Loading...
HomeMy WebLinkAbout20181333 Ver 1_401 Application_20181002Environmental Consultants, 8412 Falls of Neuse Road, Suite 104, Raleigh, NC 27615 - Phone: (919) 846-5900 - Fax: (919) 846-9467 sandec.com October 2, 2018 S&EC Project # 12913.W5 To: US Army Corps of Engineers NC DWR, 401 & Buffer Permitting Unit Raleigh Regulatory Field Office Attn: Karen Higgins Attn: James Lastinger Archdale Building — 91h Floor 3331 Heritage Trade Drive, Suite 105 512 North Salisbury Street Wake Forest, NC 27587 Raleigh, NC 27604 From: Deborah Edwards Shirley Middle Creek Soil & Environmental Consultants, PA Neuse Re: Town of Apex -Middle Creek Regional Pump Station, Force Mai & Interceptor Apex, Wake County, NC Class On behalf of the applicant, Mr. David Hughes, the Assistant Town Manager, please find attached a complete application and supplemental information requesting written concurrence from the U.S. Army Corps of Engineers (USACE) and the N. C. Division of Water Resources (NCDWR) that the activities proposed below may proceed under Nationwide Permit 12 and Water Quality Certification 4133. In addition, the applicant would like to request a Neuse Riparian Buffer No Practical Alternatives Determination from the NCDWR for the proposed impacts to riparian buffers. Please contact me at (919) 846-5900 if you have any questions or require additional information. PROJECT SUMMARY Project Name Town of Apex- Middle Creek Regional Pump Station, Force Mai & Interceptor Project Type Utility -Pump Station, Force Main & Interceptor Owner / Applicant Town of Apex County Wake Nearest Town Apex Waterbody Name Middle Creek Basin Neuse Index Number 274-43-15-(l) Class C; NSW IMPACT SUMMARY Stream Impact (acres): 0.041 Wetland Impact (acres): 1.049 Open Water Impact (acres): 0 Total Impact to Waters of the U.S. acres 1.09 Total Stream Impact (linear feet): 307 Total Riparian Buffer Impact (sq. ft.) Zone 1: 14,311 Zone 2: 13,266 Attachments: Pre -construction Notification (PCN) Application Form Agent Authorization Form USGS Topographic Map NRCS Soil Survey Map TOA Master Sewer Plan 2014 DWR Buffer Determination NBRRO#17-116 NCDMS Mitigation Acceptance SOA letter -Wetland Mitigation SOA letter -Buffer Mitigation Overall Index Maps Wetland, Stream & Buffer Impact Maps NCDWR ONLY: $570 Application Fee check \o�pF W A TFRQG 1 1 > 1�.�1 p -r Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Page 1 of 13 PCN Form — Version 1.3 December 10, 2008 Version Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 12 or General Permit (GP) number: N/A 1c. Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ® Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ® Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ® Yes ❑ No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Town of Apex -Middle Creek Basin Regional Pump Station, Force Main & Interceptor 2b. County: Wake 2c. Nearest municipality / town: Apex 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: Town of Apex -Public Works & Utilities Department 3b. Deed Book and Page No. N/A 3c. Responsible Party (for LLC if applicable): David Hughes -Assistant Town Manager 3d. Street address: P. O. Box 250 3e. City, state, zip: Apex, NC 27502 3f. Telephone no.: 919-249-3414 3g. Fax no.: 919-387-7055 3h. Email address: David. Hughes ApexNC.org. Page 1 of 13 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ® Other, specify: Owner-please send correspondence to Agent and Owner 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Deborah Edwards Shirley 5b. Business name (if applicable): Soil & Environmental Consultants, PA 5c. Street address: 8412 Falls of Neuse Road, Ste. 104 5d. City, state, zip: Raleigh, NC 27615 5e. Telephone no.: 919-846-5900 5f. Fax no.: 919-846-9467 5g. Email address: DShir/e SandEC.com Page 2 of 13 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): Parcel ID: N/A-linear utility project 1 b. Site coordinates (in decimal degrees): IMPACT #1 Latitude: 35.6933 Longitude: -78.8243 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: N/A 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to UT to Middle Creek, 27-43-15-(1) proposed project: 2b. Water Quality Classification of nearest receiving water: C, NSW 2c. River basin: Neuse; Hydrologic Unit Code 03020201 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The existing conditions of the project area consist of forested land on the east side of Middle Creek, within the floodplain. Perennial streams, intermittent streams and jurisdictional wetlands are present within the proposed 60' easement. The general land use in the vicinity of the project is residential, forested land and a wastewater treatment plant at the northern terminus. 3b. List the total estimated acreage of all existing wetlands on the property: > 1 acre of wetlands within the delineated utility corridor. Note that corridor delineation included additional width, however only what is within the 60' corridor is estimated. 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: > 300 linear feet within the delineated utility corridor. Note that corridor delineation included additional width, however only what is within the 60' corridor is estimated. 3d. Explain the purpose of the proposed project: The purpose of the proposed project is to construct a regional pump station, force main and gravity sewer for the Town of Apex. 3e. Describe the overall project in detail, including the type of equipment to be used: The overall project consists of the construction of a regional wastewater pump station, and approximately 8, 000 linear feet of a 16-inch force main, and a gravity sewer line. This project has been on the Town's Sewer System Master Plan for several years (copy attached) and will ultimately allow the Pinnacle Park Pump Station to be taken out of service. There will be a total of nine (9) wetland impact areas and five (5) stream crossings. Typical equipment used for excavation and construction will be utilized for this project. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ®Yes [:1 No El Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ® Preliminary ❑ Final Comments: PJD package sent to Corps on 9-12-18 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Soil & Environmental Name (if known): Steven Ball Consultants, PA Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. USACE: Site visit & field verification completed by James Lastinger on November 17, 2016; NCDWR: Riparian buffer determination completed by Stephanie Goss on May 1, 2017 (NBRRO#17-116) Page 3 of 13 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ❑ No ® Unknown 5b. If yes, explain in detail according to "help file" instructions. N/A 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. N/A Page 4 of 13 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams - tributaries ® Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of Forested (Corps - 404, 10 Area of impact Permanent (P) or wetland DWQ - non-404, other) (acres) Temporary T if known W1 (#2-W6) Utility -Open Cut (Permanent-No Bottomland ® Yes ® Corps 0.054 ® P ❑ T Permanent Loss) Hardwood ❑ No ❑ DWQ W2 (#2-W6) Utility-Rip-Rap Keyed Bottomland ® Yes ® Corps 0.001 ® P ❑ T into stream bank Hardwood ❑ No ❑ DWQ W3 (#2-W6) Utility- Open Cut Bottomland ® Yes ® Corps 0.005 ❑ P ® T Construction Corridor Hardwood ❑ No ❑ DWQ W4 (#3-W5) Utility -Open Cut (Permanent-No Bottomland ® Yes ® Corps 0.029 ® P ❑ T Permanent Loss) Hardwood ❑ No ❑ DWQ W5 (#4-W5) Utility -Open Cut (Permanent-No Bottomland ® Yes ® Corps 0.098 ® P ❑ T Permanent Loss) Hardwood ❑ No ❑ DWQ W6 (#4-W5) Utility- Open Cut Bottomland ® Yes ® Corps 0.006 ❑ P ® T Construction Corridor Hardwood ❑ No ❑ DWQ W7 (#5-W5) Utility -Open Cut (Permanent-No Bottomland ® Yes ® Corps 0.025 ® P ❑ T Permanent Loss) Hardwood ❑ No ❑ DWQ W8 (#5-W5) Utility-Rip-Rap Keyed Bottomland ® Yes ® Corps 0.001 ® P ❑ T into stream bank Hardwood ❑ No ❑ DWQ W9 (#5-W5) Utility- Open Cut Bottomland ® Yes ® Corps 0.005 ❑ P ® T Construction Corridor Hardwood ❑ No ❑ DWQ W10 (#6-W3/4) Utility -Open Cut (Permanent-No Bottomland ® Yes ® Corps 0.554 ® P ❑ T Permanent Loss) Hardwood ❑ No ❑ DWQ W11 (#6-W3/4) Utility-Rip-Rap Keyed Bottomland ® Yes ® Corps 0.001 ® P ❑ T into stream bank Hardwood ❑ No ❑ DWQ W12 (#6-W3/4) Utility- Open Cut Bottomland ® Yes ® Corps 0.092 ❑ P ® T Construction Corridor Hardwood ❑ No ❑ DWQ W13 (#7-W2/3) Utility -Open Cut (Permanent-No Bottomland ® Yes ® Corps 0.040 ® P [-IT Permanent Loss) Hardwood ❑ No ❑ DWQ W14 (#7-W2/3) Utility-Rip-Rap Keyed Bottomland ® Yes ® Corps 0.001 ® P ❑ T into stream bank Hardwood ❑ No ❑ DWQ W15 (#7-W2/3) Utility- Open Cut Bottomland ® Yes ® Corps 0.008 ❑ P ® T Construction Corridor Hardwood ❑ No ❑ DWQ W16 (#8-W2) Utility -Open Cut (Permanent-No Bottomland ® Yes ® Corps 0.074 ® P ❑ T Permanent Loss) Hardwood ❑ No ❑ DWQ W17 (#8-W2) Rip-Rap lined swale Bottomland ® Yes ® Corps 0.007 Page 5 of 13 PCN Form - Version 1.3 December 10, 2008 Version ® P [:1T Hardwood ElNo ❑ DWQ W18 (#8-W2) Utility- Open Cut Bottomland ® Yes ® Corps 0.001 ❑ P ® T Construction Corridor Hardwood ❑ No ❑ DWQ W19 (#9-W2) Utility -Open Cut (Permanent -No Bottomland ® Yes ® Corps 0.029 ® P ❑ T Permanent Loss) Hardwood ❑ No ❑ DWQ W20 (#10-W1) Utility -Open Cut (Permanent -No Bottomland ® Yes ® Corps 0.018 ® P ❑ T Permanent Loss) Hardwood ❑ No ❑ DWQ 2g. Total wetland impacts 1.049 2h. Comments: Total proposed Permanent, No Permanent Loss Wetland impacts= 0.922 acres; Total proposed Permanent Loss Wetland impacts= 0.010 acres; Total proposed Temporary Wetland impacts for construction= 0.117 acres. Temporary Stream impacts will be brought back to pre -construction contours and revegetated with a wetland seed mix. Impacts in bold potentially require compensatory mitigation. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 39. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number -Permanent (PER) or (Corps - 404, 10stream length (P) or Temporary (T) intermittent DWQ — non -404, width (linear (INT)? other) (feet) feet) Utility -Open Cut S1 (#1-G) ® P ❑ T w/Rip-Rap Keyed into stream bed UT to middle ❑ PER ® Corps 10 (Permanent -No Creek5 ®INT ❑DWQ Permanent Loss) S2 (#1-G) ❑ P ® T Utility -Open Cut UT to middle ❑ PER ® Corps 5 51 Construction Corridor Creek ® INT ❑ DWQ Utility -Open Cut S3 (#2-F) ® P ❑ T w/Rip-Rap Keyed into stream bed UT to middle ® PER ® Corps 8 10 (Permanent -No Creek ❑ INT ❑ DWQ Permanent Loss) S4 (#2-F) [:1 P ®T Utility -Open Cut UT to middle ® PER ® Corps 8 51 Construction Corridor Creek El INT El DWQ Utility -Open Cut S5 (#5-E) ® P ❑ T w/Rip-Rap Keyed into stream bed UT to middle ❑ PER ® Corps 3 10 (Permanent -No Creek ® INT ❑ DWQ Permanent Loss) S6 (#5-E) ❑ P ® T Utility -Open Cut UT to middle ❑ PER ® Corps 3 51 Construction Corridor Creek ® INT ❑ DWQ Utility -Open Cut S7 (#6-D) ® P ❑ T w/Rip-Rap Keyed into stream bed UT to middle ® PER ® Corps 7 10 (Permanent -No Creek ❑ INT ❑ DWQ Permanent Loss) S8 (#6-D) ❑ P ® T Utility -Open Cut UT to middle ® PER ® Corps 7 50 Construction Corridor Creek ❑ INT ❑ DWQ Utility -Open Cut S9 (#7-C) ® P ❑ T w/Rip-Rap Keyed into stream bed UT to middle ❑ PER ® Corps 4 10 (Permanent -No Creek ® INT ❑ DWQ Permanent Loss) Page 6 of 13 S10(#7 -C) El P ®T Utility -Open Cut UT to middle F-1PER® Corps 5 54 Construction Corridor Creek ®INT ❑ DWQ 3h. Total stream and tributary impacts 307 3i. Comments: Total proposed Permanent, No Permanent Loss Stream impacts = 50 linear feet; Total proposed Temporary Stream impacts for construction= 257 linear feet. Temporary Stream impacts will be brought back to pre -construction elevations and the stream banks will be stabilized. Impacts in bold potentially require compensatory mitigation. 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water im acts below. 4a. 4b. 4c. 4d. 4e. Open water impact Name of waterbody number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Tempora T 01 ❑P❑T 0. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then com tete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose of (acres) number pond Flo ode Filled Excavated Flooded Filled Excavated Flooded d P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 7 of 13 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ® Neuse ❑ Tar-Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason for impact Buffer Zone 1 impact Zone 2 impact Permanent (P) or Stream name mitigation (square feet) (square feet) Temporary T required? B1 (#1) ® P ❑ T Utility-Perpendicular UT to Middle ❑ Yes 3,888 3,189 Crossing Creek ® No B2 (#2) ® P ❑ T Utility-Perpendicular UT to Middle ❑ Yes 3,672 2,798 Crossing Creek ® No B3 (#5) ® P ❑ T Utility-Perpendicular UT to Middle ❑ Yes 1,127 2,323 Crossing Creek ® No B4 (#6) ® P ❑ T Utility-Perpendicular UT to Middle ❑ Yes 3,620 2,415 Crossing Creek ® No B5(#10) ® P ❑ T Utility-Parallel Crossing UT to Middle Creek ® Yes ❑ No 2,004 (1,394 requires 2,541 mitigation) 6h. Total buffer impacts 14,311 13,266 6i. Comments: B5 (#10)-1,394 of riparian buffer outside of wetland area that will require compensatory mitigation. Impacts in bold potentially require compensatory mitigation. Page 8 of 13 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. S&EC completed a wetland & stream delineation for the entire easement in order to identify natural resources so that impacts could be avoided & minimized to the maximum extent practicable. The proposed project includes nine (9) wetland crossings, and five (5) stream crossings. Directional drill or Bore & Jack construction methods are not being proposed because the town requires that the project includes a permanent rip -rap lined maintenance vehicle crossing for each stream. It was determined to not be practical to use directional drill or Bore & Jack techniques to install the pipe lines, and then impact the streams and wetlands above the pipe lines by constructing the required maintenance vehicle access crossings. The rip -rap lined maintenance vehicle crossings have been minimized to 10 ft. wide at each crossing and compensatory mitigation is being proposed at a 1:1 ratio. The proposed easement falls on numerous tracts of land owned by different individuals. Each impact area was evaluated to minimize stream & wetland impacts to the maximum extent practicable and also minimize the encroachment on the individual properties. At Impact #8 there is an existing stormwater management BMP that is adjacent to the proposed force main and easement. The easement is positioned as close to the BMP as allowed by regulation. The town is requiring the constructed rip -rap lined swale across the easement to convey discharge from the existing stormwater BMP. At Impact #10, the force main will be directionally drilled under the wetland and Pristine Water Drive and will avoid impacts to wetlands. The gravity line will terminate on the north side of Pristine Water Dr. At Impact #10, there is also an existing stormwater BMP on the upslope (eastern) side of the proposed gravity sewer easement, and the stream and twin 60 -inch culverts on the downslope (western) side of the proposed easement. These existing constraints made is difficult to avoid wetland and parallel riparian buffer impacts within this location. All remaining wetland, stream & riparian buffer impacts have been designed to cross the wetlands and streams at a near perpendicular angle. All temporary wetland impacts will be brought back to pre -construction contours and vegetated with a wetland seed mix. All temporary stream impacts will be brought back to pre -construction elevations and the stream banks will be stabilized. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. As per the project engineer; There will be silt fence along all of the disturbed areas, to prevent any sediment from leaving the site. The proposed stream crossings all have minimal dry weather flows, which should allow the pipeline installation across the stream to be relatively quick. There will be the opportunity to use a cofferdam and bypass pipe if there is any stream flow at the time of the crossing. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ® Yes ❑ No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ® Corps ® Mitigation bank 2c. If yes, which mitigation option will be used for this ®Payment to in -lieu fee program project? ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: EBX-Neuse sponsored Neu -Con Wetland & Stream Umbrella Mitigation Bank, specifically the Howell Woods Site Type: Quantity: 3b. Credits Purchased (attach receipt and letter) Riparian Wetland 0.94 credits Riparian Buffer 4,182 credits Page 9 of 13 PCN Form — Version 1.3 December 10, 2008 Version 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ® Yes 4b. Stream mitigation requested: 50 linear feet 4c. If using stream mitigation, stream temperature: ® warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): 0 square feet 4e. Riparian wetland mitigation requested: 0 acres 4f. Non -riparian wetland mitigation requested: 0 acres 4g. Coastal (tidal) wetland mitigation requested: 0 acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ® Yes ❑ No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 Parallel Utility 1,394 3 (2 for Catawba) 4,182 Zone 2 1 1.5 0 6f. Total buffer mitigation required: 4,182 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). Payment to a private bank, see attached SOA letter. 6h. Comments: Per Town of Apex LIDO Section 6-6.1.14(D)(2)(d)-Impacts to wetlands within Zones 1 & 2 of the riparian buffer that are subject to mitigation under 15A NCAC 2H.0506 shall comply with the mitigation ratios in 15A NCA C 2H .0506. This impact is identified within the impact exhibits and Impact #10. Of the 2,004 sq. ft., 610 sq. ft. is within the wetland and wetland mitigation is required. Page 10 of 13 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? N/A, proposed activity will not add impervious to project area. 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Proposed activity will not add impervious to project area and is not a high-density development. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II ❑ NSW 3b. Which of the following locally -implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been El Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 11 of 13 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an ❑ Yes ® No environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval El Yes El No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. We have reviewed the "Draft Internal Policy, Cumulative impacts and the 401 Water Quality Certification and Isolated Wetlands Programs" document prepared by the NC Division of Water Quality on April 10, 2004, version 2.1. The draft states that other publically funded projects mayor may not result in cumulative impacts. The Middle Creek Regional Pump Station, Force Main and Interceptor project is a privately funded (with partial public reimbursement) within a partially developed watershed. Please note that this project is located within the Town of Apex, therefore the adjacent properties that have potential for development will have the following regulations to protect downstream waters: 1) the Neuse River Basin Riparian Buffer Protection regulations, these regulations require limited activities within the riparian buffer areas, in addition to "diffuse flow" requirements, and could require Best Management Practices that treat nitrogen if diffuse flow cannot be achieved; 2) the Phase II NPDES Stormwater Permit Program, this program includes permitting requirements for Municipal Separate Storm Sewer Systems (MS4s) in addition to post -construction stormwater management requirements. We anticipate that the DWR will advise us if any additional information is needed. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. The Town of Apex will ensure that capacity of their pump stations will not be exceeded. Page 12 of 13 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? The NC -Natural Heritage Programs Data Explorer Map was used to search for elemental occurrences of federally protected species listed within and within 1 mile of the project boundaries. It was determined based on the search that there are no elemental occurrences that are listed as federally Threatened/Endangered within or within 1 mile of the project boundaries. References: North Carolina Natural Heritage Program. 2018. Geographic Information System (GIS) data. NCDNCR, Raleigh, NC. Available at hag.-1%yww.ncnhp.o&1 (Accessed: September 18, 2018). 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? The NOAH Habitat Conservation/Habitat Protection: National Marine Fish Service; Essential Fish Habitat Mapper website was referenced. No Essential Fish Habitat was identified near the project. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? The NC State Historic Preservation Office HPOWEB GIS Service interactive map was referenced on September 18, 2018; no historic listings or study list entries or determined eligible listings were identified within the easement. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ® Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: Per the project engineer.- A portion of the pump station site and segments of the proposed line work will be within the 100 -year flood fringe, but not within the floodway. The line work creates no changes in the existing topography and has no effect on the 100 -year flood elevations. The pump station site will have a relatively small amount of fill placed in the flood fringe. Fill is allowed in the 100 -year flood fringe; the effects of fill in the flood fringe in reflected in FEMA's flood study. 8c. What source(s) did you use to make the floodplain determination? Per project engineer & NC Floodplain Mapping Program Deborah E. Shirley October 2, 2018 Applicant/Agent's Signature Applicant/Agent's Printed Name (Agent's signature is valid only if an authorization letter fru the applicant is provided.) Date Page 13 of 13 Soil & Environmental Consultants, PA 8412 Falls of Neuse Road, Suite 104, Raleigh, NC 27615 • Phone: (919) 846-5900 • Fax: (919) W-9467 sandec.com MUNICIPAL OFFICIAL / AGENT AUTHORIZATION Project Name/Description: Middle Creek Basin Regional Pump Station Force Main & Interceptor S&EC Project # 12913 Date: The Department of the Army U.S. Army Corps of Engineers, Wilmington District 69 Darlington Avenue Wilmington, NC 28403 Attn: James Lastinger Field Office: Regulatory Field Office This document authorizes Soil & Environmental Consultants, PA (S&EC) (as my agent) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of a permit or certification and any and all associated standard and special conditions. This notification supersedes any previous correspondence concerning the agent for this project. NOTICE: This authorization, for liability and professional courtesy reasons, is valid only for government officials to enter the property when accompanied by S&EC staff. You should call S&EC to arrange a site meeting prior to visiting the site. PARCEL INFORMATION: Parcel lndexNumber(s)(PIN): multiple Site Address: City, County, State: MUNICIPAL OFFICIAL INFORMATION: Name: Town of Apex: David Hughes -Assistant Town Manager Address: P.O. Box 250, Apex, NC 27502 Phone No.: (919) 249-3414 Fax No.: (919) 387-7055 Mobile No.: ( ) Email: David.Hughes?,ApexNC.ore __D1aytn A0 ,tk65 712 011.5 Municipal Official (please print) Date's We hereby certify the above information submitted in this application is true and accurate to the best of our know/edge. 11 PRISTINEW4TE- PO, 1 , 1 }� Pond 1 q } .. 1, ] f B Red Line is Eastern Evaluation Limit a Feature B is Western Evaluation Limit _ 1 Y � � 1 B J !{ r S. I• a E 0B RD Project Number: 12913 Map Title: Figure 1 - USGS Map N o 800 x,600 Project Manager: I I I I I I I I I SB Middle Creek PS Feet Scale: 191 = 800' Wake County, NC • — A Source: Soil & Environmental Consultants, PA Date: NC USGS Apex 9462 ., .1'%,—R -d., ui, I"Ndro, \C 7] 15. rJw --(919)1 59-F'-:[919]xv'9 10/18/16 Quadrangle —`&"°°'° { Cg'BL Au ru � A x rael3 WSC L 5 50 Cm _1 f+r i - � .. 4 � EnU 5 HrEI <CE 44R X 1 CRG2:. 45x r Go F ¢r Red Line is Eastern Ag C' ...- s -Affil' Evaluation Limit CrO D r GDC III. Feature B is Western C ' lil Evaluation Limit CLB HrC.._4. C rl . x A CryPB `rrl= F _ rr ti Crl HrC XX VVU . ,i GOC _ H { S Au C r} %7 A88 4 - Project Number: 12913 Map Title: N Figure 2 - Soil Survey Map 0 800 1,600 Project Manager: I i i i I i i i I SB Middle Creek PS Feet Scale: 1 800' Wake County, NC " = • — A Source: Soil & Environmental Consultants, P�1 Date: Wake County Soil 94621:,, .1N—R-d. ti -i- I" Ndmo. W MI 5• M—,-(919)1 5m5 o•F-[919]RLV' 1 10/18/16 Survey Sheet 75 -L&— Wa ter Resources ENVIRONMENTAL. QUALITY Town of Apex P4 Box 250 Apex, NC 27502 Determination Type: Buffer ® Neuse (15A NCAC 2B .0233) ❑ Tar -Pamlico 05A NCAC 2B.0259) ❑ Jordan (15A NCAC 2B .0267) (governmental and/or interjurisdictional projects) ROY COOPER Governor MICHAEL S. REGAN Secre[aq S. JAY ZIMMERMAN Ffredor ` II - `J May 1, 2017 MAY 08 nu Ry: Soil & E'Ivircnmerola C0`o$U#3n1s, PA Subject: Buffer Determination. Letter NBRRO #17-116 Wake County I ntermittenilPere nn€al ❑ intermittent/Perennial determination (where local buffer ordinances apply) Project Name: Middle Creek Sewer Expansion Address/Location: Pristine Water Drive Apex. NC Stream(s): Middle Creek Determination Date: May 1, 2017 Staff: Stephanie Goss Stream E/IUP* Not Subject Subject Start{q, Stop n Soil USGS Sure Ta o A p X Thmu bout evaluation limit X X B: Middle P X Throughout X X Creek D p X Throughout evaluation limit X X E I X Start at DWR q X F p X Throughout evaluation limit X G I X Throughout evaluation limit X Pond 1 X X X *E111P = Ephemertrll[niermiltenilPerennial Explanation: The stream(s) listed above has been located on the most recent published MRCS Soil Survey of Waite County, North Carolina and/or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each stream that is checked "Not Subject" has been determined to not be at least intermittent or is not present. Streams that are checked "Subject" have been located on the property and possess characteristics that qualify it to be at least an intermittent stream. There may be other streams located on the property that do not show up an the maps referenced above but may be considered jurisdictional according to the US Army Corps of Engineers. Division of Woter ltesotlrce�, italeioll 11cgnma4 011iQC, water Quality operatizxis Section itir.tp: porrtl.nedcnr.korg. web wLl ap-"x l62' iylaiI Seryice iselzter, Ralei,;lt, SNC 2"•6t1{J-IO i ['hone: (to I ) 7�]1-4200 Location: 3N00 f3arrett lhirc. ILilci.h. `C 17(,i1'y Fax: [trlti} "ix -?i U Middle Creek Sewer Expansion Waite County May 1, 2017 Page 2 of 2 This on-site determination shall expire rive (5) years From the date of this letter. Landowners or affected parties that dispute a determination made by the DWR may request a determination by the Director. An appeal request must be made within sixty (60) days of date of this letter. A request for a determination by the Director shall be referred to the Director in writing. If sending via US Postal Service: c/o Karen Higgins; DWR — 401 & Buffer Permitting Unit; 1617Mail Service Center; Raleigh, NC 27699-1617. If sending via delivery service (UPS, FedEv, etc.): Karen Higgins; DWR — 401 & Buffer Permitting Unit; 512 N. Salisbury Street; Raleigh, NC27604. This determination is final and binding unless, as detailed above, unless an appeal is requested within sixty (60) days. This project may require a Section 4041401 Permit for the proposed activity. Any inquiries should be directed to the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554-4$$4. If you ve questions regardin s etermin 'on, please feel free to contact Stephanie Goss at (919)791-4256. Si erel , 09 Daiuiy Smith Supervisor, Water Quality Regional Operations Center cc: RRO DWR File Copy David Gainey, SkEC, 8412 Falls of Neuse Road, Suite 104, Raleigh, NC 27615 17-116: Middle Creek Sewer Expansion Mitigation Services ENVIRONMENTAL QUALITY September 13, 2018 ROY COOPER MICHAEL S. REGAN ", 1, 1(111 David Hughes Town of Apex P.O. Box 250 Apex, NC 27502 Expiration of Acceptance: 3/13/2019 Project: Town of Apex=Middle:Creek-RegioTml�'S,TM &`trtterceptor County: Wake The purpose of this letter is to notify you that the NCDEQ Division of Mitigation Services (DMS) is willing to accept payment for compensatory mitigation for impacts associated with the above referenced project as indicated in the table below. Please note that this decision does not assure that participation in the DMS in - lieu fee mitigation program will be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility of the applicant to contact permitting agencies to determine if payment to the DMS will be approved. You must also comply with all other state, federal or local government permits, regulations or authorizations associated with the -proposed activity including G.S. § 143-214.11. This acceptance is valid for six months from the date of this letter and is not transferable. If we have not received a copy of the issued 404 Permit/401 Certification within this time frame, this acceptance will expire. It is the applicant's responsibility to send copies of the permits to DMS. Once DMS receives a copy of the permit(s) an invoice will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized work. The amount of the in -lieu fee to be paid by an applicant is calculated based upon the Fee Schedule and policies listed on the DMS website. -Based on the information supplied -lay -you in -your request to use the -DMS, the impacts for which you are requesting compensatory mitigation credit are summarized in the following table. The amount of mitigation required and assigned to DMS for this impact is determined by permitting agencies and may exceed the impact amounts shown below. River Basin River Bas��_7 Impact Location (8 -digit HUC) Impact Type Impact Quantity Neuse 03020201 Warm Stream 50 Upon receipt of payment, DMS will take responsibility for providing the compensatory mitigation. The mitigation will be performed in accordance with the In -Lieu Fee Program instrument dated July 28, 2010 and 15A NCAC 02B .0295 as applicable. Thank you for your interest in the DMS in -lieu fee mitigation program. If you have any questions or need additional information, please contact Kelly Williams at (919) 707-8915. cc: Debbie E. Shirley, agent Sincerely, Ja e . B Stanfill Ass Management Supervisor State ot'North Carolina I Environmental Quality I Mitigation Services 1652 Mail Service Center I Raleigh, NC 27699-1652 1 217 W. Jones Street, Suite 3000 919 707 8976 T fires EBX-Neuse I, LLC Stream and Wetland Banks Statement of Availability September 12, 2018 U.S. Army Corps of Engineers James Lastinger Raleigh Regulatory Field Office 3331 Heritage Trade Center, Suite 105 Wake Forest, NC 27587 Re Project: Town of Apex -Middle Creek Regional PS, FM & Interceptor This document confirms that Town of Apex (Applicant) for the Town of Apex -Middle Creek Regional PS, FM & Interceptor (Project) has expressed an interest to utilize 0.94 Riparian Wetland Mitigation Credits from the EBX-Neuse sponsored Neu -Con Wetland & Stream Umbrella Mitigation Bank, specifically from the Howell Woods Site in the Neuse HUC 03020201. As the official Bank Sponsor, EBX-Neuse I, LLC, attests to the fact that mitigation is available for reservation at this time. These mitigation credits are not considered secured, and consequently are eligible to be used for alternate purposes by the Bank Sponsor, until payment in full is received from the Applicant resulting in the issuance of a Mitigation Credit Transfer Certificate by the bank acknowledging that the Applicant has fully secured credits from the bank and the Banker has accepted full responsibility for the mitigation obligation requiring the credits/units. The Banker will issue the Mitigation Credit Transfer Certificate within three (3) days of receipt of the purchase price. Banker shall provide to Applicant a copy of the Mitigation Credit Transfer Certificate and a documented copy of the debit of credits from the Bank Official Credit Ledger(s), indicating the permit number and the resource type secured by the applicant. A copy of the Mitigation Credit Transfer Certificate, with an updated Official Credit Ledger will also be sent to regulatory agencies showing the proper documentation. If any questions need to be answered, please contact me at 919-209-1075. Best Regards, ()�FTA'w' Caitlan B. Parker Resource Environmental Solutions, LLC 302 Jefferson Street, Suite 110 Raleigh, NC 27605 fires EBX Buffer Mitigation Banks Statement of Availability September 12, 2018 NC Division of Water Resources Stephanie Goss 512 N. Salisbury St. Archdale Building, 9th floor Raleigh, NC 27604 Re Project: Town of Apex -Middle Creek Regional PS, FM & Interceptor This document confirms that Town of Apex (Applicant) for the Town of Apex -Middle Creek Regional PS, FM & Interceptor (Project) has expressed an interest to utilize 4,182 Square Feet of Riparian Buffer Mitigation Credits from one of the following banks, EBX-Neuse I, LLC Neuse Riparian Buffer Umbrella Mitigation Bank, RES Neuse Buffer and Nutrient Offset Umbrella Mitigation Bank, or EBX Upper Neuse Riparian Buffer Umbrella Mitigation Bank. Specific bank sites that may be debited are Arrington Bridge I, Arrington Bridge II, Buffalo Branch, Selma Mill, Cedar Grove, Hatley, Ezell, and Polecat, all located in HUC 03020201. As the official Bank Sponsor, EBX-Neuse I, LLC and EBX, attests to the fact that mitigation is available for reservation at this time. These mitigation credits are not considered secured, and consequently are eligible to be used for alternate purposes by the Bank Sponsor, until payment in full is received from the Applicant resulting in the issuance of a Mitigation Credit Transfer Certificate by the bank acknowledging that the Applicant has fully secured credits from the bank and the Banker has accepted full responsibility for the mitigation obligation requiring the credits/units. The Banker will issue the Mitigation Credit Transfer Certificate within three (3) days of receipt of the purchase price. Banker shall provide to Applicant a copy of the Mitigation Credit Transfer Certificate and a documented copy of the debit of credits from the Bank Official Credit Ledger(s), indicating the permit number and the resource type secured by the applicant. A copy of the Mitigation Credit Transfer Certificate, with an updated Official Credit Ledger will also be sent to regulatory agencies showing the proper documentation. Please contact me at 919-209-1075 or cparkergres.us if you have any questions or need additional information. Best Regards, ��FT� Caitlan B. Parker Resource Environmental Solutions, LLC 302 Jefferson Street, Suite 110 Raleigh, NC 27605 Bank Sponsor — EBX-Neuse I, LLC and Environmental Banc & Exchange (EBX) **Impact No. 10 - Zone 1 Impact had 1394 sf outside of wetland & 610 sf within wetland Type of Impact Impact No. Intermittent Stream Temp. Const. Corridor (LF) Intermittent Stream Temp. Const. Corridor (SF) Intermittent Stream Perm. - No Perm. Loss (LF) Intermittent Stream Perm. - No Perm. Loss (SF) Perennial Stream Temp. Const. Corridor (LF) Perennial Stream Temp. Const. Corridor (SF) Perennial Perennial Stream Perm. - Stream Perm. No Perm. Loss No Perm. Loss (LF ) (SF) Zone 1 Zone 2 Zone 2 (Grading & Re -vegetating) Zone 3 WETLANDS Permanent No Perm. Loss WETLANDS Permanent Loss WETLANDS Temporary Construction Corridor 1 51 253 10 48 3888 3189 1743 2 51 435 10 86 3672 2798 2338 54 226 3 1243 4 4280 282 5 51 152 10 30 1127 2323 1081 57 243 6 50 394 10 75 3620 2415 6043 24128 17 4010 7 54 287 10 41 1778 39 329 8 3242 294 17 9 1269 10** 2004 2541 5838 799 11 955 Totals 105 540 20 89 152 981 30 191 14311 13266 1743 12836 40158 461 5107 **Impact No. 10 - Zone 1 Impact had 1394 sf outside of wetland & 610 sf within wetland � � I � � I V I \ f \ r I 1 / r \ r / PEMBERLEY PROPERTY OWNERS' ASSOCIATION, INC. / D. B. 16533, PG. 1996 B. M. 2015, PGS. 406-408 PIN 0750.07-179279 TRINITY APEX NORTH DAYLENE PAGE HEIRS / l D.B. 4439 PG. 797 I I / / 100, LLC GERTRUDE ' I LOOMIS HORTON, JR. / PIN 0750.07 B. M. PG. 114 - - - - - - - PG. 685 D. B. 1065, PG. 391 PIN 07500.07.01- 78- 4078 -09 4684 D.B.2353, PG. 559 I 1 - - - _ _ _ _ _ - - -11 / D.B. 14735, / STEELE / I , - / / / PIN 0750.01-0,9-6187 I - - - - - - - - - -, B. M. 2006, / lz� - - - - - - - - - - PG. 414 . . . . . . . . . PIN / i - - 0750.01- 08-5838 I PUMP f` % y STATION MFW INVESTMENTS LLC \ j - _ - _ - _ - _ - - C _ _ _ _ _ _ _ _ _ _ _ _ _/ _ D. B. 17139 PG. 745 .� _ _ _ / - _ - - � _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ i' _ _ _ _ _ _ I w PIB 0750 42'7PG. 06 4 16" GRAVITY / _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , _ �' �� w < _________ SEWER MAIN 7 _ _ ----MF-W- MF-W-INVE•STMENTS,L-LC _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Al " -D. P. 76638, PC fi192 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ / _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ / - - - - - - - - - -9.M. -20Q, PO10b7 l _ w +� `��_-----''° `_°'' \ . . . . . . . . . . P/N 0750-19- 705.3 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ / _ _ _ _ _ _ _ - _ ' ...... . . . . . . . . . . . . . . _ /- - - - - - - ' .' �� / f f — _ — — -�_ ''"_•.- — — — -- — "� - - - - - - - - - - - - - - - /'^' _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 1 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ II 1 . . . . . . . . . . �39+00 _ i i II I _"'777 16" FORCE MAIN IMPACT 2 } _ _ --_,_ + 1 . IMPACT 1 — — ——==�—�— / 0 — -- o STREAM 'F' — ak° (STREAM 'G') IMPACT 3 III 'i WETLAND W6 / -- ---- 9 ,1k°° I (WETLAND W5) WE �E I I I IMPACT 4 I I OOR�� pN RARY - - co (WETLAND W5) z&SF F ' IMPACT 5 _ STREAM 'E' LOOMIS HORTON R. / D. B. 2353, PG. 559 J WETLAND 'W5') % '_�' i �\- - - - - - - - - - -I/ B. M. 1942, PG. 114 � � / PIN 0750.01-27-4707 IMPACT 6 �; / STREAM 'D' I / DELINEATED WETLAND 'W4') ; I / WETLANDS LIMITS \ / MFW INVESTMENTS,LLC / / \ D. B. 16638, PG. 1192 i B. M. 2017, PG. 1067 PIN 0750-29-2070 � I � I I \ I i 1 GRAPHIC SCALE 100 0 50 100 200 1 inch = 100 ft. DESIGN DRAWN CHECKED SCALE 1" = l00' FILE 1dCBPS-lMD0CIS l -6 w a SHEET 1 of 14 I <'(0 N��oN Q (9 (7 1 I�N I I 1 1 1 � I I 1 I' MARTHA M. SMITH i _I D.B. 13314, PG. 137 ' PIN 075/. 03-10-2449 4 1'f __ ----- ---- <� ----1- 1 :. \��..... .... .........I. 1 ! . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..-.--.-.-.r..........................................................................1I. . ......................................................................;. ...................................................................... '1.. ,................................................---------------------------------------i ...._-�_______________________________________________________ _i1`. --------------- ------------------------------------------------------------------------ ........................................................................ 1. ' .....�......................................................................I �: ....... ................... . IMPACT 7 DELINEATED TRE M A C WETLANDS LIMIT!(S WETLAND ' W3' ALA COMMERICAL, LLC D. B. 12448, PG. 2163 B. M. 2005, PG. 1584 - TRA C T 2 PIN 0751.0.3- 01-1288 i t)IXIE PIPE LINE COMPANY / D. B. 1936, PG. 328 0 AA 907/1 O/' I/14' _ _ _ _ _ _ _ _ _ \ \\ wl............ IMPACT 9 \ \ (WETLAND 'W21) \ `\ '_. 111 1 \ \ ```. '' •; �° \�,�•� � RALEIGH RECLAMATION, LLC¢' I 1 \ \ D.B. 15746, PG. 2646 B. M. 2014, PG 627 TRACT 1 I � CHARLES H. WOMBLE, ET AL. PIN °751.03— "-3934 IMPACT 10 / �\ � � � \ D.B. 4443, PG. 949 (WETLAND 'W1') i \\ PIN 0750.01-29-0721 n / PRISTINE PARTNERS, LLC i D. B. 15899, PG. 326 / \ B. U. 2014, PG. 627 PIN 0751.0.3-22-2279 IMPACT 11 JACK 1, LLC D.B. 16969, PG. 2028 PIN: 0751137742 GRAPHIC SCALE 100 0 50 100 200 1 inch = 100 ft. DESIGN DRAWN CHECKED SCALE 1 " = 100' FILE -101 IL 0 SHEET 2 OF 14 DIEHL & PHILLIPS, P.A. D&PI CONSULTING ENGINEERS - LIC. NO. C-0465 1500 PINEY PLAINS RD., SUITE 200 CARY, N.C. 27518 • (919) 467-9972 --�__ N.0 CR/D NORM NAD31_1 ZONE 2 IMP T - 2,798 S.FF' PERENNIAL STREAM ZON li PACT j � TEMPORARY-� � j -3,67 I CONSTRUCTION CORRIDOR - 51 LF (4�3 SF) WET LAN PERMANENT M M�� ST READ LOSS - 54 SFS I I ` I PERMANEN'm PERMANENT LOSS- 1► 0 LF TEMP. STONE 1 J5q I Q 50' PUBLIC UTILITY & � I CHECK DAM I ` 10' Wa � (86 SF) SILT FENCE IMH No. 6 (6'0) GREENWAY EASEMENT m (REMOVE AFTER,d,IT I PERM. I OUTLET (TYP.)� iF STA. 23+34.67 INTE .� SITE. IS SiABILIZgD) STREAM STA. 10+00 LINE 'B I I CROSSING I I ���►�t�1117■■CEI AIEI:!!: a■■❑■■■/IVAN All 0 ■Mtt� aEit� ME 11 �.��■■■SII■■■i24 '%i.a■M■■■■■■i���������������. 1�00 ■11■■■L::1 .111■■■■■■■16- roni PVC FOTl 1►1111///' i 77 /. ,0 10' TEMP. CONST. .I77 — _ ASEMENT 1 60' PUBLI UTILITY & I INSTALIJ. PIPELINES A OSS CHANNEL BY TRACER WIRE WETLANDS PERM�A�NENT GREENWAI EASEMENT I I OPEN UT STABILIZE STREAM BANKS WTH TEST STATION (NO TEMP. EASEMENT) I I NORT ER*W CRE N BIONET S1508N I NO PERMANENT LOSS - FROM E OF BAN" \ OF BANK MH No. BA (6'0) 2,338 SF 1 a WETLAND TEW.QR_ARY - STA. 10+30 LINE MFW INV. MENTS 4LC 22+QQ o.B 1rj 50906 7.5 CONSiRUCTJON COR"I BM. 19.11I I - 226 SFl PIN 0750.07 \ PLAN - IMPACT 2 PERENNIAL STREAM - TEMPORARY CONSTRUCTION CORRIDOR - 51 LF (435 SF) SCALE: 1 "= 40' PERENNIAL STREAM - PERMANENT -NO PERMANENT LOSS - 10 LF (86 SF) WETLAND PERMANENT - NO PERMANENT LOSS - 2,338 SF == = WETLANDS - PERMANENT LOSS - 54 SF WETLAND TEMPORARY - CONSTRUCTION CORRIDOR- 226 SF ZONE 1 IMPACT - 3,672 SF ZONE 2 IMPACT - 2,798 SF DELINEATED WETLANDS 23+00 PROFILE - IMPACT 2 SCALE: 1"= 40' HORIZ. 1"= 4' VERT. LEGEND 24 :sszss�ss� PROPOSED 16" PVC GRAVITY SEWER �FM�FM—FM— PROPOSED 16" C905 PVC FORCE MAIN —Llm —Lim —Lim — LIMITS OF DISTURBANCE & CLEARING —Ra—Ra,—PBI—PBI— LIMITS OF ZONE 1 LIMITS OF ZONE 2 — WL—WL— LIMITS OF DELINEATED WETLANDS TOP OF STREAM BANK SF/TP TREE PROTECTION/SILT FENCE SILT FENCE —TP—TP—TP— TREE PROTECTION FENCE DIEHL & PHILLIPS, P.A. MIDDLE CREEK REGIONAL IMPACT 2 - WETLANDS, STREAM, AND SHEET CONSULTING ENGINEERS - LIC. NO. C-0465 P.S, F.M., & INTERCEPTOR ZONES 1 & 2 4 D&P OF 1500 PINEY PLAINS RD., SUITE 200 MFW INVESTMENTS, LLC 14 GARY, N.C. 27518 • (919) 467-9972 APEX, NORTH CAROLINA l C) MFW IN'VE�TMtN4S,LLC ID.B. 156J4`PC 102 /l SM. 2017 PC /Q6 7 LF �' PIN 0750 197053 \ / NAD 83IWn . j 4. No. 8 6'0 I \ 50' PUBLI0. ULNTY & 23+34.67) INTERCEPTOR- 7A4 GREENWAY EASEMENT 10+00 LINE 'B' TM 2'55" N 25+00 IM lM—,M 26+00— — 24+00 25+00 26+00 24+00 ���w.�•w mow„C9 P C FORCE MAIN 0 TRACER WIRE 10' TEMP. CONST EASEMENT J MFW INVESTMENTS,LLC / TEST STATION D.B. 166.3$ PC 1192 B.M. 2017, PC 1067 No. SA (6'0) PIN 0750-29-2070 / A. 10+30 LINE 'B' / WETLANDS -PERMANENT - NO _-PERYAANENT LOSS -1,243 SF --- WETLANDS PERMANENT - NO PERMANENT LOSS -1,243 SF DELINEATED WETLANDS PLAN - IMPACT 3 SCALE: 1"= 40' I I LEGEND ss=ss�ss� PROPOSED 16" PVC GRAVITY SEWER �FM�FM—FM— PROPOSED 16" C905 PVC FORCE MAIN —LM —Li- —Li- — LIMITS OF DISTURBANCE & CLEARING —aa—Ra—Ra,—Ra— LIMITS OF ZONE 1 —PB2—Ra�Ra—Aa=— LIMITS OF ZONE 2 — WL WL— LIMITS OF DELINEATED WETLANDS —TP—TP—TP— TREE PROTECTION FENCE sr/'" TREE PROTECTION/SILT FENCE SILT FENCE 24+00 25+00 PROFILE - IMPACT 3 SCALE: 1 "= 40' HORIZ. 1 "= 4' VERT. 26 DIEHL & PHILLIPS, P.A. MIDDLE CREEK REGIONAL IMPACT 3 - WETLANDS SHEET 13&P CONSULTING ENGINEERS - LIC. NO. C-0465 P.S, F.M., & INTERCEPTOR of 1500 PINEY PLAINS RD., SUITE 200 MFW INVESTMENTS, LLC GARY, N.C. 27518 • (919) 467-9972 APEX, NORTH CAROLINA 14 A4FW I1 D.B. \ / BM ily, J I NAD l WETLANDS PERMANENT —NH Nc �, � - NO PERMANENT LOSS - �— �I,M STA. ,x,280 SF I50' PUBLIC UTAITY & ,�. GREENWAY EASEMENT ,m. 60' PUBLIC UTILITY & ^' MFW INVESTMENTS,= '�` GREENWAY EASEMENT D.B. 16634 PC 1192 B.*'2017 PG 1067 \ 29+00 C i PIN 0750-19-7053 , 50' PUBLIC UTILITY & GREENWAY EASEMENT 'm` No _ 0 y 9+ 00 MH No. 9 (5'0) 28+0 STA. 26+52.56 TM -IM �• 2� \O�PVC FORCE MAW 16 27+00 28+00" 10' TEMP. CONST. EASEMENT 27+00 WETLANDS TEMP. CONST. EASEMENT TEMPORARY o CONSTRUCTION TRACER WIRE TEST STATION CORRIDOR - 282 SF 16" 11.25' MJ BEND MFW INVESTMENTS,LLC D.B. 16634 PC 1192 B.M. 2017, PC 1067 ---- PIN 0750-29-2070 WETLANDS PERMANENT - NO PERMANENT LOSS - 4,280 SF WETLANDS TEMPORARY CONSTRUCTION CORRIDOR - 282 SF DELINEATED WETLANDS PLAN - IMPACT 4 27+00 28+00 29+00 PROFILE - IMPACT 4 SCALE: 1 "= 40' HORIZ. 1"= 4' VERT. LEGEND SS=ss�ss� PROPOSED 16" PVC GRAVITY SEWER �FM�FM-FM— PROPOSED 16" C905 PVC FORCE MAIN LIMITS OF DISTURBANCE & CLEARING —Ra--�—Ra— LIMITS OF ZONE 1 LIMITS OF ZONE 2 — WL -WL— LIMITS OF DELINEATED WETLANDS —TP—TP—TP— TREE PROTECTION FENCE TREE PROTECTION/SILT FENCE SILT FENCE SCALE: 1"= 40' DIEHL & PHILLIPS, P.A. MIDDLE CREEK REGIONAL IMPACT 4 — WETLANDS SHEET CONSULTING ENGINEERS - LIC. NO. C-0465 P.S, F.M., & INTERCEPTOR 6 cl- 1500 PINEY PLAINS RD., SUITE 200 MFW INVESTMENTS, LLC GARY, N.C. 27518 9 (919) 467-9972 APEX, NORTH CAROLINA 14 ,MFW INVESTMENTS,LLC — ,�, D.B. 166A PC. 1191 ,�, � c. 8M 2017, P& 1067 ZONE 2 IMPACT N I NLD H3/YWI ; PIN 0750-19053 ,mI -2,323SF c� M ZONE 1 IMPACT, W`� ^l e a ,m- va a au a x 1 TA P 1 ACR Y N D N CU . STAB UZE S REAM NKSWITH % m 1,127 SF �` FR T F K T TOP OF SANk ri \ m \ n � m - — �\ TEMP. SP���NE \ —M No. 10 (5'0) SILT I 1 CHECK EtC pII ?M \ ,m. STA. 29+74.44 m� OUT T (TYP.) I I 10" WD. I '� \ TM m INSTALL PIPELINES ACROSS ANNEL BY v // I J I — ` STREAM I I NORTH CAMERICAN I LGREEN IZE !RBIOET S 150BNH 50" PUBLIC UTILITY & / CROSSING GREENWAY EASEMENT ( p FROM TOE OF BANK TO TOP F BANK IN PO IT/VE C E 1962753" o = _ i1+00 �J 29+0 �1� Q N S VI O •_ p • \) ilb a-� R'i Q b 1 ei'� - 31 +00 I 29+00 RCE I,IpMi , .)� \ / ww� ,�` M� 16" 11.25' ,m W BEND I m �I I AIR VALVE MH � STA. 29+65.38 m 10' TEMP. CONST. EASEMENT U \ I 3 1 WETLAND PERMANENT NO PERMANENT LOSS -1,081 SF�� =�"——°a"�p0/ WETLAND \ �s W INVIESTI�dIEPfSI LC a 29+00 30+00 31+00 Do 66, X16 3d, 1192 PERMANENT -WETLAND TEMPORARY BM 2 1 'li 1�7 ��e 1 9 CONSTRUCTION PIN 0750 2070"� 4 LOSS — 57 SF 3 pa�R�wa �— CORRIDOR — 243 SF \ \ PROFILE - IMPACT 5 SCALE: 1 "= 40' HORIZ. PLAN - IMPACT 5 1 "= 4' VERT. SCALE: 1"= 40' LEGEND PERENNIAL STREAM —TEMPORARY ss z ss � ss � PROPOSED 16" PVC GRAVITY SEWER �FM�FM�FM� PROPOSED 16" C905 PVC FORCE MAIN CONSTRUCTION CORRIDOR — 51 LF (152 SF) _gym _gym _gym — LIMITS OF DISTURBANCE & CLEARING PERENNIAL STREAM — PERMANENT—NO — ei—Ra,—Ra— LIMITS of ZONE 1 PERMANENT LOSS — 10 LF (30 SF)LIMITS OF ZONE 2 - WL WL- LIMITS OF DELINEATED WETLANDS WETLAND PERMANENT — NO PERMANENT TOP OF STREAM BANK LOSS —1,081 SF ZONE 1 IMPACT —1,127 SF—TP-TP—TP— TREE PROTECTION FENCE TREE PROTECTION/SILT FENCE ZONE 2 IMPACT — 2,323 SF ===========- WETLAND — PERMANENT LOSS — 57 SF SILT FENCE DELINEATED WETLANDS WETLAND TEMPORARY — CONSTRUCTION CORRIDOR— 243 SF DIEHL & PHILLIPS, P.A. MIDDLE CREEK REGIONAL IMPACT 5 — WETLANDS, STREAM, AND SHEET CONSULTING CONSULTING ENGINEERS — LIC. NO. C-0465 P.S, F.M., & INTERCEPTOR ZONES 1 & 2 / cl- D&P 1500 PINEY PLAINS RD., SUITE 200 MFW INVESTMENTS, LLC 14 GARY, N.C. 27518 9 (919) 467-9972 1 APEX, NORTH CAROLINA � p I NAp e9j� Rpy � / II QW' ZONE 3 IMPACT – 6,043 SF —\ 00 MFW INVESTMENTSll'ZONE2 IMPACT = 2,415�`SF WETLAND 1 ,LLc / \\ N/ D PERMANENT l I D.B. 166.34 PG 1192 / LO S — 17 SF B.M. 2OL7, PG. 1067- ,� ,� ,� ,� ,� T \ PIN 0750-19-7053 / ?QNE 1 IMPACT MH No. 1 (5'0) 50' PUBLIC / \ Jl-"00 WETLAND PERMANENT - NO C� 3i �r 0,6 , r WT­ i5T30UTILITY STf0+' UY3 620 SF EASEMENT CHECK DAM (REMOVE AFTER MH No11 (5'0) ISITE IS STABZED) STA33+40.26 TERCEPTORSILT FENCE-PERAA�ENT LOSS – 24,128 SF TEMPSTONE n''�UTLET (TYP.71i00 LINE C� � fpt/0aE0tdE.�pt'l1 �O / / 34+00 �r�'i'i r'i r'ii r'i r'� r'i i'i,, �y� '382b 00- 1 , 58'10'36" i i i i i' � � 36j � �33�009000 `moo � 34+0 10' TEMP. (/ CONSTRUCTION EASEMENT I \ / 16" 22.5' `yL' MJ BEND MH No. 12A (910 / \ \ MH No. 11A (5'0) TRACER WIRE PIPELINES ACROSS STA. I0+30.15 LIE 'D CHANNEL BY STA. 10+30.00 LINE 'C' 16" INSTALL 22 5• TEST STATION OPEN CUT. STABILIZE STREAM BANKS WITH \ \ WETLAND TEMPORARY MJ BEAD l NORTH AMERICAN GREEN BNESANK / / ' mk FROM""TOE OF BANK'�`TO TOPPOFF SANK ( o I - CONSTRUCTION WETLAND TEMPORARYl IA CORRIDOR -1,058 SF a CONSTRUCTION \ CORRIDOR - 2,952 SF `- - \\ MFW INVESTM, 1192 Lc PERENNIAL STRFAM P �VIANENT – No 1 � D.B. J66.iQ PG J792 ( BM 750 -9 070 PERMANENT LOSS –10 L 5 SF) \ PIN 0750-29-2070 CHARLES H. WOMBLE, ET AL. l D.B 444A PO. 949 / / PIN 0750.01-29-07 27 PERENNIAL STREAVTEMP A,ARY// \ / CONSTRUCTON CORRIDO - 0 LF (394 SF) PLAN - IMPACT 6 Jv ' - LEGEND PERENNIAL STREAM – TEMPORARY _ ss _ ss _ ss _ PROPOSED 16" PVC GRAVITY SEWER CONSTRUCTION CORRIDOR – 50 LF (394 SF) �FM■>_FM■>_FM� PROPOSED 16" C905 PVC FORCE MAIN ZONE 1 IMPACT – 3,620 SF PERENNIAL STREAM – PERMANENT–NO—£m—£m—£m— LIMITS OF DISTURBANCE & CLEARING PERMANENT LOSS – 10 LF 75 SF — LIMITS of ZONE 1 ZONE 2 IMPACT – 2,415 SF ( )—a�—R�—Ra—RB— LIMITS OF ZONE 2 WETLAND PERMANENT – NO PERMANENTLIMITS OF ZONE 3 ZONE 3 IMPACT – 6,043 SF LOSS – 24,128 SF—WT W'_ LIMITS OF DELINEATED WETLANDS TOP OF STREAM BANK WETLANDS – PERMANENT LOSS –17 SF—TP—TP—TP— TREE PROTECTION FENCE DELINEATED WETLANDS WETLAND TEMPORARY – CONSTRUCTION �`�° TREE PROTECTION/SILT FENCE SILT FENCE CORRIDOR– 4,010 SF DIEHL & PHILLIPS, P.A. MIDDLE CREEK REGIONAL PLAN - IMPACT 6 - WETLANDS, STREAM, SHEET D&P CONSULTING ENGINEERS - LIC. NO. C-0465 P.S, F.M., & INTERCEPTOR AND ZONES 1, 2, & 3 Q cj 1500 PINEY PLAINS RD., SUITE 200 MFW INVESTMENTS, LLC CARY, N.C. 27518 9 (919) 467-9972 APEX, NORTH CAROLINA 14 PROFILE - IMPACT 6 SCALE: 1 "= 40' HORIZ. 1"= 4' VERT. DIEHL & PHILLIPS, P.A. MIDDLE CREEK REGIONAL PROFILE - IMPACT 6 - WETLANDS, SHEET CONSULTING ENGINEERS - LIC. NO. C-0465 P.S, F.M., & INTERCEPTOR STREAM, AND ZONES 1, 2, & 3 9 93&P 1500 PINEY PLAINS RD., SUITE 200 MFW INVESTMENTS, LLC 14 CARY, N.C. 27518 • (919) 467-9972 1 APEX, NORTH CAROLINA 1!!!!!!!!!!!!!!!!!!!!!!!!!! E�E�!!!!!!!!!!!!!!!!!E■�i►37���i��l•Ti■!!!E] Imo■ 1!!!!!!!!!!!!!!!!!!!!!!!!!®�!!!!!!!!!!!!!!!!!!■i�i4�lJ�%'IV�Y.tFNY�#.- �,WF'�11y'.'Mi■!ll�E�i■ 1!.'1.7!!!!!!!!!!!!!!!!!!!!!!!! E�'!■!!!!!!!!!!!!!!!!■■!!!!!!!!!■E■�I,'1:■ 1!!!!!!!!!!!!!!!!!!!!!!!!!■■■E■l131!!■■!■�!!!!!!!!!!!!■■!!!!'c'���!■■11■■ 1!!■!!!!!!!!!!!!!!!!l����!■■■■li1�illlliilliEi■tllL�r�E!!!!!!!!!!!■■!!!!!!!!!■SI■■ 1!!!!!!!lEmil�®®®se®���■������:.�1!$EE■■E�!!r�!!!!!!!lE�I�E+.■�E�■wE■�!!!E■■!!E■■E■EE�■IE■f■ 1!'!1•��w!!!_!!_!!-■■AllllJl�l�!!!!!!!!!■■■■!!!!!!l1�1�!!II■11!!_!!!!��'_�1����!!�■��:■ 1!l�����C���=���Ea�!■w!�!!_!!II■!!_!ll�����_1������!!!!!!!!!!■■IES■ 11 11 11 11 11 36+00 PROFILE - IMPACT 6 SCALE: 1 "= 40' HORIZ. 1"= 4' VERT. DIEHL & PHILLIPS, P.A. MIDDLE CREEK REGIONAL PROFILE - IMPACT 6 - WETLANDS, SHEET CONSULTING ENGINEERS - LIC. NO. C-0465 P.S, F.M., & INTERCEPTOR STREAM, AND ZONES 1, 2, & 3 9 93&P 1500 PINEY PLAINS RD., SUITE 200 MFW INVESTMENTS, LLC 14 CARY, N.C. 27518 • (919) 467-9972 1 APEX, NORTH CAROLINA MJ 16" 22.5' / I \ I BEND WETLAND PERMANENT - < �WETLA D — /� / ESI NO PERMANENT LOSS - PERMANENT / R o"I —£" 1,778 SF I LOSS - /39 SF % �n i�I i �Etx / \ J ;00 Oc TEMP. STONE \ SWT FE CE / CHECK DAM OUTLET �\ 116" 22.5 MJ BEND H MARTHA M. SMITH- D.B. D.B. 13314, PG 137 / PIN 0751.0310-2449 \ \ J6v I/ / / w INTERMITTENT STREAM - -/� PERMANENT- NO PERMANENT 1 _ IDE P MJ BEND 1 STREW bSS -10 LF ((41 SF) STREAM C SSING 1 INSTALL IPELIN(5 ACROSS CHANNEL l - -BB PEN CUT. STA IAALII�Z1ERSTR GREEN II TERMITI ENT STREIiKM BIONET S150BN FROMY-0E OF BANK TEMPOR,�RY - CONS/iRUCTION TO TOP OF BANK 6 P°B`IG UTI`I CbRRIDO/R - 54 LF (287 LF) „GRE TEVP EASEM T � (NO TEkIP. EASHM NT) \ WTLAND TEMPORARY - C NSTRdCTION CORRIDOR - 329 SF 1 PLAN - IMPACT 7 SCALE: 1"= 40' 43+00 44+00 PROFILE - IMPACT 7 SCALE: 1 "= 40' HORIZ. I"= 4' VERT. INTERMITTENT STREAM - TEMPORARY CONSTRUCTION CORRIDOR - 54 LF (287 SF) INTERMITTENT STREAM - PERMANENT -NO PERMANENT LOSS - 10 LF (41 SF) WETLAND PERMANENT LOSS - 39 SF WETLAND PERMANENT - NO PERMANENT LOSS -1,778 SF WETLAND TEMPORARY CONSTRUCTION CORRIDOR- 329 SF DELINEATED WETLANDS 45+00 LEGEND FUTURE GRAVITY SEWER �FMZMFM =FMm PROPOSED 16" C905 PVC FORCE MAIN -Lm -Lim -Lim - LIMITS OF DISTURBANCE & CLEARING -W WL- LIMITS OF DELINEATED WETLANDS TOP OF STREAM BANK -TP -TP -TP- TREE PROTECTION FENCE -s'/Tp-TREE PROTECTION/SILT FENCE SILT FENCE DIEHL & PHILLIPS, P.A. MIDDLE CREEK REGIONAL IMPACT 7 - WETLANDS, STREAM, AND -- D&P CONSULTING ENGINEERS - LIC. NO. C-0465 P.S, F.M., & INTERCEPTOR ZONES I & 2 10 1500 PINEY PLAINS RD., SUITE 200 MFW INVESTMENTS, LLC GARY, N.C. 27518 9 (919) 467-9972 APEX, NORTH CAROLINA 14 i T EMPORARY - STORMWATER sMP 1 �j CONSTRUCTION - - CORgI�R-17 SF RALEIGH RECLAMATION, LLC RALEIGH RECLAMATION, LLC D.B. 15746, PG. 2646 y y B.M. 2014. PG. 627 - TRACT 1 D.B 15746, PG 2646 - NAp e9 RTy \ TRACT 1 B.M./� 2014 PG 627 PIN 0751.03-11-3934 j WETLANDS PERMANENT LOSS - 294 SF 50' PUBLIC iM .� CONSTRUCT RIPRAP LINED SWALE ACROSS UTILITY EASEMENT F M I EASEMENT TO CONVEY DISCHARGE FROM EKISTING 4TORMWATER BMR RIPRAP TO G> /, \ BE 22" THICK CLASS / V TM SILT FENCE I'I'I �. _ �. .. .. _.w,�••-, \� piHERS) \ -J MJ BEND =EWER �� 1125* �- OUTLET (TYP.) ��„�""�.�' Ef MJ BEND _ TRACER WIRE TE: 55+00.00 000 010 o _56+0 �STATION (TYP.) u 10' TEMP. CONST \ - EASEMENT 16 � 16" 11.25' WETLANDS / J W BEND WETLANDS PERMANENT - NO PERMANENT LOSS - 3,242 SF J �J EXIST. T EMPORARY - STORMWATER sMP 1 �j CONSTRUCTION - - CORgI�R-17 SF RALEIGH RECLAMATION, LLC D.B. 15746, PG. 2646 ^ B.M. 2014. PG. 627 - TRACT 1 / / PIN 0751.03-11-3934 55+00 56+00 57+00 PROFILE - IMPACT 8 SCALE: 1 "= 40' HORIZ. 1 "= 4' VERT. WETLAND PERMANENT - NO PERMANENT LOSS - 3,242 SF LEGEND 2' FUTURE GRAVITY SEWER 4 4 WETLAND PERMANENT LOSS- 294 SF _F_MZ -FM =FMPROPOSED 16” C905 PVC FORCE MAIN -- ---—Lim —Lim —Lim — LIMITS OF DISTURBANCE & CLEARING WETLAND TEMPORARY - CONSTRUCTION CORRIDOR -17 SF -RBI -PBI -RB' -RBI- LIMITS of ZONE 1 —Ra — LIMITS OF ZONE 2 — W W R- LIMITS OF DELINEATED WETLANDS DELINEATED WETLANDS -TP -TP -TP- TREE PROTECTION FENCENON—WOVEN GEOTEXTILE —SF/'P—TREE PROTECTION/SILT FENCE 22 " THK. CLASS 'B FILTER FABRIC SILT FENCE RIPRAP (D5o = 9') PLAN -IMPACT 8----------------- ----------- EXISTING STORM SEWER STORMWATER BMP DISCHARGE SWALE DETAIL SCALE: 1 "= 40' NO SCALE DIEHL & PHILLIPS, P.A. MIDDLE CREEK REGIONAL IMPACT 8 - WETLANDS D&P CONSULTING ENGINEERS - LIC. NO. C-0465 P.S, F"M., & INTERCEPTOR 11 1500 PINEY PLAINS RD., SUITE 200 MFW INVESTMENTS, LLC CARY, N.C. 27518 • (919) 467-9972 APEX, NORTH CAROLINA 14 WETLANDS PERMANENT -ATO" PERMANENT L6SS"-1,263 SF SILT FENCE --� "OUTLET (TYP.) 5' P��11BL16 UTILITY & 1'001, I(AY EASEMENT 00 6e_, D _ �— — C905 yF C — 16" 11.25' e. F�F.„sF«_FL 00 MJ BEND — ---� _ 3 � 10' TEMP. CONST. EASEMENT a � \ i EXIST. SEPTIC FIELD \— —397— WETLAND PERMANENT - NO PERMANENT LOSS -1,269 SF DELINEATED WETLANDS PLAN - IMPACT 9 SCALE: 1"= 40' 62+00 63+00 64+00 PROFILE - IMPACT 9 SCALE: 1 "= 40' HORIZ. I"= 4' VERT. LEGEND — — — — — — FUTURE GRAVITY SEWER —FM—FM—FM— PROPOSED 16" C905 PVC FORCE MAIN — T —Lm —Lm — LIMITS OF DISTURBANCE & CLEARING — WL— WL— LIMITS OF DELINEATED WETLANDS —TP—TP—TP— TREE PROTECTION FENCE sF/TP TREE PROTECTION/SILT FENCE SILT FENCE DIEHL & PHILLIPS, P.A. MIDDLE CREEK REGIONAL IMPACT 9 - WETLANDS ;NtET 93&P CONSULTING ENGINEERS - LIC. NO. C-0465 P.S, F.M., & INTERCEPTOR 120E 1500 PINEY PLAINS RD., SUITE 200 MFW INVESTMENTS, LLC CARY, N.C. 27518 . (919) 467-9972 APEX, NORTH CAROLINA 14 RALEIGH RECLAMATION, LLC D.B. 15746, PC. 2646 B.M. 2014, P0. 627 - TRACT I PIN 0751.03-11-3934 NOW ae,—aaz_Aa—Raz_aa�a�—�z— 'WEILANDSPERAMNENT MA _ — NO PERNP LOSSB2—a, L � 799 SF _ J / ZONE 1 IMPACT (WITRIN�-- WETLAND) — 610 SF ZONE 1 IMPACT (OUTSIDE .-r-r — — WETLANPUt;394� _F — =y—r — --- _—_— f— — r _ —,ZONE 2 IMPAC !NL W ^ Rig 7, RB1—R8161 RB2� / R62gz/ RBz— R12— RB 50' PUBLIC '.L"s , ` `, , ... . CREENWAY EASEMENT . ♦ . . ` ` ` ` ` . . • - �.( 7OXUP-3 IMPACT 373- - —374— R- —376—� — x,838 SF 1 � ' � ; �'�'�.� R ,`,`,`.�.�.�.�.�.�.�.� .`.�.�♦�.� �. — — — � A . ♦ ♦..♦`.``. ♦ . . .` ♦` ♦ . ♦ ♦ . ♦` .` . ..♦� ♦` ` ` `, `, ♦ . ♦` .` .`. ♦ ` // AY EAS TRACER WIRE TEST STATION L — `. -'tREENW 4 /33 Rg4 3 —361 381 ST 6 CMP -6 CMP - RB2 0 �F MO.// \ ICONSTRUCWN EASEMENT�` \ EXIST. STORMWA TE2,Wp AIR VALVE MH STA. 68+26.20 ZONE 1 IMPACT (OUTSIDE WETLAND) —1,394 SF ZONE 1 IMPACT (WITHIN WETLAND) — 610 SF ZONE 2 IMPACT — 2,541 SF ZONE 3 IMPACT — 5,838 SF WETLAND PERMANENT — NO PERMANENT LOSS — 799 SF DELINEATED WETLANDS PLAN - IMPACT 10 SCALE: 1"= 40' I \ I 68+00 I I LEGEND FUTURE GRAVITY SEWER — FM=FMFM— PROPOSED 16" C905 PVC FORCE MAIN —Llm �Lim =Li-- LIMITS OF DISTURBANCE & CLEARING -RBI R61 LIMITS OF ZONE 1 RBz RBz- LIMITS OF ZONE 2 RBS RB3 LIMITS OF ZONE 3 - WL WL— LIMITS OF DELINEATED WETLANDS TOP OF STREAM BANK -TP -TP -TP- TREE PROTECTION FENCE TREE PROTECTION/SILT FENCE SILT FENCE ----------------= EXISTING STORM SEWER ESAA IIRON SERIES No. 20 69+00 70+00 PROFILE - IMPACT 10 SCALE: 1"= 40' HORIZ. 1"= 4' VERT. DIEHL & PHILLIPS, P.A. MIDDLE CREEK REGIONAL IMPACT 10 — WETLANDS SHEET 13&P CONSULTING ENGINEERS - LIC. NO. C-0465 P.S, F.M., & INTERCEPTOR 1'" OF 1500 PINEY PLAINS RD., SUITE 200 MFW INVESTMENTS, LLC 14 CARY, N.C. 27518 9 (919) 467-9972 APEX, NORTH CAROLINA 393 I \ \ \ / ( I 392 / CD I cR'f— a. 16-969, PG. 26s� — o \lfd�7511.5�74�200 \ \ 3 \ \ �` \ — ZONE 3 IMPACT-_— 955 SF- _ \ \ \ ��� O \ \ 38 R+ � ♦ e� ♦ ♦, ♦ a iaa � \ ♦ ♦ 4aa \ \ IN ZONE 3 IMPACT - 955 SF PLAN - IMPACT 11 SCALE: 1 "= 40' LEGEND �FM�FM�FM� PROPOSED 16" C905 PVC FORCE MAIN — m—Lim—Lim— LIMITS OF DISTURBANCE & CLEARING RB1 RB1 LIMITS OF ZONE 1 -RBz RBz— LIMITS OF ZONE 2 RB, RB3 LIMITS OF ZONE 3 — WL WL— LIMITS OF DELINEATED WETLANDS —TP—TP—TP— TREE PROTECTION FENCE 5Pn° TREE PROTECTION/SILT FENCE SILT FENCE _______________ EXISTING STORM SEWER DIEHL & PHILLIPS, P.A. MIDDLE CREEK REGIONAL IMPACT 11 - ZONE 3 SHEET 13&P CONSULTING ENGINEERS — LIC. NO. C-0465 P.S, F.M., & INTERCEPTOR 14 1500 PINEY PLAINS RD., SUITE 200 MFW INVESTMENTS, LLC GARY, N.C. 27518 9 (919) 467-9972 APEX, NORTH CAROLINA 14