦�♦�♦7♦�♦�♦�!�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�( ►�/ ►♦A��♦�a7t r a'�� r �!r �♦♦♦t♦i' �♦ � �� - • .- . . �s�♦� ' \aa` ''♦�♦�►♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�@�♦�♦�♦�♦�♦�♦�♦� X1,1 - �`♦�♦!� � •�♦,./ � �.� ' �.♦ ,` ♦�♦�\�^� . ♦ • - ' Cpl d VIII' r♦ ♦♦♦1♦.1 ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦ ♦♦ ♦♦1 ♦ ,LNC t�C a ♦♦♦ ♦ • � • • .. � � - ►fir ✓ : ♦i���♦�♦�♦�♦� ��♦� ��►�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦���A�♦� � i♦�<�_♦. � t�Q� ♦ � ♦'y v���� �♦ Ari♦♦ ,'i♦'�♦�♦�♦� • � • • � • � ♦♦♦�1 ♦♦ ♦ �.♦♦1 ♦♦/ ♦♦♦♦♦♦♦♦♦♦i♦_♦♦�♦♦♦♦♦♦♦♦♦♦SII ♦i1 ♦ ^^^^^'0���� � ♦i! �♦ �♦♦ _ 0, ♦♦♦♦♦ ►♦�.•♦ter%♦�♦♦♦♦►♦♦•`-+♦♦♦♦♦♦♦♦♦�iA�♦.♦♦♦♦♦♦♦♦��♦i♦ ra �� ?♦.:♦ i.�t•, �♦i ♦♦♦ _ ` ' • �_ � • -. • . �1► y ►♦♦♦♦♦<�♦♦i'.1►� �►♦ ♦♦♦♦♦ �♦A♦♦♦♦j�♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦� ♦rte♦Y♦4♦" 1♦♦,♦♦ ►♦♦'� • 1 ♦♦♦♦♦♦ ►♦ ♦♦v ♦♦A♦♦♦♦♦ ♦♦♦♦♦♦♦♦♦♦♦♦♦ r1 ♦♦ o♦♦ aWsi �II ►AL►♦♦♦♦♦1 �♦♦♦♦♦♦♦♦♦♦♦♦i♦�♦♦Yid i � • ►� Y O lA.♦ � 1 ♦ ♦ t`t♦ ♦ � .�♦ ♦ ♦ ♦ ♦ ♦f. � • O ♦ ♦ ♦ ♦ ♦ ♦w♦ % -T � � �♦ / ♦O♦♦1♦♦♦♦♦♦♦♦♦♦►♦♦♦�.. - � �� � � ♦♦♦♦♦♦♦♦1.'vs�♦♦♦♦ ♦ `♦♦♦♦♦♦♦ iii•. ► \ � - ` ♦ ♦♦♦♦ ♦ ♦ ♦ ♦♦♦♦♦ ♦♦i. ♦♦♦♦♦ ♦♦♦►♦♦♦♦♦♦♦rhe ♦♦♦♦ ♦ . ►II♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦i♦♦ ���♦A. �1.��♦_♦_♦.a.. ♦♦♦♦♦, • I♦♦♦♦♦♦♦♦♦♦ ♦♦♦♦1 ♦ 'f'♦�'� ♦Iapiuss iii♦�•' � � `� , I♦s♦♦♦♦♦♦�►♦♦♦s♦♦♦♦♦♦♦♦ ♦♦♦♦♦♦♦♦I ►1 ♦s♦♦♦♦♦♦♦A�♦♦♦ � : � t♦♦♦1�►♦♦♦�►♦♦1'♦tea♦♦�� , '� �IIIII A � �♦�@��♦�♦�O�i.. ♦.♦♦ �♦♦♦�♦♦♦♦♦♦♦♦♦♦�O�♦�♦�♦� �1 - • ��♦�i�0�♦�♦�A�s�♦�♦�♦�♦�♦�♦�♦�♦�♦��♦sem �♦�♦�♦�♦�♦�A�♦���♦�♦� �♦�� � � 'I`� . ♦SOA- �♦♦♦♦♦�♦♦ ♦♦♦♦♦�♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦<♦♦1♦♦♦♦♦♦ � �`• � 1t♦♦sem.. ♦�.1�A♦`�♦�?� . ♦�♦♦♦� �1� ��♦s♦s♦s♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦1 ♦♦♦♦♦♦♦@sj ♦ � ♦ �� III��I� � / ►♦♦♦�s♦♦♦♦♦♦♦s♦♦♦s♦��s♦♦ice i.. ♦ i♦�♦♦1.. ►♦♦, � ♦r� ♦ ♦ ♦ ♦ ♦ ♦ @ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ► ♦ ♦ Y ♦ ♦ ♦ ♦i. ♦♦♦♦♦♦♦♦o ♦♦♦♦♦♦♦♦♦♦<f♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦moi. `♦moi: ?►♦♦s♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦A♦♦♦♦♦♦♦s♦♦♦♦♦♦sem♦♦♦♦♦♦♦♦♦♦1 ►♦♦♦♦♦♦A♦♦♦♦i l♦♦♦♦♦♦t♦♦s♦♦♦♦♦♦♦s►♦♦s♦♦♦♦♦♦♦♦♦♦s♦♦♦♦♦♦♦♦♦♦♦♦��♦ 11►♦♦♦♦♦♦♦@♦♦♦♦♦s♦♦♦st♦s♦♦♦s♦♦♦s♦♦♦s♦♦♦s♦♦s♦♦♦♦s♦♦♦♦♦�♦♦��►;</►@♦l♦s♦♦♦♦♦♦♦ss♦♦♦♦♦♦s♦♦♦♦♦♦♦♦♦s♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦s♦i♦♦♦♦OO♦�♦♦Y♦♦♦♦@♦♦♦♦♦♦♦♦ III , pi / `� �♦�♦i�j�j�j�:�:�:�:�:�:�:�:�:�:�:�:�:�:�� �1� �:��:�:�:�:�:�:�:�:�:�:�:�:�j�:�i � ,IIII ! ♦ ♦♦�♦♦�1 ��♦� � ♦o�♦�♦�♦A♦�♦�AA♦�♦�♦�♦�♦s'♦ IIII �/ I VIII, IIII 1 `9\ � O r I 1 1 � ��, _ � \ � �`� \ IIg111 II -_ //rr, r/ //rrrrr rr rr v / / I irjrrjrrjrr�rrirri � \ -��ii I - -- - rrr rrr rr N, - rr/r/rr r A ♦ V A rrr�rrrrrrirri/r/r - - I I / / WET POND iirr rr rr rr rr rr r r//r/r//��� "rr//rri//rrrir�rrrrrr / - _ )_ / i'/ •- /_ \`- _, \\` -_, \\ \\ \ \a I J `�\ \ , PARKING AREAS NP. ,rrrrrrrrrrrrrrrrrrr , r I Vv � � � I / ---- r �V - rrr grr rr rr rr rr rrr � A / / l / I l �irrr' rrrrrrr/rim/rrr/r/ri�ri/rrrr /� �� --- I I I V I I A I I A� / / I - %r/%�/jr//rr/i%ri%rr/fir/rrrr//r/ popp- ��B//� '7� �� �'< .. • - . °'%�f/!i✓<�� / //SIV . �.® � v�� I III Mull �' 7 I� _ ♦ ♦ ♦ w ♦ ♦ ♦ ♦ ♦ ♦ i /6� ! i� IIII .� 'v r {11 ♦,��♦ p�120 00 c In MIKA, o I . i ♦ '� � / �♦♦♦����i'♦♦♦♦•� ♦ 1♦< ♦'� ���1►�� 'fes �� - ♦ _'♦►'� -�: �!�i'��♦♦♦•� �♦♦♦�ri i ,I�I ilI FARM ,II MIS ----- �� \ ♦ ♦ �`� ,p .��, ��.�- oeL IN ♦♦jam '' ��♦� '�♦♦ \ ♦ ♦ �"♦♦ . , y,,.-....... .■o..o-.a-wos�ova.� oo.►.rr..enco...ur.ap.� � � • .yj ��_� ♦♦♦ ,♦♦ .�'� �• `r, -�♦� ♦' � ��, �, � - �m �'w'� � .+� O� :�♦♦jam `���♦�� .���♦�Iii ��v ��♦ Vii♦ :` ��� � ,,u �"�V ♦ t 1 r nom, ..♦ , �y�� _. , A`�' �, � �` ,► �sy��� � , ®•. ♦'•♦ � �.'♦♦;�' ♦ ♦�,♦♦ ♦,♦,�. ' ,,� � �� ��,.=• ,--� �' �, ,lo, ,v,, �°♦�►� ,, ,�� �♦.i♦ ��i♦♦ :�♦♦i ♦♦♦ i��♦♦�♦, IIIIIIII�Ii111111 IMA Owl low "t lo N714 ♦��► r.iii.oee .✓ /♦♦♦♦♦♦♦♦♦♦♦♦�♦♦♦ ���♦♦♦�� V� ..♦� ♦♦� ♦♦ ��♦♦♦♦♦♦♦ ��i�� ,� ;�,�,;5�;•; A''o♦♦ice O♦♦♦♦♦♦♦�♦♦' it .14 ��♦� . ♦'♦�j♦ �'♦ �- -� 1�♦� •,✓' ♦♦♦� ®I♦♦♦♦♦♦♦�♦♦1 ♦♦� ♦♦♦ ♦♦ice♦♦♦♦ 1 ♦♦ ♦♦�i� - ♦♦♦ /♦�•0�♦� •%♦♦ice♦♦♦♦♦♦♦♦♦!-♦♦.♦ �♦♦iii♦♦♦�`•♦�♦♦♦♦♦♦� -�♦♦♦ . ♦♦♦� ♦ .� �•���►�♦ - d'� .d roe°`♦♦♦ ,�1♦♦♦♦♦♦♦♦�. ♦♦ ♦♦♦♦.O♦�•♦♦♦♦��♦�♦�♦♦♦,♦ ♦♦♦moi �' ��','•,�' �''�♦`� \� iii♦♦♦�''®♦' ♦s�►♦��j�,�♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦1 ,1♦� ♦♦♦♦♦♦��i'♦♦♦♦♦♦♦♦♦♦♦♦♦��, ��♦i��♦♦♦�® _ • ♦''♦♦♦♦�. q ,� t.}♦��- ♦ ♦♦♦♦moi♦��♦♦♦♦♦♦♦♦♦♦� EPA, ♦♦♦♦♦♦♦♦♦♦♦���♦♦ �►,♦♦♦ is �I♦�� q i'♦♦♦�%� '�♦.�♦♦♦moi♦♦♦�♦♦���♦�♦�♦�♦�� ♦'♦�1i.� �♦♦�♦♦♦♦♦�♦♦��♦��♦♦♦i17 Wr Irst�. w ♦♦i��'r ♦� �` ♦♦♦ i i ,,♦ -�� moi♦♦♦♦�♦� ♦�y �i♦�!ci�.�♦�i�i�i♦♦♦♦♦ VLA ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦Ill ♦♦♦♦♦♦♦♦♦♦♦�♦��♦� ♦ �i♦�♦♦♦♦�♦♦9♦ Ii�>♦�i♦j♦♦�I♦♦♦♦��♦♦�� ���4�1♦ '♦♦♦♦♦♦♦♦♦♦♦♦♦.�♦04�♦♦ s♦��♦.♦♦fi�r ��j♦��� -. . �♦♦ �'♦��♦♦� ♦♦♦� i o♦♦�♦ ♦ 0♦t8♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦�♦♦ ... ♦♦iii �� ♦►♦♦♦♦♦♦ �►♦♦ I _ ��•�♦� ♦ ��� w♦♦♦♦1:i♦�♦�♦♦.`I►♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦��♦�►�► ♦♦�!►♦♦♦e_ �♦♦♦yam%` r♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦� ..... ��♦♦♦ice ♦♦ ♦r��♦��, ,ME 01 ♦ ♦� 1 ♦�• �► - . - INNER 'A Im, IF ON IF RVAF 110 el 0000,0740VA OVA ♦���♦♦��♦��♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦� �♦���♦���♦♦���♦,��!�♦������ �1 �. ♦♦♦ ��♦♦ 1, ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦ ♦♦ ��♦♦♦� I �� �♦♦♦♦♦���♦♦♦♦♦♦♦♦j♦♦.♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦.♦♦♦� A♦NAl♦♦♦�� -,. �,. �..♦♦�G ♦�►♦♦♦♦♦♦ ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦ !1, N4 1 ♦ �♦♦ .� ♦♦���. IIII i�♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦� ♦�, i♦ ♦�.. �� ♦����♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦��♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦®♦♦♦♦♦♦♦♦♦� �♦ 4I♦♦♦��1�r1�`� ♦♦♦ ����� . ♦♦♦♦♦♦♦♦ ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦ VAN ♦♦V, BE howl howl SEA howl ♦♦♦♦♦♦♦♦♦•♦i�-� - i. ♦ ♦ e ♦ ♦ ♦ ,� ;♦�♦♦♦ '��♦. �♦♦�,I♦♦♦♦j • � VIII► ♦♦♦♦♦♦♦♦♦♦♦♦♦♦�♦♦♦♦ �♦.�_�� ! .. .., �♦�� ♦ �• �♦� i`♦♦ice .��i'♦ ��, - , ♦♦♦♦♦♦♦♦♦♦♦♦♦♦� ♦1 ����� ,�� ��. , ♦ �i♦� �i�♦♦♦ ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦.�� . _ _ . _ ♦ . ♦� . , ♦♦♦ .♦♦♦ ME ME VAN 6w, 0, a +114 11, NNINA 1111 WMANI, Oft FAN All 0#1 NAME FRIM5,94901 I 'i IVA FA I At; VAN ♦♦♦♦♦♦♦♦♦♦,♦♦♦♦♦♦♦♦♦♦♦♦♦♦O♦C♦C♦�`♦♦♦♦♦.♦♦♦♦♦♦♦♦i1♦�♦� ,♦�♦♦♦�i♦♦♦♦♦� ♦.� - �� III FA IVA IF, ��IIJI�♦♦♦♦♦♦�.�♦♦♦♦♦♦♦♦♦♦♦♦� STOW- IN•�.♦ ♦♦♦�►♦♦♦� "i ��♦o♦�►.00. COULTER JEWELL THAMES, P.A. 111 WEST MAIN ST DURHAM, NC 27701 (919) 682-0768 ROCKY MOUNT MILLS APRIL 27, 2017 SCALE: 1"=100' DRAWN BY: TRM 0 Coulter Jewell Thames, PA Project Name: Rocky Mount Mills Project Number: 1445 By: TRM Date: 06.03.2017 11 Peak Flow Analysis Summary Revised: TRM Date: 08.22.17 Drainage Basins to River Tc Area CN Q1 Q10 Q25 Analysis Point (min) (ac) 86 (cfs) (cfs) (cfs) Pre -Development --- 133.59 --- 208.79 417.07 490.36 Post Development --- 133.59 --- 216.21 422.19 495.79 Post -Development with 12.1 74.88 88 --- --- --- Treatment --- 133.59 --- 111.00 278.46 322.75 Percent difference between Pre - --- --- --- 213.45 408.64 476.12 Development and Post 3% -1% -2% Development with Treatment I I I 1 -47% -33% 1 -34% Drainage Basin 1 Tc (min) Area (ac) CN Q1 (cfs) Q10 (cfs) Q25 (cfs) Basin 1 (onsite) 12.1 78.86 86 --- --- --- Basin1 (offsite) 18.2 1.8 89 --- --- --- Pre-Development --- --- --- 208.04 412.45 483.65 Basin 1 (onsite) 12.1 74.88 88 --- --- --- Basin1 (offsite) 18.2 1.8 89 --- --- --- Post Development --- --- --- 213.45 408.64 476.12 Percent difference between Pre - Development and Post Development 3% -1% -2% Drainage Basin 2 Tc (min) Area (ac) CN Q1 (cfs) Q10 (cfs) Q25 (cfs) Basin 2 (onsite) 20.5 21.15 83 --- --- --- Basin2 (offsite) 24.4 10.54 93 --- --- --- Pre-Development --- --- --- 61.60 122.12 143.36 Basin 2 (onsite) 20.5 21.15 83 --- --- --- Basin2 (offsite) 24.4 10.54 93 --- --- --- Post Development --- --- --- 61.6 122.12 143.36 Percent difference between Pre - Development and Post Development 0% 0% 0% 0 Coulter Jewell Thames, PA Project Name: Rocky Mount Mills Project Number: 1445 By: TRM Date: 06.03.2017 11 Peak Flow Analysis Summary (cont.) Revised: Date: Drainage Basin to Bypass Tc Area CN Q1 Q10 Q25 Drainage Basin 3 (min) (ac) (cfs) (cfs) (cfs) Pre -Development (min) (ac) 87 (cfs) (cfs) (cfs) Pre -Development 21.8 2.42 77 3.00 7.29 8.87 Post Development 21.8 2.42 77 3.00 7.29 8.87 Percent difference between Pre - Development and Post 0% 0% 0% Development 0% 0% 0% Drainage Basin to Bypass Tc Area CN Q1 Q10 Q25 Drainage Basin 4 (min) (ac) (cfs) (cfs) (cfs) Pre -Development (min) (ac) 87 (cfs) (cfs) (cfs) Pre -Development 17.6 12.73 86 27.71 55.37 65.02 Post Development 5 16.71 91 65.1 117.87 135.96 Percent difference between Pre - Development and Post 0% 0% 0% Development 135% 113% 109% Drainage Basin to Bypass Tc Area CN 01 010 Q25 Analysis Point (min) (ac) (cfs) (cfs) (cfs) Pre -Development 5 6.09 87 20.68 39.99 46.67 Post Development 5 6.09 87 20.68 39.99 46.67 Percent difference between Pre - Development and Post Development 0% 0% 0% 1S 2S Ex Basin 1 (o site) Ex B sin 1 (offsite) 3L Ex Basin (iS (i� Ex Basin 2 (o ite) ExB sin 2 (offsite) I5L] Subcat Reach on Link 0 5S 6S Ex B sin 3 Ex B sin 4 9R 10R :h Basin 3 reach B sin 4 reach 11L Ex River Analysis Point 7S Ex Area to bypass analysis point Campus Pond analysis Type 11 24 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here} Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 1S: Ex Basin 1 (onsite) Runoff = 204.14 cfs @ 12.04 hrs, Volume= 11.148 af, Depth> 1.70" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.20" Area (ac) CN Description 27.820 98 Paved parking, HSG D 32.830 80 >75% Grass cover, Good, HSG D 18.210 77 Woods, Good, HSG D 78.860 86 Weighted Average 51.040 64.72% Pervious Area 27.820 35.28% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.4 407 0.0320 2.88 Shallow Concentrated Flow, Segment 3 Unpaved Kv= 16.1 fps 2.9 1,092 0.0111 6.26 11.07 Pipe Channel, Segment 4 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 4.4 571 0.0105 2.18 2.18 Trap/Vee/Rect Channel Flow, Segment 5 Bot.W=0.00' D=1.00' Z= 11.07' Top.W=2.00' n= 0.035 Earth, dense weeds 0.1 81 0.0250 18.07 227.12 Pipe Channel, Segment 6 48.0" Round Area= 12.6 sf Perim= 12.6' r= 1.00' n= 0.013 2.3 1,071 0.0318 7.87 70.87 Trap/Vee/Rect Channel Flow, Segment 7 Bot.W=0.00' D=3.00' Z= 1.0'/' Top.W=6.00' n= 0.035 Earth, dense weeds 12.1 3,222 Total Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 3 Subcatchment 1S: Ex Basin 1 (onsite) Hydrograph 220❑Runoff � � - - 204.14 cfs � � � 210 200 Tj pe Ir 180 1 _-airhfallk3,210" 170 160 Fnuri4ff A_ lre��Z8.�66�0 lac 150 140 Iu "0ffinie-7 148 —af ,a 120 3110 � I � Runoo f Mep-th1-t 70" 4ow ength- 0100 90 4- 4 A T -6_-t2. t-n� m 80 t t t- t P -N=186 670 0 50 40 _ _ — — 30 20 — - 10 5 6 7 8 9 10 11 12 13 14 15 16 1 Time (hours) Campus Pond analysis Type 11 24 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here} Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 2S: Ex Basin 1 (offsite) Runoff = 4.34 cfs @ 12.10 hrs, Volume= 0.290 af, Depth> 1.93" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.20" Area (ac) CN Description 0.900 98 Paved parking, HSG D 0.900 80 >75% Grass cover, Good, HSG D 1.800 89 Weighted Average 0.900 50.00% Pervious Area 0.900 50.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.3 50 0.0200 0.16 Sheet Flow, Segment 1 Grass: Short n= 0.150 P2= 3.60" 0.8 171 0.0350 3.80 Shallow Concentrated Flow, Segment 2 Paved Kv= 20.3 fps 2.4 407 0.0320 2.88 Shallow Concentrated Flow, Segment 3 Unpaved Kv= 16.1 fps 2.9 1,092 0.0111 6.26 11.07 Pipe Channel, Segment 4 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 4.4 571 0.0105 2.18 2.18 Trap/Vee/Rect Channel Flow, Segment 5 Bot.W=0.00' D=1.00' Z= 1.0'/' Top.W=2.00' n= 0.035 0.1 81 0.0250 18.07 227.12 Pipe Channel, Segment 6 48.0" Round Area= 12.6 sf Perim= 12.6' r= 1.00' n= 0.013 2.3 1,071 0.0318 7.87 70.87 Trap/Vee/Rect Channel Flow, Segment 7 Bot.W=0.00' D=3.00' Z= 1.0'/' Too.W=6.00' n= 0.035 18.2 3,443 Total Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 5 4 3 w 3 0 LL 2 1 Subcatchment 2S: Ex Basin 1 (offsite) Hydrograph 1 1 ❑Runoff 4.34 cfs TYpeAi 24L hr ' --Y aw I Rainfa11�=3.2�0" Runoff Areal=1.800 lac Rupoffl Vollum�=0.12901 of Runoff Delpth�1.93" F4ow-Le-ngt+h=3;443' Tc -42 min 1 tN=189 5 6 7 8 9 10 11 12 13 14 15 16 1 Time (hours) Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 3S: Ex Basin 2 (onsite) Runoff = 37.04 cfs @ 12.14 hrs, Volume= 2.598 af, Depth> 1.47" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.20" Area (ac) CN Description 5.810 98 Paved parking, HSG D 4.020 80 >75% Grass cover, Good, HSG D 11.320 77 Woods, Good, HSG D 21.150 83 Weighted Average 15.340 26 72.53% Pervious Area 5.810 Paved Kv= 20.3 fps 27.47% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 84 0.0165 2.61 Shallow Concentrated Flow, portion of Segment 2 onsite 26 -- Paved Kv= 20.3 fps 13.7 470 0.0130 0.57 Shallow Concentrated Flow, Segment 3 T 3: 0 20 Woodland Kv= 5.0 fps 6.3 1,745 0.0103 4.62 65.13 Trap/Vee/Rect Channel Flow, draw to reach LL 18 Bot.W=14.00' D=1.00' Z= 0.1 T Top.W=14.20' 16 — — n= 0.030 Earth, qrassed & winding 20.5 2,299 Total Subcatchment 3S: Ex Basin 2 (onsite) Hydrograph 37.04 cfs 34 �— - �4� 32 I- 37.04 cfs 34 �— - 1 32 30 - - - 28 26 -- - a 24 22 T 3: 0 20 LL 18 16 — — 14 12 10 — 8 '-1- 4 T�peAi 24� hr �Y"r d- -� � kairifa11�=3.2O" t Ru noff Altea=�21-1-50 lac -Rupoffi Volump=-2.18981-af R-ynr D�plh. wZ 726.-s =22 ' n%in dN43 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1'9 20 Time (hours) ■Runoff Campus Pond analysis Type 11 24 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here} Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 4S: Ex Basin 2 (offsite) Runoff = 24.83 cfs @ 12.17 hrs, Volume= 2.005 af, Depth> 2.28" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.20" Area (ac) CN Description 7.790 98 Paved parking, HSG D 2.240 80 >75% Grass cover, Good, HSG D 0.510 77 Woods, Good, HSG D 10.540 93 Weighted Average 2.750 26.09% Pervious Area 7.790 73.91 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 50 0.0400 1.68 Sheet Flow, Segment 1 Smooth surfaces n= 0.011 P2= 3.60" 3.9 606 0.0165 2.61 Shallow Concentrated Flow, Segment 2 Paved Kv= 20.3 fps 13.7 470 0.0130 0.57 Shallow Concentrated Flow, Segment 3 Woodland Kv= 5.0 fps 6.3 1,745 0.0103 4.62 65.13 Trap/Vee/Rect Channel Flow, draw to reach Bot.W=14.00' D=1.00' Z= 0.1 T Top.W=14.20' n= 0.030 Earth, qrassed & windinq 24.4 2,871 Total Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 8 6 7 8 9 10 11 12 13 14 15 16 17 18 Time (hours) ❑Runoff Subcatchment 4S: Ex Basin 2 (offsite) Hydrograph 26 24.83 cfs -4 �-Y�a- 24 22T -F T�p i l 2 -hr r 7 7 lka—Wall�3.�" 20 4- ft no#f Atea4t0.540 lac '$ V$I u =-2 00"f 16 14 I �nr D�p#h 2.28 M 12 10 _ FVow—Len th=2871 T 41-n241.4 n 8 ! I 1 I CN=43 6 4 2 6 7 8 9 10 11 12 13 14 15 16 17 18 Time (hours) ❑Runoff Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 5S: Ex Basin 3 Runoff = 3.00 cfs @ 12.16 hrs, Volume= 0.221 af, Depth> 1.09" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.20" Area (ac) CN Description 0.020 98 Paved parking, HSG D 0.100 80 >75% Grass cover, Good, HSG D 2.300 77 Woods, Good, HSG D 2.420 77 Weighted Average 2.400 99.17% Pervious Area 0.020 Woods: Light underbrush n= 0.400 P2= 3.60" 0.83% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0200 0.07 Sheet Flow, Segment 1 Woods: Light underbrush n= 0.400 P2= 3.60" 3.5 228 0.0480 1.10 Shallow Concentrated Flow, Segment 2 Woodland Kv= 5.0 fps 6.7 472 0.0550 1.17 Shallow Concentrated Flow, draw to reach Woodland Kv= 5.0 fps 21.8 750 Total Subcatchment 5S: Ex Basin 3 Hydrograph ❑ Runoff 3.00 cfs 3 Type II 24L hr -Year Rainfall=3.20" Runoff Area=2.420 ac 2 Ru- offlVolump=0.221 of Runoff Delpth>1.09" U. Flow Length=750' _ TcL21.8 min 11t CN=77 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 6S: Ex Basin 4 Runoff = 27.71 cfs @ 12.10 hrs, Volume= 1.796 af, Depth> 1.69" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.20" Area (ac) CN Description 4.640 98 Paved parking, HSG D 6.280 80 >75% Grass cover, Good, HSG D 1.810 77 Woods, Good, HSG D 12.730 86 Weighted Average 8.090 63.55% Pervious Area 4.640 Grass: Short n= 0.150 P2= 3.60" 36.45% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.3 50 0.0200 0.16 Sheet Flow, Segment 1 Grass: Short n= 0.150 P2= 3.60" 2.3 148 0.0470 1.08 Shallow Concentrated Flow, Segment 2 Woodland Kv= 5.0 fps 3.9 461 0.0152 1.98 Shallow Concentrated Flow, Segment 3 Unpaved Kv= 16.1 fps 6.1 406 0.0490 1.11 Shallow Concentrated Flow, Segment 4 Woodland Kv= 5.0 fps 17.6 1,065 Total Subcatchment 6S: Ex Basin 4 Hydrograph I 30-27.71 cfs 26 ' w 26 % p�i4 l -hr - r ' — 24 _ kairifa11i=3.2O" 22 L -i --J 1 Runoff Area=12.7-30laz 20 -I - - I- Runoff VoiLirnp=1.17-1.7 18 3 16 4 --41 4- �qno�De1ph��l. 0 .2 14 Flow Len tb=1,0 5 12 - - _ - - �C=47 A min 10 - - - �I=86 8 6-_ L J/ � 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■Runoff Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 7S: Ex Area to bypass analysis point Runoff = 20.68 cfs @ 11.96 hrs, Volume= 0.902 af, Depth> 1.78" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.20" Area (ac) CN Description 2.320 98 Paved parking, HSG D 3.770 80 >75% Grass cover, Good, HSG D 6.090 87 Weighted Average 3.770 61.90% Pervious Area 2.320 3.1 590 38.10% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 50 0.0400 1.68 Sheet Flow, 18 — I — IN 47 Smooth surfaces n= 0.011 P2= 3.60" 3.1 590 0.0250 3.21 Shallow Concentrated Flow, Paved Kv= 20.3 fas 3.6 640 Total, Increased to minimum Tc = 5.0 min Subcatchment 7S: Ex Area to bypass analysis point Hydrograph 21 -i — 20 - _J ka falkl:iID" - - :RunnbfU-Areal 6.090 :Ofc 19 Fn&I 11�p�I��' , 18 — I — IN 47 17 - -T16 15 14 4 13 12 c 11 — 10 9 8 6 5 4 3 2 - 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Runoff 20.68 cfs - T- pe- 'I Z4� �r �-Y"r - _J ka falkl:iID" - - :RunnbfU-Areal 6.090 :Ofc _ :�Rupof VroIlump---O.l902+af Fn&I 11�p�I��' , I �w Cen�t 6 I lh=4�' ��54 rain — I — IN 47 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Runoff Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 12 Summary for Reach 8R: Basin 2 reach Inflow Area = 31.690 ac, 42.92% Impervious, Inflow Depth > 1.74" for 1 -Year event Inflow = 61.60 cfs @ 12.15 hrs, Volume= 4.602 of Outflow = 60.45 cfs @ 12.21 hrs, Volume= 4.581 af, Atten= 2%, Lag= 3.8 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 0.72 fps, Min. Travel Time= 2.3 min Avg. Velocity = 0.20 fps, Avg. Travel Time= 8.0 min Peak Storage= 8,247 cf @ 12.17 hrs, Average Depth at Peak Storage= 0.48' Bank -Full Depth= 4.00', Capacity at Bank -Full= 2,084.67 cfs 175.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 183.00' Length= 98.0' Slope= 0.0010T Inlet Invert= 16.30', Outlet Invert= 16.20' 3 0 LL Reach 8R: Basin 2 reach Hydrograph I I I I �nfI w Akre`a=311.690 ac 1-A�g.be�t"0.48' 1 -MI 3x Ve1�012 Vs n=0.040 +4U�98-a0' gapaci�=2 0 4 q7 ds 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Inflow ❑ Outflow 61.60 cfs 60.45 cfs I I I I �nfI w Akre`a=311.690 ac 1-A�g.be�t"0.48' 1 -MI 3x Ve1�012 Vs n=0.040 +4U�98-a0' gapaci�=2 0 4 q7 ds 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Inflow ❑ Outflow Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 13 Summary for Reach 9R: Basin 3 reach Inflow Area = 34.110 ac, 39.93% Impervious, Inflow Depth > 1.69" for 1 -Year event Inflow = 63.30 cfs @ 12.21 hrs, Volume= 4.801 of Outflow = 22.11 cfs @ 13.65 hrs, Volume= 4.195 af, Atten= 65%, Lag= 86.6 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 0.56 fps, Min. Travel Time= 65.1 min Avg. Velocity = 0.24 fps, Avg. Travel Time= 154.7 min Peak Storage= 86,450 cf @ 12.56 hrs, Average Depth at Peak Storage= 0.33' Bank -Full Depth= 4.00', Capacity at Bank -Full= 1,417.61 cfs 120.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 128.00' Length= 2,186.5' Slope= 0.0010'/' Inlet Invert= 16.20', Outlet Invert= 14.00' 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Reach 9R: Basin 3 reach Hydrograph 70 � + � � � 63.30 cfs — �nfI" "C ❑Inflow ❑ Outflow 65 J�re�=34.41 �A� 5° 50 -///— .be�th�O.�3' Mix Y GI�O.J6 f 0s 45-� T �n-0.04V L�7-211 K5 3 35 " 30 T_ T _T -1 I F T_ 25 4- 4 __4 I 22.11 cfs acid �,417�1 clfs 2015101, 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 14 Summary for Reach 1OR: Basin 4 reach Inflow Area = 46.840 ac, 38.98% Impervious, Inflow Depth > 1.54" for 1 -Year event Inflow = 28.17 cfs @ 12.10 hrs, Volume= 5.992 of Outflow = 20.02 cfs @ 14.51 hrs, Volume= 5.616 af, Atten= 29%, Lag= 144.8 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 1.15 fps, Min. Travel Time= 29.7 min Avg. Velocity = 0.61 fps, Avg. Travel Time= 56.0 min Peak Storage= 35,714 cf @ 14.02 hrs, Average Depth at Peak Storage= 0.23' Bank -Full Depth= 4.00', Capacity at Bank -Full= 2,301.11 cfs 75.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 83.00' Length= 2,056.0' Slope= 0.00687' Inlet Invert= 14.00', Outlet Invert= 0.00' Reach 1OR: Basin 4 reach Hydrograph ■ ■ Outflow 11 —� �I �����I%!��//moi 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 30 T_ T 28 26 24 22 20 T T T T w 18 3 16 LL 14 �- 4 -4 1 12 10 8 6 T ■ ■ Outflow 11 —� �I �����I%!��//moi 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Campus Pond analysis Type 11 24 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here} Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 15 Summary for Link 3L: Ex Basin 1 Inflow Area = 80.660 ac, 35.61 % Impervious, Inflow Depth > 1.70" for 1 -Year event Inflow = 208.04 cfs @ 12.04 hrs, Volume= 11.438 of Primary = 208.04 cfs @ 12.04 hrs, Volume= 11.438 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 3L: Ex Basin 1 Hydrograph F11-1 nflow ❑ Primary Inndi"�Ar"=6.660�ic- ILLI_L 230 220 4- -4- 4 208.04 cfs 210 t 200 L L I 190 I __L — 180 170 1-- 4— + 4 160 150 t t + —i— _ 140 — �' 130 120 4 4 — c 110 — LL 10090 t t t 1 70-k-_�4� 60 50 40 30 20 10 F11-1 nflow ❑ Primary Inndi"�Ar"=6.660�ic- ILLI_L t t t t t I X4-4 I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Campus Pond analysis Type 11 24 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here} Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 16 Summary for Link 5L: Ex Basin 2 Inflow Area = 31.690 ac, 42.92% Impervious, Inflow Depth > 1.74" for 1 -Year event Inflow = 61.60 cfs @ 12.15 hrs, Volume= 4.602 of Primary = 61.60 cfs @ 12.15 hrs, Volume= 4.602 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 5L: Ex Basin 2 Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) F11-1 nflow ❑ Primary Campus Pond analysis Type 11 24 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here} Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 17 Summary for Link 11 L: Ex River Analysis Point Inflow Area = 127.500 ac, 36.85% Impervious, Inflow Depth > 1.61" for 1 -Year event Inflow = 208.79 cfs @ 12.04 hrs, Volume= 17.054 of Primary = 208.79 cfs @ 12.04 hrs, Volume= 17.054 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 11 L: Ex River Analysis Point Hydrograph L3U 220 I It t t 1— 4-- 208.79 cfs 210 t t t 200 t t + 190 180 170 — 160 150 t t —i— _ 140 — �' 130 120 — c 110 — LL 10090 t t t 1 70-k-_�4� 60 50 + + _r —I 40 30 20 10 �Ifi fl" YVre�--1 7. OQ�c_ I It t t 1— 4-- t t t t t I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Inflow ❑ Primary Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 18 Summary for Subcatchment 1S: Ex Basin 1 (onsite) Runoff = 405.04 cfs @ 12.04 hrs, Volume= 22.877 af, Depth> 3.48" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.28" Area (ac) CN Descriation 27.820 98 Paved parking, HSG D 32.830 80 >75% Grass cover, Good, HSG D 18.210 77 Woods, Good, HSG D 78.860 86 Weighted Average 51.040 64.72% Pervious Area 27.820 35.28% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.4 407 0.0320 2.88 Shallow Concentrated Flow, Segment 3 Unpaved Kv= 16.1 fps 2.9 1,092 0.0111 6.26 11.07 Pipe Channel, Segment 4 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 4.4 571 0.0105 2.18 2.18 Trap/Vee/Rect Channel Flow, Segment 5 Bot.W=0.00' D=1.00' Z= 1.07' Top.W=2.00' n= 0.035 Earth, dense weeds 0.1 81 0.0250 18.07 227.12 Pipe Channel, Segment 6 48.0" Round Area= 12.6 sf Perim= 12.6' r= 1.00' n= 0.013 2.3 1,071 0.0318 7.87 70.87 Trap/Vee/Rect Channel Flow, Segment 7 Bot.W=0.00' D=3.00' Z= 1.07' Top.W=6.00' n= 0.035 Earth, dense weeds 12.1 3,222 Total Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 19 Subcatchment 1S: Ex Basin 1 (onsite) 5 6 7 8 9 10 11 12 13 14 15 16 1 Time (hours) Hydrograph 440 - - - - - - - 1 ❑Runoff 420/1405.04 380 t t cfs - tTyye� 360 1ta�rhfal�.��� 340 320 � ��{ p���p �(�(� Rungff-A1rea-F-9.VA Jac 300 260 t t� af u�O —7M7�I I 1_ N 240 0 220 1 _ _ _ Runoff D-epa>-S4r Fovenlgth13 212' iy 200 180 + -4 I - - + 4 � T-( J 1- .�n 160 - - ---- – (� w' 86 -- - T 120 100 80 :ET — — T I 60 40 5 6 7 8 9 10 11 12 13 14 15 16 1 Time (hours) Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 20 Summary for Subcatchment 2S: Ex Basin 1 (offsite) Runoff = 8.22 cfs @ 12.10 hrs, Volume= 0.567 af, Depth> 3.78" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.28" Area (ac) CN Description 0.900 98 Paved parking, HSG D 0.900 80 >75% Grass cover, Good, HSG D 1.800 89 Weighted Average 0.900 50.00% Pervious Area 0.900 50.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.3 50 0.0200 0.16 Sheet Flow, Segment 1 Grass: Short n= 0.150 P2= 3.60" 0.8 171 0.0350 3.80 Shallow Concentrated Flow, Segment 2 Paved Kv= 20.3 fps 2.4 407 0.0320 2.88 Shallow Concentrated Flow, Segment 3 Unpaved Kv= 16.1 fps 2.9 1,092 0.0111 6.26 11.07 Pipe Channel, Segment 4 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 4.4 571 0.0105 2.18 2.18 Trap/Vee/Rect Channel Flow, Segment 5 Bot.W=0.00' D=1.00' Z= 1.07' Top.W=2.00' n= 0.035 0.1 81 0.0250 18.07 227.12 Pipe Channel, Segment 6 48.0" Round Area= 12.6 sf Perim= 12.6' r= 1.00' n= 0.013 2.3 1,071 0.0318 7.87 70.87 Trap/Vee/Rect Channel Flow, Segment 7 Bot.W=0.00' D=3.00' Z= 1.07' Tor).W=6.00' n= 0.035 18.2 3,443 Total Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 21 Subcatchment 2S: Ex Basin 1 (offsite) Hydrograph 0 8.22 CfS I — I I — - ❑Runoff +Type II 24 -hr 10 -Year -RaltifailLs.2�8" 1 Runoff -Areal -T-8W lac 1_ LRu_pofTVoIjum�=0.15671 of 1 Run off Delpth�378" 1 1 tN=1$y 5 6 7 8 9 10 11 12 13 14 15 16 1 Time (hours) 9 8 7- 6- 6L L 1 --1 1 5- 0 4 0 8.22 CfS I — I I — - ❑Runoff +Type II 24 -hr 10 -Year -RaltifailLs.2�8" 1 Runoff -Areal -T-8W lac 1_ LRu_pofTVoIjum�=0.15671 of 1 Run off Delpth�378" 1 1 tN=1$y 5 6 7 8 9 10 11 12 13 14 15 16 1 Time (hours) Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 22 Summary for Subcatchment 3S: Ex Basin 2 (onsite) Runoff = 78.66 cfs @ 12.13 hrs, Volume= 5.604 af, Depth> 3.18" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.28" Area (ac) CN Description 5.810 98 Paved parking, HSG D 4.020 80 >75% Grass cover, Good, HSG D 11.320 77 Woods, Good, HSG D 21.150 83 Weighted Average 15.340 72.53% Pervious Area 5.810 Paved Kv= 20.3 fps 27.47% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 84 0.0165 2.61 Shallow Concentrated Flow, portion of Segment 2 onsite Paved Kv= 20.3 fps 13.7 470 0.0130 0.57 Shallow Concentrated Flow, Segment 3 60 Woodland Kv= 5.0 fps 6.3 1,745 0.0103 4.62 65.13 Trap/Vee/Rect Channel Flow, draw to reach w 50 Bot.W=14.00' D=1.00' Z= 0.1 T Top.W=14.20' 45 4 n= 0.030 Earth, qrassed & winding 20.5 2,299 Total Subcatchment 3S: Ex Basin 2 (onsite) Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■Runoff �- -+ � I �- cfs -Ty e 11'2 l rl b- Y�ar 78.66 85 1- Rti noff Altea=�21. M la -c 80-/1- Rup oRffni VoIlurnp.1604, of 4- 4 " ono# — IIp hl�3'1 �. 75-/ Faow-Lem th=2,299 TCiT�LO.J Min 70 60 55 w 50 45 4 - 240 LL 35- 5 30: 30 _ 25 20- 0 15: 15 10 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■Runoff �- -+ � I �- cfs -Ty e 11'2 l rl b- Y�ar 78.66 1- Rti noff Altea=�21. M la -c Rup oRffni VoIlurnp.1604, of 4- 4 " ono# — IIp hl�3'1 �. Faow-Lem th=2,299 TCiT�LO.J Min 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■Runoff Campus Pond analysis Type 11 24 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here} Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 23 Summary for Subcatchment 4S: Ex Basin 2 (offsite) Runoff = 44.11 cfs @ 12.17 hrs, Volume= 3.667 af, Depth> 4.17" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.28" Area (ac) CN Description 7.790 98 Paved parking, HSG D 2.240 80 >75% Grass cover, Good, HSG D 0.510 77 Woods, Good, HSG D 10.540 93 Weighted Average 2.750 26.09% Pervious Area 7.790 73.91 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 50 0.0400 1.68 Sheet Flow, Segment 1 Smooth surfaces n= 0.011 P2= 3.60" 3.9 606 0.0165 2.61 Shallow Concentrated Flow, Segment 2 Paved Kv= 20.3 fps 13.7 470 0.0130 0.57 Shallow Concentrated Flow, Segment 3 Woodland Kv= 5.0 fps 6.3 1,745 0.0103 4.62 65.13 Trap/Vee/Rect Channel Flow, draw to reach Bot.W=14.00' D=1.00' Z= 0.1 T Top.W=14.20' n= 0.030 Earth, qrassed & windinq 24.4 2,871 Total Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 24 Subcatchment 4S: Ex Basin 2 (offsite) Hydrograph 44.11 cfs Ty e R 124 firl b=Y"r 4- 4 - Ikaikal k5.28" 7 RO noff Atea410.540 Fac I- �R-o# VdIlua�g�.I66Tf P!�noj D�plh _ F w -L �O 7%4=41 n�n 1-1&NV43 6 7 8 9 10 11 12 13 14 15 16 17 18 Time (hours) ❑Runoff - - 48 46 44 42 — 40 +- 38 36 T -T -7- 34 32 30 — i Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment 5S: Ex Basin 3 Runoff = 7.29 cfs @ 12.15 hrs, Volume= 0.530 af, Depth> 2.63" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.28" Area (ac) CN Description 0.020 98 Paved parking, HSG D 0.100 80 >75% Grass cover, Good, HSG D 2.300 77 Woods, Good, HSG D 2.420 77 Weighted Average 2.400 99.17% Pervious Area 0.020 Woods: Light underbrush n= 0.400 P2= 3.60" 0.83% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0200 0.07 Sheet Flow, Segment 1 Woods: Light underbrush n= 0.400 P2= 3.60" 3.5 228 0.0480 1.10 Shallow Concentrated Flow, Segment 2 Woodland Kv= 5.0 fps 6.7 472 0.0550 1.17 Shallow Concentrated Flow, draw to reach Woodland Kv= 5.0 fps 21.8 750 Total Subcatchment 5S: Ex Basin 3 Hydrograph 8 - 7 -Z --p-- 7.29 cfs -Type Ifi�llir�l b=Y�ar I mai iifal k- .21&" 6 1 Runbff Areal=2.420 lac 5 1 1 Rumoffl Vollum�=0.15301 of R-Inol Belpfh�. " 4 1U. Flow Length=7 0' 3 Tc -211.8 rri in -4 -4 1 it -N=177 2 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■Runoff Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 26 Summary for Subcatchment 6S: Ex Basin 4 Runoff = 55.37 cfs @ 12.10 hrs, Volume= 3.687 af, Depth> 3.48" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.28" Area (ac) CN Description 4.640 98 Paved parking, HSG D 6.280 80 >75% Grass cover, Good, HSG D 1.810 77 Woods, Good, HSG D 12.730 86 Weighted Average 8.090 63.55% Pervious Area 4.640 Grass: Short n= 0.150 P2= 3.60" 36.45% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.3 50 0.0200 0.16 Sheet Flow, Segment 1 Grass: Short n= 0.150 P2= 3.60" 2.3 148 0.0470 1.08 Shallow Concentrated Flow, Segment 2 Woodland Kv= 5.0 fps 3.9 461 0.0152 1.98 Shallow Concentrated Flow, Segment 3 Unpaved Kv= 16.1 fps 6.1 406 0.0490 1.11 Shallow Concentrated Flow, Segment 4 Woodland Kv= 5.0 fps 17.6 1,065 Total Subcatchment 6S: Ex Basin 4 Hydrograph 55 55.37 cfs � � � ■Runoff Tye II 24 -lir 1 b -Year 50-'/// kainfall�:5.28" 45 L _j _j L Runoff Al-ea�12.7-30 lac 40 +Runoff Volume-3.l687�af U 35 l�nr 11 �p#h� . �, LL30 F�ov�Le1 #1=0 5' 25 1/1 _ Tc=471�min 20 4-1=86 15 10 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment 7S: Ex Area to bypass analysis point Runoff = 39.99 cfs @ 11.95 hrs, Volume= 1.821 af, Depth> 3.59" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.28" Area (ac) CN Description 2.320 98 Paved parking, HSG D 3.770 80 >75% Grass cover, Good, HSG D 6.090 87 Weighted Average 3.770 -4 61.90% Pervious Area 2.320 3.1 590 38.10% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 50 0.0400 1.68 Sheet Flow, — 4 -4 1 Smooth surfaces n= 0.011 P2= 3.60" 3.1 590 0.0250 3.21 Shallow Concentrated Flow, --t� 1- Paved Kv= 20.3 fas 3.6 640 Total, Increased to minimum Tc = 5.0 min 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■Runoff Subcatchment 7S: Ex Area to bypass analysis point Hydrograph 44 / 4239.99 3$ 1 :1— cfs 1 1 ZTy�e lir-1 b=Y 36 — 4- — 4 -4 1 4- —124 — 4 � katrifall�=5.28n 34 32 -+ --t� 1- nn � -Rub Arec1 -6.090 -ac 30 28 1 :LR"-" V$Ilmp=-1.1821�-af -, 26 24 c 22 n �, - 20 LL - - I n h= 4 . a.nl 16 Mi c—=54 n 14 12 18- 6 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■Runoff Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 28 Summary for Reach 8R: Basin 2 reach Inflow Area = 31.690 ac, 42.92% Impervious, Inflow Depth > 3.51" for 10 -Year event Inflow = 122.12 cfs @ 12.14 hrs, Volume= 9.270 of Outflow = 119.92 cfs @ 12.19 hrs, Volume= 9.239 af, Atten= 2%, Lag= 2.9 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 0.95 fps, Min. Travel Time= 1.7 min Avg. Velocity = 0.26 fps, Avg. Travel Time= 6.4 min Peak Storage= 12,491 cf @ 12.16 hrs, Average Depth at Peak Storage= 0.73' Bank -Full Depth= 4.00', Capacity at Bank -Full= 2,084.67 cfs 175.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 183.00' Length= 98.0' Slope= 0.0010T Inlet Invert= 16.30', Outlet Invert= 16.20' E 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Reach 8R: Basin 2 reach Hydrograph L L _L _L L _L — 122.12 cfs o o�tfoW 130 119.92 cfs Inflow Ar@a=1.90_ac 120 110 I L L _L - -1 � AVg . e��/��0. /` a7, 100 F J_ + jb I� �V eI*0.95 fos 90 n=10.040 80 U 70 — — — + - — — — — — — L-79� `` 60 �-s 0' 0p 1 o-./� 50 40 - 1 Ca�aclily �,0�4_ 7 1 30 E 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 29 Summary for Reach 9R: Basin 3 reach Inflow Area = 34.110 ac, 39.93% Impervious, Inflow Depth > 3.44" for 10 -Year event Inflow = 126.97 cfs @ 12.19 hrs, Volume= 9.769 of Outflow = 58.81 cfs @ 13.19 hrs, Volume= 8.986 af, Atten= 54%, Lag= 60.1 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 0.83 fps, Min. Travel Time= 44.1 min Avg. Velocity = 0.30 fps, Avg. Travel Time= 123.2 min Peak Storage= 156,035 cf @ 12.45 hrs, Average Depth at Peak Storage= 0.59' Bank -Full Depth= 4.00', Capacity at Bank -Full= 1,417.61 cfs 120.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 128.00' Length= 2,186.5' Slope= 0.0010'/' Inlet Invert= 16.20', Outlet Invert= 14.00' E 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Inflow ❑ Outflow Reach 9R: Basin 3 reach Hydrograph t t t-1 I t t 140 130 126.97 cfs - Inflow Ar a=i4.1� "C- 120 fi rt - A�.rDe]�th_j�0.�9'_ 110 100 IYFx Vel*0.83 foS- 90 �1rn-I.,-040- U 80 3 70 L72 v 88655 — 0 58.81 cfs V 09 50 �aCfty i 1,4—Ml r-fS- 40 30 T_ T E 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Inflow ❑ Outflow Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 30 Summary for Reach 1OR: Basin 4 reach Inflow Area = 46.840 ac, 38.98% Impervious, Inflow Depth > 3.25" for 10 -Year event Inflow = 62.86 cfs @ 13.18 hrs, Volume= 12.672 of Outflow = 54.89 cfs @ 13.75 hrs, Volume= 12.211 af, Atten= 13%, Lag= 34.1 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 1.72 fps, Min. Travel Time= 19.9 min Avg. Velocity = 0.74 fps, Avg. Travel Time= 46.5 min Peak Storage= 65,714 cf @ 13.42 hrs, Average Depth at Peak Storage= 0.42' Bank -Full Depth= 4.00', Capacity at Bank -Full= 2,301.11 cfs 75.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 83.00' Length= 2,056.0' Slope= 0.00687' Inlet Invert= 14.00', Outlet Invert= 0.00' Reach 1OR: Basin 4 reach Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑Inflow ❑ Outflow T 7 - 70 Z 65In' love Asea --461.846 60 !Depth" 55 50 -IYIQx Velt1 .-12#og 45 n*0.040T w 40 3 35 L;�2, 456-0' A LL 30 7 7 25 C pa�_cit =2 301.111( 20 15 T7 __..0 10 ' T 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑Inflow ❑ Outflow 62.86 cfs 4 _t _ 54.89 cfs 7 7 7 T 7 I -T F _t 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑Inflow ❑ Outflow Campus Pond analysis Type 11 24 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here} Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 31 Summary for Link 3L: Ex Basin 1 Inflow Area = 80.660 ac, 35.61 % Impervious, Inflow Depth > 3.49" for 10 -Year event Inflow = 412.45 cfs @ 12.04 hrs, Volume= 23.444 of Primary = 412.45 cfs @ 12.04 hrs, Volume= 23.444 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 3L: Ex Basin 1 Hydrograph L 1 � 4 4412.45 A19 AR r cfs 7 -F T -T �4 4-+ r: L -I --L4 rt 4 4 4 I-n#iaw �Ar"=k0.6360�-ac 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Inflow ❑ Primary I L rt 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Inflow ❑ Primary Campus Pond analysis Type 11 24 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here} Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 32 Summary for Link 5L: Ex Basin 2 Inflow Area = 31.690 ac, 42.92% Impervious, Inflow Depth > 3.51" for 10 -Year event Inflow = 122.12 cfs @ 12.14 hrs, Volume= 9.270 of Primary = 122.12 cfs @ 12.14 hrs, Volume= 9.270 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 5L: Ex Basin 2 Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) F11-1 nflow ❑ Primary Campus Pond analysis Type 11 24 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here} Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 33 Summary for Link 11 L: Ex River Analysis Point Inflow Area = 127.500 ac, 36.85% Impervious, Inflow Depth > 3.36" for 10 -Year event Inflow = 417.07 cfs @ 12.04 hrs, Volume= 35.655 of Primary = 417.07 cfs @ 12.04 hrs, Volume= 35.655 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 11 L: Ex River Analysis Point Hydrograph I 41DU 440 417.07 cfs 420 400 t+ + —1 1 380 360 340 _ 320 300 t t + —i— _ 280 — �' 260 240 4 4 — c 220 — LL 200 t t + 1 18 180 160 140 17 T T -T 7 - 120 100 80 cn — ILI Ififi YlVre�=:1 7.500 -ac - I I t t t 1— 4-- t t t 4 t t I 4- 4 I � - 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Inflow ❑ Primary Campus Pond analysis Type// 24 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here} Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 34 Summary for Subcatchment 1S: Ex Basin 1 (onsite) Runoff = 475.03 cfs @ 12.04 hrs, Volume= 27.098 af, Depth> 4.12" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 25 -Year Rainfall=6.00" Area (ac) CN Description 27.820 98 Paved parking, HSG D 32.830 80 >75% Grass cover, Good, HSG D 18.210 77 Woods, Good, HSG D 78.860 86 Weighted Average 51.040 64.72% Pervious Area 27.820 35.28% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.4 407 0.0320 2.88 Shallow Concentrated Flow, Segment 3 Unpaved Kv= 16.1 fps 2.9 1,092 0.0111 6.26 11.07 Pipe Channel, Segment 4 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 4.4 571 0.0105 2.18 2.18 Trap/Vee/Rect Channel Flow, Segment 5 Bot.W=0.00' D=1.00' Z= 11.07' Top.W=2.00' n= 0.035 Earth, dense weeds 0.1 81 0.0250 18.07 227.12 Pipe Channel, Segment 6 48.0" Round Area= 12.6 sf Perim= 12.6' r= 1.00' n= 0.013 2.3 1,071 0.0318 7.87 70.87 Trap/Vee/Rect Channel Flow, Segment 7 Bot.W=0.00' D=3.00' Z= 1.0'/' Top.W=6.00' n= 0.035 Earth, dense weeds 12.1 3,222 Total Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 35 Subcatchment 1S: Ex Basin 1 (onsite) Hydrograph 500 450- 400-' 350 w 300 v c 250 t t .2 200 7- T 150 ❑Runoff 475.03 cfs Tye i 24= � r-215= Y�-a-r - -Ra nfa-II--&. dam' Runoff Area;�78.4-60 Jac --u�off�Vome�2710981 of Runoff Depth>4.1,2" Flow Length=3,222' Td=12.1 ni n "=186 5 6 7 8 9 10 11 12 13 14 15 16 1 Time (hours) Campus Pond analysis Type// 24 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here} Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 36 Summary for Subcatchment 2S: Ex Basin 1 (offsite) Runoff = 9.55 cfs @ 12.10 hrs, Volume= 0.664 af, Depth> 4.43" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 25 -Year Rainfall=6.00" Area (ac) CN Description 0.900 98 Paved parking, HSG D 0.900 80 >75% Grass cover, Good, HSG D 1.800 89 Weighted Average 0.900 50.00% Pervious Area 0.900 50.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.3 50 0.0200 0.16 Sheet Flow, Segment 1 Grass: Short n= 0.150 P2= 3.60" 0.8 171 0.0350 3.80 Shallow Concentrated Flow, Segment 2 Paved Kv= 20.3 fps 2.4 407 0.0320 2.88 Shallow Concentrated Flow, Segment 3 Unpaved Kv= 16.1 fps 2.9 1,092 0.0111 6.26 11.07 Pipe Channel, Segment 4 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 4.4 571 0.0105 2.18 2.18 Trap/Vee/Rect Channel Flow, Segment 5 Bot.W=0.00' D=1.00' Z= 1.0'/' Top.W=2.00' n= 0.035 0.1 81 0.0250 18.07 227.12 Pipe Channel, Segment 6 48.0" Round Area= 12.6 sf Perim= 12.6' r= 1.00' n= 0.013 2.3 1,071 0.0318 7.87 70.87 Trap/Vee/Rect Channel Flow, Segment 7 Bot.W=0.00' D=3.00' Z= 1.0'/' Too.W=6.00' n= 0.035 18.2 3,443 Total Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 37 Subcatchment 2S: Ex Basin 1 (offsite) I 6 7 8 9 10 11 12 13 14 15 16 17 18 Time (hours) ❑Runoff Hydrograph 10-/'9.55 cfs ITy-ple it 124- fir -2r -Year 9 -i--1 1 L A --I fair ftll s 4 1 4- -Runbf -Amci -1 .800 oc '+Rupo# VQ um x.664 f 6 R nofj D�jpth 4.43" LL 4 fi rt FlowLen th=3,443 rt 1 T 181.2 rr in I 6 7 8 9 10 11 12 13 14 15 16 17 18 Time (hours) ❑Runoff Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 38 Summary for Subcatchment 3S: Ex Basin 2 (onsite) Runoff = 93.43 cfs @ 12.13 hrs, Volume= 6.703 af, Depth> 3.80" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 25 -Year Rainfall=6.00" Area (ac) CN Description 5.810 98 Paved parking, HSG D 4.020 80 >75% Grass cover, Good, HSG D 11.320 77 Woods, Good, HSG D 21.150 83 Weighted Average 15.340 T 72.53% Pervious Area 5.810 Paved Kv= 20.3 fps 27.47% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 84 0.0165 2.61 Shallow Concentrated Flow, portion of Segment 2 onsite fi T I T Paved Kv= 20.3 fps 13.7 470 0.0130 0.57 Shallow Concentrated Flow, Segment 3 -4 - -I Woodland Kv= 5.0 fps 6.3 1,745 0.0103 4.62 65.13 Trap/Vee/Rect Channel Flow, draw to reach Bot.W=14.00' D=1.00' Z= 0.1 T Top.W=14.20' n= 0.030 Earth, qrassed & winding 20.5 2,299 Total 1 90 85 75 70 65 60 55 c 50 LL d� 15 10 5 Subcatchment 3S: Ex Basin 2 (onsite) Hydrograph 93.43 cfs -Typ4-e fC�24�ir-2�ea_r 4 -tal-r fatlL-6.d0" Rtmo f Mea:02t-150 lac tRUI�Off fiVellu".17-031 of �Ru� r Delpthi 3- r Fc L ' c-20.5 mi n --I t -N=133 4- 4 - -I 5 6 7 8 9 10 1'1 1'2 1'3 14 15 16 1'7 18 1'9 20 Time (hours) ❑Runoff + t + fi T I T T -4 - -I 93.43 cfs -Typ4-e fC�24�ir-2�ea_r 4 -tal-r fatlL-6.d0" Rtmo f Mea:02t-150 lac tRUI�Off fiVellu".17-031 of �Ru� r Delpthi 3- r Fc L ' c-20.5 mi n --I t -N=133 4- 4 - -I 5 6 7 8 9 10 1'1 1'2 1'3 14 15 16 1'7 18 1'9 20 Time (hours) ❑Runoff Campus Pond analysis Type// 24 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here} Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 39 Summary for Subcatchment 4S: Ex Basin 2 (offsite) Runoff = 50.72 cfs @ 12.17 hrs, Volume= 4.244 af, Depth> 4.83" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 25 -Year Rainfall=6.00" Area (ac) CN Description 7.790 98 Paved parking, HSG D 2.240 80 >75% Grass cover, Good, HSG D 0.510 77 Woods, Good, HSG D 10.540 93 Weighted Average 2.750 26.09% Pervious Area 7.790 73.91 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 50 0.0400 1.68 Sheet Flow, Segment 1 Smooth surfaces n= 0.011 P2= 3.60" 3.9 606 0.0165 2.61 Shallow Concentrated Flow, Segment 2 Paved Kv= 20.3 fps 13.7 470 0.0130 0.57 Shallow Concentrated Flow, Segment 3 Woodland Kv= 5.0 fps 6.3 1,745 0.0103 4.62 65.13 Trap/Vee/Rect Channel Flow, draw to reach Bot.W=14.00' D=1.00' Z= 0.1 T Top.W=14.20' n= 0.030 Earth, qrassed & windinq 24.4 2,871 Total Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 40 Subcatchment 4S: Ex Basin 2 (offsite) Hydrograph 55- 50 50.72 cfs _ Type II 124 - fir 2 -Year 45 1 -T 7 Ika—Wa11�:6.00" 40 Runoff Atea410.540 lac 35 Rugoffl Vollumg=4.12441 of 030 L R�noj Delpth�4.83'; U. 25 -L --I_ 4 - Flow Length=2,871 4 fic' 411 20 n�in + CIN 43 15 10 7 T- 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Time (hours) ❑Runoff Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 41 Summary for Subcatchment 5S: Ex Basin 3 Runoff = 8.87 cfs @ 12.15 hrs, Volume= 0.647 af, Depth> 3.21" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 25 -Year Rainfall=6.00" Area (ac) CN Description 0.020 98 Paved parking, HSG D 0.100 80 >75% Grass cover, Good, HSG D 2.300 77 Woods, Good, HSG D 2.420 77 Weighted Average 2.400 99.17% Pervious Area 0.020 Woods: Light underbrush n= 0.400 P2= 3.60" 0.83% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0200 0.07 Sheet Flow, Segment 1 Woods: Light underbrush n= 0.400 P2= 3.60" 3.5 228 0.0480 1.10 Shallow Concentrated Flow, Segment 2 Woodland Kv= 5.0 fps 6.7 472 0.0550 1.17 Shallow Concentrated Flow, draw to reach Woodland Kv= 5.0 fps 21.8 750 Total Subcatchment 5S: Ex Basin 3 Hydrograph 8.87 cfs Type II X14 -lir 2�-Y�ar lkainfa11�=6.0" 7 1 I I Runoff Alreal=2.420 lac 6 1umoff� j Vium� x.16471 of 31 -Runoff Delpth fi'� 5 LL �Iow Lengtl�7 4 1 I I I I I I I I D -21.8_in 3 1 1 1 1 tN=177 2- ' I I I I I I I I I I I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■Runoff Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 42 Summary for Subcatchment 6S: Ex Basin 4 Runoff = 65.02 cfs @ 12.09 hrs, Volume= 4.368 af, Depth> 4.12" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 25 -Year Rainfall=6.00" Area (ac) CN Description 4.640 98 Paved parking, HSG D 6.280 80 >75% Grass cover, Good, HSG D 1.810 77 Woods, Good, HSG D 12.730 86 Weighted Average 8.090 Rainfall=6.00" 63.55% Pervious Area 4.640 Grass: Short n= 0.150 P2= 3.60" 36.45% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.3 50 0.0200 0.16 Sheet Flow, Segment 1 Rainfall=6.00" 55 50 Grass: Short n= 0.150 P2= 3.60" 2.3 148 0.0470 1.08 Shallow Concentrated Flow, Segment 2 Rulpo ff Vollump=4.1368�af Woodland Kv= 5.0 fps 3.9 461 0.0152 1.98 Shallow Concentrated Flow, Segment 3 3 35 LL 30 Unpaved Kv= 16.1 fps 6.1 406 0.0490 1.11 Shallow Concentrated Flow, Segment 4 rcT-471:61111n I N 46 15 10 Woodland Kv= 5.0 fps 17.6 1,065 Total 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■Runoff Subcatchment 6S: Ex Basin 4 Hydrograph 7065.02 65 cfs T Tye '24-- 60 Rainfall=6.00" 55 50 RIno�-fi-ea'r2.730 lac 45-L Rulpo ff Vollump=4.1368�af w 40 7 7 19 -F R�nr D I��4. 3 35 LL 30 Flow-Lemgth-,065' , 25 20 T -T 7 rcT-471:61111n I N 46 15 10 — 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■Runoff Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 43 Summary for Subcatchment 7S: Ex Area to bypass analysis point Runoff = 46.67 cfs @ 11.95 hrs, Volume= 2.149 af, Depth> 4.24" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 25 -Year Rainfall=6.00" Area (ac) CN Description 2.320 98 Paved parking, HSG D 3.770 80 >75% Grass cover, Good, HSG D 6.090 87 Weighted Average 3.770 61.90% Pervious Area 2.320 3.1 590 38.10% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 50 0.0400 1.68 Sheet Flow, 46 Smooth surfaces n= 0.011 P2= 3.60" 3.1 590 0.0250 3.21 Shallow Concentrated Flow, 40 Paved Kv= 20.3 fas 3.6 640 Total, Increased to minimum Tc = 5.0 min Subcatchment 7S: Ex Area to bypass analysis point Hydrograph 52 46.67 cfs - — — - Ty e it 12A lir-2�Y"r 50 4- 4I��rii ll - 48 RunbfVAr-eA 6.090 Ac tRu-°#�f V�IIu p=2.149 f 46 naf —'" 44 42 4 — — 40 — I 36 — 34 — 32 30 — 3 26 0 24 — LL 22 20 — 18 16 14 12 10 8 — 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Runoff 46.67 cfs - — — - Ty e it 12A lir-2�Y"r I 4- 4I��rii ll - RunbfVAr-eA 6.090 Ac tRu-°#�f V�IIu p=2.149 f naf —'" T:J aw I �Length--640' ��51 nr m: dN 47 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Runoff Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 44 Summary for Reach 8R: Basin 2 reach Inflow Area = 31.690 ac, 42.92% Impervious, Inflow Depth > 4.15" for 25 -Year event Inflow = 143.36 cfs @ 12.14 hrs, Volume= 10.947 of Outflow = 140.82 cfs @ 12.18 hrs, Volume= 10.913 af, Atten= 2%, Lag= 2.7 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 1.02 fps, Min. Travel Time= 1.6 min Avg. Velocity = 0.27 fps, Avg. Travel Time= 6.0 min Peak Storage= 13,767 cf @ 12.16 hrs, Average Depth at Peak Storage= 0.80' Bank -Full Depth= 4.00', Capacity at Bank -Full= 2,084.67 cfs 175.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 183.00' Length= 98.0' Slope= 0.0010T Inlet Invert= 16.30', Outlet Invert= 16.20' 160 r I I I 150 140 --k — 130 1 20110100 �I 3 80 I� LL 70- 60 50 F T T 40 30 t t t E Reach 8R: Basin 2 reach Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) L Inflow ❑ Outflow Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 45 Summary for Reach 9R: Basin 3 reach Inflow Area = 34.110 ac, 39.93% Impervious, Inflow Depth > 4.07" for 25 -Year event Inflow = 149.44 cfs @ 12.18 hrs, Volume= 11.560 of Outflow = 73.15 cfs @ 13.11 hrs, Volume= 10.720 af, Atten= 51 %, Lag= 55.6 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 0.90 fps, Min. Travel Time= 40.5 min Avg. Velocity = 0.31 fps, Avg. Travel Time= 115.9 min Peak Storage= 178,014 cf @ 12.43 hrs, Average Depth at Peak Storage= 0.67' Bank -Full Depth= 4.00', Capacity at Bank -Full= 1,417.61 cfs 120.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 128.00' Length= 2,186.5' Slope= 0.0010'/' Inlet Invert= 16.20', Outlet Invert= 14.00' w 0 LL iE 0 Reach 9R: Basin 3 reach Hydrograph '— �— 4- —4- —Inflow 149.44 cfs o outflow Inflow Ar a=i4.1L "c 74Vg.bej tfA0A7' Marx Ve".90 fibs �- -�-n=40•040 I I I —L-2;180�5' 73.15 cfs F_S= A -0910T 1' Capad1 Y417.�1 c-fs 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) L L T - � F fi T -1 4 4 -� T T 7 '— �— 4- —4- —Inflow 149.44 cfs o outflow Inflow Ar a=i4.1L "c 74Vg.bej tfA0A7' Marx Ve".90 fibs �- -�-n=40•040 I I I —L-2;180�5' 73.15 cfs F_S= A -0910T 1' Capad1 Y417.�1 c-fs 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 46 Summary for Reach 1OR: Basin 4 reach Inflow Area = 46.840 ac, 38.98% Impervious, Inflow Depth > 3.87" for 25 -Year event Inflow = 78.14 cfs @ 13.10 hrs, Volume= 15.088 of Outflow = 68.86 cfs @ 13.62 hrs, Volume= 14.598 af, Atten= 12%, Lag= 30.8 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 1.88 fps, Min. Travel Time= 18.2 min Avg. Velocity = 0.78 fps, Avg. Travel Time= 44.0 min Peak Storage= 75,353 cf @ 13.31 hrs, Average Depth at Peak Storage= 0.49' Bank -Full Depth= 4.00', Capacity at Bank -Full= 2,301.11 cfs 75.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 83.00' Length= 2,056.0' Slope= 0.00687' Inlet Invert= 14.00', Outlet Invert= 0.00' 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) F11-1 -f 10—. ❑ Outflow Reach 1OR: Basin 4 reach Hydrograph 85 78.14 cfs I Area_ --461.846 4- 4 -4 80 n� ovv a 75 A�g.�De�tlr�0 � 68.86 cfs Max Ve1�1,88#0s I - so 55n D.CT40 C T 7 w 50 v 45 U�2105". '—t T I 3 LL S:9 -90U9 ,1� 35 30 C"- city=2�3(� .11 c 25 20 4 15 10 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) F11-1 -f 10—. ❑ Outflow Campus Pond analysis Type// 24 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here} Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 47 Summary for Link 3L: Ex Basin 1 Inflow Area = 80.660 ac, 35.61 % Impervious, Inflow Depth > 4.13" for 25 -Year event Inflow = 483.65 cfs @ 12.04 hrs, Volume= 27.762 of Primary = 483.65 cfs @ 12.04 hrs, Volume= 27.762 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 3L: Ex Basin 1 Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) F11-1 nflow ❑ Primary Campus Pond analysis Type// 24 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here} Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 48 Summary for Link 5L: Ex Basin 2 Inflow Area = 31.690 ac, 42.92% Impervious, Inflow Depth > 4.15" for 25 -Year event Inflow = 143.36 cfs @ 12.14 hrs, Volume= 10.947 of Primary = 143.36 cfs @ 12.14 hrs, Volume= 10.947 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 5L: Ex Basin 2 Hydrograph Time (hours) F11-1 nflow ❑ Primary Campus Pond analysis Type// 24 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here} Printed 7/17/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 49 Summary for Link 11 L: Ex River Analysis Point Inflow Area = 127.500 ac, 36.85% Impervious, Inflow Depth > 3.99" for 25 -Year event Inflow = 490.36 cfs @ 12.04 hrs, Volume= 42.361 of Primary = 490.36 cfs @ 12.04 hrs, Volume= 42.361 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 11 L: Ex River Analysis Point Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) F11-1 nflow ❑ Primary 12S 13S Post- Basin 1 (o site) Post- asin 1 (offsite) 22L Post- Baso 14S 15S Post- Basin 2 (osite) Post- asin 2 (offsite) 23L Subcat Reach on Link 16S Post- asin 3 41 17S Post- asin 4 [20R] --� [271R each Basin 3 reach sin 4 reach 24L Post- River Analysis Point 18S Post- Area to bypass analysis point Campus Pond analysis Type 11 24 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 12S: Post- Basin 1 (onsite) Runoff = 209.57 cfs @ 12.04 hrs, Volume= 12.429 af, Depth> 1.99" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.20" Area (ac) CN Description 33.600 98 Paved parking, HSG D 31.830 80 >75% Grass cover, Good, HSG D 9.450 77 Woods, Good, HSG D 74.880 88 Weighted Average 41.280 55.13% Pervious Area 33.600 44.87% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.4 407 0.0320 2.88 Shallow Concentrated Flow, Segment 3 Unpaved Kv= 16.1 fps 2.9 1,092 0.0111 6.26 11.07 Pipe Channel, Segment 4 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 4.4 571 0.0105 2.18 2.18 Trap/Vee/Rect Channel Flow, Segment 5 Bot.W=0.00' D=1.00' Z= 1.07' Top.W=2.00' n= 0.035 0.1 81 0.0250 18.07 227.12 Pipe Channel, Segment 6 48.0" Round Area= 12.6 sf Perim= 12.6' r= 1.00' n= 0.013 2.3 1,071 0.0318 7.87 70.87 Trap/Vee/Rect Channel Flow, Segment 7 Bot.W=0.00' D=3.00' Z= 1.07' ToD.W=6.00' n= 0.035 12.1 3,222 Total Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 3 Subcatchment 12S: Post- Basin 1 (onsite) 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Hydrograph 230 + + ❑Runoff 220 200 209.57 cfs ITy��I 2 -h�r 1 Year - 190taThf�11= Zb" 180 170 1 ::1 - 1IRu -AIre - 160 14o150 I q OI ° - 9 w 130 BVI Runoff Dept -h>4 -.9V LL 110 D fig_ fi22. 100 90 1�-42.f-n� 80 70 I +—I I I D—+ CN=p 60 50 40 I- C L t— I V I-1 1 1 30 20 — 4 10 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 13S: Post- Basin 1 (offsite) Runoff = 4.34 cfs @ 12.10 hrs, Volume= 0.311 af, Depth> 2.07" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.20" Area (ac) CN Description 0.900 98 Paved parking, HSG D 0.900 80 >75% Grass cover, Good, HSG D 1.800 89 Weighted Average 0.900 50.00% Pervious Area 0.900 50.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.3 50 0.0200 0.16 Sheet Flow, Segment 1 Grass: Short n= 0.150 P2= 3.60" 0.8 171 0.0350 3.80 Shallow Concentrated Flow, Segment 2 Paved Kv= 20.3 fps 2.4 407 0.0320 2.88 Shallow Concentrated Flow, Segment 3 Unpaved Kv= 16.1 fps 2.9 1,092 0.0111 6.26 11.07 Pipe Channel, Segment 4 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 4.4 571 0.0105 2.18 2.18 Trap/Vee/Rect Channel Flow, Segment 5 Bot.W=0.00' D=1.00' Z= 1.07' Top.W=2.00' n= 0.035 0.1 81 0.0250 18.07 227.12 Pipe Channel, Segment 6 48.0" Round Area= 12.6 sf Perim= 12.6' r= 1.00' n= 0.013 2.3 1,071 0.0318 7.87 70.87 Trap/Vee/Rect Channel Flow, Segment 7 Bot.W=0.00' D=3.00' Z= 1.07' ToD.W=6.00' n= 0.035 18.2 3,443 Total Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 5 Subcatchment 13S: Post- Basin 1 (offsite) Hydrograph � ❑Runoff 4.34 cfs +y��+ 2�-h- 1---�ear 4 1 1 1 kai%fah=x.20" IROnoff Ares=11.800 ac 3 1 Ryngff YolgrPe=9.311 of 1 IRur ofl D�pt�>F.07'; LO Frew-Leng23-443 2 T�=118.2 min CSI=89 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 14S: Post- Basin 2 (onsite) Runoff = 37.04 cfs @ 12.14 hrs, Volume= 2.821 af, Depth> 1.60" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.20" Area (ac) CN Description 5.910 98 Paved parking, HSG D 3.920 80 >75% Grass cover, Good, HSG D 11.320 77 Woods, Good, HSG D 21.150 83 Weighted Average 15.240 72.06% Pervious Area 5.910 Paved Kv= 20.3 fps 27.94% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 84 0.0165 2.61 Shallow Concentrated Flow, portion of Segment 2 onsite Paved Kv= 20.3 fps 13.7 470 0.0130 0.57 Shallow Concentrated Flow, Segment 3 Woodland Kv= 5.0 fps 6.3 1,745 0.0103 4.62 65.13 Trap/Vee/Rect Channel Flow, draw to reach Bot.W=14.00' D=1.00' Z= 0.1 T Top.W=14.20' n= 0.030 Earth, qrassed & winding 20.5 2,299 Total Subcatchment 14S: Post- Basin 2 (onsite) Hydrograph - 4- 37.04 cfs 32 30 28 — 26 + a 24 22 T T c 20 M 18 16 14 12 10 L iyIi ` 2�-h� f-Y"r � I I I F�aiilf�ll=�.2�f" t-- Ruhoff Ate'd�--21.M -Ac t-R"p"11 Y-o1yMe=X2.6? 1-pf jTnRuofl - T >11.609V wZ n =2991 �g _ — I— — '�O. min G�l43 -4 4 5 6 7 8 9 10 11 12 13 14 15 16 1'7 18 1'9 20 21 22 23 24 Time (hours) ■Runoff Campus Pond analysis Type 11 24 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 15S: Post- Basin 2 (offsite) Runoff = 24.83 cfs @ 12.17 hrs, Volume= 2.136 af, Depth> 2.43" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.20" Area (ac) CN Description 7.790 98 Paved parking, HSG D 2.240 80 >75% Grass cover, Good, HSG D 0.510 77 Woods, Good, HSG D 10.540 93 Weighted Average 2.750 26.09% Pervious Area 7.790 73.91 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 50 0.0400 1.68 Sheet Flow, Segment 1 Smooth surfaces n= 0.011 P2= 3.60" 3.9 606 0.0165 2.61 Shallow Concentrated Flow, Segment 2 Paved Kv= 20.3 fps 13.7 470 0.0130 0.57 Shallow Concentrated Flow, Segment 3 Woodland Kv= 5.0 fps 6.3 1,745 0.0103 4.62 65.13 Trap/Vee/Rect Channel Flow, draw to reach Bot.W=14.00' D=1.00' Z= 0.1 T Top.W=14.20' n= 0.030 Earth, qrassed & windinq 24.4 2,871 Total Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 8 Subcatchment 15S: Post- Basin 2 (offsite) Hydrograph I I � I � I I I I ❑Runoff 26 24.83 cfs 24 ��efli 2�-hi T�Ye-ar 22 - Oa—W-a1l l =--i2-6" 20Ruhoff A tea�T0.540 �c 18 - 1-R"qff )I$Ipm�e=?•""f 16 Runr D�p M 12 F�ow�ength-2 871 10 T�'--4. mIn 6 4 i 7 T 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 16S: Post- Basin 3 Runoff = 3.00 cfs @ 12.16 hrs, Volume= 0.243 af, Depth> 1.20" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.20" Area (ac) CN Description 0.020 98 Paved parking, HSG D 0.100 80 >75% Grass cover, Good, HSG D 2.300 77 Woods, Good, HSG D 2.420 77 Weighted Average 2.400 99.17% Pervious Area 0.020 Woods: Light underbrush n= 0.400 P2= 3.60" 0.83% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0200 0.07 Sheet Flow, Segment 1 Woods: Light underbrush n= 0.400 P2= 3.60" 3.5 228 0.0480 1.10 Shallow Concentrated Flow, Segment 2 Woodland Kv= 5.0 fps 6.7 472 0.0550 1.17 Shallow Concentrated Flow, draw to reach Woodland Kv= 5.0 fps 21.8 750 Total Subcatchment 16S: Post- Basin 3 Hydrograph ❑ Runoff 3.00 cfs 3-/ Type II 24 -hr 1-1Year kaififall=x.20" Runoff Area=2.420 ac 2 - -Ry- Off )1o1gme=0.243 of Runoff Depth>1.20" U. Flow Length=750' T�=21.81 min CIS=77 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 17S: Post- Basin 4 Runoff = 65.10 cfs @ 11.95 hrs, Volume= 3.142 af, Depth> 2.26" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.20" Area (ac) CN Description 10.420 98 Paved parking, HSG D 5.320 80 >75% Grass cover, Good, HSG D 0.970 77 Woods, Good, HSG D 16.710 91 Weighted Average 6.290 37.64% Pervious Area 10.420 62.36% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ❑Runoff Subcatchment 17S: Post- Basin 4 Hyldrograph 65 65.10 cfs I �PeA 2-hx''Year 60 kainfall X5.20" 55 50 7 T T F Runoff aitea=16.710 ac 45 j_ � Ryn(?ff )/o1ume=3.1"2 of 40 F Runoff Depth�?.26" 35 c LL tc-=54min 30 - --1 =91 25 20 1/1 17 15 10 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ❑Runoff Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 18S: Post- Area to bypass analysis point Runoff = 20.68 cfs @ 11.96 hrs, Volume= 0.971 af, Depth> 1.91" Runoff by SCS TR -20 method, UH=SCS, Time Si 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.20" Area (ac) CN Description 2.320 98 Paved parking, HSG D 3.770 80 >75% Grass cover, Good, HSG D 6.090 87 Weighted Average 3.770 61.90% Pervious Area 2.320 3.1 590 38.10% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 50 0.0400 1.68 Sheet Flow, Smooth surfaces n= 0.011 13.60" 3.1 590 0.0250 3.21 Shallow Concentrated Flow, Paved 120.3 fas 3.6 640 Total, Increased to minimum Tc = 5.0 min Subcatchment 18S: Post- Area to bypass analysis point Hydrograph 23 22 - 20.68 cfs I ,�/ 21 20 — — — — Pew` Z�-� �l "r 19 18 t17 ���n 16 :F- �7 IRU —nofU mtl =:6-090 :2�C 15 — 14 - ��4�nQ)fol lue1 f 112 1 rt fi l nII .9' 0 0 ,a -Flow Len th=640' - 5.:6min II1 = _ IIII --1 CA 47 6 5 4 3 2 -I 1 i 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ■ Runoff Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 12 Summary for Reach 19R: Basin 2 reach Inflow Area = 31.690 ac, 43.23% Impervious, Inflow Depth > 1.88" for 1 -Year event Inflow = 61.60 cfs @ 12.15 hrs, Volume= 4.958 of Outflow = 60.45 cfs @ 12.21 hrs, Volume= 4.939 af, Atten= 2%, Lag= 3.8 min Routing by Stor-Ind+Trans method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 0.72 fps, Min. Travel Time= 2.3 min Avg. Velocity = 0.19 fps, Avg. Travel Time= 8.5 min Peak Storage= 8,247 cf @ 12.17 hrs, Average Depth at Peak Storage= 0.48' Bank -Full Depth= 4.00', Capacity at Bank -Full= 2,084.67 cfs 175.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 183.00' Length= 98.0' Slope= 0.0010T Inlet Invert= 16.30', Outlet Invert= 16.20' Reach 19R: Basin 2 reach Hydrograph — – 61.60 cfs 65 60.45 cfs Ilnfi— A -re -a-3-160 rX — — — —.- alc 55 �Av�g.�elptl=dam$' 50 X - -M-x VeI�:01721 #pls 45 &OA40 a 40 35_/XK8,W 3 , a 30 -7-_0'9_ 1a'/~ 25 -Ca acit - 084 67 cfs 20--///— Ip �� 15 10 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ❑Inflow ❑ Outflow Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 13 Summary for Reach 20R: Basin 3 reach Inflow Area = 34.110 ac, 40.22% Impervious, Inflow Depth > 1.82" for 1 -Year event Inflow = 63.30 cfs @ 12.21 hrs, Volume= 5.181 of Outflow = 22.11 cfs @ 13.65 hrs, Volume= 4.735 af, Atten= 65%, Lag= 86.6 min Routing by Stor-Ind+Trans method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 0.56 fps, Min. Travel Time= 65.1 min Avg. Velocity = 0.23 fps, Avg. Travel Time= 160.6 min Peak Storage= 86,450 cf @ 12.56 hrs, Average Depth at Peak Storage= 0.33' Bank -Full Depth= 4.00', Capacity at Bank -Full= 1,417.61 cfs 120.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 128.00' Length= 2,186.5' Slope= 0.0010'/' Inlet Invert= 16.20', Outlet Invert= 14.00' Reach 20R: Basin 3 reach Hydrograph F11-1 nflow 63.30 cfs ❑ outflow I nfi6v`r 60 55 50 45- 40 j 3 35 0 LL 30 25 22.11 cfs 20 15 _T T 10 ' , Av�.-be�tI----d.3�' - Mix Vel-OA61 fpls ICapalcIV ,4�17�611 cfs 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 14 Summary for Reach 21 R: Basin 4 reach Inflow Area = 50.820 ac, 47.50% Impervious, Inflow Depth > 1.86" for 1 -Year event Inflow = 65.51 cfs @ 11.95 hrs, Volume= 7.877 of Outflow = 29.68 cfs @ 12.48 hrs, Volume= 7.61Oaf, Atten= 55%, Lag= 31.6 min Routing by Stor-Ind+Trans method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 1.36 fps, Min. Travel Time= 25.2 min Avg. Velocity = 0.60 fps, Avg. Travel Time= 57.2 min Peak Storage= 45,926 cf @ 12.06 hrs, Average Depth at Peak Storage= 0.30' Bank -Full Depth= 4.00', Capacity at Bank -Full= 2,301.11 cfs 75.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 83.00' Length= 2,056.0' Slope= 0.00687' Inlet Invert= 14.00', Outlet Invert= 0.00' 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ❑ Inflow ❑ Outflow Reach 21 R: Basin 4 reach Hydrograph 70 J65.51 cfs 1 �a#�orre�a=0.8�2� 65 60 D I alc Avb.- je�tl =dib' 55 -Ms' k VeL1 A61 fpm 50 45 -�-n*01040- 40- 0 L L� 2� 56.01 35 " 30 29.68 cf s v V • `� V �� ��� 25 I��palc-ty=: 3`01 X11 cfs 20 � 15t —7 10 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ❑ Inflow ❑ Outflow Campus Pond analysis Type 11 24 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 15 Summary for Link 22L: Post- Basin 1 Inflow Area = 76.680 ac, 44.99% Impervious, Inflow Depth > 1.99" for 1 -Year event Inflow = 213.45 cfs @ 12.04 hrs, Volume= 12.740 of Primary = 213.45 cfs @ 12.04 hrs, Volume= 12.740 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Link 22L: Post- Basin 1 Hydrograph I�lo�iv �re�=�f-6 �6i8b�c 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ❑ Inflow ❑ Primary 00 :0 120z ' LL i 90-: 70- 60- 50z 40 20 ._. ---------- I�lo�iv �re�=�f-6 �6i8b�c 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ❑ Inflow ❑ Primary Campus Pond analysis Type 11 24 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 16 Summary for Link 23L: Post- Basin 2 Inflow Area = 31.690 ac, 43.23% Impervious, Inflow Depth > 1.88" for 1 -Year event Inflow = 61.60 cfs @ 12.15 hrs, Volume= 4.958 of Primary = 61.60 cfs @ 12.15 hrs, Volume= 4.958 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Link 23L: Post- Basin 2 Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) F11-1 nflow ❑ Primary Campus Pond analysis Type 11 24 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 17 Summary for Link 24L: Post- River Analysis Point Inflow Area = 127.500 ac, 45.99% Impervious, Inflow Depth > 1.92" for 1 -Year event Inflow = 216.21 cfs @ 12.04 hrs, Volume= 20.350 of Primary = 216.21 cfs @ 12.04 hrs, Volume= 20.350 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Link 24L: Post- River Analysis Point Hydrograph :�: r _- I I I - 230 216.21 cfs 220 210 200 190 180 170 10 1550 1 N 140 130 3 120 0 110 LL 100 90 70 60 50 E 1 1410-w+ Area=127.500 ac --- 1 1 - 1 t t- - --�i t t- I 1 =I - 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) F11-1 nflow ❑ Primary Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 18 Summary for Subcatchment 12S: Post- Basin 1 (onsite) Runoff = 401.25 cfs @ 12.03 hrs, Volume= 24.493 af, Depth> 3.93" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.28" Area (ac) CN Descriation 33.600 98 Paved parking, HSG D 31.830 80 >75% Grass cover, Good, HSG D 9.450 77 Woods, Good, HSG D 74.880 88 Weighted Average 41.280 55.13% Pervious Area 33.600 44.87% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.4 407 0.0320 2.88 Shallow Concentrated Flow, Segment 3 Unpaved Kv= 16.1 fps 2.9 1,092 0.0111 6.26 11.07 Pipe Channel, Segment 4 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 4.4 571 0.0105 2.18 2.18 Trap/Vee/Rect Channel Flow, Segment 5 Bot.W=0.00' D=1.00' Z= 1.07' Top.W=2.00' n= 0.035 0.1 81 0.0250 18.07 227.12 Pipe Channel, Segment 6 48.0" Round Area= 12.6 sf Perim= 12.6' r= 1.00' n= 0.013 2.3 1,071 0.0318 7.87 70.87 Trap/Vee/Rect Channel Flow, Segment 7 Bot.W=0.00' D=3.00' Z= 1.07' Top.W=6.00' n= 0.035 12.1 3,222 Total Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 19 Subcatchment 12S: Post- Basin 1 (onsite) 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Hydrograph 440 420401.25 400 fi + cfs _ + 1 iyp -a �-hr I O Year ❑Runoff 380 360 I I I—kaWcA=�Ie 340 320 � IRu�f AIreal-7.8 � D _ fi t- I � O1 VI° - '73 y 260 v 240 LL 200 - i�1Jna f Dep h>�9 FCdwe�gtl=3�22�X 180 1 1 1 1 -- 7 11 -min 160 120 fi C- 1 1 1 rt N=48 180 - -7J:F 60 40 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 20 Summary for Subcatchment 13S: Post- Basin 1 (offsite) Runoff = 8.22 cfs @ 12.10 hrs, Volume= 0.603 af, Depth> 4.02" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.28" Area (ac) CN Description 0.900 98 Paved parking, HSG D 0.900 80 >75% Grass cover, Good, HSG D 1.800 89 Weighted Average 0.900 50.00% Pervious Area 0.900 50.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.3 50 0.0200 0.16 Sheet Flow, Segment 1 Grass: Short n= 0.150 P2= 3.60" 0.8 171 0.0350 3.80 Shallow Concentrated Flow, Segment 2 Paved Kv= 20.3 fps 2.4 407 0.0320 2.88 Shallow Concentrated Flow, Segment 3 Unpaved Kv= 16.1 fps 2.9 1,092 0.0111 6.26 11.07 Pipe Channel, Segment 4 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 4.4 571 0.0105 2.18 2.18 Trap/Vee/Rect Channel Flow, Segment 5 Bot.W=0.00' D=1.00' Z= 1.07' Top.W=2.00' n= 0.035 0.1 81 0.0250 18.07 227.12 Pipe Channel, Segment 6 48.0" Round Area= 12.6 sf Perim= 12.6' r= 1.00' n= 0.013 2.3 1,071 0.0318 7.87 70.87 Trap/Vee/Rect Channel Flow, Segment 7 Bot.W=0.00' D=3.00' Z= 1.07' ToD.W=6.00' n= 0.035 18.2 3,443 Total Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 21 Subcatchment 13S: Post- Basin 1 (offsite) Hydrograph 9 1 � rt � � — ❑Runoff 8.22 cfs 8 T�p� II 24-1hr 10 -Year 7 - --kal�fall=5.28" I— IROnoff-Are -I.N0 ac 6- I Ry ngff Yolprrne:�9.693_af 5 Ru of f D pth> .02" II L III 1 I 44 , M 4 Flowf ength 3 V T�= 8.2 -min 3 1 1L I CN=89 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 22 Summary for Subcatchment 14S: Post- Basin 2 (onsite) Runoff = 78.66 cfs @ 12.13 hrs, Volume= 6.015 af, Depth> 3.41" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.28" Area (ac) CN Description 5.910 98 Paved parking, HSG D 3.920 80 >75% Grass cover, Good, HSG D 11.320 77 Woods, Good, HSG D 21.150 83 Weighted Average 15.240 72.06% Pervious Area 5.910 Paved Kv= 20.3 fps 27.94% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 84 0.0165 2.61 Shallow Concentrated Flow, portion of Segment 2 onsite Paved Kv= 20.3 fps 13.7 470 0.0130 0.57 Shallow Concentrated Flow, Segment 3 Woodland Kv= 5.0 fps 6.3 1,745 0.0103 4.62 65.13 Trap/Vee/Rect Channel Flow, draw to reach Bot.W=14.00' D=1.00' Z= 0.1 T Top.W=14.20' n= 0.030 Earth, qrassed & winding 20.5 2,299 Total Subcatchment 14S: Post- Basin 2 (onsite) Hydrograph 85 78.66 cfs 75 - T�� A ��-Ihr4l 0-- e"r 70 _ _ I_ _-Ftanfall I:t.24 65 - r Fl u huff Aute -2'I - M c 60 55 �}�e I� •� �f w 50 Run # V 41 45 � �'' , ° 40Leng LL 35 th= 299 30:/1 0. mm 25 III_I �0�13 20 15 l l l rt 10 / 5 6 7 8 9 10 11 12 13 14 15 16 1'7 18 1'9 20 21 22 23 24 Time (hours) ■Runoff Campus Pond analysis Type 11 24 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 23 Summary for Subcatchment 15S: Post- Basin 2 (offsite) Runoff = 44.11 cfs @ 12.17 hrs, Volume= 3.889 af, Depth> 4.43" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.28" Area (ac) CN Description 7.790 98 Paved parking, HSG D 2.240 80 >75% Grass cover, Good, HSG D 0.510 77 Woods, Good, HSG D 10.540 93 Weighted Average 2.750 26.09% Pervious Area 7.790 73.91 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 50 0.0400 1.68 Sheet Flow, Segment 1 Smooth surfaces n= 0.011 P2= 3.60" 3.9 606 0.0165 2.61 Shallow Concentrated Flow, Segment 2 Paved Kv= 20.3 fps 13.7 470 0.0130 0.57 Shallow Concentrated Flow, Segment 3 Woodland Kv= 5.0 fps 6.3 1,745 0.0103 4.62 65.13 Trap/Vee/Rect Channel Flow, draw to reach Bot.W=14.00' D=1.00' Z= 0.1 T Top.W=14.20' n= 0.030 Earth, qrassed & windinq 24.4 2,871 Total Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 24 Subcatchment 15S: Post- Basin 2 (offsite) Hydrograph 48 fi --1- - ❑Runoff 46 42 44.11 cfs - T � - � Ih�10-Y"r 40����n 38 36 34 - T:F Willof Aitea� Q.5 0 c 30 3o fi FR "-PIP w 28 0 a 26 24_ .. Ru n � r I�p �J.4 U— 20 18 Faow-Langth= 871 1 1 = fit- 1 14 16 14 - + CSI 43 12 10 fi - - - - 4 - 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment 16S: Post- Basin 3 Runoff = 7.29 cfs @ 12.15 hrs, Volume= 0.573 af, Depth> 2.84" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.28" Area (ac) CN Description 0.020 98 Paved parking, HSG D 0.100 80 >75% Grass cover, Good, HSG D 2.300 77 Woods, Good, HSG D 2.420 77 Weighted Average 2.400 99.17% Pervious Area 0.020 Woods: Light underbrush n= 0.400 P2= 3.60" 0.83% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0200 0.07 Sheet Flow, Segment 1 Woods: Light underbrush n= 0.400 P2= 3.60" 3.5 228 0.0480 1.10 Shallow Concentrated Flow, Segment 2 Woodland Kv= 5.0 fps 6.7 472 0.0550 1.17 Shallow Concentrated Flow, draw to reach Woodland Kv= 5.0 fps 21.8 750 Total Subcatchment 16S: Post- Basin 3 Hydrograph 8 - rt + 7.29 cfs p��hr�10�Ye�ar 7 Y I mai-Mall x.28" 6 IROnoff Ares=2.4210 ac 5 1 Rynpff )/o1yrge=0.573 of 0 4 R of 1 B 9pts .84', .2 MOW Len th=750 3 � fi f =i1.8 m-rn - -4 GN47 2 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ■Runoff Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 26 Summary for Subcatchment 17S: Post- Basin 4 Runoff = 117.87 cfs @ 11.95 hrs, Volume= 5.900 af, Depth> 4.24" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.28" Area (ac) CN Description 10.420 98 Paved parking, HSG D 5.320 80 >75% Grass cover, Good, HSG D 0.970 77 Woods, Good, HSG D 16.710 91 Weighted Average 6.290 37.64% Pervious Area 10.420 62.36% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, ❑Runoff Subcatchment 17S: Post- Basin 4 130 +Hydrograph t t— t T 125117.87 1 cfs 1 y 114r Oer 110 105 -7 F Afa�j-42�� 100 95 90 t-- I Rwia fi Mea;OC 0 Ac 85 c 60 LL 555 0 —1m - IC C-�1 45 40t 35 -_ fi --— t 25 20 15 10 5 " 0- 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ❑Runoff Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment 18S: Post- Area to bypass analysis point Runoff = 39.99 cfs @ 11.95 hrs, Volume= 1.943 af, Depth> 3.83" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.28" Area (ac) CN Description 2.320 98 Paved parking, HSG D 3.770 80 >75% Grass cover, Good, HSG D 6.090 87 Weighted Average 3.770 + 61.90% Pervious Area 2.320 3.1 590 38.10% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 50 0.0400 1.68 Sheet Flow, 34 32 + J Smooth surfaces n= 0.011 P2= 3.60" 3.1 590 0.0250 3.21 Shallow Concentrated Flow, Y$Iel .9�3f 26Q 0 2z IRanI Paved Kv= 20.3 fas 3.6 640 Total, Increased to minimum Tc = 5.0 min 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ■ Runoff Subcatchment 18S: Post- Area to bypass analysis point Hydrograph 44 ' 42 38 39.99 cfs — T61t Ihr�10�Ye r 36 - 4- 4 I kainfa11=x.28" 34 32 + J p� Runolf !"A AreA .090 -ac 30 Y$Iel .9�3f 26Q 0 2z IRanI of M 20 16 - —F ow Lenn-�gth--64A 14 12 + - 10 8 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ■ Runoff Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 28 Summary for Reach 19R: Basin 2 reach Inflow Area = 31.690 ac, 43.23% Impervious, Inflow Depth > 3.75" for 10 -Year event Inflow = 122.12 cfs @ 12.14 hrs, Volume= 9.905 of Outflow = 119.92 cfs @ 12.19 hrs, Volume= 9.878 af, Atten= 2%, Lag= 2.9 min Routing by Stor-Ind+Trans method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 0.95 fps, Min. Travel Time= 1.7 min Avg. Velocity = 0.24 fps, Avg. Travel Time= 6.8 min Peak Storage= 12,491 cf @ 12.16 hrs, Average Depth at Peak Storage= 0.73' Bank -Full Depth= 4.00', Capacity at Bank -Full= 2,084.67 cfs 175.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 183.00' Length= 98.0' Slope= 0.0010T Inlet Invert= 16.30', Outlet Invert= 16.20' Reach 19R: Basin 2 reach Hydrograph T L -Inflow 122.12 cfs o outflow 130 119.92 cfs120 —1 ��f�_�v �rea=il .06 ac 110 - I -1 -LAvg.1Dey#Ih=U 7t1 100_//1-fMaX Mel=0.95 foS 80 — — —I —I I — I— — — — U 70 50 - P iy r4I.�7cs 40 — — 30 E 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 29 Summary for Reach 20R: Basin 3 reach Inflow Area = 34.110 ac, 40.22% Impervious, Inflow Depth > 3.68" for 10 -Year event Inflow = 126.97 cfs @ 12.19 hrs, Volume= 10.452 of Outflow = 58.81 cfs @ 13.19 hrs, Volume= 9.847 af, Atten= 54%, Lag= 60.1 min Routing by Stor-Ind+Trans method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 0.83 fps, Min. Travel Time= 44.1 min Avg. Velocity = 0.28 fps, Avg. Travel Time= 129.0 min Peak Storage= 156,035 cf @ 12.45 hrs, Average Depth at Peak Storage= 0.59' Bank -Full Depth= 4.00', Capacity at Bank -Full= 1,417.61 cfs 120.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 128.00' Length= 2,186.5' Slope= 0.0010'/' Inlet Invert= 16.20', Outlet Invert= 14.00' Reach 20R: Basin 3 reach Hydrograph E hill" )krea=i4 ti"c 1 _� _TA 4 .TDe1ptli=6.5J' 1 --1 �M4x Vel -7-!-01.83 fills 1 - T — 1-1=0040 1 L=a 1$6.x' 1 -1 _T S=0.0010 '/' 1�3p�c�y 1,4171.'1) c#S -7 T 1 I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Inflow ❑ Outflow --t 7 F 140 r�_ 126.97 cfs 130 120 110 100-—A— 90 80 — 3 70 58.81 cfs " 60 1 1 __1 7 50- 0401 -4 4 111 40-1 30 __1 7 E hill" )krea=i4 ti"c 1 _� _TA 4 .TDe1ptli=6.5J' 1 --1 �M4x Vel -7-!-01.83 fills 1 - T — 1-1=0040 1 L=a 1$6.x' 1 -1 _T S=0.0010 '/' 1�3p�c�y 1,4171.'1) c#S -7 T 1 I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Inflow ❑ Outflow Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 30 Summary for Reach 21 R: Basin 4 reach Inflow Area = 50.820 ac, 47.50% Impervious, Inflow Depth > 3.72" for 10 -Year event Inflow = 120.64 cfs @ 11.95 hrs, Volume= 15.748 of Outflow = 68.92 cfs @ 12.35 hrs, Volume= 15.392 af, Atten= 43%, Lag= 23.6 min Routing by Stor-Ind+Trans method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 1.88 fps, Min. Travel Time= 18.2 min Avg. Velocity = 0.74 fps, Avg. Travel Time= 46.2 min Peak Storage= 75,569 cf @ 12.04 hrs, Average Depth at Peak Storage= 0.49' Bank -Full Depth= 4.00', Capacity at Bank -Full= 2,301.11 cfs 75.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 83.00' Length= 2,056.0' Slope= 0.00687' Inlet Invert= 14.00', Outlet Invert= 0.00' Reach 21 R: Basin 4 reach Hydrograph 130 7-1 120.64 cfs 120 110 100 90- 80-// 0 ao 68.92 cfs U 70 3 LLso - __r lrfl" ikre_a_=k826_�c �' -TWx Vel=11.88 f0s 1 —1 - i 11=0�04E0 -1 - L=2 yO�"' S=0.006 '/' � p ci vr=2, 01.11 c s -I � � -7 •��o�iiiiiiiiiii5ii, Inflow ❑ Outflow Campus Pond analysis Type 11 24 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 31 Summary for Link 22L: Post- Basin 1 Inflow Area = 76.680 ac, 44.99% Impervious, Inflow Depth > 3.93" for 10 -Year event Inflow = 408.64 cfs @ 12.04 hrs, Volume= 25.097 of Primary = 408.64 cfs @ 12.04 hrs, Volume= 25.097 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Link 22L: Post- Basin 1 Hydrograph 408.64 cfs Zn 260 240 3 220 LL 0 18 180 160 140 1 1 --4 4 120 100 an Inflow Area=76.680-�c I1 --1 +11I +�IIII 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) F11-1 nflow ❑ Primary Campus Pond analysis Type 11 24 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 32 Summary for Link 23L: Post- Basin 2 Inflow Area = 31.690 ac, 43.23% Impervious, Inflow Depth > 3.75" for 10 -Year event Inflow = 122.12 cfs @ 12.14 hrs, Volume= 9.905 of Primary = 122.12 cfs @ 12.14 hrs, Volume= 9.905 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Link 23L: Post- Basin 2 Hydrograph - I F11-1 nflow ❑ Primary 130 122.12 cfs Inflo-iv Area ac 110- 10 100- 10090 90 -- 80 N 70 3 60 - LL 50 40 30 0 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 11 24 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 33 Summary for Link 24L: Post- River Analysis Point Inflow Area = 127.500 ac, 45.99% Impervious, Inflow Depth > 3.81" for 10 -Year event Inflow = 422.19 cfs @ 12.04 hrs, Volume= 40.489 of Primary = 422.19 cfs @ 12.04 hrs, Volume= 40.489 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Link 24L: Post- River Analysis Point Hydrograph 460A99 10 422.19 cfs 440 420 T F 1 400 —1 --1 380 360 340 320 300 280 — 260 240 0 220 — LL 200 180 160 140 120 100 on — ❑Inflow ❑ Primary 1 Inflow Area=127.500 ac � T I -T T F 1 —1 --1 fi�1 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 34 Summary for Subcatchment 12S: Post- Basin 1 (onsite) Runoff = 467.52 cfs @ 12.03 hrs, Volume= 28.769 af, Depth> 4.61" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 25 -Year Rainfall=6.00" Area (ac) CN Descriation 33.600 98 Paved parking, HSG D 31.830 80 >75% Grass cover, Good, HSG D 9.450 77 Woods, Good, HSG D 74.880 88 Weighted Average 41.280 55.13% Pervious Area 33.600 44.87% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.4 407 0.0320 2.88 Shallow Concentrated Flow, Segment 3 Unpaved Kv= 16.1 fps 2.9 1,092 0.0111 6.26 11.07 Pipe Channel, Segment 4 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 4.4 571 0.0105 2.18 2.18 Trap/Vee/Rect Channel Flow, Segment 5 Bot.W=0.00' D=1.00' Z= 1.07' Top.W=2.00' n= 0.035 0.1 81 0.0250 18.07 227.12 Pipe Channel, Segment 6 48.0" Round Area= 12.6 sf Perim= 12.6' r= 1.00' n= 0.013 2.3 1,071 0.0318 7.87 70.87 Trap/Vee/Rect Channel Flow, Segment 7 Bot.W=0.00' D=3.00' Z= 1.07' Top.W=6.00' n= 0.035 12.1 3,222 Total Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 35 Subcatchment 12S: Post- Basin 1 (onsite) Hydrograph 520 — — 500 -_ 467.52 cfs 480 460 440 420 400 380 360 340 — 320 m 300 v 280 — 3 260 0 240 — u 220 200 — 180 — 160 140 120 100 80 60 40 , 6 7 8 9 10 11 1 � � � ❑Runoff �yp 4 2& h r--25tYe�i- F:IRu-AIrc=74- 0c- fi -Rgfo"o-Iq-nr-2P'79 Ru- noo f Uep-th>4�6V 3,1-22-. T x%42. i-m�n Cid-ft8 I I � ' 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 36 Summary for Subcatchment 13S: Post- Basin 1 (offsite) Runoff = 9.55 cfs @ 12.10 hrs, Volume= 0.707 af, Depth> 4.71" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 25 -Year Rainfall=6.00" Area (ac) CN Description 0.900 98 Paved parking, HSG D 0.900 80 >75% Grass cover, Good, HSG D 1.800 89 Weighted Average 0.900 50.00% Pervious Area 0.900 50.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.3 50 0.0200 0.16 Sheet Flow, Segment 1 Grass: Short n= 0.150 P2= 3.60" 0.8 171 0.0350 3.80 Shallow Concentrated Flow, Segment 2 Paved Kv= 20.3 fps 2.4 407 0.0320 2.88 Shallow Concentrated Flow, Segment 3 Unpaved Kv= 16.1 fps 2.9 1,092 0.0111 6.26 11.07 Pipe Channel, Segment 4 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 4.4 571 0.0105 2.18 2.18 Trap/Vee/Rect Channel Flow, Segment 5 Bot.W=0.00' D=1.00' Z= 1.07' Top.W=2.00' n= 0.035 0.1 81 0.0250 18.07 227.12 Pipe Channel, Segment 6 48.0" Round Area= 12.6 sf Perim= 12.6' r= 1.00' n= 0.013 2.3 1,071 0.0318 7.87 70.87 Trap/Vee/Rect Channel Flow, Segment 7 Bot.W=0.00' D=3.00' Z= 1.07' ToD.W=6.00' n= 0.035 18.2 3,443 Total Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 37 Subcatchment 13S: Post- Basin 1 (offsite) Hydrograph ❑Runoff 10 9.55 cfs 9 1 T�* �*Ihr-15-- ear 8 - I-Runoff-#rte=1.800 ac 7 I + � �R4�ngff �/QI�e�.ZQ7�af 0 5 i;lo Runof Dp>�LL ' Length=3 LT 4 I T 18.3 min 3 1 I CIN=$g 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 38 Summary for Subcatchment 14S: Post- Basin 2 (onsite) Runoff = 93.43 cfs @ 12.13 hrs, Volume= 7.179 af, Depth> 4.07" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 25 -Year Rainfall=6.00" Area (ac) CN Description 5.910 98 Paved parking, HSG D 3.920 80 >75% Grass cover, Good, HSG D 11.320 77 Woods, Good, HSG D 21.150 83 Weighted Average 15.240 72.06% Pervious Area 5.910 Paved Kv= 20.3 fps 27.94% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 84 0.0165 2.61 Shallow Concentrated Flow, portion of Segment 2 onsite 80 75- Paved Kv= 20.3 fps 13.7 470 0.0130 0.57 Shallow Concentrated Flow, Segment 3 - 55 Woodland Kv= 5.0 fps 6.3 1,745 0.0103 4.62 65.13 Trap/Vee/Rect Channel Flow, draw to reach 40 _ Bot.W=14.00' D=1.00' Z= 0.1 T Top.W=14.20' 30 n= 0.030 Earth, qrassed & winding 20.5 2,299 Total Subcatchment 14S: Post- Basin 2 (onsite) Hydrograph 10 r -P W, 1-TYpe 114 r-15-Ye�r Rudoff A-tee:02t.15F0 Ac -Rqn-qff-Yo1y mp=7 • 79 if Rurlloff �1 Qeptb>4-077 Fe1vv-Length=2-299' E 1 Tc-20.;min 1 - -C4=63 5 6 7 8 9 10 11 12 13 14 15 16 1'7 18 19 20 21 22 23 24 Time (hours) ❑Runoff 100 93.43 cfs 95 90 - 85 80 75- 70 - - 65 60/ - 55 c 50 M 45 _ 40 _ 35 30 25 20 10 r -P W, 1-TYpe 114 r-15-Ye�r Rudoff A-tee:02t.15F0 Ac -Rqn-qff-Yo1y mp=7 • 79 if Rurlloff �1 Qeptb>4-077 Fe1vv-Length=2-299' E 1 Tc-20.;min 1 - -C4=63 5 6 7 8 9 10 11 12 13 14 15 16 1'7 18 19 20 21 22 23 24 Time (hours) ❑Runoff Campus Pond analysis Type// 24 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 39 Summary for Subcatchment 15S: Post- Basin 2 (offsite) Runoff = 50.72 cfs @ 12.17 hrs, Volume= 4.498 af, Depth> 5.12" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 25 -Year Rainfall=6.00" Area (ac) CN Description 7.790 98 Paved parking, HSG D 2.240 80 >75% Grass cover, Good, HSG D 0.510 77 Woods, Good, HSG D 10.540 93 Weighted Average 2.750 26.09% Pervious Area 7.790 73.91 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 50 0.0400 1.68 Sheet Flow, Segment 1 Smooth surfaces n= 0.011 P2= 3.60" 3.9 606 0.0165 2.61 Shallow Concentrated Flow, Segment 2 Paved Kv= 20.3 fps 13.7 470 0.0130 0.57 Shallow Concentrated Flow, Segment 3 Woodland Kv= 5.0 fps 6.3 1,745 0.0103 4.62 65.13 Trap/Vee/Rect Channel Flow, draw to reach Bot.W=14.00' D=1.00' Z= 0.1 T Top.W=14.20' n= 0.030 Earth, qrassed & windinq 24.4 2,871 Total Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 40 Subcatchment 15S: Post- Basin 2 (offsite) Hydrograph 1 50.72 cfs 35 W 30 3 LL 25 10� I ❑Runoff Typ� II 24- r 25 -Year I I I6ai%fai114.0-6" Runoff Aitea�--10.540 c1c I Rgngff )1olgTe=4.4 8 �f �—�on;L RuofjD�p�, ength=2 871 - T� 4.� min x.93 I —17 -1 -T 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 41 Summary for Subcatchment 16S: Post- Basin 3 Runoff = 8.87 cfs @ 12.15 hrs, Volume= 0.698 af, Depth> 3.46" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 25 -Year Rainfall=6.00" Area (ac) CN Description 0.020 98 Paved parking, HSG D 0.100 80 >75% Grass cover, Good, HSG D 2.300 77 Woods, Good, HSG D 2.420 77 Weighted Average 2.400 99.17% Pervious Area 0.020 Woods: Light underbrush n= 0.400 P2= 3.60" 0.83% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0200 0.07 Sheet Flow, Segment 1 Woods: Light underbrush n= 0.400 P2= 3.60" 3.5 228 0.0480 1.10 Shallow Concentrated Flow, Segment 2 Woodland Kv= 5.0 fps 6.7 472 0.0550 1.17 Shallow Concentrated Flow, draw to reach Woodland Kv= 5.0 fps 21.8 750 Total Subcatchment 16S: Post- Basin 3 Hydrograph 9 8.87 cfs I 1 TYiR6 11 14 -'hr 15 -Year 8-1 kainfah=6.06" 7 (Runoff Areti=2.420 aic 6 1RyngfU)1o1q-e=-O."8 of Runoff [�lpth 5 .46" -Fiow Length 750' LL 4 3 1 CIS=17 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ■ Runoff Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 42 Summary for Subcatchment 17S: Post- Basin 4 Runoff = 135.96 cfs @ 11.95 hrs, Volume= 6.863 af, Depth> 4.93" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 25 -Year Rainfall=6.00" Area (ac) CN Description 10.420 98 Paved parking, HSG D 5.320 80 >75% Grass cover, Good, HSG D 0.970 77 Woods, Good, HSG D 16.710 91 Weighted Average 6.290 37.64% Pervious Area 10.420 62.36% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 17S: Post- Basin 4 Hydrograph 7 T T T ❑Runoff �- -Typ� n r -25 -Year T F I I Fka-j�fajl l=t.0�' Rudo#i A+ea=1-M Ac -RgTf4"o1yme=P.8?3 of RI ur�of DT>�.9r M—p5.01111p Cf =�j L L 1 � A +I I 140 130 135.96 cfs 120 110 100 90 w .S 80 0 70 - LL 60 50 / 101 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 43 Summary for Subcatchment 18S: Post- Area to bypass analysis point Runoff = 46.67 cfs @ 11.95 hrs, Volume= 2.289 af, Depth> 4.51" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 25 -Year Rainfall=6.00" Area (ac) CN Description 2.320 98 Paved parking, HSG D 3.770 80 >75% Grass cover, Good, HSG D 6.090 87 Weighted Average 3.770 — — — — T � A �- Ihr�-25 Ye�dr 61.90% Pervious Area 2.320 3.1 590 38.10% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 50 0.0400 1.68 Sheet Flow, — — — — T � A �- Ihr�-25 Ye�dr 44 42 Smooth surfaces n= 0.011 P2= 3.60" 3.1 590 0.0250 3.21 Shallow Concentrated Flow, 40 38 36 — - Paved Kv= 20.3 fas 3.6 640 Total, Increased to minimum Tc = 5.0 min 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ■Runoff Subcatchment 18S: Post- Area to bypass analysis point Hydrograph 52 ---� –1 T – 50 — - 46.67 cfs48 — — — — — T � A �- Ihr�-25 Ye�dr 44 42 _ F��i1fII.Q" 40 38 36 — - IUnotf#r.00 t c 34 3o 1 = LR"nff N 3 26 - R_anI o#'5" ,° 22 - 20 Length--640'loLength--640' 51 min 116 4 — —-- 1 t L 1 1 1(j� 47 12 8 — — - 4 I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ■Runoff Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 44 Summary for Reach 19R: Basin 2 reach Inflow Area = 31.690 ac, 43.23% Impervious, Inflow Depth > 4.42" for 25 -Year event Inflow = 143.36 cfs @ 12.14 hrs, Volume= 11.677 of Outflow = 140.82 cfs @ 12.18 hrs, Volume= 11.648 af, Atten= 2%, Lag= 2.7 min Routing by Stor-Ind+Trans method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 1.02 fps, Min. Travel Time= 1.6 min Avg. Velocity = 0.26 fps, Avg. Travel Time= 6.4 min Peak Storage= 13,767 cf @ 12.16 hrs, Average Depth at Peak Storage= 0.80' Bank -Full Depth= 4.00', Capacity at Bank -Full= 2,084.67 cfs 175.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 183.00' Length= 98.0' Slope= 0.0010T Inlet Invert= 16.30', Outlet Invert= 16.20' Reach 19R: Basin 2 reach Hydrograph 160 _ 143.36 cfs 150 —I 140.82 cfs 140 130- 120- 110 30120110 100 a 90 — — 3 80 ,° 70 — — 60 50 40 M I l�flo�iv �re�=�1 ��9b�c -1 dWx Vel=11.02 fills _ 1 _1 _rt _T fi 11=0 M_40 1 S=0.0010-7' C�p�ci I-,�U_67 c#s 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) L Inflow ❑ Outflow Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 45 Summary for Reach 20R: Basin 3 reach Inflow Area = 34.110 ac, 40.22% Impervious, Inflow Depth > 4.34" for 25 -Year event Inflow = 149.44 cfs @ 12.18 hrs, Volume= 12.346 of Outflow = 73.15 cfs @ 13.11 hrs, Volume= 11.698 af, Atten= 51 %, Lag= 55.6 min Routing by Stor-Ind+Trans method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 0.90 fps, Min. Travel Time= 40.5 min Avg. Velocity = 0.30 fps, Avg. Travel Time= 121.4 min Peak Storage= 178,014 cf @ 12.43 hrs, Average Depth at Peak Storage= 0.67' Bank -Full Depth= 4.00', Capacity at Bank -Full= 1,417.61 cfs 120.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 128.00' Length= 2,186.5' Slope= 0.0010'/' Inlet Invert= 16.20', Outlet Invert= 14.00' Reach 20R: Basin 3 reach Hydrograph Inflow ❑ outflow - [nil" jkr"=k 41 "c 1 -T44g.:bel—Rt k=__6_itr' -f x Vel=0..90 fills 4 + —11=10M40 S=0.001 VP CL;P7 r,�171.611 cfs I Time (hours) I I I —4 4-- I- 149.44 cfs 6o 160- 150 150 140 130 120 110 4 � - 100 a v 90 — — 0 73.15 cfs 80 LL 70 60 50 o 3 Inflow ❑ outflow - [nil" jkr"=k 41 "c 1 -T44g.:bel—Rt k=__6_itr' -f x Vel=0..90 fills 4 + —11=10M40 S=0.001 VP CL;P7 r,�171.611 cfs I Time (hours) Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 46 Summary for Reach 21 R: Basin 4 reach Inflow Area = 50.820 ac, 47.50% Impervious, Inflow Depth > 4.38" for 25 -Year event Inflow = 139.95 cfs @ 11.95 hrs, Volume= 18.562 of Outflow = 82.69 cfs @ 12.32 hrs, Volume= 18.181 af, Atten= 41 %, Lag= 22.1 min Routing by Stor-Ind+Trans method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 2.03 fps, Min. Travel Time= 16.9 min Avg. Velocity = 0.79 fps, Avg. Travel Time= 43.6 min Peak Storage= 84,891 cf @ 12.04 hrs, Average Depth at Peak Storage= 0.55' Bank -Full Depth= 4.00', Capacity at Bank -Full= 2,301.11 cfs 75.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 83.00' Length= 2,056.0' Slope= 0.00687' Inlet Invert= 14.00', Outlet Invert= 0.00' Reach 21 R: Basin 4 reach Hydrograph - ___� �_ o Inflow 139.95 cfs- outflow 140 150 I�f1" ikr"=k82O C 130r�_�A� .tDeptl�=U 120 _ —I 4 I— I -1 4Uix Vel=21.0-31 f�IS 110 �I 100 � _0M40 W 90 — 82.69 cfs �- 80 t t���� 60 c�#�,=2, 1.4-1 cfs 40 I I 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type// 24 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 47 Summary for Link 22L: Post- Basin 1 Inflow Area = 76.680 ac, 44.99% Impervious, Inflow Depth > 4.61" for 25 -Year event Inflow = 476.12 cfs @ 12.03 hrs, Volume= 29.476 of Primary = 476.12 cfs @ 12.03 hrs, Volume= 29.476 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Link 22L: Post- Basin 1 Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) F11-1 nflow ❑ Primary Campus Pond analysis Type// 24 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 48 Summary for Link 23L: Post- Basin 2 Inflow Area = 31.690 ac, 43.23% Impervious, Inflow Depth > 4.42" for 25 -Year event Inflow = 143.36 cfs @ 12.14 hrs, Volume= 11.677 of Primary = 143.36 cfs @ 12.14 hrs, Volume= 11.677 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Link 23L: Post- Basin 2 Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) F11-1 nflow ❑ Primary Campus Pond analysis Type// 24 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 49 Summary for Link 24L: Post- River Analysis Point Inflow Area = 127.500 ac, 45.99% Impervious, Inflow Depth > 4.49" for 25 -Year event Inflow = 495.79 cfs @ 12.04 hrs, Volume= 47.657 of Primary = 495.79 cfs @ 12.04 hrs, Volume= 47.657 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Link 24L: Post- River Analysis Point Hydrograph Time (hours) F11-1 nflow ❑ Primary 25S 26S Post- Basin 1 Ake to Post- B sin 1 area to Pond (onsite) P d (offsite) Pond 1 \ \YJ 27L Post- Basin 1 29S Post- asin 1 Area to byp s Pond (onsite) Subcat Reach on Link 14S 15S Post- Basin 2 (o site) Post- asin 2 (offsite) 23L Post- Basin 3 16S 17S Post- asin 3 Post- asin 4 F19R � 2oR 21 R Basin 2 reach Basin 3 reach sin 4 reach 24L Post- River Analysis Point 18S Post- Area to bypass analysis point Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 14S: Post- Basin 2 (onsite) Runoff = 37.04 cfs @ 12.14 hrs, Volume= 2.821 af, Depth> 1.60" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.20" Area (ac) CN Description 5.910 98 Paved parking, HSG D 3.920 80 >75% Grass cover, Good, HSG D 11.320 77 Woods, Good, HSG D 21.150 83 Weighted Average 15.240 72.06% Pervious Area 5.910 Paved Kv= 20.3 fps 27.94% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 84 0.0165 2.61 Shallow Concentrated Flow, portion of Segment 2 onsite Paved Kv= 20.3 fps 13.7 470 0.0130 0.57 Shallow Concentrated Flow, Segment 3 Woodland Kv= 5.0 fps 6.3 1,745 0.0103 4.62 65.13 Trap/Vee/Rect Channel Flow, draw to reach Bot.W=14.00' D=1.00' Z= 0.1 T Top.W=14.20' n= 0.030 Earth, qrassed & winding 20.5 2,299 Total Subcatchment 14S: Post- Basin 2 (onsite) Hydrograph - 4- 37.04 cfs 32 30 28 — 26 + a 24 22 T T c 20 M 18 16 14 12 10 L iyIi ` 2�-h� f-Y"r � I I I F�aiilf�ll=�.2�f" t-- Ruhoff Ate'd�--21.M -Ac t-R"p"11 Y-o1yMe=X2.6? 1-pf jTnRuofl - T >11.609V wZ n =2991 �g _ — I— — '�O. min G�l43 -4 4 5 6 7 8 9 10 11 12 13 14 15 16 1'7 18 1'9 20 21 22 23 24 Time (hours) ■Runoff Campus Pond analysis Type 11 24 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 15S: Post- Basin 2 (offsite) Runoff = 24.83 cfs @ 12.17 hrs, Volume= 2.136 af, Depth> 2.43" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.20" Area (ac) CN Description 7.790 98 Paved parking, HSG D 2.240 80 >75% Grass cover, Good, HSG D 0.510 77 Woods, Good, HSG D 10.540 93 Weighted Average 2.750 26.09% Pervious Area 7.790 73.91 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 50 0.0400 1.68 Sheet Flow, Segment 1 Smooth surfaces n= 0.011 P2= 3.60" 3.9 606 0.0165 2.61 Shallow Concentrated Flow, Segment 2 Paved Kv= 20.3 fps 13.7 470 0.0130 0.57 Shallow Concentrated Flow, Segment 3 Woodland Kv= 5.0 fps 6.3 1,745 0.0103 4.62 65.13 Trap/Vee/Rect Channel Flow, draw to reach Bot.W=14.00' D=1.00' Z= 0.1 T Top.W=14.20' n= 0.030 Earth, qrassed & windinq 24.4 2,871 Total Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 4 Subcatchment 15S: Post- Basin 2 (offsite) Hydrograph I I � I � I I I I ❑Runoff 26 24.83 cfs 24 ��efli 2�-hi T�Ye-ar 22 - Oa—W-a1l l =--i2-6" 20Ruhoff A tea�T0.540 �c 18 - 1-R"qff )I$Ipm�e=?•""f 16 Runr D�p M 12 F�ow�ength-2 871 10 T�'--4. mIn 6 4 i 7 T 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 16S: Post- Basin 3 Runoff = 3.00 cfs @ 12.16 hrs, Volume= 0.243 af, Depth> 1.20" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.20" Area (ac) CN Description 0.020 98 Paved parking, HSG D 0.100 80 >75% Grass cover, Good, HSG D 2.300 77 Woods, Good, HSG D 2.420 77 Weighted Average 2.400 99.17% Pervious Area 0.020 Woods: Light underbrush n= 0.400 P2= 3.60" 0.83% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0200 0.07 Sheet Flow, Segment 1 Woods: Light underbrush n= 0.400 P2= 3.60" 3.5 228 0.0480 1.10 Shallow Concentrated Flow, Segment 2 Woodland Kv= 5.0 fps 6.7 472 0.0550 1.17 Shallow Concentrated Flow, draw to reach Woodland Kv= 5.0 fps 21.8 750 Total Subcatchment 16S: Post- Basin 3 Hydrograph ❑ Runoff 3.00 cfs 3-/ Type II 24 -hr 1-1Year kaififall=x.20" Runoff Area=2.420 ac 2 - -Ry- Off )1o1gme=0.243 of Runoff Depth>1.20" U. Flow Length=750' T�=21.81 min CIS=77 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 17S: Post- Basin 4 Runoff = 65.10 cfs @ 11.95 hrs, Volume= 3.142 af, Depth> 2.26" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.20" Area (ac) CN Description 10.420 98 Paved parking, HSG D 5.320 80 >75% Grass cover, Good, HSG D 0.970 77 Woods, Good, HSG D 16.710 91 Weighted Average 6.290 37.64% Pervious Area 10.420 62.36% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ❑Runoff Subcatchment 17S: Post- Basin 4 Hyldrograph 65 65.10 cfs I �PeA 2-hx''Year 60 kainfall X5.20" 55 50 7 T T F Runoff aitea=16.710 ac 45 j_ � Ryn(?ff )/o1ume=3.1"2 of 40 F Runoff Depth�?.26" 35 c LL tc-=54min 30 - --1 =91 25 20 1/1 17 15 10 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ❑Runoff Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 18S: Post- Area to bypass analysis point Runoff = 20.68 cfs @ 11.96 hrs, Volume= 0.971 af, Depth> 1.91" Runoff by SCS TR -20 method, UH=SCS, Time Si 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.20" Area (ac) CN Description 2.320 98 Paved parking, HSG D 3.770 80 >75% Grass cover, Good, HSG D 6.090 87 Weighted Average 3.770 61.90% Pervious Area 2.320 3.1 590 38.10% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 50 0.0400 1.68 Sheet Flow, Smooth surfaces n= 0.011 13.60" 3.1 590 0.0250 3.21 Shallow Concentrated Flow, Paved 120.3 fas 3.6 640 Total, Increased to minimum Tc = 5.0 min Subcatchment 18S: Post- Area to bypass analysis point Hydrograph 23 22 - 20.68 cfs I ,�/ 21 20 — — — — Pew` Z�-� �l "r 19 18 t17 ���n 16 :F- �7 IRU —nofU mtl =:6-090 :2�C 15 — 14 - ��4�nQ)fol lue1 f 112 1 rt fi l nII .9' 0 0 ,a -Flow Len th=640' - 5.:6min II1 = _ IIII --1 CA 47 6 5 4 3 2 -I 1 i 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ■ Runoff Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 25S: Post- Basin 1 Area to Pond (onsite) Runoff = 176.80 cfs @ 11.99 hrs, Volume= 8.946 af, Depth> 1.99" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.20" Area (ac) CN Description 25.200 98 Paved parking, HSG D 25.720 80 >75% Grass cover, Good, HSG D 2.910 77 Woods, Good, HSG D 53.830 88 Weighted Average 28.630 53.19% Pervious Area 25.200 46.81 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.4 407 0.0320 2.88 Shallow Concentrated Flow, Segment 3 Unpaved Kv= 16.1 fps 2.9 1,092 0.0111 6.26 11.07 Pipe Channel, Segment 4 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 1.9 242 0.0105 2.18 2.18 Trap/Vee/Rect Channel Flow, Segment 5 Bot.W=0.00' D=1.00' Z= 1.07' Top.W=2.00' n= 0.035 0.1 103 0.0900 34.29 430.93 Pipe Channel, Segment6 48.0" Round Area= 12.6 sf Perim= 12.6' r= 1.00' n= 0.013 7.3 1,844 Total 190 180 170 160 150 140 130 120 w 110 3 100 0 90 LL 80 30 20 10 Subcatchment 25S: Post- Basin 1 Area to Pond (onsite) Hydrograph 1 1 -4- 176,80 176.80 cfs +y-�e-� 2�-h� 1 Year -kainfall--i " -Rudoff A.0ea=51830 ac I-R4nQ °�N �e •9 6 IRIu1r r Dpt .9F Flow -Le th-- X844 7,.,�-3 min I --t 4CA=88 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ❑Runoff Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 26S: Post- Basin 1 area to Pond (offsite) Runoff = 4.34 cfs @ 12.10 hrs, Volume= 0.311 af, Depth> 2.07" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.20" Area (ac) CN Description 0.900 98 Paved parking, HSG D 0.900 80 >75% Grass cover, Good, HSG D 1.800 89 Weighted Average 0.900 50.00% Pervious Area 0.900 50.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.3 50 0.0200 0.16 Sheet Flow, Segment 1 Grass: Short n= 0.150 P2= 3.60" 0.8 171 0.0350 3.80 Shallow Concentrated Flow, Segment 2 Paved Kv= 20.3 fps 2.4 407 0.0320 2.88 Shallow Concentrated Flow, Segment 3 Unpaved Kv= 16.1 fps 2.9 1,092 0.0111 6.26 11.07 Pipe Channel, Segment 4 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 4.4 571 0.0105 2.18 2.18 Trap/Vee/Rect Channel Flow, Segment 5 Bot.W=0.00' D=1.00' Z= 1.07' Top.W=2.00' n= 0.035 0.1 81 0.0250 18.07 227.12 Pipe Channel, Segment 6 48.0" Round Area= 12.6 sf Perim= 12.6' r= 1.00' n= 0.013 2.3 1,071 0.0318 7.87 70.87 Trap/Vee/Rect Channel Flow, Segment 7 Bot.W=0.00' D=3.00' Z= 1.07' ToD.W=6.00' n= 0.035 18.2 3,443 Total Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 10 Subcatchment 26S: Post- Basin 1 area to Pond (offsite) Hydrograph ❑Runoff 4.34 cfs +y��+ 2�-h- 1---�ear 4 1 1 1 Itai%fah=x.20" IROnoff Ares=11.800 ac 3 1 Ryngff )/oIgme=Q.311 of 1 IRur ofl D�pt�>F.07'; L 2 Flow-Lengt�r= 443 T�=118.2 min CSI=89 i 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 29S: Post -Basin 1 Area to bypass Pond (onsite) Runoff = 77.82 cfs @ 11.89 hrs, Volume= 3.215 af, Depth> 1.84" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.20" Area (ac) CN Description 8.400 98 Paved parking, HSG D 6.100 80 >75% Grass cover, Good, HSG D 6.520 77 Woods, Good, HSG D 21.020 86 Weighted Average 12.620 T 60.04% Pervious Area 8.400 R f ho Ate—& -21.020 _c1Ci 39.96% Impervious Area Subcatchment 29S: Post -Basin 1 Area to bypass Pond (onsite) Hydrograph ❑Runoff 85 80 75 77.82 cfs � fl` 2_ _h„ ,�e_ar = P 70 _ T LL L�i11FA���� - 65 60 T F R f ho Ate—& -21.020 _c1Ci 55 t t -R" ff Y$ipw9e=�•21"f - w 50 4o — -FZUno-17=0A TIIILLMM- 35I- 30 _ - 20 15 1 1 1 1 —17 T 7_- 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 Time (hours) 17 18 19 20 21 22 23 24 ❑Runoff Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 12 Summary for Reach 19R: Basin 2 reach Inflow Area = 31.690 ac, 43.23% Impervious, Inflow Depth > 1.88" for 1 -Year event Inflow = 61.60 cfs @ 12.15 hrs, Volume= 4.958 of Outflow = 60.45 cfs @ 12.21 hrs, Volume= 4.939 af, Atten= 2%, Lag= 3.8 min Routing by Stor-Ind+Trans method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 0.72 fps, Min. Travel Time= 2.3 min Avg. Velocity = 0.19 fps, Avg. Travel Time= 8.5 min Peak Storage= 8,247 cf @ 12.17 hrs, Average Depth at Peak Storage= 0.48' Bank -Full Depth= 4.00', Capacity at Bank -Full= 2,084.67 cfs 175.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 183.00' Length= 98.0' Slope= 0.0010T Inlet Invert= 16.30', Outlet Invert= 16.20' Reach 19R: Basin 2 reach Hydrograph — – 61.60 cfs 65 60.45 cfs Ilnfi— A -re -a-3-160 rX — — — —.- alc 55 �Av�g.�elptl=dam$' 50 X - -M-x VeI�:01721 #pls 45 &OA40 a 40 35_/XK8,W 3 , a 30 -7-_0'9_ 1a'/~ 25 -Ca acit - 084 67 cfs 20--///— Ip �� 15 10 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ❑Inflow ❑ Outflow Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 13 Summary for Reach 20R: Basin 3 reach Inflow Area = 34.110 ac, 40.22% Impervious, Inflow Depth > 1.82" for 1 -Year event Inflow = 63.30 cfs @ 12.21 hrs, Volume= 5.181 of Outflow = 22.11 cfs @ 13.65 hrs, Volume= 4.735 af, Atten= 65%, Lag= 86.6 min Routing by Stor-Ind+Trans method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 0.56 fps, Min. Travel Time= 65.1 min Avg. Velocity = 0.23 fps, Avg. Travel Time= 160.6 min Peak Storage= 86,450 cf @ 12.56 hrs, Average Depth at Peak Storage= 0.33' Bank -Full Depth= 4.00', Capacity at Bank -Full= 1,417.61 cfs 120.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 128.00' Length= 2,186.5' Slope= 0.0010'/' Inlet Invert= 16.20', Outlet Invert= 14.00' Reach 20R: Basin 3 reach Hydrograph F11-1 nflow 63.30 cfs ❑ outflow I nfi6v`r 60 55 50 45- 40 j 3 35 0 LL 30 25 22.11 cfs 20 15 _T T 10 ' , Av�.-be�tI----d.3�' - Mix Vel-OA61 fpls ICapalcIV ,4�17�611 cfs 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 14 Summary for Reach 21 R: Basin 4 reach Inflow Area = 50.820 ac, 47.50% Impervious, Inflow Depth > 1.86" for 1 -Year event Inflow = 65.51 cfs @ 11.95 hrs, Volume= 7.877 of Outflow = 29.68 cfs @ 12.48 hrs, Volume= 7.61Oaf, Atten= 55%, Lag= 31.6 min Routing by Stor-Ind+Trans method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 1.36 fps, Min. Travel Time= 25.2 min Avg. Velocity = 0.60 fps, Avg. Travel Time= 57.2 min Peak Storage= 45,926 cf @ 12.06 hrs, Average Depth at Peak Storage= 0.30' Bank -Full Depth= 4.00', Capacity at Bank -Full= 2,301.11 cfs 75.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 83.00' Length= 2,056.0' Slope= 0.00687' Inlet Invert= 14.00', Outlet Invert= 0.00' 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ❑ Inflow ❑ Outflow Reach 21 R: Basin 4 reach Hydrograph 70 J65.51 cfs 1 �a#�orre�a=0.8�2� 65 60 D I alc Avb.- je�tl =dib' 55 -Ms' k VeL1 A61 fpm 50 45 -�-n*01040- 40- 0 L L� 2� 56.01 35 " 30 29.68 cf s v V • `� V �� ��� 25 I��palc-ty=: 3`01 X11 cfs 20 � 15t —7 10 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ❑ Inflow ❑ Outflow Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 15 Summary for Pond 28P: Pond 1 Inflow Area = 55.630 ac, 46.92% Impervious, Inflow Depth > 2.00" for 1 -Year event Inflow = 179.85 cfs @ 11.99 hrs, Volume= 9.257 of Outflow = 98.08 cfs @ 12.09 hrs, Volume= 6.979 af, Atten= 45%, Lag= 6.1 min Primary = 98.08 cfs @ 12.09 hrs, Volume= 6.979 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 82.82' @ 12.09 hrs Surf.Area= 62,075 sf Storage= 159,588 cf Plug -Flow detention time= 145.5 min calculated for 6.961 of (75% of inflow) Center -of -Mass det. time= 56.1 min ( 868.6 - 812.5 ) Volume Invert Avail.Storage Storage Description #1 80.00' 374,718 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 80.00 46,678 0 0 80.50 53,154 24,958 24,958 81.00 55,832 27,247 52,205 81.75 58,378 42,829 95,033 82.00 59,234 14,702 109,735 83.00 62,691 60,963 170,697 84.00 66,204 64,448 235,145 84.70 68,697 47,215 282,360 85.00 69,774 20,771 303,131 86.00 73,400 71,587 374,718 Device Routing Invert Outlet Devices #1 Primary 75.00' 48.0" Round Culvert X 2.00 L= 71.0' RCP, square edge headwall, Ke= 0.500 Outlet Invert= 73.00' S=0.0282'/' Cc= 0.900 n=0.013 #2 Device 1 81.75' 120.0" W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #3 Device 1 81.75' 48.0" W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 84.00' 72.0" x 168.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 84.40' 25.0' long x 17.8' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=96.88 cfs @ 12.09 hrs HW=82.81' (Free Discharge) L1=Culvert (Passes 96.88 cfs of 291.72 cfs potential flow) 2=Orifice/Grate (Orifice Controls 69.20 cfs @ 3.46 fps) 3=Orifi ce/G rate (Orifice Controls 27.68 cfs @ 3.46 fps) 4=Orifi ce/G rate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=80.00' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 16 200 j 190 / 180 / 170 / 160 / 150 / 140 / 130 / 120 / 110 / 3 100 / 0 90 / LL 80 / 70 / 60 / 50 40 30On / 0.00 cfs 0 5 6 Pond 28P: Pond 1 Hydrograph 179.85 cfs 7 1141" -4rea--�5 0b arc t -1 - - - - I I -�oTg r J591,588 of 98.08 cfs -- 1-1 1- 7 1141" -4rea--�5 0b arc t - I 1 —1 POA EIIDn:�-82.8V - - I I -�oTg r J591,588 of -- 1-1 1- 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ■ In 7 outflow ❑ Primary ■ Secondary Campus Pond analysis Type 11 24 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 17 Summary for Link 23L: Post- Basin 2 Inflow Area = 31.690 ac, 43.23% Impervious, Inflow Depth > 1.88" for 1 -Year event Inflow = 61.60 cfs @ 12.15 hrs, Volume= 4.958 of Primary = 61.60 cfs @ 12.15 hrs, Volume= 4.958 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Link 23L: Post- Basin 2 Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) F11-1 nflow ❑ Primary Campus Pond analysis Type 11 24 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 18 Summary for Link 24L: Post- River Analysis Point Inflow Area = 127.470 ac, 46.00% Impervious, Inflow Depth > 1.68" for 1 -Year event Inflow = 111.00 cfs @ 12.09 hrs, Volume= 17.804 of Primary = 111.00 cfs @ 12.09 hrs, Volume= 17.804 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) F11-1 nflow ❑ Primary Link 24L: Post- River Analysis Point Hydrograph 4 4- 120 115 111.00 cfs Inflow Area=1-27.470 110 105 a 100 95 90 I —4 i- 85 80 I- 1 L I I I _;5 �+ 70 65--1t t 3 60 50 1 1--4 4 — 1--1 4 11 1 45 40 30 25 — — — 20 15 10 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) F11-1 nflow ❑ Primary Campus Pond analysis Type 1124 -hr 1 -Year Rainfall=3.20" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 19 Summary for Link 27L: Post- Basin 1 Inflow Area = 76.650 ac, 45.01 % Impervious, Inflow Depth > 1.60" for 1 -Year event Inflow = 107.68 cfs @ 12.09 hrs, Volume= 10.194 of Primary = 107.68 cfs @ 12.09 hrs, Volume= 10.194 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Link 27L: Post- Basin 1 Hydrograph — — - — — — ❑Inflow 120 — 110 , 107.68 CfS IIr-'f a �b a c ❑Primary 100 _T T T7— 100 95 - — 90 + 85 — 80 - — — 75 - - rn 70 - — 65 60 — — 3 0 55 —I — LL 50 45 — 40 35 — 30 — 25 t— _ — 2 0 _ 15 10 5i 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 20 Summary for Subcatchment 14S: Post- Basin 2 (onsite) Runoff = 78.66 cfs @ 12.13 hrs, Volume= 6.015 af, Depth> 3.41" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.28" Area (ac) CN Description 5.910 98 Paved parking, HSG D 3.920 80 >75% Grass cover, Good, HSG D 11.320 77 Woods, Good, HSG D 21.150 83 Weighted Average 15.240 72.06% Pervious Area 5.910 Paved Kv= 20.3 fps 27.94% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 84 0.0165 2.61 Shallow Concentrated Flow, portion of Segment 2 onsite Paved Kv= 20.3 fps 13.7 470 0.0130 0.57 Shallow Concentrated Flow, Segment 3 Woodland Kv= 5.0 fps 6.3 1,745 0.0103 4.62 65.13 Trap/Vee/Rect Channel Flow, draw to reach Bot.W=14.00' D=1.00' Z= 0.1 T Top.W=14.20' n= 0.030 Earth, qrassed & winding 20.5 2,299 Total Subcatchment 14S: Post- Basin 2 (onsite) Hydrograph 85 78.66 cfs 75 - T�� A ��-Ihr4l 0-- e"r 70 _ _ I_ _-Ftanfall I:t.24 65 - r Fl u huff Aute -2'I - M c 60 55 �}�e I� •� �f w 50 Run # V 41 45 � �'' , ° 40Leng LL 35 th= 299 30:/1 0. mm 25 III_I �0�13 20 15 l l l rt 10 / 5 6 7 8 9 10 11 12 13 14 15 16 1'7 18 1'9 20 21 22 23 24 Time (hours) ■Runoff Campus Pond analysis Type 11 24 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 21 Summary for Subcatchment 15S: Post- Basin 2 (offsite) Runoff = 44.11 cfs @ 12.17 hrs, Volume= 3.889 af, Depth> 4.43" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.28" Area (ac) CN Description 7.790 98 Paved parking, HSG D 2.240 80 >75% Grass cover, Good, HSG D 0.510 77 Woods, Good, HSG D 10.540 93 Weighted Average 2.750 26.09% Pervious Area 7.790 73.91 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 50 0.0400 1.68 Sheet Flow, Segment 1 Smooth surfaces n= 0.011 P2= 3.60" 3.9 606 0.0165 2.61 Shallow Concentrated Flow, Segment 2 Paved Kv= 20.3 fps 13.7 470 0.0130 0.57 Shallow Concentrated Flow, Segment 3 Woodland Kv= 5.0 fps 6.3 1,745 0.0103 4.62 65.13 Trap/Vee/Rect Channel Flow, draw to reach Bot.W=14.00' D=1.00' Z= 0.1 T Top.W=14.20' n= 0.030 Earth, qrassed & windinq 24.4 2,871 Total Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 22 Subcatchment 15S: Post- Basin 2 (offsite) Hydrograph 48 fi --1- - ❑Runoff 46 42 44.11 cfs - T � - � Ih�10-Y"r 40����n 38 36 34 - T:F Willof Aitea� Q.5 0 c 30 3o fi FR "-PIP w 28 0 a 26 24_ .. Ru n � r I�p �J.4 U— 20 18 Faow-Langth= 871 1 1 = fit- 1 14 16 14 - + CSI 43 12 10 fi - - - - 4 - 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 23 Summary for Subcatchment 16S: Post- Basin 3 Runoff = 7.29 cfs @ 12.15 hrs, Volume= 0.573 af, Depth> 2.84" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.28" Area (ac) CN Description 0.020 98 Paved parking, HSG D 0.100 80 >75% Grass cover, Good, HSG D 2.300 77 Woods, Good, HSG D 2.420 77 Weighted Average 2.400 99.17% Pervious Area 0.020 Woods: Light underbrush n= 0.400 P2= 3.60" 0.83% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0200 0.07 Sheet Flow, Segment 1 Woods: Light underbrush n= 0.400 P2= 3.60" 3.5 228 0.0480 1.10 Shallow Concentrated Flow, Segment 2 Woodland Kv= 5.0 fps 6.7 472 0.0550 1.17 Shallow Concentrated Flow, draw to reach Woodland Kv= 5.0 fps 21.8 750 Total Subcatchment 16S: Post- Basin 3 Hydrograph 8 - rt + 7.29 cfs p��hr�10�Ye�ar 7 Y I mai-Mall x.28" 6 IROnoff Ares=2.4210 ac 5 1 Rynpff )/o1yrge=0.573 of 0 4 R of 1 B 9pts .84', .2 MOW Len th=750 3 � fi f =i1.8 m-rn - -4 GN47 2 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ■Runoff Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 24 Summary for Subcatchment 17S: Post- Basin 4 Runoff = 117.87 cfs @ 11.95 hrs, Volume= 5.900 af, Depth> 4.24" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.28" Area (ac) CN Description 10.420 98 Paved parking, HSG D 5.320 80 >75% Grass cover, Good, HSG D 0.970 77 Woods, Good, HSG D 16.710 91 Weighted Average 6.290 37.64% Pervious Area 10.420 62.36% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, ❑Runoff Subcatchment 17S: Post- Basin 4 130 +Hydrograph t t— t T 125117.87 1 cfs 1 y 114r Oer 110 105 -7 F Afa�j-42�� 100 95 90 t-- I Rwia fi Mea;OC 0 Ac 85 c 60 LL 555 0 —1m - IC C-�1 45 40t 35 -_ fi --— t 25 20 15 10 5 " 0- 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ❑Runoff Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment 18S: Post- Area to bypass analysis point Runoff = 39.99 cfs @ 11.95 hrs, Volume= 1.943 af, Depth> 3.83" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.28" Area (ac) CN Description 2.320 98 Paved parking, HSG D 3.770 80 >75% Grass cover, Good, HSG D 6.090 87 Weighted Average 3.770 + 61.90% Pervious Area 2.320 3.1 590 38.10% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 50 0.0400 1.68 Sheet Flow, 34 32 + J Smooth surfaces n= 0.011 P2= 3.60" 3.1 590 0.0250 3.21 Shallow Concentrated Flow, Y$Iel .9�3f 26Q 0 2z IRanI Paved Kv= 20.3 fas 3.6 640 Total, Increased to minimum Tc = 5.0 min 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ■ Runoff Subcatchment 18S: Post- Area to bypass analysis point Hydrograph 44 ' 42 38 39.99 cfs — T61t Ihr�10�Ye r 36 - 4- 4 I kainfa11=x.28" 34 32 + J p� Runolf !"A AreA .090 -ac 30 Y$Iel .9�3f 26Q 0 2z IRanI of M 20 16 - —F ow Lenn-�gth--64A 14 12 + - 10 8 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ■ Runoff Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 26 Summary for Subcatchment 25S: Post- Basin 1 Area to Pond (onsite) Runoff = 336.29 cfs @ 11.98 hrs, Volume= 17.625 af, Depth> 3.93" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.28" Area (ac) CN Description 25.200 98 Paved parking, HSG D 25.720 80 >75% Grass cover, Good, HSG D 2.910 77 Woods, Good, HSG D 53.830 88 Weighted Average 28.630 F -I 53.19% Pervious Area 25.200 T 46.81 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.4 407 0.0320 2.88 F -I Shallow Concentrated Flow, Segment 3 220 T F Hoff V me='I-7.625 of w V 200 0 180 Unpaved Kv= 16.1 fps 2.9 1,092 0.0111 6.26 11.07 Pipe Channel, Segment 4 120 T --N=88 100 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 1.9 242 0.0105 2.18 2.18 Trap/Vee/Rect Channel Flow, Segment 5 40 Bot.W=0.00' D=1.00' Z= 1.07' Top.W=2.00' n= 0.035 0.1 103 0.0900 34.29 430.93 Pipe Channel, Segment6 48.0" Round Area= 12.6 sf Perim= 12.6' r= 1.00' n= 0.013 7.3 1,844 Total 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ❑Runoff Subcatchment 25S: Post- Basin 1 Area to Pond (onsite) Hydrograph - 1 -4 360 340 336.29 cfs L iyp� 4 24- h r�'I O-YeaT 320 300 --tainfal1=$.2V 280 260 - F -I upofjf Irea=53.8 0 ac 220 T F Hoff V me='I-7.625 of w V 200 0 180 Runoff Depth> -3.93" Rw-Let It,844' LL 160 140-,/fi gt� -T&4.S-min 120 T --N=88 100 - - 80 z 60 40 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ❑Runoff Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment 26S: Post- Basin 1 area to Pond (offsite) Runoff = 8.22 cfs @ 12.10 hrs, Volume= 0.603 af, Depth> 4.02" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.28" Area (ac) CN Description 0.900 98 Paved parking, HSG D 0.900 80 >75% Grass cover, Good, HSG D 1.800 89 Weighted Average 0.900 50.00% Pervious Area 0.900 50.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.3 50 0.0200 0.16 Sheet Flow, Segment 1 Grass: Short n= 0.150 P2= 3.60" 0.8 171 0.0350 3.80 Shallow Concentrated Flow, Segment 2 Paved Kv= 20.3 fps 2.4 407 0.0320 2.88 Shallow Concentrated Flow, Segment 3 Unpaved Kv= 16.1 fps 2.9 1,092 0.0111 6.26 11.07 Pipe Channel, Segment 4 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 4.4 571 0.0105 2.18 2.18 Trap/Vee/Rect Channel Flow, Segment 5 Bot.W=0.00' D=1.00' Z= 1.07' Top.W=2.00' n= 0.035 0.1 81 0.0250 18.07 227.12 Pipe Channel, Segment 6 48.0" Round Area= 12.6 sf Perim= 12.6' r= 1.00' n= 0.013 2.3 1,071 0.0318 7.87 70.87 Trap/Vee/Rect Channel Flow, Segment 7 Bot.W=0.00' D=3.00' Z= 1.07' ToD.W=6.00' n= 0.035 18.2 3,443 Total Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 28 Subcatchment 26S: Post- Basin 1 area to Pond (offsite) Hydrograph 9 rt � � � — ❑Runoff 8.22 cfS 8 T�p� II 24-1hr 10 -Year 7 - --kal�fall=5.28" I— IROnoff-Arm -I.N0 ac 6- I Ry ngff Yolprrne:�9.693_af 5 Ru of f D pth> .02" II L III 1 I 44 , M 4 Flowf ength 3 V T�= 8.2 -min 3 1 1L I CN=89 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 29 Summary for Subcatchment 29S: Post -Basin 1 Area to bypass Pond (onsite) Runoff = 151.84 cfs @ 11.89 hrs, Volume= 6.532 af, Depth> 3.73" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.28" Area (ac) CN Description 8.400 98 Paved parking, HSG D 6.100 80 >75% Grass cover, Good, HSG D 6.520 77 Woods, Good, HSG D 21.020 86 Weighted Average 12.620 60.04% Pervious Area 8.400 39.96% Impervious Area Subcatchment 29S: Post -Basin 1 Area to bypass Pond (onsite) Hydrograph 170 1 1 1 150 151.84 cfs Ty �"r� O�ear 150 1� 140 130 p ww� /�,� �/� 120 Rtni o J I " ea#2�. O'" ac 110 1Agnpff-/olyme=6.5 2 of 100 90 RI ur ofl Depth>�7?' $° �c=O.EZ O mt� 70 60 G =86 50 1 L 40 30 20 10 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ❑Runoff Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 30 Summary for Reach 19R: Basin 2 reach Inflow Area = 31.690 ac, 43.23% Impervious, Inflow Depth > 3.75" for 10 -Year event Inflow = 122.12 cfs @ 12.14 hrs, Volume= 9.905 of Outflow = 119.92 cfs @ 12.19 hrs, Volume= 9.878 af, Atten= 2%, Lag= 2.9 min Routing by Stor-Ind+Trans method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 0.95 fps, Min. Travel Time= 1.7 min Avg. Velocity = 0.24 fps, Avg. Travel Time= 6.8 min Peak Storage= 12,491 cf @ 12.16 hrs, Average Depth at Peak Storage= 0.73' Bank -Full Depth= 4.00', Capacity at Bank -Full= 2,084.67 cfs 175.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 183.00' Length= 98.0' Slope= 0.0010T Inlet Invert= 16.30', Outlet Invert= 16.20' Reach 19R: Basin 2 reach Hydrograph T L -Inflow 122.12 cfs o outflow 130 119.92 cfs120 —1 ��f�_�v �rea=il .06 ac 110 - I -1 -LAvg.1Dey#Ih=U 7t1 100_//1-fMaX Mel=0.95 foS 80 — — —I —I I — I— — — — U 70 50 - P iy r4I.�7cs 40 — — 30 E 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 31 Summary for Reach 20R: Basin 3 reach Inflow Area = 34.110 ac, 40.22% Impervious, Inflow Depth > 3.68" for 10 -Year event Inflow = 126.97 cfs @ 12.19 hrs, Volume= 10.452 of Outflow = 58.81 cfs @ 13.19 hrs, Volume= 9.847 af, Atten= 54%, Lag= 60.1 min Routing by Stor-Ind+Trans method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 0.83 fps, Min. Travel Time= 44.1 min Avg. Velocity = 0.28 fps, Avg. Travel Time= 129.0 min Peak Storage= 156,035 cf @ 12.45 hrs, Average Depth at Peak Storage= 0.59' Bank -Full Depth= 4.00', Capacity at Bank -Full= 1,417.61 cfs 120.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 128.00' Length= 2,186.5' Slope= 0.0010'/' Inlet Invert= 16.20', Outlet Invert= 14.00' Reach 20R: Basin 3 reach Hydrograph E hill" )krea=i4 ti"c 1 _� _TA 4 .TDe1ptli=6.5J' 1 --1 �M4x Vel -7-!-01.83 fills 1 - T — 1-1=0040 1 L=a 1$6.x' 1 -1 _T S=0.0010 '/' 1�3p�c�y 1,4171.'1) c#S -7 T 1 I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Inflow ❑ Outflow --t 7 F 140 r�_ 126.97 cfs 130 120 110 100-—A— 90 80 — 3 70 58.81 cfs " 60 1 1 __1 7 50- 0401 -4 4 111 40-1 30 __1 7 E hill" )krea=i4 ti"c 1 _� _TA 4 .TDe1ptli=6.5J' 1 --1 �M4x Vel -7-!-01.83 fills 1 - T — 1-1=0040 1 L=a 1$6.x' 1 -1 _T S=0.0010 '/' 1�3p�c�y 1,4171.'1) c#S -7 T 1 I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Inflow ❑ Outflow Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 32 Summary for Reach 21 R: Basin 4 reach Inflow Area = 50.820 ac, 47.50% Impervious, Inflow Depth > 3.72" for 10 -Year event Inflow = 120.64 cfs @ 11.95 hrs, Volume= 15.748 of Outflow = 68.92 cfs @ 12.35 hrs, Volume= 15.392 af, Atten= 43%, Lag= 23.6 min Routing by Stor-Ind+Trans method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 1.88 fps, Min. Travel Time= 18.2 min Avg. Velocity = 0.74 fps, Avg. Travel Time= 46.2 min Peak Storage= 75,569 cf @ 12.04 hrs, Average Depth at Peak Storage= 0.49' Bank -Full Depth= 4.00', Capacity at Bank -Full= 2,301.11 cfs 75.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 83.00' Length= 2,056.0' Slope= 0.00687' Inlet Invert= 14.00', Outlet Invert= 0.00' Reach 21 R: Basin 4 reach Hydrograph 130 7-1 120.64 cfs 120 110 100 90- 80-// 0 ao 68.92 cfs U 70 3 LLso - __r lrfl" ikre_a_=k826_�c �' -TWx Vel=11.88 f0s 1 —1 - i 11=0�04E0 -1 - L=2 yO�"' S=0.006 '/' � p ci vr=2, 01.11 c s -I � � -7 •��o�iiiiiiiiiii5ii, Inflow ❑ Outflow Campus Pond analysis Type 11 24 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 33 Summary for Pond 28P: Pond 1 Inflow Area = 55.630 ac, 46.92% Impervious, Inflow Depth > 3.93" for 10 -Year event Inflow = 342.18 cfs @ 11.98 hrs, Volume= 18.228 of Outflow = 206.01 cfs @ 12.07 hrs, Volume= 15.902 af, Atten= 40%, Lag= 5.3 min Primary = 206.01 cfs @ 12.07 hrs, Volume= 15.902 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 84.26' @ 12.07 hrs Surf.Area= 67,118 sf Storage= 252,257 cf Plug -Flow detention time= 101.0 min calculated for 15.901 of (87% of inflow) Center -of -Mass det. time= 40.4 min ( 834.0 - 793.6 ) Volume Invert Avail.Storage Storage Description #1 80.00' 374,718 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 80.00 46,678 0 0 80.50 53,154 24,958 24,958 81.00 55,832 27,247 52,205 81.75 58,378 42,829 95,033 82.00 59,234 14,702 109,735 83.00 62,691 60,963 170,697 84.00 66,204 64,448 235,145 84.70 68,697 47,215 282,360 85.00 69,774 20,771 303,131 86.00 73,400 71,587 374,718 Device Routing Invert Outlet Devices #1 Primary 75.00' 48.0" Round Culvert X 2.00 L= 71.0' RCP, square edge headwall, Ke= 0.500 Outlet Invert= 73.00' S=0.0282'/' Cc= 0.900 n=0.013 #2 Device 1 81.75' 120.0" W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #3 Device 1 81.75' 48.0" W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 84.00' 72.0" x 168.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 84.40' 25.0' long x 17.8' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=202.24 cfs @ 12.07 hrs HW=84.22' (Free Discharge) L1=Culvert (Passes 202.24 cfs of 325.17 cfs potential flow) 2=Orifice/Grate (Orifice Controls 134.80 cfs @ 6.74 fps) 3=Orifi ce/G rate (Orifice Controls 53.92 cfs @ 6.74 fps) 4=Orifi ce/G rate (Weir Controls 13.52 cfs @ 1.53 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=80.00' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 34 Pond 28P: Pond 1 Hydrograph I I t r I : / 342.18 cfs — IN Inflow / T 1,� �� keIi�,�—f 6JV�I-1 �c 7 outflow ❑Primary 380 / — 111 ■Secondary 360 / 1 1 A POAElIv�8�.2-• 340 _ 320 i -S�°r�g�PU,,2`7 �f 300 / 280 260 / I_'qnr, ni+�I I�rtlI 240 206.01 cfs - ,� 220 200 180 11 — — LL 160 140 120 / 100 / 80 / 60 / 40 0.00 cfs 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 11 24 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 35 Summary for Link 23L: Post- Basin 2 Inflow Area = 31.690 ac, 43.23% Impervious, Inflow Depth > 3.75" for 10 -Year event Inflow = 122.12 cfs @ 12.14 hrs, Volume= 9.905 of Primary = 122.12 cfs @ 12.14 hrs, Volume= 9.905 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Link 23L: Post- Basin 2 Hydrograph - I F11-1 nflow ❑ Primary 130 122.12 cfs Inflo-iv Area ac 110- 10 100- 10090 90 -- 80 N 70 3 60 - LL 50 40 30 0 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 11 24 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 36 Summary for Link 24L: Post- River Analysis Point Inflow Area = 127.470 ac, 46.00% Impervious, Inflow Depth > 3.56" for 10 -Year event Inflow = 278.46 cfs @ 11.91 hrs, Volume= 37.826 of Primary = 278.46 cfs @ 11.91 hrs, Volume= 37.826 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Link 24L: Post- River Analysis Point Hydrograph Time (hours) F11-1 nflow ❑ Primary Campus Pond analysis Type 11 24 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 37 Summary for Link 27L: Post- Basin 1 Inflow Area = 76.650 ac, 45.01 % Impervious, Inflow Depth > 3.51" for 10 -Year event Inflow = 270.65 cfs @ 11.91 hrs, Volume= 22.434 of Primary = 270.65 cfs @ 11.91 hrs, Volume= 22.434 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Link 27L: Post- Basin 1 Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) F11-1 nflow ❑ Primary Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 38 Summary for Subcatchment 14S: Post- Basin 2 (onsite) Runoff = 93.43 cfs @ 12.13 hrs, Volume= 7.179 af, Depth> 4.07" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 25 -Year Rainfall=6.00" Area (ac) CN Description 5.910 98 Paved parking, HSG D 3.920 80 >75% Grass cover, Good, HSG D 11.320 77 Woods, Good, HSG D 21.150 83 Weighted Average 15.240 72.06% Pervious Area 5.910 Paved Kv= 20.3 fps 27.94% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 84 0.0165 2.61 Shallow Concentrated Flow, portion of Segment 2 onsite 80 75- Paved Kv= 20.3 fps 13.7 470 0.0130 0.57 Shallow Concentrated Flow, Segment 3 - 55 Woodland Kv= 5.0 fps 6.3 1,745 0.0103 4.62 65.13 Trap/Vee/Rect Channel Flow, draw to reach 40 _ Bot.W=14.00' D=1.00' Z= 0.1 T Top.W=14.20' 30 n= 0.030 Earth, qrassed & winding 20.5 2,299 Total Subcatchment 14S: Post- Basin 2 (onsite) Hydrograph 10 r -P W, 1-TYpe 114 r-15-Ye�r Rudoff A-tee:02t.15F0 Ac -Rqn-qff-Yo1y mp=7 • 79 if Rurlloff �1 Qeptb>4-077 Fe1vv-Length=2-299' E 1 Tc-20.;min 1 - -C4=63 5 6 7 8 9 10 11 12 13 14 15 16 1'7 18 19 20 21 22 23 24 Time (hours) ❑Runoff 100 93.43 cfs 95 90 - 85 80 75- 70 - - 65 60/ - 55 c 50 M 45 _ 40 _ 35 30 25 20 10 r -P W, 1-TYpe 114 r-15-Ye�r Rudoff A-tee:02t.15F0 Ac -Rqn-qff-Yo1y mp=7 • 79 if Rurlloff �1 Qeptb>4-077 Fe1vv-Length=2-299' E 1 Tc-20.;min 1 - -C4=63 5 6 7 8 9 10 11 12 13 14 15 16 1'7 18 19 20 21 22 23 24 Time (hours) ❑Runoff Campus Pond analysis Type// 24 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 39 Summary for Subcatchment 15S: Post- Basin 2 (offsite) Runoff = 50.72 cfs @ 12.17 hrs, Volume= 4.498 af, Depth> 5.12" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 25 -Year Rainfall=6.00" Area (ac) CN Description 7.790 98 Paved parking, HSG D 2.240 80 >75% Grass cover, Good, HSG D 0.510 77 Woods, Good, HSG D 10.540 93 Weighted Average 2.750 26.09% Pervious Area 7.790 73.91 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 50 0.0400 1.68 Sheet Flow, Segment 1 Smooth surfaces n= 0.011 P2= 3.60" 3.9 606 0.0165 2.61 Shallow Concentrated Flow, Segment 2 Paved Kv= 20.3 fps 13.7 470 0.0130 0.57 Shallow Concentrated Flow, Segment 3 Woodland Kv= 5.0 fps 6.3 1,745 0.0103 4.62 65.13 Trap/Vee/Rect Channel Flow, draw to reach Bot.W=14.00' D=1.00' Z= 0.1 T Top.W=14.20' n= 0.030 Earth, qrassed & windinq 24.4 2,871 Total Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 40 Subcatchment 15S: Post- Basin 2 (offsite) Hydrograph 1 50.72 cfs 35 W 30 3 LL 25 10� I ❑Runoff Typ� II 24- r 25 -Year I I I6ai%fai114.0-6" Runoff Aitea�--10.540 c1c I Rgngff )1olgTe=4.4 8 �f �—�on;L RuofjD�p�, ength=2 871 - T� 4.� min x.93 I —17 -1 -T 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 41 Summary for Subcatchment 16S: Post- Basin 3 Runoff = 8.87 cfs @ 12.15 hrs, Volume= 0.698 af, Depth> 3.46" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 25 -Year Rainfall=6.00" Area (ac) CN Description 0.020 98 Paved parking, HSG D 0.100 80 >75% Grass cover, Good, HSG D 2.300 77 Woods, Good, HSG D 2.420 77 Weighted Average 2.400 99.17% Pervious Area 0.020 Woods: Light underbrush n= 0.400 P2= 3.60" 0.83% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0200 0.07 Sheet Flow, Segment 1 Woods: Light underbrush n= 0.400 P2= 3.60" 3.5 228 0.0480 1.10 Shallow Concentrated Flow, Segment 2 Woodland Kv= 5.0 fps 6.7 472 0.0550 1.17 Shallow Concentrated Flow, draw to reach Woodland Kv= 5.0 fps 21.8 750 Total Subcatchment 16S: Post- Basin 3 Hydrograph 9 8.87 cfs I 1 TYiR6 11 14 -'hr 15 -Year 8-1 kainfah=6.06" 7 (Runoff Areti=2.420 aic 6 1RyngfU)1o1q-e=-O."8 of Runoff [�lpth 5 .46" -Fiow Length 750' LL 4 3 1 CIS=17 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ■ Runoff Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 42 Summary for Subcatchment 17S: Post- Basin 4 Runoff = 135.96 cfs @ 11.95 hrs, Volume= 6.863 af, Depth> 4.93" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 25 -Year Rainfall=6.00" Area (ac) CN Description 10.420 98 Paved parking, HSG D 5.320 80 >75% Grass cover, Good, HSG D 0.970 77 Woods, Good, HSG D 16.710 91 Weighted Average 6.290 37.64% Pervious Area 10.420 62.36% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 17S: Post- Basin 4 Hydrograph 7 T T T ❑Runoff �- -Typ� n r -25 -Year T F I I Fka-j�fajl l=t.0�' Rudo#i A+ea=1-M Ac -RgTf4"o1yme=P.8?3 of RI ur�of DT>�.9r M—p5.01111p Cf =�j L L 1 � A +I I 140 130 135.96 cfs 120 110 100 90 w .S 80 0 70 - LL 60 50 / 101 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 43 Summary for Subcatchment 18S: Post- Area to bypass analysis point Runoff = 46.67 cfs @ 11.95 hrs, Volume= 2.289 af, Depth> 4.51" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 25 -Year Rainfall=6.00" Area (ac) CN Description 2.320 98 Paved parking, HSG D 3.770 80 >75% Grass cover, Good, HSG D 6.090 87 Weighted Average 3.770 — — — — T � A �- Ihr�-25 Ye�dr 61.90% Pervious Area 2.320 3.1 590 38.10% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 50 0.0400 1.68 Sheet Flow, — — — — T � A �- Ihr�-25 Ye�dr 44 42 Smooth surfaces n= 0.011 P2= 3.60" 3.1 590 0.0250 3.21 Shallow Concentrated Flow, 40 38 36 — - Paved Kv= 20.3 fas 3.6 640 Total, Increased to minimum Tc = 5.0 min 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ■Runoff Subcatchment 18S: Post- Area to bypass analysis point Hydrograph 52 ---� –1 T – 50 — - 46.67 cfs48 — — — — — T � A �- Ihr�-25 Ye�dr 44 42 _ F��i1fII.Q" 40 38 36 — - IUnotf#r.00 t c 34 3o 1 = LR"nff N 3 26 - R_anI o#'5" ,° 22 - 20 Length--640'loLength--640' 51 min 116 4 — —-- 1 t L 1 1 1(j� 47 12 8 — — - 4 I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ■Runoff Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 44 Summary for Subcatchment 25S: Post- Basin 1 Area to Pond (onsite) Runoff = 391.33 cfs @ 11.98 hrs, Volume= 20.700 af, Depth> 4.61" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 25 -Year Rainfall=6.00" Area (ac) CN Description 25.200 98 Paved parking, HSG D 25.720 80 >75% Grass cover, Good, HSG D 2.910 77 Woods, Good, HSG D 53.830 88 Weighted Average 28.630 U 240 53.19% Pervious Area 25.200 0 200 46.81 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) _ IRu qo# AIrea=53.810 ac 2.4 407 0.0320 2.88 U 240 Shallow Concentrated Flow, Segment 3 0 200 F�civ e gt - 84 ' 180.3 Unpaved Kv= 16.1 fps 2.9 1,092 0.0111 6.26 11.07 Pipe Channel, Segment 4 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 1.9 242 0.0105 2.18 2.18 Trap/Vee/Rect Channel Flow, Segment 5 Bot.W=0.00' D=1.00' Z= 1.07' Top.W=2.00' n= 0.035 0.1 103 0.0900 34.29 430.93 Pipe Channel, Segment6 48.0" Round Area= 12.6 sf Perim= 12.6' r= 1.00' n= 0.013 7.3 1,844 Total Subcatchment 25S: Post- Basin 1 Area to Pond (onsite) Hy 420 400 380 Idrograph 391.33 cfs - - t ypf X 12 hr425-e�r Runoff 360 n rainfall OV 340 300 _ IRu qo# AIrea=53.810 ac 280-///- 260 -Rn-off-Volume=2 0 of - 1 _4 U 240 Runoff Depth>A- W 0 200 F�civ e gt - 84 ' 180.3 fi lc7-m i n 160 120 GN=88 100 80 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 45 Summary for Subcatchment 26S: Post- Basin 1 area to Pond (offsite) Runoff = 9.55 cfs @ 12.10 hrs, Volume= 0.707 af, Depth> 4.71" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 25 -Year Rainfall=6.00" Area (ac) CN Description 0.900 98 Paved parking, HSG D 0.900 80 >75% Grass cover, Good, HSG D 1.800 89 Weighted Average 0.900 50.00% Pervious Area 0.900 50.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.3 50 0.0200 0.16 Sheet Flow, Segment 1 Grass: Short n= 0.150 P2= 3.60" 0.8 171 0.0350 3.80 Shallow Concentrated Flow, Segment 2 Paved Kv= 20.3 fps 2.4 407 0.0320 2.88 Shallow Concentrated Flow, Segment 3 Unpaved Kv= 16.1 fps 2.9 1,092 0.0111 6.26 11.07 Pipe Channel, Segment 4 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 4.4 571 0.0105 2.18 2.18 Trap/Vee/Rect Channel Flow, Segment 5 Bot.W=0.00' D=1.00' Z= 1.07' Top.W=2.00' n= 0.035 0.1 81 0.0250 18.07 227.12 Pipe Channel, Segment 6 48.0" Round Area= 12.6 sf Perim= 12.6' r= 1.00' n= 0.013 2.3 1,071 0.0318 7.87 70.87 Trap/Vee/Rect Channel Flow, Segment 7 Bot.W=0.00' D=3.00' Z= 1.07' ToD.W=6.00' n= 0.035 18.2 3,443 Total Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 46 Subcatchment 26S: Post- Basin 1 area to Pond (offsite) Hydrograph — ❑Runoff 10 9.55 cfs 9 1 Typ� * �* Ihr-15-- ear 8 - I-Runoff-#rte=1.800 ac 7 I + � �R4�ngff �/QI�e�.ZQ7�af 0 5 i;lo Runof Dp>�LL ' Length=3 LT 4 I T 18.3 min 3 1 I CIN=$g 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 47 Summary for Subcatchment 29S: Post -Basin 1 Area to bypass Pond (onsite) Runoff = 177.51 cfs @ 11.89 hrs, Volume= 7.721 af, Depth> 4.41" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 25 -Year Rainfall=6.00" Area (ac) CN Description 8.400 98 Paved parking, HSG D 6.100 80 >75% Grass cover, Good, HSG D 6.520 77 Woods, Good, HSG D 21.020 86 Weighted Average 12.620 1 � 60.04% Pervious Area 8.400 39.96% Impervious Area Subcatchment 29S: Post -Basin 1 Area to bypass Pond (onsite) Hydrograph Iso 180 177.51 cfs 1 _T' p 1124-r-25�ear 160- I -1�aiilfA=tOtr' 150 140 1 � - p ww� AtA �/� Rud�I Ateay2 I 020 6c 130 120 - � � i— Rg Q-ume 1 — -I-II_ w 110 � ° 1go- - �° Depth>4 LL- 80 \i +C�+04=i6 70 60- 50- 30 20 - - - 10 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ❑ Runoff Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 48 Summary for Reach 19R: Basin 2 reach Inflow Area = 31.690 ac, 43.23% Impervious, Inflow Depth > 4.42" for 25 -Year event Inflow = 143.36 cfs @ 12.14 hrs, Volume= 11.677 of Outflow = 140.82 cfs @ 12.18 hrs, Volume= 11.648 af, Atten= 2%, Lag= 2.7 min Routing by Stor-Ind+Trans method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 1.02 fps, Min. Travel Time= 1.6 min Avg. Velocity = 0.26 fps, Avg. Travel Time= 6.4 min Peak Storage= 13,767 cf @ 12.16 hrs, Average Depth at Peak Storage= 0.80' Bank -Full Depth= 4.00', Capacity at Bank -Full= 2,084.67 cfs 175.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 183.00' Length= 98.0' Slope= 0.0010T Inlet Invert= 16.30', Outlet Invert= 16.20' Reach 19R: Basin 2 reach Hydrograph 160 _ 143.36 cfs 150 —I 140.82 cfs 140 130- 120- 110 30120110 100 a 90 — — 3 80 ,° 70 — — 60 50 40 M I l�flo�iv �re�=�1 ��9b�c -1 dWx Vel=11.02 fills _ 1 _1 _rt _T fi 11=0 M_40 1 S=0.0010-7' C�p�ci I-,�U_67 c#s 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) L Inflow ❑ Outflow Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 49 Summary for Reach 20R: Basin 3 reach Inflow Area = 34.110 ac, 40.22% Impervious, Inflow Depth > 4.34" for 25 -Year event Inflow = 149.44 cfs @ 12.18 hrs, Volume= 12.346 of Outflow = 73.15 cfs @ 13.11 hrs, Volume= 11.698 af, Atten= 51 %, Lag= 55.6 min Routing by Stor-Ind+Trans method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 0.90 fps, Min. Travel Time= 40.5 min Avg. Velocity = 0.30 fps, Avg. Travel Time= 121.4 min Peak Storage= 178,014 cf @ 12.43 hrs, Average Depth at Peak Storage= 0.67' Bank -Full Depth= 4.00', Capacity at Bank -Full= 1,417.61 cfs 120.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 128.00' Length= 2,186.5' Slope= 0.0010'/' Inlet Invert= 16.20', Outlet Invert= 14.00' Reach 20R: Basin 3 reach Hydrograph Inflow ❑ outflow - [nil" jkr"=k 41 "c 1 -T44g.:bel—Rt k=__6_itr' -f x Vel=0..90 fills 4 + —11=10M40 S=0.001 VP CL;P7 r,�171.611 cfs I Time (hours) I I I —4 4-- I- 149.44 cfs 6o 160- 150 150 140 130 120 110 4 � - 100 a v 90 — — 0 73.15 cfs 80 LL 70 60 50 o 3 Inflow ❑ outflow - [nil" jkr"=k 41 "c 1 -T44g.:bel—Rt k=__6_itr' -f x Vel=0..90 fills 4 + —11=10M40 S=0.001 VP CL;P7 r,�171.611 cfs I Time (hours) Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 50 Summary for Reach 21 R: Basin 4 reach Inflow Area = 50.820 ac, 47.50% Impervious, Inflow Depth > 4.38" for 25 -Year event Inflow = 139.95 cfs @ 11.95 hrs, Volume= 18.562 of Outflow = 82.69 cfs @ 12.32 hrs, Volume= 18.181 af, Atten= 41 %, Lag= 22.1 min Routing by Stor-Ind+Trans method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 2.03 fps, Min. Travel Time= 16.9 min Avg. Velocity = 0.79 fps, Avg. Travel Time= 43.6 min Peak Storage= 84,891 cf @ 12.04 hrs, Average Depth at Peak Storage= 0.55' Bank -Full Depth= 4.00', Capacity at Bank -Full= 2,301.11 cfs 75.00' x 4.00' deep channel, n= 0.040 Winding stream, pools & shoals Side Slope Z -value= 1.0'/' Top Width= 83.00' Length= 2,056.0' Slope= 0.00687' Inlet Invert= 14.00', Outlet Invert= 0.00' Reach 21 R: Basin 4 reach Hydrograph - ___� �_ o Inflow 139.95 cfs- outflow 140 150 I�f1" ikr"=k82O C 130r�_�A� .tDeptl�=U 120 _ —I 4 I— I -1 4Uix Vel=21.0-31 f�IS 110 �I 100 � _0M40 W 90 — 82.69 cfs �- 80 t t���� 60 c�#�,=2, 1.4-1 cfs 40 I I 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type// 24 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 51 Summary for Pond 28P: Pond 1 Inflow Area = 55.630 ac, 46.92% Impervious, Inflow Depth > 4.62" for 25 -Year event Inflow = 398.20 cfs @ 11.98 hrs, Volume= 21.406 of Outflow = 268.82 cfs @ 12.06 hrs, Volume= 19.067 af, Atten= 32%, Lag= 4.8 min Primary = 263.97 cfs @ 12.06 hrs, Volume= 19.039 of Secondary = 4.91 cfs @ 12.06 hrs, Volume= 0.029 of Routing by Stor-Ind method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 84.59' @ 12.06 hrs Surf.Area= 68,291 sf Storage= 274,560 cf Plug -Flow detention time= 92.6 min calculated for 19.066 of (89% of inflow) Center -of -Mass det. time= 38.4 min ( 827.9 - 789.5 ) Volume Invert Avail.Storage Storage Description #1 80.00' 374,718 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 80.00 46,678 0 0 80.50 53,154 24,958 24,958 81.00 55,832 27,247 52,205 81.75 58,378 42,829 95,033 82.00 59,234 14,702 109,735 83.00 62,691 60,963 170,697 84.00 66,204 64,448 235,145 84.70 68,697 47,215 282,360 85.00 69,774 20,771 303,131 86.00 73,400 71,587 374,718 Device Routing Invert Outlet Devices #1 Primary 75.00' 48.0" Round Culvert X 2.00 L= 71.0' RCP, square edge headwall, Ke= 0.500 Outlet Invert= 73.00' S=0.0282'/' Cc= 0.900 n=0.013 #2 Device 1 81.75' 120.0" W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #3 Device 1 81.75' 48.0" W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 84.00' 72.0" x 168.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 84.40' 25.0' long x 17.8' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=257.90 cfs @ 12.06 hrs HW=84.55' (Free Discharge) L1=Culvert (Passes 257.90 cfs of 332.57 cfs potential flow) 2=Orifice/Grate (Orifice Controls 145.84 cfs @ 7.29 fps) 3=Orifi ce/G rate (Orifice Controls 58.33 cfs @ 7.29 fps) 4=Orifi ce/G rate (Weir Controls 53.72 cfs @ 2.43 fps) Secondary OutFlow Max=4.39 cfs @ 12.06 hrs HW=84.56' (Free Discharge) L5= Broad -Crested Rectangular Weir (Weir Controls 4.39 cfs @ 1.08 fps) Campus Pond analysis Type 1124 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 52 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) IN Inflow 7 outflow ❑ Primary ■ Secondary Pond 28P: Pond 1 Hydrograph L7 I- t7 17t -t 398.20 cfs t ilc nN jkre� 5 �6b a1C 440 / / z: I— 1 ::1P#a- KEIO� -8'4.59' 4420 00 3360 40 320 300 /380 / / 2 2 fs 263.97 cfs 280 240 / % 200 / 1 -1 +I —f U. 180 160 140 / / — — 120 100 / / 80 60 / / ao 4.91 cfs 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) IN Inflow 7 outflow ❑ Primary ■ Secondary Campus Pond analysis Type// 24 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 53 Summary for Link 23L: Post- Basin 2 Inflow Area = 31.690 ac, 43.23% Impervious, Inflow Depth > 4.42" for 25 -Year event Inflow = 143.36 cfs @ 12.14 hrs, Volume= 11.677 of Primary = 143.36 cfs @ 12.14 hrs, Volume= 11.677 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Link 23L: Post- Basin 2 Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) F11-1 nflow ❑ Primary Campus Pond analysis Type// 24 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 54 Summary for Link 24L: Post- River Analysis Point Inflow Area = 127.470 ac, 46.00% Impervious, Inflow Depth > 4.23" for 25 -Year event Inflow = 322.75 cfs @ 11.91 hrs, Volume= 44.969 of Primary = 322.75 cfs @ 11.91 hrs, Volume= 44.969 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Link 24L: Post- River Analysis Point Hydrograph 7 322.75 cfs F11Inflow ❑ Primary 11 n l" Area=1-27.47"c- -i i—ice rt� r i i i a 1 -4 -I 1 --1 4 F11Inflow ❑ Primary 11 n l" Area=1-27.47"c- -i i—ice rt� r i i i a 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Campus Pond analysis Type// 24 -hr 25 -Year Rainfall=6.00" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Page 55 Summary for Link 27L: Post- Basin 1 Inflow Area = 76.650 ac, 45.01 % Impervious, Inflow Depth > 4.19" for 25 -Year event Inflow = 312.00 cfs @ 11.90 hrs, Volume= 26.788 of Primary = 312.00 cfs @ 11.90 hrs, Volume= 26.788 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Link 27L: Post- Basin 1 Hydrograph 312.00 cfs 260 240 220 cn 200 180 0 160 LL 140 120 100 !OT t--II1--4T I Inflow Area=76.650 _ac -1 T T L11I 1 T T T T11 IT T T T 1-17 IT T T T t Tt- 1-1 I 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ❑ Inflow ❑ Primary STORMWATER POLLUTANT ANALYSIS Nutrient Export Reduction `COULTER JEWELL THAMES, P.A. 111 WEST MAIN ST DURHAM, NC 27701 (9 19) 682-0368 ----- --------- I\ j j ---J/j / \ I I/ --------- _ 1 \ / I / ' I I / /// \ I I I // /' I --- ' 1 \\ i i III ii / 1 11 I I I 1 _- % \I / l III I' 1 -' `�\11 I I I \\\ 1\\ // /1 1111 i I -_� -- 1111 I I I' / ... ■ ■ \\ \\\ / \ _ I l ■ __ ,-�'�'_"''/-'-''____--\\------- \/ \\�_ �� �� I I I l l I I . ■ \\ __' \\ _ i_ ' ' /,//"///,/-/,---------------------I' __ 1 �-___��� ``\ I I / / l 111 =_�� \ \ �' i , /�/ - - ___ / / /r ' ' ' i ,i /%iii - /,', ,/ // -- ___________________' ' 1\ - ' \\// I / / I l ' / / lull' \\\\ \\\\ i - i'- --i//' / I l l , ''' ' ' - / In.,',' /i/i' /i'/�/ - ____-_-- _-______- ------ - I I ' I 1 I I, 1 /I 11 \\� -' / / / / - � /,/ ,/ /----- --- --_ I I I l III 11 / / /ice/, ' ` / /i', / / / --- - ___ 1 , l l l Ill 11 _ _ \\\ -- --- -_-- 1 I / / ! I Il lI _ / ---- ___________ _____ `\ ---\ -\ I I 11 / , , 1111 ;=_ - ---- __ --- -- ---- \ \ I 1 I 1 I I / / / 1111 � __�\\ \` \\ ___ _ /i /, , / / ___ __ / ' / / /,// / //'// //'/ ,/'/ __ --- __--- \\\ \ I \ III / / II __ - // i///i i' '/ / / /// /' /'� _---____ _ ---- `_-_-- \I \\ \\ 1 I// 11 \\ III / / / II I _-_ \ - \I / / / ' / ' / /i / __ - - \ I I / 1111 „_„� _ ___--______. _- _ i' / _ ``\\ �/ '/ // / /'// ' % % / % 1 �/' i /// ------ --- \\ \ I , 11 IIII / II II -- \\ �� \ i /j ` ` �\� �� \ /' ,i/i / / /� / I j \\ \\ - \ /I \\ I IIII / ' III --___ - - \ II 1 / \-____--/ \ I I I I I / / \\\\\ \\\�______- \\�\\\I\I 1 III / )017 7 / / / / III I , II ti� �`�---_____ _ �\\\�\ __ TRANSPORTATION //, // - ' / , / , 1 / \`. \ IIII 1 1 I 11 - \\ \\\ \\ \ l /� ij �/% % / / / 1 / j ' `\ \\\\ 1 \ I\ 1\I\11 1\ \ I 11 c_ ,-"��' ---- \\\\ \\\\1 I / ///////__-- / ///, / / // / \\\\\ \` 1,III 11\\\ ,1\ 11 , ______- \1\\II\` I , , / / / _ _ _ / / / / / / , I I I \, \ 1 / I / - /i I /I `� - - i ;; /; --- ; 111 1111 IMPERVIOUS //// ""I I , ' / / / 1 , I, II I I -- ROOF IMPERVIOUS it I , , , / I , \ / I / / / I I `\ 1 %//;/;; I l l 1, l // / , / 1 \ I Ill! ' / / / / 111 1 \�`:.;; ��� �yI\ -- , /,,/,/// I, , /,, / // / / Y _ It , ; \ ; IIII / / ; ; ; ; (I 1 ' - �\\ -_ ==__=-- 1 /ji/'///i/ I l ,l l �I �' ,l l /// l \ I 1\_ l 1111 l l I ' ' I it _--\\ '- ---- _ - - --___--_ __ _ ®WOODED PERVIOUS % /III ll'I' I/ / l i l , , i / \\ I I l / I I l l /lii / / III , f \\ - - - -_ - \I / /'ll (Ijl /\ / I I I / \\ \\ l / l I l I / �_ 11 1 I -- _ -- ---- \ / //%' l,'I I \\ / l 1 / ' ' I I \ \\ \ , l l / l I I j j IIII I l _-________ - - - - - \ \\\ 6) / / / / / / \ 1 / / / \\ \ \ / 1111 I I 11 j I ' _ \_---` _ - -� - \ C'J / \ //'/ ///l \ l I II / \ \ 1111 IIII I / _ - - --- _ I \ / / /� / , // l ( \ I I I I % l I / \ \ / l / 1 I I I I � 01 1 I I - - - - - - ---- / /'/ / // / \ I l I I / I / \ \-� / l ' j I I I IIII I �\ \\ l//, it \ I, l 1 1 I , \\ \\ i i /, i i i i 1 p I I I \� \Z \ ---- 1 i /ll i 1i l ,,-- \\ i I\ It 1 \ \ I / i i III 1 i i I 1 /li i _ - - - --\ \ I'll 11 //// ///,' / -- \\ \\ / / I / \\ \\ l / l I I I II II 1I,I 1 - - - --`` I /�' //l ii \ \/ ` \I ' / \ \ l i / i I (1 I i II I i i ' - - - \\\ - - �`�`=: \\ 11 i ��' /�//i/ lI \V I I I �� % / / I A/ / / I 1 ( I , l 1 1 1 1111 I , '- - -� I 1 ,1\ 1\/\ /I \ 1 I 1 1 I ' \ / / , III / , l I 11,11 - -- I 11\ 1 1 1 I \ I I , / / 1 / / , I I I I // i / 111 I \ - \I % / / I / I l / / / / III I �--- I / / 1111 , // / __ ,_ ___ ______ 1\ - I I I I, IIII I I I i i I / , l l l l / / Ili /J __ --____ ___ ____ -- � _ `\ y 1 I I II III II �-_____ I I I 1 / -- ___�' \� -- ��' II IIII II --- - - _ _ 1 III "\_________-/ 1 / , / 1/ l I I I / I I \_ __ _____--_ I I I III 1 I I I \ _'_�_/ _ ,\ , \\ I II I / IIII __-- \I � _ -----_---- 1 1 1 / ' - - _ ' _____/ --__ II IIII jl / \\ \-/'"- ����� - -``\ \`\1\ \ 1111 __-___ '_ - I 111 IIII II -----I / I I \ I ---` �, -`\11 1 I I 1 --'___ _ _________ I I 1 1 1 1 11 I I , I I 1 \ 1 // //' _ <- _ /'i'i�',%_ -',I 1) �,I, 1 /ill I, I I I I I I I I I 11 1 I I / I I 1 \ \ \ " �',i-,, '-\\ I j 111 -'" / // // I I I iI I I IIII II I /'''' t1 \\ \ � ' _____ -_ �__-__-_ i' I �I IIII 1111 1 I \\\\\\ I\ \\ 1///���i 1 I I/'� // / 1I ____ / \ moi/ //// /, // �,r �_'�-1 //II 1111 III /� :I/� //' / ____ i / /- I I 111 111 ' \ \ \ \\ j / / I 1 j __ ,' ,--_ _ j////////ice^\l\I IIII III, IIII ��/,, ,// I,l, _-_ \ -\I\,. / II 1 1 III --- - ------ \ 1 IIIIl!l/ `Il 1 I!I ,I IIII ,1, ,/ / /' , II / _ ___ _ _ \ 1_ / 1111 _ I / // l(lI 111 / / , `\ `\\ \ \ 1 I I , 11 I I„I ,111 ,/ / / / , II ___ --_ --__ - \ / ///Ill//I I - \ I1\\`\ (/jj 11\\ -SII 111111 I/1%/,/1,1,11// / / I I, - - - / \-_______ \ I\I1 \ _ _ I , / ////,///I \ \\ 1 \\ \ \ \\- \\I I I II III I //,/ l,l 11 / / l , „ - ,, _ - 11 ____- / / ///1 \\\\\ 1,�,\,, ��\1y{11 11111 /IIII 1111 //h l�/ / I II ' --- " - \111\\ / ,//,///11 \ \\\ i// 1,� I /IIII IIII 1„1,1 /,,,/ 1 I 1 1 _ ___-_____ - - /"/ -111 / / / / //// I I I \ _ -111 II II II 1 11 / 1 \ I lI ' -_ ---- �_ \\\\ / // '/%' 1 I I \\ `\\\ \ \ \\ \\ /� �/ /ii moi/ =- III II 111111 111 �I11 III, �, `\ \ 1 11 ______________ - ��-- _ \\\\ - -____ moi' / \\\\ / // %%% I I I \ \ \\ \\ ��/� ii/�'c\ %�J� -il 1 IIII II�� IIII IIIA \-\ \I\I 1 II ---- --\ \\\\\ ______ / //// _ \\ \ \ ,I, II/11, l)il 111 \ I 111 '< // / /1 1 I I I -_-___ `\\ -- 1\\�_\\, �- \-_ � %'ll' 1111 I'llIII( \\_1 111 11 11 Il __-_�_``- / \ \ \ \ - - \ \\ - \ - \ \\ \ \\ `- -\ \` \ ` ` I ' 1 I I III \\ \\ \ -- \ `� `\ `\ _ - ' I 1/ \\ \\ \\ / --\\\, ,, `\\.`-- --- -"_ ;%//'/'//%'/I/1\I\\ I I I1 14j 11 - - \\\\�\\ \ - U`\ I III 1 / / \ / \ - - ',111 I\ \ I 1 1 ' I ' t / _/ -� -' \\ O `-- I� I I I it I/ /I J \\ `- \ %' /� �'I II II II II 11 II j'//�/l ' / \ -\\\ `\ \ / � / I 1 11'11 ' __ / _ \\ % I I I III l \\I / -:1 ,/ 1\I -`It II / II 1 1 /'/i%//'// - __'_�__' - \ \ \\ \\ \\ \\ O I I I I/ / 1 I // / / \� - __ \ / \ \ \\.`\ \ \ 1 / 1 1111/ \` / ( 1j _ __ _ . ■ . ■ ...... ■ . ■ . \�� a / 1 1 111 I I/' / \I \ I , /-- - ` \ \\ \\ \\ / \ \ I I I l I i%//////� \I I , 1, -- \ \, 1 , ''' \�� \8 \ W ___'-- \ \ `----- '' \ / I ' 1/\I \\ I IIII III __ _ __' '' I _- '�'' �� ■ ■ . ■ .. �_______- \ \ \ �\ `�\\ I I IIII „ \ / \ I , / `'//;,//'/'-- I 1 IIII // 1 \ I / ` �\ `�\- `� ```` / I / II I I I - _ I _- - - / , //,//III, I;;! II I i �� �� \ \ \ I / l !/1/ / \I 1 \\ _ 1 / /' / / / ///� �1,�// 11 I IIj� III I ''�-��� % / _/ _ --_ \ -� / I \IIIIII ,\ \I \\ \ 1 ' ----- .________- / / IIII II/ / I ll� /�__-/-)1 % / // // / i, % /� \IIS_- / `__�-\`` \ \ , \\ - \\ 11 I/ \ 3 I \`\ - - - /{ / \ I l 11 l I/�- �/ I / / / \ - 1 1 \1 I \ ______ ------- -__-- , \ - / I �// 11 , \ \\\\\\ llr_,_ / / ---,. \\\\1 1111 I I I 111 ---_- \ 1 ____' __________ _- ,- / I I l \\\\ \ \__ "// 'i \ / / /� / / / /� / , -`\ \\ \\ �\\ �`\\ �`\\ 1, \II II 1 1 I I \I \ \ I/ \ \\ \\ \\ - ___----- �------------------- / /4 / / I \\ \ ' / / 1 / / \ - \\ \ \ \ \ `- \ 11 I \\\ ` - _ ' - ^ \ \ \ \ - - / _ ____ / // I / \\ //% / / / 11 ■ \ \ \ \ \111 II I / ' /' 0 / / / _ / / /\ / / , / / / , / \ \ \ `\\ 111/'-- \ 1 1 / \I / `\ \\ I % / / I I X11 / / I , / /'// / - , / // ' -----' // / /// / / / / , / II - I / \\\\ \\\ \\\ \ \\\111 I„ /%\ \\ \ I I i. / /l I / / %,/ / 1 / / / / _ / , / / / 1.1 ■ --' \ \ \\ \\\ \ \ \\I\ 0 ' / °// ---- I ,9// / / , //"/i i'' �� 1 I i / / /i __ �________--� / / , / /' // , IIII\\\ -�_- \\\ \\\\ \\ \\\ \ --�- \\\ \\ \\ \\\,/IIII\\ 0\ '/\\ ■ - ____-_ --_/-___- 1 1 I 1 I I I / __ I / I ice/ l ,�- / / / i / / / \ - - \` \\ \ \ \\III I -- ____- I /I - ' _ - - I1 1 I 1 I ' / - , / / / ' \\ // 111 I /ll i I / / / I / / / / / /I'.I \`\ \ \\ - -- \\ \ 11 \------------ `- / I / / , \ `-- / ii/ / \ / I l 1 , I l r I I l ,/' / j / / / / ' / / I I \ \ \ X1111 i __ / I I I , / , / , - / / iii / 111 111 ( / / / / I 1 _ ___ __-__ --- --- 1j 1' I I - / / -" Ill I I ! , / / / , , , / / / / I - ,-- \ \ \I \\ \ 1, 111 11111; /// / / / 1/ / I ' I / / / \ \ \ / / II 1r - -\-- \ \\ \ \ \ \\\\ - \\`\ II II 1 1 \\\\\\\\\\\� \\\\I 1 1111 / \ ----- / /, / i / / __ 1 I 11/111,11 I ,' , 1 /,/,/ ' ,/ ,/ I \\ \\ 1 I 1 \\\II\\\ I I I I _ I\ / -\ \\y1 1\ / / / / ��i, �lll 1, I1 I , I / / I 1\ 1\\ \\\ \\\\ -_ , , - I \ \ \ 1 __ _ _ / / ,/' '/i/ \ 1I 11 I I l I \ / I I II I 1 1 \ \ \ \ \ / / ,'11 - ■ \\\ \ \\ \ \ \ \\\\\ \\ \\ , g / I - \ / / -\ \ \ \ / , - - \ \ I \ \ \ \ // I l l I / i`-�'' -_ _ -- . _ , / ,// „ ' �� \ \ \ \ \ \ \ / / 111 \ \ \ \ \I\\ \\ \1 / %/ / I / I-- \ \ \ \ \ \ \ \ \ / / II \ \ \\ \ \\\\-�\ \\/ l l l l I l , - `I \ / I / / ,//// 111 1 \ \ \ \ \ \ \ _ , / \\ \\ I ` \ \� Z;- \JJ/ // - - -\l / i// /Im,,_ 1 \ \ \ \ \ \ / \ \ \ \ ` 1 ' ` / \ - \ / / / / / / / _ 1 - \\\ I / / iii I\ \ - / -I -At \ \\ `\ \ \ \\ , I \\��- \\ \ \ \ 1 I / / / / / I / / / _- I -' 1 /i / / , 1 \\ \ \ / 1 \ \ / / 1 \ \\ - / / //i \ \ \ \ \ \ 1 I I l / 1 \\ \\I 1, I / / I// // / / / \I `\_- \ ' ` I / /11 I /- 1 \\ \ \ / / / / __ \ 1 1 \ ----_ III 111 ,/ %// \ \ 1 / / I / I \ / l 1 `\ \ -'' \� / l l l / 4/i ' I lIl _� ---i 1 \ \� l l l \ \ l l , / / 11 __ \ \ --__ 1 1 �I / / / / / - ,-_- \ / I ' , / ii - \ \ \ I I I ! \ \ I / III ■ 1 I / / /' \ \ I 1 1 I \ , 1 l / I / / / / / / \ - _____--1 / / I / 4%// 1 \ / I I l l \' ' t I 1 1 1 / / II I I 1 I I 1 / / / , j - I \`\ / ` / / iG// \ 1 , II I/ \ / , / I \ 1 1 1 I l / 1 ,, /�, /// / / I/ \\\ / / /q// \\ , 1 ///Il\\� , III 1 1 I I / ( , / 1�1 I I 1 I I I / / \ \\ l /// % , /// / ' / - r \ I I 1 \ I / / l I Ih 1 1 \\\ \\ \ 1 I I 1 1 \ /' i -- / / / / \ - I / / I // //I I I I / I 1 _ 1 I I ' ' I i �/i / / 1 I l \ _ 11 111'1% / I 1/' \ \ I / i , _ 1 � _� I I I I I / // , , \_, I \ _�, \\ I I I i ' !\ / / 1 1 I I I I1 I \ 1 I I \\ I I i„/ / \\ % / ' /'' / i/ i� / / '- \\ \ �l 1\ \\ \ \\\ 11 % 11 1 / \ / \ 1 11 II \\ I I 11((' I I \ \ l / ��' i'' // // // --' ^ \\ \ \ \\\\ / , , / I , // 1 l \ / , I I IIII , \ 1 I i /// 1 1 1111 I \ 1 \\-__-__\\ ---' I I I / / i -/ 4//i // 1 \\ \ \\ \ \\\\ / , ( 1 1 I I I I // / \ f 1 1 1 I I / ' / 1111/ / '/// / \ III I \ \ 1 / / / - _--_---__--/ 1 / / , , /�// / 1 \ \ \\ 1 , \ \ \ \ \ , / / I I \ I 1 I , / / / I 1 1 11 \\` Ej \ -= 1 1 SITE AREA 24.07 ACRES 1 1 I\1 .,1 1 I 1 I I / / I / _ I- -\ \\\\ , \\ ` \ \ \ \ 1 / I 1 I 1 ( l�`�\\ 1 1 1 I / \\ I . __ I \ 1 1111 1 \ \ \ 1 I / �/1, ///i 1 \\ I I I \ 1 - 1 I I I \� III \ \ \ 1 \ / I'// \ \ I I l \ \ 1 , I , \ 1 / I \ I 1 i�ll�l I I \/ 111 I / ! / I \ \ I 1 I 1 / i. , / I 1 1 \ I I I 1 \ / / / - \ \ // / / I I i __ ' / i / / _ _ \\ 1 \ / / lf/ I, 1 II \ II / s /(\ 1 \\1 \11 1111 I I I /�/ ii��/// /' / /i i��//' � 1\\\\\\\I\\\\`�\\\\\\\\ 1\`\( \\ //- // / /// /// \\ \\\ I I 1 // // // /// ' ' �`\\ \\I I I III\\\ \\VI 11 111111 \' ' ' \\ / 11 //' ___ \ \I I I I I 1 ii/�// / // i���i ��// i'�i ,// -//I '� - _\ \ \ \\ \ \ \ \\ \ / ' / / / / / / / / \11 I j / / / /' \\ I II 1 j i I 11\\\-\�\III i / 111 / / 1 I I /� / -, I I 1 111\\r 1\I \ 1 I I / I 1 / l - - " ___-__ I 11111 \ '119 \ \\I \ 1 1 I , I / I / / 1 �// \ - 1 11 1 11 \\\\ \ 1 \ 1 ! ,. - / , _-1 I I i - - ♦ \ \ / / / / / _/ \ I I 11 I 1 '�-- -�' / / / / ' ''�'�'' ' \ \ \ / / / / / / I / I I 11 I / i/i ''' _ - \ \ I / / / / , I / / // ■ I I , , 1 IIII 1 \\\\ \ \ \ I , I _ / / / ��i/i --i i - / / _ `-\ \ \\ \ \ / / / / / / I l , / / / i- \ \`\ I I I 1 1 IIII, I I \\\\\\\\\\ I, , , /j --_ _ - ' / / / / /' / / /\ -�\ `\\\\ \\\\ f\/ ' I` / / / / / / ' / / I I / / l / / \\ / I I I 1 1 I I I 1 111111 III \\\\\\ I / l/ \/ _ / ' // l',, - - / // \ \\ \\\\ \ \\ \ l / / ' / / I I / / , / 1 / 1 I \ II 1 \\ P\\ _ / / 1 / ' \ i '/ / ' / ' / __- \ 1 1 I / / I l l % I 11 /IIII 111 \\1 \ I / / \\ / /l I / i / r ' \ \ \ 1 \ / / / / 1 / / l I I 1 I / l l / 111 \ 1 , , / `I - / , / , / r'�/ I \ \\\\ \I\ \\ \ \ \ / / / / / l \ , I , I I I IIII II 111111 \\ \ 1 _ 1\\ // -/ / I I // ////i -_� /' // / - ' \ ! 1 1 1 , 1\ \ 1 / 1 ' I / / / /� - 1 I , 1 / / / l / / l 1 1111 , II 111111 \\\ \\ \\ -\\ --I' / // / // III I / _ / // '/// \ - ---- _���' __ = 11\ 111 , \ / / / //i I 1' / / -_ , / / / ' / I , / / / / ' / / I \ I j1j1 II / _ I / I / II I \ I \ - _ /%// /// / / --- - _ \\ / I / i / / \\ I / / / I \ \ III I \ \ \ \ I 1 I / / ' / I I / / // / / 1 / \ \ 1 ( I l / / / \ \ 'IIII \ 1 / I / / ' 1 / / / / 1 / \ 1 / / / , , \ \ 1111 I I I\ \ \ \ \ l/ / / / \ _ Ir / / / / 11 I / / I I l 1\\\\\ \\ \\\ \ \ \ - "� I I^ -' / ' ' 1 t 1 _ -\, 1 \ , / , I 1 I , 1 / / % / , , \ I , I I 1 , / , / , l \ \ \ I I„ 1'111/ \ �` `` _ / _ / i %,/i / /j \ \ \\\ \ \ \ _ /-------____ice//iii''"' I I l \\\\ I -_ \\\ \\ \ _-///1 lY --___- / __ 111 /' -\\ 11 1 I // // // 11 I / I/ / \\ \\ 111° _ \`� \\ \ __/ I 1 _ � I 1 1 I \ \ \ \ I 1 I I 1 / / / ' / \ / I I I / I / / / / l \ II (1 1111 1 \ I , I / / \ I I I / / / l \ \ \ "I'll" l,l I 11 \- \\11\1 /''_ _---____- -_/ / 111 _ \ 1 1 I 1 / / / / / \ I I , l / / \ \ \ \ 111 I,"I' _ ` 1 1 I \ 1 -- , , / / 1 I \ 1 / / / / / ■ \ / / / \ \ I 1 111 I , 11 I / / / 1 1 / / , I \ I1 1 i \ \ / / l \ I / / / / 1, I l / I `� - \ \ \ / / r J - / \ l l / / I IIII I I / / / l - ' J _ 1 1 \ 1 I / / , Y I I / / / \ \ \ \ 1111 1 11 I/ 1I, / I / / 1 I „l,I II / II / // //-' \\ I \ \ 1 \ l / / / / \ \ 11111 / - / / / / '/� 1 1 \ I I / / , , / / 1 \ 11 I I / / I f J // / / / '/' \\ \\ \ \ 1 I / 1 / `1 1 1 / / 1 <' ``\ I I \ \ \ \ / I I I / , / 1 , I 1111 / I (/ 111 / /, \ - \\ \\ / \ \ \ \ / / I Q / / / / 1 111 j _ / I 11\ , _ \ \\ / \ \ \ i 111 III / /!/ __- \ \\ _�--- '� / `\°I 1 1 \ 1 \, \ \ \ \ I / - 1 111 III - / /-'' -_ \___� '--' 1 I / 1 1 / / / 1 1 N I / / l / / / / // / / / ,/ / / 11 I 11)','/1/,'/1/ //4'//1 / \ - / 1 / l I / \ I W / / / / / I I I , 1 /%/' / ///// IIII I I, \ i "I _ / 1 / //%/'// \ \ \-- \ I I I 1 / I \ \ \ �`I I / 1 / / I l / I / / / / / / / I I I / / l / 1 I I Iii - - - \ I (\ 1 / 1111 /' - \/( - - , \\ \ -1 \ I I / , I I l / l 1 1141 \\ / / / \ \I j / / \\ `\ \ i i i 51 / / / / / / / 1 U , / / 1 //, 1141/ I I, � 1 , , ' ' � - \ \ i - I \ \I 1 1 ! / / \ \\ / / , / //\\ / / / / / / / / I I 1111/ / //%/p I 1 111 11,1 --1 I ii/ ///::''' / /'' - \\\\-/ / _/ \ 1 _ `\\ 1 \ / , I \\ % / / ,/ I / / I / , . 0 I \ , / / / / / / I I 1111/ „//„/ / / ,I I iii' -- 'iii' / / `-- ----- / \`\ `I 1 /' / i \\\ \ I // /' I \ `\ `I \ / / 1 / / I l 1 v I \ l / / / / / / / / i /ii'/i a"N 1 //// / / 1 /,,,-_______' i// ' '9` / --- " / \ \\ , I \I �- 1 \ 1 I I 1 / ' / I I// \ / / / / / / / / / / I 1111/ 1111/ / I ` / 1 \ / 1 / / I \ / / / I // zz_ / / / //// __ (// - \ -' \ \ \ _ / i 1 \ , 1 / / / / % I / 1 I \\ , I / / /' / / 1 / i //,b n/,'y I / / i /moi / / / ' - _ _ _ / \ 1 1 I I l / / ---' 1 / / / / / 1 ///// ; ` - / ii .5;'' ; ;. '' / _ _ ` \ \ 1 I I / I // / // j - \ \ \ \ \ I I / I 1 \ / / / / / / , I //// 1111 \ \ - --�_\ /,/ ///, ,/�i'ii'B i i� _ , _----_-_____- _____-- / / - --___ �\ \\\\ \ \\ \ / 1 I l/I/ l/// ° / ////// //,% _\1, - 1 - // //iii �j/ /' _ S(�/�{,�\{{�\��J\.��\/�}y�1 % / '-- _-_-----_- --' -' / _ /^V __-_\-\\ \\\\ \ \\ II II iU , I I 1 \ / / / / ////I // / //// -J i / / // /// \�� ♦ \ 1 \ 1 I 1 1 I I I 1 11 I / 1 I \ \ \ \ l 1 / 1111/ // / 1 111 l /i/ / / _ / \ \ I I \ l I I' 1 \ I // \ / /Il/ // / /,/ / /// r / _ \ // iii / I\ 1 / / - / / _ \ p \ 1 1 I I l , I I \ \ \ \ \ I l / 1 /l/i l/ /' / /// , ' \\\ I // // ` 1 - - - - - - l / // �\ 1 1 / / l I J / / I , \ \ I \ / I _ ____ 1111 // / / ❑ I I // % i '/ /11 // /-\` \\\ \11111 \ %'/%% /iiii/// / I , \`/,' C I `�\ti I 1 /I _ �..\I 1 \\ 1 \ / I / / , / / / I , \ \ \I //'-_=_''/ _ c--____ ____'�/ 1111 /l, l / __ / /// I/// /111 / i/i/ \\\ IIII \\\ /i//i//i iii- ,�'MN , //�'/i/ \- % / l ----� ` - I 1 / / I I \ \ _ _--_________-__ // / / , , / / // / / 111 11 'i / \\11\I /IIII `\ /��%�/%// i^l !-__ % / ' -_ - __--__�_________-_ \ / / / I \ ` / I 11 1 I -�/ \ / / , 11 / I I ,I \ \\ / ,/'__ - - - �" // / / / /i // / I 1 II Il l 1\\III I\\ `- /,%//i ' //` y / a _______ \ \ , / / \ 1 I I 1 1 / , , I I / \ \ // --I r `1 `I///i / / / / / I \ -\\ \ 1 / ///, / / ` / /// / ' \\ \ - ___--__- _ \ , // I `� / 1 1 1 \ 1 \ \/ \ I \ 1 I I , \ i /i l / \\ / / /// / / / // / /// I X11 \ \ \ _I 111 \ \ / / / ,//i I // // / -_ - - ___\\ J 1-� 1 I ( I I \ \ \ I 1 I / I 1 \, 1 / // / \_II/ 1111 / / //'/ / //// _ ' \\\`\ \\\\\ -- _''\\\\ \ ` ' '/j111111% / /// // �,� \\\ c-- \/ I \ \ / / / / / / , , \\ \ `, ,/ I /� �/ / / ,�\ I�\ 11 I / / I 1 1 / I I I I 1 / l // / - / '/ \-A1'\\\s \I // / _ J -\`l % / / /'''/' / ( / - _ 311 = \ I I / , I 1111 / /// / / / /// / / _-_ -`\ 1111 // / // II l /l� --_ II I\ \III _ / / / / \ \ \\ 1 I 11 II 11 I // I / / I I 1 I , I // �Il/ / / / / / / - \_\ \ / 1 / ♦ \ - \ \ / / ' �\` \ \\�\ /'\ 1' 1111 1111 /r-�- \ \ \\ -_�'' \\1\ I\Ilf _ - \ \ \ , , / , ,/ // / _ 4" \\ ' �- \\ \\ \\;\\ \\I , 11, / //",/ ` oY ' \-- - \\ /'',i' \ \ \\ \\ I I I I , ( 1 // I I / I l 1 / 1111 / / / / ' l I / / 1 / I `\\\ \\\\ / I. III, 11/l %I�%'/// --- - 1 I I I I ( % / i l( l I I it /// , 'll _ / // //� / ' 1 Il% ' / -\ 1/// //%//�I // ® ///'- --- - _ -_ / / \\ `\_ -1 \ \ \\\\\ \\ \\\ \\ \\ 1 I / 1 11 I I / / ' I l l /� / ,/ ' l l l l / I / //_ `- j' IIII /' / / \\ ---- \ I \I 11 11 \\ \\ \\ I / l I / I l / I / 1 'i / / \ 1 1 I 1 \ I ( I / 11 / 1 / '' 1 I 1 %/'4 I/ / i / l l / l / j I /j1/ /j///i `\ \_ �I - 1 1 1 \ 1 I I / 1 I 1 / / / , / \ A� / / /-� , , l l l I\ - / / I' \\/���-�/ /l /i 1 1 I- 1 i I / 1 I// 1 / 11 I \ I 1 \ \ \ I 1 I I \ 1 I I l l I I \ %'%1111 I1/l / I,- -i / l / / / / / �i /%/ I \ \ �\\ / 1 II II II 1 i _ 1� f \`\ ' I / // 1 IIIIII / 1,11111 / \ / ` \ \ 1 I I I 1 1 I / I / I I / IIIIII IIII I / \\ I / I/ I I 1 11 l I /- _/ / -\\ 1 I /// \ / �/ 1111 I ' 1 \ \\ I \ I I I I 1 I I I 1 1 I I 1 '111111 11,11 / / / 1 - _____ _ \ l 1 / I / / 1111/ / / \ 1 I 1 I \ , I I /' / I I I I I 1 III IIII IIII I / -',//- _ \ I ' /iii// //, , /'` / / / ( , \ I I 1 / / I 1 1 I I 1 111111 /IIII/ / -_ _-// / _ - `�`\\ \ /'e I I // 11/11 \ _ / --- '­ / / \ , / I 1 \ \ I , , 1 / I I I 1 (l 11 II �/ ///// "/� - ---\ \ i 1 1 / i/ 1111/ IIII II- i \ ----- _ - / / / / / \1 \ 1 I I / / / I I I 111 II Il / ' 1111/%//% _ \\\\ -\ / ,''/i'-- .", /,/ //1111/ l /IJ II // / - /Ilp I \ . ._----- �\ \ \ ------ J , / / / / / / I 11 I I I 1 / / / / I I I 1\ 1 I /IIII, / / , / / I I , I I 1 I I I\ 1 I I I \ /,IIII +-1'�I IIT// / / / / / � �--_ \ `\\\\ I 1 I I 1%'111% �%/ll l/ / / -- - - ___ , 1 I I 1 1 III -I \ ' I I I-\\ \ f , - _-- \ �.___- --\-- --� \ 1 1 / I l I 1\ I \ \\ // / I \1%jlIIII 111,/\1\ /// -//// / / l / i'�-- ,`�\\ \\\\ ,, \ \\ �// 1111 l %!/'l1 // //(l I-/llli�/////�,�-�`��\\\\\\\'\\\\\\ // i I �j 1111 I /l' II- --_ I-///// / 1 / I I 1 I I 11 \\ \ \, � 11 / ,l11I II III II\/ I / \ \ 1 - _ 1 I l 11111 / / / // „ /' , --' \ii`\ \\\\\\\\\\\\\' i /' ��/iii/ I l l , II / -___' -- I '--/ �' \ 1 I ' I I I i�/II i \ 1 1 1 II I /(\_ '' ' i I IJ\ / / //,/'/i// �,\4\1 111 - /, 1111,II, - / / \\,\`�\\' \,'I, ,,,/„/,l/Ui11' _ ----, ( 1 II 1 , 1 1 1 \ 1;, ,;1 ,l,Il // I / 11 I I /-� = I - //,,> II 1 / / ! I 1 I 1 I I I 1 I I--- I,,,// /,// /I 111 , 1, / i / \I \\ 1 1 11 II 1 \''; r---- 1 // "/,/, %/;/ /;;;% % ~"' '/ ^`/' - / __ --- - - I / I \- / \ \ , ( I I I 1 1 1 I I 1 11,11/ 1,111/ II/ 111 I /, --_ / // '`• - --- _ IIII /// / I // / 11 \1 II 11 \��/ /-_ I IIII/ % / / / � / I I b, / � , Ill %`♦ � II '1111 II I II II II -------_ I I I IIII II' _--� I I , 11 1111 II; I I , 11 1111 II, I I 11 I II III III III 1 I ; I III 11111 I I II II ''I 11 Ii 1' Ili i ' II II II I 1 I % 1 1 ----------- I _ _ ;I \I I I \\I I I IIII 1 I,I 11'1 I I I I I I II II I I I II II II II I I I I I I � I 1 I I I III I I I I II , I I I'1 jlll 11 I ' II II II I II 111 II 111 II I Iu I,u II 1 1 '' II 11111 IIS \\ 11 I 11 1 COULTER JEWELL THAMES, P.A. 111 WEST MAIN ST DURHAM, NC 27701 (919) 682-0368 - = - - - - -' ''% -ROAv = Ne 4s- aa---------. FALLS ROAD I - ----- R/W VARIES _- R/R VARIES - –------------- -- — — — — —� I M"nnnnnnnnnnnA"IA 1 / ���\U..\o I � \ \ 4 I \\ \ ---- kill 9 WAN ,�. \dIM m \\\!\I 'iii ��\��►�\\\\ \\\\\\MMEN\\IMILM\\\ �M,`;; M�\\\� \\\\1 \!\1dmo\\\\ ---1 e !ZAI\\\\\\ \\\\ \\ RUM \\►\\\\d 1 11\111\\ \\!\ \c\\\\\\\\\\\i �i'�\`�►\\�\�\ `��►v ------ Ilk -- �n... _ \\ \\\\\\1\\\ok WNW • I WE !�\ \ I I► \ ! \ !! \!\\\!\! LOIN,\\\\\\\ IM I \\►\\\\\\ \� \\\\\\ \\ ��� �-� • \\\\I I1 \ \i1 \\`\\\ \\\ \I D e 1 \\\\IIII• \\ \� _ `` \ \ `1 Q e���Y�\Zwallu,►.I 11\\\\\ I :fir - ►. ,1\\\��,. \\\\\,��� ■■■.■■■■■■■■..s..■■■■■■■■■■. ■■: ■■�■_:■_■._■■ ROAD VARIES r ROCKY MOUNT MILLS — The Mill NUTRIENT ANALYSIS POST -DEVELOPMENT TRANSPORTATION IMPERVIOUS ROOF IMPERVIOUS _ - - WOODED PERVIOUS -----------_ ---------- -- - \--------- , ----------------------------------------- -------------- _ V _ I------------- ---- ---------------------- ---- ---------------------------- ------------------- . ----- 1 r_ ' ' / "-'------------ %'-'- -' -------- _________- � — �. \``\�,`\ / \\\\ ,111\1 `. ------------------ ---------------- ---------- Q,, ------------- -------- 1 _ - ------ ■i \ ♦ _ --------------- -------------- V\\ \\ \\ \ \ \ 1 1I ♦ ♦ 1\1 1 1\ t� 1 ---------------- ---------------------- ____________ -------------- -SITE AREA = 24.07 ACRES ------ i ■ / I I'I ♦ ■I ------- /' 1 --------------- 1 tl 1 1 1 I ' 1111 1\ I I 1 II�__--____ — _____ __ � `------- I I - I 4 i L— ------_— I --- ; ;IA I;I 1;�1 Ilh jL -�—�1 I, 645 I I I '1 • ; 1 1 1 � � I' � ' '/ ; ' II I ' /'I' ' I I I ••/ I 111 X IIII% // 1 I I — I /� I I / I 1 Q 1 I I I 1 1� I I ' / I '1 , II I �• I i' i Lo WU) W I / OO I , y I 1 ' 1 I iii ;% I �, z\♦ I 1 x'111 � � ;;1,_' , ; ,, ♦,;�-- I I % I ; `♦ I h Z ; ; �, I II ► ► I ��Pv i' %' I \\ ' I'' ► o? I I I 4 I I FALLS ROAD - NC 43 & 19 --- IV M us '0 R/W VARIES / 1 II FALLS ROAD DATE: 08.25.2017 SCALE.- 1'= 60' DRAWN BY.- TRM ������/ v�1 I1� V1 �11��- I��/IA�AlIl/lI11�I1•lA11l1�ll1 V1\v/lI�ll1l1�AllIw��,� fIlA�l1iv11'lV11�//�l1�1l1�v� ll1VlAIvv�jw\l\�1lIAIllA� vIII�ll\�lI\IIA�OIll\V� f v .I\l\l�r �v A\ �� ��`1_�A \ �/ \v \VA �V �� � `�z_vv� _,; v//�V-\ �>/ �-- ��iA-/ /.ll\�i i V��/A �v.�__ i�i�A�\\�\� � //_ V�V//lr/V �AI �-It lI- /�\ 1\�lI` /�Ivl/I/IIv llI��/ II�1/1-II�\ I1I II,II /1 III/1�I �1I � 1IVI1v! \�A A 1 II V v \V� 1 v ���� 1A f°�'�h❑vAs�. V\ Ae II1 lI v�w%� ��� 'V �./ \ ♦ V\ �\v1\ �\-\� \/ \ d / � / /I \\ �A�\_'� \\ d _ \ � Ar �/ // >-_A- _ '� �—\V - �i.�\ �\ \1/ i //\\- � \✓\\�� /\ A �\ /\ - \/ r\/l \ \ �I/c_ >,\�\ <� i\, \\I A/r \ �// /'�\ � f�i_///A•��\- I /\ \ / I \ II\ _Iv � /\� �// V/\//�.\ o . \�III, / \\A \\/- \��vo /lIi �-/ �Id/� 1III I ®I/ �< v ��/v � �'\ .i, ♦ / /.I\ \\,/ \ A I =I //d �\�\� / ��_/ ./5__J�`az�,_�l/�_"�����' . /��\�'V,�� —' - ��\/ �/� ���/�— -lv// \ / �� -1 r-�\/ �- E� �;I \I l/%v-� r�v✓ - -s�1I/A.�// I,- �/� (V / 1I -I ilI - -/�l \a� u- / �/-�1-/�� ),/� " _�4� /4 / �'/ ' - J - ,�-,,, /_ �.% •-\ _ �-/���/-�-/ —/ -��/ -�/—_/ //- / '-�'� � v - P \� ii/ I I\III /iV{{lIV\kII IlI/ I11IIIIvIII�IlAI A1 IlI I�vII\v�Av �1V�°1vs/�v\ 1I//lv\/1i/I Ir\lS�1gl\Ij lA /jlv\� \/Iv�l V/iA�1IA I1/Av�p�\I�VIvIlI1I �1I�1Vl1lIl 1v11 I �A11IIplI I pIf1,v I D l\� 11 1 Vv>I II \ \ V 1, \„vA A A\ \I\I \\A l I v\\ \A\ l\\ � A� AI I A/v 1I I I/ 1 11 \/ A � v� \� \ —\/— \- - �AR EA S A/NOT % OWNED WNED � B Y ROCKY MOUNT MILLS (NOTINCLUDEDIN NUTRIENT REDUCTIONS) ) ❑ TRANSPORTATION IMPERVIOUS ROOF IMPERVIOUS /%jj WOODED PERVIOUS BMP AREA ---------- 1A --------' coos wodds //rr////// rrr— — — —_— M DS, - 00/1 S, / ii ' FUTURE DEVELOPMENT (NOT INCLUDED IN ANALYSIS) aSIDE INN�/A �.- ex. shed -'"!” ` / / `� / L ♦ / / Ilk '000, � a � � f II ;100� AV �l COULTER JEWELL THAMES, P.A. 111 WEST MAIN ST DURHAM, NC 27701 (919) 682-0368 ROCKY MOUNT MILLS - PHASE 2B ANALYSIS , WET POND DRAI = 44.35 ACRES / / / \ / / / / / / / / / / / / / / 06.05.2017 SCALE: 1"=100' DRAWN BY: TRM 0 Coulter Jewell Thames, PA Project Name: Rocky Mount Mill - Phase 2B Analysis By: TRM Revised: Project Number: 1445 Date: 06.03.2017 Date: Nutrient Analysis Summary Site Existing Condition River Basin Export Limits (lbs/ac/yr) Nitrogen Phosphorus Nutrient Export Ib/ac/yr Ib/yr Nitrogen 5.15 123.96 Phosphorus 0.72 17.33 Site Post Development River Basin Export Limits (lbs/ac/yr) Nitrogen Phosphorus Un -Treated Nutrient 4.0 0.4 Export Ib/ac/yr Ib/yr Nitrogen 7.4 178.12 Phosphorus 0.91 21.90 Project Location River Basin Export Limits (lbs/ac/yr) Nitrogen Phosphorus Tar -Pamlico 4.0 0.4 NC DEQ Approved Reduction in Nutrient Loading from Existing Condition for Re -development Projects Nitrogen 30% Phosphorus 0% Tar -Pamlico Re - Development Export Limits Ib/ac/yr Ib/yr Nitrogen 3.61 86.77 Phosphorus 0.72 17.33 Phase 2B Reductions Required Ib/yr Nitrogen 91.35 Phosphorus 4.57 Site Area 24.07 acres 0 Coulter Jewell Thames, PA Project Name: Rocky Mount Mill - Phase 2B Analysis By: TRM Revised: TRM Project Number: 1445 Date: 06.03.2017 Date: 07.17.17 Nutrient Analysis Summary (cont.) Nutrient Export for Drainage Area to Wet Pond Ib/ac/yr Ib/yr Nitrogen 6.63 294.04 Phosphorus 0.84 37.25 NC DEQ Approved Nutrient Reduction for Wet Pond Nitrogen 30% Phosphorus 30% Nutrient reduction from Wet Pond Ib/yr Nitrogen 88.21 Phosphorus 11.18 Surplus Nutrient Reductions by Pond (Ib/yr) Nitrogen 0.00 Phosphorus 6.60 Nutrient Export reduction to be met with offsite payment (lbs/yr) Nitrogen 3.13 Phosphorus none Drainage Area to Wet Pond 44.35 acres Tar -Pamlico Stormwater Rule 15A NCAC 28.0258 Last Modified 8/25/2017 Piedmont of the Tar -Pamlico River Basin: Includes Oxford, Henderson, Rocky Mount and Tarboro as well as Franklin, Nash and Edgecome Counties Total Nitrogen and Total Phosphorus Loading Calculation Worksheet (Automated) Project Name: Rocky Mount Mill - The Mill Date: 08.25.2017 By: TRM Checked By: Directions (same for pre -development and post -development tables): > Enter the acres of each type of land cover in the green boxes. The spreadsheet will calculate all of the values in light blue. > Compare total areas of development in pre- and post- tables for consistency (bottom of column (2)), and also for consistency with the site plans. If all of these values are not the same, there is an error that must be corrected. > Unless drainage onto the development from offsite is diverted around or through the site, offsite catchment area draining in must be included in the acreage values and treated. Pre -development: (1) (2) (3) (4) (5) (6) (7) Type of Land Cover Area S.M. Formula Average EMC Column Average EMC Column acres 0.46 + 8.3I of TN (mg/L 2 3 4 of TP (mg/L 2 3 6 Transportation impervious 3.32 3.09 2.60 26.71 0.19 1.95 Roof impervious 4.31 3.09 1.95 26.01 0.11 1.47 Managed pervious (lawn/landscaped) 15.83 3.09 1.42 69.55 0.28 13.71 Managed pervious (cropland) 3.09 4.23 0.00 1.23 0.00 Managed pervious (pasture) 3.09 2.04 0.00 0.62 0.00 Wooded pervious 3.09 0.94 1.77 0.14 0.26 Fraction Impervious (1) = 0.32 TN Loading 124.04 TP Loading 17.40 (lb/yr) = (lb/yr) = Total Area of Development = 24.07 TN Exp. Coeff. 5.15 TP Exp. Coeff. 0.72 (lb/ac/yr) _ (lb/ac/yr) _ Post -development. (1) (2) (3) (4) (5) (6) (7) Type of Land Cover Area S.M. Formula Average EMC Column Average EMC Column (acres) (0.46 + 8.3I of TN (m2/L) 2 * 3 * 4 of TP (m2/L) 2 * 3 * 6 Transportation impervious 4.12 2.60 60.57 0.19 4.43 Roof impervious 1 4.93 4.12 1.95 39.57 0.11 2.23 Managed pervious 13.11 4.12 1.42 76.63 0.28 15.11 Wooded pervious J.37 4.12 0.95 1.45 0.14 0.21 Fraction Impervious (1) = 0.44 TN Loading 178.22 TP Loading 21.98 (lb/yr) = (lb/yr) = Total Area of Development = 24.07 TN Exp. Coeff. 7.40 TP Exp. Coeff. 0.91 (lb/ac/yr) _ (lb/ac/yr) _ Note: The nutrient loading goals are 4.0 lb/ac/yr for TN and 0.4 lb/ac/yr for TP. If the post -development nutrient loading is below these levels, then no BMP is necessary. Otherwise, the next worksheet calculates post -development TN and TP loadings after BMPs are installed. Tar -Pamlico Stormwater Rule 15A NCAC 28.0258 Piedmont of the Tar -Pamlico River Basin: Includes Oxford, Henderson, Rocky Mount and Tarboro as well as Franklin, Nash and Edgecome Counties Last Modified 5/23/03 BMP Removal Calculation Worksheet (Automated) Project Name: Rocky Mount Mill - Mill Phase 2b Analysis Date: 06.29.2017 By: TRM Checked By: Directions: > It may be advantageous to split the development into separate catchments to be handled by separate BMPs. The tables below allow the development to be split into as many as three catchments, and can be copied for greater than three. NOTE: Unless runoff flowing onto the development from offsite is routed separately around or through the site, the offsite catchment area draining in must be included in the acreage values of the appropriate land use(s) and treated. > Above each table: Enter the catchment acreage in the top green blank. Based on a comparison of the post -development TN and TP export coefficients you calculated above to the rule requirements of 4.0 lb/ae/yr TN and 0.4 lb/ac/yr TP, select BMP(s) from the list for treating the catchment runoff. Enter the chosen BMP(s) nutrient removal rates in the green blanks. If more than one BMP is to be used in series, the combined removal rates will be calculated automatically in the blue blanks. > Catchment Tables: Enter the acres of each type of land cover in the green boxes. The spreadsheet will calculate all of the light blue boxes. NOTE: Compare the Total Catchment Acreage for the Development (final table) to the value you established in the pre -BMP worksheet tables, and also to the site plans, for consistency. All of these values need to be the same TN TP Design Standard BMP Wet Detention Pond 25 40 NC BMP Manual Nutrient Stormwater Wetland 40 35 NC BMP Manual Removal Sand Filter 35 45 NC BMP Manual Rates Bioretention 35 45 NC BMP Manual Grass Swale 20 20 NC BMP Manual Vegetated Filter Strip w/ 20 35 NC BMP Manual Level Spreader Dry Detention 10 10 NC BMP Manual Catchment 1: Total acreage of catchment 1 = ac First BMP's TN removal rate = % First BMP's TP removal rate =% Second BMP's TN removal rate = % Second BMP's TP removal rate = % Third BMP's TN removal rate = % Third BMP's TP removal rate = % TOTAL TN REMOVAL RATE = 0 % TOTAL TP REMOVAL RATE = 0 % (1) (2) (3) (4) (5) (6) (7) Type of Land Cover Catchment S.M. Formula Average EMC of Column Average EMC of Column Acreage 0.46 + 8.3I TN (mg/L 2 3 4 TP (mg/]L 2 3 6 Transportation impervious 10.11 3.71 2.60 97.40 0.19 7.12 Roof impervious 7.21 3.71 1.95 52.09 0.11 2.94 Managed pervious 25.90 3.71 1.42 136.27 0.28 26.87 Wooded pervious 3.71 0.94 0.00 0.14 0.00 Area taken up by BMP 3.71 1.95 8.17 0.11 0.46 Fraction Impervious (I) = 0.39 Pre -BMP TN 293.93 Pre -BMP TP 37.39 Load (lb/yr) = Load (Ib/yr) = Total Area of Development = 44.35 Pre -BMP TN 6.63 Pre -BMP TP 0.84 Export (Ib/ac/yr)Export (Ib/ac/yr) Post -BMP TN Post -BMP TP 293.93 37.39 Load (lb/yr) = Load (Ib/yr) = Post -BMP TN 6.63 Post -BMP TP 0.84 Export (Ib/adyr) 1 Export (Ib/ac/yr) = Wet Pond Calculations 0 Coulter Jewell Thames, PA Project Name: Rocky Mount Mill By: TRM Revised: TRM Project Number: 1445 Date: 06.05.2017 Date: 08.25.17 Wet Pond Calculations Drainage Area = 55.64 ac Impervious Area = 26.10 ac Runoff Volume: NRCS Method S = 1000/CN - 10 Q* =[ (P -0.2S)^2 j / (P+0.8S) P = 1.0 in Disconnected Impervious Area A = 26.1 ac CN = 98 S = 0.204 in Q* = 0.791 in WQV = 74,933 cf Total required Water Quality Volume: V = 83,432 cf Water Quality Volume Provided: V = 95,033 cf Pervious Area A = 25.72 ac CN = 80 A = 2.91 ac CN = 77 A = 0.9 ac CN = 80 A = 29.53 CN = 80 S = 2.546 in Q* = 0.079 in WQV = 8,499 cf 0 Coulter Jewell Thames, PA Project Name: Rocky Mount Mill By: TRIM Revised: TRM Project Number: 1445 Date: 06.05.2017 Date: 08.25.17 Wet Pond Calculations (cont.) Water Quality Orifice Sizing (Dynamic Head Condition) Time to Water Quality Elevation 24.75 hrs Time to Normal Pool Elevation 107.25 hrs Time to drawdown 82.50 hrs 3.4 days (see table from HydroCad output Pond1-drawdown ) Pemanent Pool Average Depth Davg = Vpp-Vshelf / Abottomofshelf Vshelf = 0.5 * Dmaxovershelf * Peri meter(perm pool) *Width (submerged pa rtofshel) 0.5 0.5 Dmaxovershelf 1,275 Peri meter(permpool) 5 Width (submerged partofsheIf) Vshelf = 1,594 cf 136,962 Vpp 40,203 Abottomofshelf Davg= 3.4 ft 0 Coulter Jewell Thames, PA Project Name: Rocky Mount Mill By: TRM Revised: TRM Project Number: 1445 Date: 06.05.2017 Date: 08.25.17 Wet Pond Calculations (cont.) Surface Area Calculation Permanent Pool Surface Area Required: Table 7: Piedmont and Mounfain SAIDA ?able (Adapt,9d from Driscoll, 1986) 10% 0.51 0.43 0.37 0.30 0.27 0.25 20% 0.84 0.69 0.61 0.51 0.44 0.40 30% 1.17 0.94 fl.84 0.72 0.61 0.56 40% 1.51 1.24 i.fl9 fl.91 0.78 0.71 50% 1.79 1.51 1.31 1.13 0.95 0.87 60% 2.09 1.77 1.49 1.31 1.12 1.03 70% 2.51 2.09 1.80 1.56 4.34 1.17 80% 2.92 2.41 2.07 1.82 4.62 1.40 90% 3.25 2.64 2.31 2.44 4.84 1.59 100% 3.55 2.79 2.52 2.34 2A4 1.75 Average Depth = 3.4 ft Percent Impervious = 47% SA/DA Ratio = 1.60% Surface Area = 0.89 ac 38,822 sf Permanent Pool Surface Area Provided Surface Area = 1.07 ac 46,678 sf 0 Coulter Jewell Thames, PA Project Name: ROCKY MOUNT MILL - THE MILL By: TRM Revised: TRM Project Number: 1445 Date: 03.02.2017 Date: 08.23.17 11 Anti -Floatation Sizing Calculations Outlet Structure Dimension Inside Riser Width: 6 ft Outside Riser Width: 7 ft Inside Riser Length: 14 ft Outside Riser Width: 15 ft Wall Thickness: 6 in Top Elevation: 84 ft Invert Elevation: 75 ft Bottom Elevation: 72 ft Extended Base: 6 in Extended Base Width: 8 ft Extended Base Length 16 ft Displaced Volume: 945 cu ft Displaced Weight: 58,968 lbs Volume of Actual Structure: 504 cu ft Weight of Concrete Structure: 75,600 lbs Weight of Earth with Extended Base: 10,580 lbs Total Weight of Structure: 86,180 lbs Factor of Safety: I1.5 OK Campus Pond analysis Type 1124 -hr 100 -Year Rainfall=7.40" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Summary for Pond 28P: Pond 1 [82] Warning: Early inflow requires earlier time span Inflow Area = 55.630 ac, 46.92% Impervious, Inflow Depth > 5.96" for 100 -Year event Inflow = 506.56 cfs @ 11.98 hrs, Volume= 27.622 of Outflow = 379.14 cfs @ 12.05 hrs, Volume= 25.259 af, Atten= 25%, Lag= 4.0 min Primary = 343.48 cfs @ 12.05 hrs, Volume= 24.916 of Secondary = 35.66 cfs @ 12.05 hrs, Volume= 0.343 of Routing by Stor-Ind method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 85.06' @ 12.05 hrs Surf.Area= 69,977 sf Storage= 307,047 cf Plug -Flow detention time= 79.5 min calculated for 25.190 of (91 % of inflow) Center -of -Mass det. time= 35.0 min ( 818.6 - 783.6 ) Volume Invert Avail.Storage Storage Description #1 80.00' 374,718 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 80.00 46,678 0 0 80.50 53,154 24,958 24,958 81.00 55,832 27,247 52,205 81.75 58,378 42,829 95,033 82.00 59,234 14,702 109,735 83.00 62,691 60,963 170,697 84.00 66,204 64,448 235,145 84.70 68,697 47,215 282,360 85.00 69,774 20,771 303,131 86.00 73,400 71,587 374,718 Device Routing Invert Outlet Devices #1 Primary 75.00' 48.0" Round Culvert X 2.00 L= 71.0' RCP, square edge headwall, Ke= 0.500 Outlet Invert= 73.00' S=0.0282'/' Cc= 0.900 n=0.013 #2 Device 1 81.75' 120.0" W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #3 Device 1 81.75' 48.0" W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 84.00' 72.0" x 168.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 84.40' 25.0' long x 17.8' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=343.42 cfs @ 12.05 hrs HW=85.05' (Free Discharge) L1=Culvert (Inlet Controls 343.42 cfs @ 13.66 fps) 2=Orifice/Grate (Passes < 161.03 cfs potential flow) 3=Orifi ce/G rate (Passes < 64.41 cfs potential flow) 4=Orifi ce/G rate (Passes < 141.45 cfs potential flow) Secondary OutFlow Max=35.56 cfs @ 12.05 hrs HW=85.05' (Free Discharge) L5= Broad -Crested Rectangular Weir (Weir Controls 35.56 cfs @ 2.17 fps) Campus Pond analysis Type 1124 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here) Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Summary for Pond 30P: Main Pool Volume [43] Hint: Has no inflow (Outflow=Zero) Routing by Stor-Ind method Peak Elev= 0.00' @ 0.00 hrs Surf.Area= 0 sf Storage= 0 cf Plug -Flow detention time= (not calculated) Center -of -Mass det. time= (not calculated) Volume Invert Avail.Storage Storage Description #1 76.00' 136,962 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 76.00 25,359 0 0 77.00 27,833 26,596 26,596 77.50 33,246 15,270 41,866 78.00 34,937 17,046 58,912 79.00 38,415 36,676 95,588 79.50 40,203 19,655 115,242 80.00 46,678 21,720 136,962 Campus Pond analysis Type 11 24 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Hydrograph for Pond 32P: Pond 1 - Drawdown Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 5.00 0.33 30 80.00 0.00 0.00 0.00 5.25 0.47 390 80.01 0.00 0.00 0.00 5.50 0.62 879 80.02 0.00 0.00 0.00 5.75 0.77 1,502 80.03 0.01 0.01 0.00 6.00 0.93 2,263 80.05 0.01 0.01 0.00 6.25 1.10 3,167 80.07 0.01 0.01 0.00 6.50 1.27 4,211 80.09 0.03 0.03 0.00 6.75 1.44 5,399 80.11 0.04 0.04 0.00 7.00 1.62 6,730 80.14 0.06 0.06 0.00 7.25 1.80 8,201 80.17 0.08 0.08 0.00 7.50 1.98 9,811 80.20 0.12 0.12 0.00 7.75 2.17 11,557 80.24 0.16 0.16 0.00 8.00 2.36 13,435 80.28 0.20 0.20 0.00 8.25 2.68 15,479 80.32 0.25 0.25 0.00 8.50 3.13 17,837 80.36 0.31 0.31 0.00 8.75 3.63 20,565 80.42 0.38 0.38 0.00 9.00 4.17 23,695 80.48 0.45 0.45 0.00 9.25 4.55 27,214 80.54 0.51 0.51 0.00 9.50 4.77 30,922 80.61 0.57 0.57 0.00 9.75 5.31 34,864 80.68 0.62 0.62 0.00 10.00 6.17 39,437 80.77 0.68 0.68 0.00 10.25 7.29 44,818 80.87 0.74 0.74 0.00 10.50 8.65 51,284 80.98 0.81 0.81 0.00 10.75 10.51 59,074 81.12 0.88 0.88 0.00 11.00 12.88 68,754 81.29 0.97 0.97 0.00 11.25 16.96 81,005 81.51 1.06 1.06 0.00 11.50 22.76 97,745 81.80 2.11 2.11 0.00 11.75 99.97 128,346 82.31 39.20 39.20 0.00 12.00 336.51 229,572 83.92 175.14 175.14 0.00 12.25 53.64 200,252 83.47 149.23 149.23 0.00 12.50 31.59 142,029 82.54 64.18 64.18 0.00 12.75 22.21 124,446 82.25 32.83 32.83 0.00 13.00 18.50 118,113 82.14 23.30 23.30 0.00 13.25 15.84 114,736 82.08 18.69 18.69 0.00 13.50 13.91 112,605 82.05 15.94 15.94 0.00 13.75 12.29 110,953 82.02 13.93 13.93 0.00 14.00 10.92 109,599 82.00 12.33 12.33 0.00 14.25 10.03 108,455 81.98 11.06 11.06 0.00 14.50 9.54 107,684 81.97 10.27 10.27 0.00 14.75 9.07 107,097 81.96 9.67 9.67 0.00 15.00 8.59 106,583 81.95 9.14 9.14 0.00 15.25 8.11 106,097 81.94 8.64 8.64 0.00 15.50 7.63 105,621 81.93 8.15 8.15 0.00 15.75 7.14 105,148 81.92 7.67 7.67 0.00 16.00 6.66 104,662 81.91 7.22 7.22 0.00 16.25 6.34 104,178 81.91 6.81 6.81 0.00 16.50 6.17 103,825 81.90 6.50 6.50 0.00 16.75 6.00 103,555 81.90 6.27 6.27 0.00 17.00 5.82 103,323 81.89 6.07 6.07 0.00 17.25 5.65 103,108 81.89 5.89 5.89 0.00 17.50 5.48 102,902 81.88 5.71 5.71 0.00 17.75 5.31 102,699 81.88 5.53 5.53 0.00 18.00 5.13 102,497 81.88 5.36 5.36 0.00 Campus Pond analysis Type 11 24 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Hydrograph for Pond 32P: Pond 1 - Drawdown (continued) Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 18.25 4.96 102,295 81.87 5.19 5.19 0.00 18.50 4.79 102,094 81.87 5.01 5.01 0.00 18.75 4.61 101,893 81.87 4.84 4.84 0.00 19.00 4.44 101,691 81.86 4.66 4.66 0.00 19.25 4.27 101,489 81.86 4.49 4.49 0.00 19.50 4.09 101,273 81.86 4.35 4.35 0.00 19.75 3.92 101,035 81.85 4.19 4.19 0.00 20.00 3.74 100,783 81.85 4.03 4.03 0.00 20.25 3.64 100,544 81.84 3.87 3.87 0.00 20.50 3.61 100,376 81.84 3.76 3.76 0.00 20.75 3.57 100,259 81.84 3.68 3.68 0.00 21.00 3.54 100,170 81.84 3.63 3.63 0.00 21.25 3.51 100,098 81.84 3.58 3.58 0.00 21.50 3.47 100,034 81.84 3.54 3.54 0.00 21.75 3.44 99,976 81.83 3.50 3.50 0.00 22.00 3.40 99,920 81.83 3.46 3.46 0.00 22.25 3.37 99,865 81.83 3.43 3.43 0.00 22.50 3.33 99,811 81.83 3.39 3.39 0.00 22.75 3.30 99,758 81.83 3.36 3.36 0.00 23.00 3.26 99,705 81.83 3.32 3.32 0.00 23.25 3.23 99,652 81.83 3.29 3.29 0.00 23.50 3.19 99,599 81.83 3.25 3.25 0.00 23.75 3.16 99,546 81.83 3.22 3.22 0.00 24.00 3.12 99,493 81.83 3.18 3.18 0.00 24.25 0.13 98,186 81.80 2.33 2.33 0.00 24.50 0.01 96,462 81.77 1.66 1.66 0.00 24.75 0.00 95,184 81.75 1.21 1.21 0.00 25.00 0.00 94,140 81.73 1.15 1.15 0.00 25.25 0.00 93,106 81.72 1.15 1.15 0.00 25.50 0.00 92,079 81.70 1.14 1.14 0.00 25.75 0.00 91,057 81.68 1.13 1.13 0.00 26.00 0.00 90,042 81.66 1.12 1.12 0.00 26.25 0.00 89,034 81.65 1.12 1.12 0.00 26.50 0.00 88,031 81.63 1.11 1.11 0.00 26.75 0.00 87,035 81.61 1.10 1.10 0.00 27.00 0.00 86,045 81.60 1.10 1.10 0.00 27.25 0.00 85,061 81.58 1.09 1.09 0.00 27.50 0.00 84,084 81.56 1.08 1.08 0.00 27.75 0.00 83,112 81.54 1.08 1.08 0.00 28.00 0.00 82,148 81.53 1.07 1.07 0.00 28.25 0.00 81,189 81.51 1.06 1.06 0.00 28.50 0.00 80,237 81.49 1.05 1.05 0.00 28.75 0.00 79,290 81.48 1.05 1.05 0.00 29.00 0.00 78,351 81.46 1.04 1.04 0.00 29.25 0.00 77,417 81.45 1.03 1.03 0.00 29.50 0.00 76,490 81.43 1.03 1.03 0.00 29.75 0.00 75,569 81.41 1.02 1.02 0.00 30.00 0.00 74,655 81.40 1.01 1.01 0.00 30.25 0.00 73,747 81.38 1.01 1.01 0.00 30.50 0.00 72,845 81.37 1.00 1.00 0.00 30.75 0.00 71,949 81.35 0.99 0.99 0.00 31.00 0.00 71,060 81.33 0.98 0.98 0.00 31.25 0.00 70,177 81.32 0.98 0.98 0.00 Campus Pond analysis Type 11 24 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Hydrograph for Pond 32P: Pond 1 - Drawdown (continued) Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 31.50 0.00 69,301 81.30 0.97 0.97 0.00 31.75 0.00 68,431 81.29 0.96 0.96 0.00 32.00 0.00 67,567 81.27 0.96 0.96 0.00 32.25 0.00 66,710 81.26 0.95 0.95 0.00 32.50 0.00 65,859 81.24 0.94 0.94 0.00 32.75 0.00 65,014 81.23 0.93 0.93 0.00 33.00 0.00 64,176 81.21 0.93 0.93 0.00 33.25 0.00 63,345 81.20 0.92 0.92 0.00 33.50 0.00 62,519 81.18 0.91 0.91 0.00 33.75 0.00 61,700 81.17 0.91 0.91 0.00 34.00 0.00 60,888 81.15 0.90 0.90 0.00 34.25 0.00 60,082 81.14 0.89 0.89 0.00 34.50 0.00 59,282 81.13 0.88 0.88 0.00 34.75 0.00 58,489 81.11 0.88 0.88 0.00 35.00 0.00 57,702 81.10 0.87 0.87 0.00 35.25 0.00 56,922 81.08 0.86 0.86 0.00 35.50 0.00 56,148 81.07 0.86 0.86 0.00 35.75 0.00 55,381 81.06 0.85 0.85 0.00 36.00 0.00 54,620 81.04 0.84 0.84 0.00 36.25 0.00 53,865 81.03 0.83 0.83 0.00 36.50 0.00 53,117 81.02 0.83 0.83 0.00 36.75 0.00 52,376 81.00 0.82 0.82 0.00 37.00 0.00 51,640 80.99 0.81 0.81 0.00 37.25 0.00 50,912 80.98 0.81 0.81 0.00 37.50 0.00 50,190 80.96 0.80 0.80 0.00 37.75 0.00 49,474 80.95 0.79 0.79 0.00 38.00 0.00 48,765 80.94 0.78 0.78 0.00 38.25 0.00 48,063 80.93 0.78 0.78 0.00 38.50 0.00 47,367 80.91 0.77 0.77 0.00 38.75 0.00 46,677 80.90 0.76 0.76 0.00 39.00 0.00 45,994 80.89 0.76 0.76 0.00 39.25 0.00 45,318 80.88 0.75 0.75 0.00 39.50 0.00 44,649 80.86 0.74 0.74 0.00 39.75 0.00 43,985 80.85 0.73 0.73 0.00 40.00 0.00 43,329 80.84 0.73 0.73 0.00 40.25 0.00 42,679 80.83 0.72 0.72 0.00 40.50 0.00 42,035 80.82 0.71 0.71 0.00 40.75 0.00 41,399 80.80 0.70 0.70 0.00 41.00 0.00 40,768 80.79 0.70 0.70 0.00 41.25 0.00 40,145 80.78 0.69 0.69 0.00 41.50 0.00 39,528 80.77 0.68 0.68 0.00 41.75 0.00 38,917 80.76 0.67 0.67 0.00 42.00 0.00 38,314 80.75 0.67 0.67 0.00 42.25 0.00 37,717 80.74 0.66 0.66 0.00 42.50 0.00 37,126 80.73 0.65 0.65 0.00 42.75 0.00 36,543 80.72 0.65 0.65 0.00 43.00 0.00 35,965 80.70 0.64 0.64 0.00 43.25 0.00 35,395 80.69 0.63 0.63 0.00 43.50 0.00 34,832 80.68 0.62 0.62 0.00 43.75 0.00 34,275 80.67 0.62 0.62 0.00 44.00 0.00 33,724 80.66 0.61 0.61 0.00 44.25 0.00 33,181 80.65 0.60 0.60 0.00 44.50 0.00 32,644 80.64 0.59 0.59 0.00 Campus Pond analysis Type 11 24 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Hydrograph for Pond 32P: Pond 1 - Drawdown (continued) Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 44.75 0.00 32,114 80.63 0.59 0.59 0.00 45.00 0.00 31,590 80.62 0.58 0.58 0.00 45.25 0.00 31,074 80.61 0.57 0.57 0.00 45.50 0.00 30,564 80.60 0.56 0.56 0.00 45.75 0.00 30,060 80.60 0.56 0.56 0.00 46.00 0.00 29,564 80.59 0.55 0.55 0.00 46.25 0.00 29,074 80.58 0.54 0.54 0.00 46.50 0.00 28,591 80.57 0.53 0.53 0.00 46.75 0.00 28,115 80.56 0.53 0.53 0.00 47.00 0.00 27,646 80.55 0.52 0.52 0.00 47.25 0.00 27,183 80.54 0.51 0.51 0.00 47.50 0.00 26,727 80.53 0.50 0.50 0.00 47.75 0.00 26,278 80.52 0.50 0.50 0.00 48.00 0.00 25,836 80.52 0.49 0.49 0.00 48.25 0.00 25,400 80.51 0.48 0.48 0.00 48.50 0.00 24,971 80.50 0.47 0.47 0.00 48.75 0.00 24,548 80.49 0.47 0.47 0.00 49.00 0.00 24,131 80.48 0.46 0.46 0.00 49.25 0.00 23,720 80.48 0.45 0.45 0.00 49.50 0.00 23,316 80.47 0.44 0.44 0.00 49.75 0.00 22,920 80.46 0.44 0.44 0.00 50.00 0.00 22,532 80.45 0.43 0.43 0.00 50.25 0.00 22,151 80.45 0.42 0.42 0.00 50.50 0.00 21,777 80.44 0.41 0.41 0.00 50.75 0.00 21,411 80.43 0.40 0.40 0.00 51.00 0.00 21,052 80.43 0.40 0.40 0.00 51.25 0.00 20,700 80.42 0.39 0.39 0.00 51.50 0.00 20,355 80.41 0.38 0.38 0.00 51.75 0.00 20,019 80.41 0.37 0.37 0.00 52.00 0.00 19,690 80.40 0.36 0.36 0.00 52.25 0.00 19,368 80.39 0.35 0.35 0.00 52.50 0.00 19,054 80.39 0.35 0.35 0.00 52.75 0.00 18,746 80.38 0.34 0.34 0.00 53.00 0.00 18,446 80.38 0.33 0.33 0.00 53.25 0.00 18,153 80.37 0.32 0.32 0.00 53.50 0.00 17,866 80.36 0.31 0.31 0.00 53.75 0.00 17,586 80.36 0.31 0.31 0.00 54.00 0.00 17,312 80.35 0.30 0.30 0.00 54.25 0.00 17,045 80.35 0.29 0.29 0.00 54.50 0.00 16,784 80.34 0.29 0.29 0.00 54.75 0.00 16,529 80.34 0.28 0.28 0.00 55.00 0.00 16,280 80.33 0.27 0.27 0.00 55.25 0.00 16,036 80.33 0.27 0.27 0.00 55.50 0.00 15,799 80.32 0.26 0.26 0.00 55.75 0.00 15,567 80.32 0.25 0.25 0.00 56.00 0.00 15,340 80.31 0.25 0.25 0.00 56.25 0.00 15,118 80.31 0.24 0.24 0.00 56.50 0.00 14,902 80.31 0.24 0.24 0.00 56.75 0.00 14,690 80.30 0.23 0.23 0.00 57.00 0.00 14,484 80.30 0.23 0.23 0.00 57.25 0.00 14,282 80.29 0.22 0.22 0.00 57.50 0.00 14,084 80.29 0.22 0.22 0.00 57.75 0.00 13,891 80.29 0.21 0.21 0.00 Campus Pond analysis Type 11 24 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Hydrograph for Pond 32P: Pond 1 - Drawdown (continued) Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 58.00 0.00 13,702 80.28 0.21 0.21 0.00 58.25 0.00 13,517 80.28 0.20 0.20 0.00 58.50 0.00 13,337 80.28 0.20 0.20 0.00 58.75 0.00 13,160 80.27 0.19 0.19 0.00 59.00 0.00 12,987 80.27 0.19 0.19 0.00 59.25 0.00 12,818 80.26 0.19 0.19 0.00 59.50 0.00 12,652 80.26 0.18 0.18 0.00 59.75 0.00 12,490 80.26 0.18 0.18 0.00 60.00 0.00 12,332 80.26 0.17 0.17 0.00 60.25 0.00 12,177 80.25 0.17 0.17 0.00 60.50 0.00 12,026 80.25 0.17 0.17 0.00 60.75 0.00 11,877 80.25 0.16 0.16 0.00 61.00 0.00 11,732 80.24 0.16 0.16 0.00 61.25 0.00 11,591 80.24 0.16 0.16 0.00 61.50 0.00 11,452 80.24 0.15 0.15 0.00 61.75 0.00 11,316 80.23 0.15 0.15 0.00 62.00 0.00 11,182 80.23 0.15 0.15 0.00 62.25 0.00 11,051 80.23 0.14 0.14 0.00 62.50 0.00 10,923 80.23 0.14 0.14 0.00 62.75 0.00 10,797 80.22 0.14 0.14 0.00 63.00 0.00 10,673 80.22 0.14 0.14 0.00 63.25 0.00 10,552 80.22 0.13 0.13 0.00 63.50 0.00 10,433 80.22 0.13 0.13 0.00 63.75 0.00 10,316 80.21 0.13 0.13 0.00 64.00 0.00 10,201 80.21 0.13 0.13 0.00 64.25 0.00 10,089 80.21 0.12 0.12 0.00 64.50 0.00 9,979 80.21 0.12 0.12 0.00 64.75 0.00 9,871 80.21 0.12 0.12 0.00 65.00 0.00 9,765 80.20 0.12 0.12 0.00 65.25 0.00 9,661 80.20 0.11 0.11 0.00 65.50 0.00 9,559 80.20 0.11 0.11 0.00 65.75 0.00 9,459 80.20 0.11 0.11 0.00 66.00 0.00 9,361 80.20 0.11 0.11 0.00 66.25 0.00 9,265 80.19 0.11 0.11 0.00 66.50 0.00 9,170 80.19 0.10 0.10 0.00 66.75 0.00 9,078 80.19 0.10 0.10 0.00 67.00 0.00 8,987 80.19 0.10 0.10 0.00 67.25 0.00 8,898 80.19 0.10 0.10 0.00 67.50 0.00 8,810 80.18 0.10 0.10 0.00 67.75 0.00 8,725 80.18 0.09 0.09 0.00 68.00 0.00 8,640 80.18 0.09 0.09 0.00 68.25 0.00 8,558 80.18 0.09 0.09 0.00 68.50 0.00 8,477 80.18 0.09 0.09 0.00 68.75 0.00 8,397 80.18 0.09 0.09 0.00 69.00 0.00 8,318 80.17 0.09 0.09 0.00 69.25 0.00 8,240 80.17 0.09 0.09 0.00 69.50 0.00 8,164 80.17 0.08 0.08 0.00 69.75 0.00 8,088 80.17 0.08 0.08 0.00 70.00 0.00 8,014 80.17 0.08 0.08 0.00 70.25 0.00 7,941 80.17 0.08 0.08 0.00 70.50 0.00 7,869 80.16 0.08 0.08 0.00 70.75 0.00 7,798 80.16 0.08 0.08 0.00 71.00 0.00 7,728 80.16 0.08 0.08 0.00 Campus Pond analysis Type 11 24 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Hydrograph for Pond 32P: Pond 1 - Drawdown (continued) Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 71.25 0.00 7,659 80.16 0.08 0.08 0.00 71.50 0.00 7,591 80.16 0.07 0.07 0.00 71.75 0.00 7,525 80.16 0.07 0.07 0.00 72.00 0.00 7,459 80.16 0.07 0.07 0.00 72.25 0.00 7,394 80.15 0.07 0.07 0.00 72.50 0.00 7,331 80.15 0.07 0.07 0.00 72.75 0.00 7,268 80.15 0.07 0.07 0.00 73.00 0.00 7,206 80.15 0.07 0.07 0.00 73.25 0.00 7,145 80.15 0.07 0.07 0.00 73.50 0.00 7,085 80.15 0.07 0.07 0.00 73.75 0.00 7,026 80.15 0.07 0.07 0.00 74.00 0.00 6,968 80.15 0.06 0.06 0.00 74.25 0.00 6,910 80.15 0.06 0.06 0.00 74.50 0.00 6,854 80.14 0.06 0.06 0.00 74.75 0.00 6,798 80.14 0.06 0.06 0.00 75.00 0.00 6,743 80.14 0.06 0.06 0.00 75.25 0.00 6,689 80.14 0.06 0.06 0.00 75.50 0.00 6,636 80.14 0.06 0.06 0.00 75.75 0.00 6,584 80.14 0.06 0.06 0.00 76.00 0.00 6,532 80.14 0.06 0.06 0.00 76.25 0.00 6,481 80.14 0.06 0.06 0.00 76.50 0.00 6,431 80.14 0.06 0.06 0.00 76.75 0.00 6,382 80.13 0.05 0.05 0.00 77.00 0.00 6,334 80.13 0.05 0.05 0.00 77.25 0.00 6,286 80.13 0.05 0.05 0.00 77.50 0.00 6,239 80.13 0.05 0.05 0.00 77.75 0.00 6,192 80.13 0.05 0.05 0.00 78.00 0.00 6,147 80.13 0.05 0.05 0.00 78.25 0.00 6,102 80.13 0.05 0.05 0.00 78.50 0.00 6,057 80.13 0.05 0.05 0.00 78.75 0.00 6,014 80.13 0.05 0.05 0.00 79.00 0.00 5,971 80.13 0.05 0.05 0.00 79.25 0.00 5,929 80.12 0.05 0.05 0.00 79.50 0.00 5,887 80.12 0.05 0.05 0.00 79.75 0.00 5,846 80.12 0.05 0.05 0.00 80.00 0.00 5,805 80.12 0.04 0.04 0.00 80.25 0.00 5,765 80.12 0.04 0.04 0.00 80.50 0.00 5,726 80.12 0.04 0.04 0.00 80.75 0.00 5,688 80.12 0.04 0.04 0.00 81.00 0.00 5,649 80.12 0.04 0.04 0.00 81.25 0.00 5,612 80.12 0.04 0.04 0.00 81.50 0.00 5,574 80.12 0.04 0.04 0.00 81.75 0.00 5,537 80.12 0.04 0.04 0.00 82.00 0.00 5,500 80.12 0.04 0.04 0.00 82.25 0.00 5,464 80.12 0.04 0.04 0.00 82.50 0.00 5,428 80.11 0.04 0.04 0.00 82.75 0.00 5,392 80.11 0.04 0.04 0.00 83.00 0.00 5,357 80.11 0.04 0.04 0.00 83.25 0.00 5,322 80.11 0.04 0.04 0.00 83.50 0.00 5,287 80.11 0.04 0.04 0.00 83.75 0.00 5,253 80.11 0.04 0.04 0.00 84.00 0.00 5,219 80.11 0.04 0.04 0.00 84.25 0.00 5,186 80.11 0.04 0.04 0.00 Campus Pond analysis Type 11 24 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Hydrograph for Pond 32P: Pond 1 - Drawdown (continued) Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 84.50 0.00 5,152 80.11 0.04 0.04 0.00 84.75 0.00 5,119 80.11 0.04 0.04 0.00 85.00 0.00 5,087 80.11 0.04 0.04 0.00 85.25 0.00 5,055 80.11 0.04 0.04 0.00 85.50 0.00 5,023 80.11 0.04 0.04 0.00 85.75 0.00 4,991 80.11 0.03 0.03 0.00 86.00 0.00 4,960 80.10 0.03 0.03 0.00 86.25 0.00 4,929 80.10 0.03 0.03 0.00 86.50 0.00 4,898 80.10 0.03 0.03 0.00 86.75 0.00 4,867 80.10 0.03 0.03 0.00 87.00 0.00 4,837 80.10 0.03 0.03 0.00 87.25 0.00 4,808 80.10 0.03 0.03 0.00 87.50 0.00 4,778 80.10 0.03 0.03 0.00 87.75 0.00 4,749 80.10 0.03 0.03 0.00 88.00 0.00 4,720 80.10 0.03 0.03 0.00 88.25 0.00 4,691 80.10 0.03 0.03 0.00 88.50 0.00 4,663 80.10 0.03 0.03 0.00 88.75 0.00 4,635 80.10 0.03 0.03 0.00 89.00 0.00 4,607 80.10 0.03 0.03 0.00 89.25 0.00 4,579 80.10 0.03 0.03 0.00 89.50 0.00 4,552 80.10 0.03 0.03 0.00 89.75 0.00 4,525 80.10 0.03 0.03 0.00 90.00 0.00 4,498 80.09 0.03 0.03 0.00 90.25 0.00 4,472 80.09 0.03 0.03 0.00 90.50 0.00 4,446 80.09 0.03 0.03 0.00 90.75 0.00 4,420 80.09 0.03 0.03 0.00 91.00 0.00 4,394 80.09 0.03 0.03 0.00 91.25 0.00 4,368 80.09 0.03 0.03 0.00 91.50 0.00 4,343 80.09 0.03 0.03 0.00 91.75 0.00 4,318 80.09 0.03 0.03 0.00 92.00 0.00 4,294 80.09 0.03 0.03 0.00 92.25 0.00 4,269 80.09 0.03 0.03 0.00 92.50 0.00 4,245 80.09 0.03 0.03 0.00 92.75 0.00 4,221 80.09 0.03 0.03 0.00 93.00 0.00 4,197 80.09 0.03 0.03 0.00 93.25 0.00 4,174 80.09 0.03 0.03 0.00 93.50 0.00 4,150 80.09 0.03 0.03 0.00 93.75 0.00 4,127 80.09 0.03 0.03 0.00 94.00 0.00 4,105 80.09 0.03 0.03 0.00 94.25 0.00 4,082 80.09 0.02 0.02 0.00 94.50 0.00 4,060 80.09 0.02 0.02 0.00 94.75 0.00 4,037 80.09 0.02 0.02 0.00 95.00 0.00 4,016 80.08 0.02 0.02 0.00 95.25 0.00 3,994 80.08 0.02 0.02 0.00 95.50 0.00 3,972 80.08 0.02 0.02 0.00 95.75 0.00 3,951 80.08 0.02 0.02 0.00 96.00 0.00 3,930 80.08 0.02 0.02 0.00 96.25 0.00 3,909 80.08 0.02 0.02 0.00 96.50 0.00 3,888 80.08 0.02 0.02 0.00 96.75 0.00 3,868 80.08 0.02 0.02 0.00 97.00 0.00 3,848 80.08 0.02 0.02 0.00 97.25 0.00 3,828 80.08 0.02 0.02 0.00 97.50 0.00 3,808 80.08 0.02 0.02 0.00 Campus Pond analysis Type 11 24 -hr 10 -Year Rainfall=5.28" Prepared by {enter your company name here} Printed 8/25/2017 HydroCAD® 9.00 s/n 02109 @2009 HydroCAD Software Solutions LLC Hydrograph for Pond 32P: Pond 1 - Drawdown (continued) Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 97.75 0.00 3,788 80.08 0.02 0.02 0.00 98.00 0.00 3,769 80.08 0.02 0.02 0.00 98.25 0.00 3,749 80.08 0.02 0.02 0.00 98.50 0.00 3,730 80.08 0.02 0.02 0.00 98.75 0.00 3,711 80.08 0.02 0.02 0.00 99.00 0.00 3,693 80.08 0.02 0.02 0.00 99.25 0.00 3,674 80.08 0.02 0.02 0.00 99.50 0.00 3,656 80.08 0.02 0.02 0.00 99.75 0.00 3,638 80.08 0.02 0.02 0.00 100.00 0.00 3,620 80.08 0.02 0.02 0.00 100.25 0.00 3,602 80.08 0.02 0.02 0.00 100.50 0.00 3,584 80.08 0.02 0.02 0.00 100.75 0.00 3,567 80.08 0.02 0.02 0.00 101.00 0.00 3,549 80.08 0.02 0.02 0.00 101.25 0.00 3,532 80.07 0.02 0.02 0.00 101.50 0.00 3,515 80.07 0.02 0.02 0.00 101.75 0.00 3,498 80.07 0.02 0.02 0.00 102.00 0.00 3,482 80.07 0.02 0.02 0.00 102.25 0.00 3,465 80.07 0.02 0.02 0.00 102.50 0.00 3,449 80.07 0.02 0.02 0.00 102.75 0.00 3,433 80.07 0.02 0.02 0.00 103.00 0.00 3,417 80.07 0.02 0.02 0.00 103.25 0.00 3,401 80.07 0.02 0.02 0.00 103.50 0.00 3,386 80.07 0.02 0.02 0.00 103.75 0.00 3,370 80.07 0.02 0.02 0.00 104.00 0.00 3,355 80.07 0.02 0.02 0.00 104.25 0.00 3,339 80.07 0.02 0.02 0.00 104.50 0.00 3,324 80.07 0.02 0.02 0.00 104.75 0.00 3,310 80.07 0.02 0.02 0.00 105.00 0.00 3,295 80.07 0.02 0.02 0.00 105.25 0.00 3,280 80.07 0.02 0.02 0.00 105.50 0.00 3,266 80.07 0.02 0.02 0.00 105.75 0.00 3,251 80.07 0.02 0.02 0.00 106.00 0.00 3,237 80.07 0.02 0.02 0.00 106.25 0.00 3,223 80.07 0.02 0.02 0.00 106.50 0.00 3,209 80.07 0.02 0.02 0.00 106.75 0.00 3,195 80.07 0.02 0.02 0.00 107.00 0.00 3,182 80.07 0.02 0.02 0.00 107.25 0.00 3,168 80.07 0.01 0.01 0.00 107.50 0.00 3,155 80.07 0.01 0.01 0.00 107.75 0.00 3,142 80.07 0.01 0.01 0.00 108.00 0.00 3,129 80.07 0.01 0.01 0.00 108.25 0.00 3,116 80.07 0.01 0.01 0.00 108.50 0.00 3,103 80.07 0.01 0.01 0.00 108.75 0.00 3,090 80.07 0.01 0.01 0.00 109.00 0.00 3,078 80.07 0.01 0.01 0.00 109.25 0.00 3,065 80.07 0.01 0.01 0.00 109.50 0.00 3,053 80.06 0.01 0.01 0.00 109.75 0.00 3,040 80.06 0.01 0.01 0.00 110.00 0.00 3,028 80.06 0.01 0.01 0.00 110.25 0.00 3,016 80.06 0.01 0.01 0.00 110.50 0.00 3,005 80.06 0.01 0.01 0.00 110.75 0.00 2,993 80.06 0.01 0.01 0.00