HomeMy WebLinkAboutWQ0032548_Final Permit_20080404 (2)O� W A R Michael F, Easley, Governor
Q William G. Ross Jr., Secretary
O p North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Q Division of water Quality
April 4, 2008
CHARLES AND 13EVERLY MCLAMB
1700 WALDEN POND LANE
WAXHAW, NORTH CAROLINA 28173
Subject: Permit No. WQ0032548
Charles & Beverly McLamb SFR
Surface Irrigation Facility
Union County
Dear Mr. and Mrs. McLamb:
In accordance with your permit application received December 6, 2007 and additional information received
February 14, 2008 and March 17, 2008 we are forwarding herewith Permit No. WQ0032548, dated April 4, 2008, to
Charles & Beverly McLamb for the construction and operation of the subject single family wastewater treatment
and surface irrigation facilities.
This permit shall be effective from the date of issuance until March 31, 2013 and shall be subject to the conditions
and limitations as specified therein. Please pay particular attention to the monitoring requirements in this permit.
Failure to establish an adequate system for collecting and maintaining the required operational information will
result in future compliance problems.
An extension shall be requested, by the permittee, at least six (6) months prior to the expiration of this permit. Upon
receipt of the request the Commission will review the adequacy of the facility described therein and, if warranted,
will extend the permit for such period of time and under such conditions and limitations as it may deem appropriate.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an
adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must
be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed
with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such
demands are made this permit shall be final and binding.
One set of approved plans and specifications is being forwarded to you. Please contact Duane Leith by email at
duane.leith@ncmail.net or by phone at (919) 715-6186 if you need additional information concerning this matter.
Sincerely, j-
ot., �.
Coleen H. Sullins
cc: Union County Health Department
Mooresville Regional Office - Aquifer Protection Section
Technical Assistance and Certification Unit
David DeCaron, Piedmont Design Associates, PA
APS Central Files (WQ0032548)
LAU Files
Aquifer Protection Section 1636 Mail Service Center
Internet: www.ncwaterqualitv.oru Location: 2728 Capital Boulevard
An Equal Opportunity/Affirmative Action Employer-50% Recycled130% Post Consumer Paper
DPZhCarolina
Xgtyra!!y
Raleigh, NC 27699-1636 Telephone: (919) 733-3221
Raleigh, NC 27604 Fax 1: (919) 715-0588
Fax 2: (919) 713-6048
Customer Service: (877) 623-6748
NORTH CAROLINA
ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
RALEIGH
SINGLE FAMILY RESIDENCE SURFACE IRRIGATION PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Charles and Beverly McLamb
Union County
FOR THE
construction and operation of a 360 gallon per day (GPD) surface irrigation wastewater treatment and disposal
system consisting of a 1,200 gallon baffled septic tank with effluent filter, a partially in -ground Advantex
AX-20 synthetic media wastewater treatment filter with a 1,200 gallon recirculation tank and 19 GPM
recirculation pump, a 7 GPM ultraviolet light disinfection unit, a 3,000 gallon storage/pump tank, a 10 GPM
pump with a high water alarm light and buzzer, a 9,520 square foot drip irrigation area consisting of 3 zones
of 3,104 to 3,260 square feet each with 8 to 9 drip lines 204 to 244 feet long; on a 2 foot spacing and all
associated piping and appurtenances, to serve the Charles & Beverly McLamb residence located at The Farms
at Heartwood Lot S, Waxhaw Creek Road, Waxhaw, North Carolina, 28173, with no discharge of wastes to
the surface waters, pursuant to the application received December 6, 2007, and in conformity with the project
plan, specifications, and other supporting data subsequently filed and approved by the Department of
Environment and Natural Resources and considered a part of this permit.
This permit shall be effective from the date of issuance until March 31, 2013 and shall be subject to the
following specified conditions and limitations:
I. PERFORMANCE STANDARDS
l . Upon completion of construction and prior to operation of this permitted facility, a certification must
be received from a professional engineer certifying that the permitted facility has been installed in
accordance with this permit, the approved plans and specifications, and other supporting materials. If
this project is to be com feted in phases and partially certifiedyou shall retain the responsibilily to
track further construction a roved under the same permit, and shall provide a final certificate of
completion once the entire proiect has been completed, Mail the Certification to the Groundwater
Protection Unit, 1636 Mail Service Center, Raleigh, NC 27699-1636.
2. The Mooresville Regional Office, telephone number (704) 663-1699, shall be notified at least forty-
eight (48) hours in advance of operation of the installed facilities so that an in place inspection can be
made. Such notification to the regional supervisor shall be made during the normal office hours from
8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays.
3. The surface irrigation facilities shall be effectively maintained and operated at all times so that there
is no discharge to surface waters, nor any contamination of ground waters, which will render them
unsatisfactory for normal use. In the event that the facilities fail to perform satisfactorily, including
the creation of nuisance conditions or failure of the irrigation area to adequately assimilate the
wastewater, the Permittee shall take immediate corrective actions including those actions that may be
required by the Division of Water Quality, such as the construction of additional or replacement
wastewater treatment and disposal facilities.
4. The issuance of this permit shall not relieve the Permittee of the responsibility for damages to surface
or ground waters resulting from the operation of this facility.
5. A leakage test shall be performed on the septic tank and storage/pump tank(s) to insure that any
exfiltration occurs at a rate, which does not exceed twenty (20) gallons per twenty-four (24) hours per
1,000 gallons of tank capacity. The Engineer's Certification will serve as proof of compliance with
this condition.
b. If excavation into bedrock is required for the installation of the septic tank, recirculation tank, pump
tank or other components, the excavation shall be lined with a 10-:mil synthetic liner.
7. A sanitary tee and filter shall be installed on the effluent pipe of the septic tank. The Engineer's
Certification will serve as evidence that these specifications have been met.
S. The residuals generated from these treatment facilities must be disposed in accordance with General
Statute 143-215.1 and in a manner approved by the Division.
9. Diversion or bypassing of the untreated wastewater from the treatment facilities is prohibited.
10. The following setbacks shall be maintained:
a. 100 feet between the wetted area and any residence or places of public assembly under separate
ownership,
b. 50 feet between the wetted area and property lines,
c. 100 feet between wetted area and wells,
d. 100 feet between the wetted area and drainage ways or surface water bodies,
e. 50 feet between the wetted area and public right of ways,
f. 100 feet between the wetted area and any swimming pool,
g. 15 feet between, the wetted area and any building foundation or basement,
h. 100 feet between the treatment/storage units and any wells, with the exception of monitoring
wells, and
i. 50 feet -between the treatment units and property lines.
11. The pump tank(s) shall have functional audible and visual high water alarms that are external to any
structure.
12. The disposal system shall be connected to a rain or moisture sensor that shall indicate when
wastewater application is not appropriate in accordance with Condition 11(4).
13. The existing vegetation on the drip irrigation site shall not be cleared or disturbed except to the extent
necessary to install the dripline.
14. All tank access risers shall extend at lest six (b) inches above finished grade and shall be provided
with properly secured covers.
FA
II. OPERATION AND MAINTENANCE REQUIREMENTS
1. The facilities shall be properly maintained and operated at all times.
2. Upon classification of the wastewater treatment and surface irrigation facilities by the Water
Pollution Control System Operators Certification Commission (WPCSOCC), the Permittee shall
designate and employ a certified operator to be in responsible charge (ORC) and one or more
certified operator(s) to be back-up ORC(s) of the facilities in accordance with 15A NCAC 8G .0201.
The ORC shall visit the facilities in accordance with 15A NCAC 8G .0204 or as specified in this
permit and shall comply with all other conditions specified in these rules.
3. A suitable year round vegetative cover or leaf litter cover shall be maintained over the disposal area.
4. Irrigation shall not be performed during inclement weather or when the ground is in a condition that
will cause runoff.
5, Adequate measures shall be taken to prevent wastewater runoff from the irrigation field.
6. The application rate shall not exceed a cumulative loading of 22.36 inches over any twelve (12)
month period at an instantaneous application rate not to exceed 0.1 inches per hour.
7. The facilities shall be effectively maintained and operated as a non -discharge system to prevent the
discharge of any wastewater resulting from the operation of this facility.
8. No type of wastewater other than that from the Charles & Beverly McLamb residence at The Farms
at Heartwood Lot 5, Waxhaw Creek Road, Waxhaw, North Carolina, 28173, shall be discharged onto
the irrigation area.
9. No traffic or equipment shall be allowed on the disposal area except while installation occurs or
while normal maintenance is being performed.
10. The irrigation field shall be fenced with at least a two -strand wire fence.
11. Wastewater treatment units open to the atmosphere shall have restricted access and pump control
panels shall be locked.
12. The Permittee is responsible for the operation and maintenance of the entire treatment and disposal
system including, but not limited to, the following items:
a. The septic tank shall be checked annually and pumped out as needed. The septic tank effluent
filter shall be checked and cleaned at the same frequency of the septic tank.
b. The ultraviolet disinfection unit shall be checked every week. The lamp shall be cleaned
and/or replaced as necessary to ensure proper disinfection.
c. The storage, pump, and alarm systems shall be inspected monthly. Any sludge or scum layer
accumulating in the pump/storage tank(s) shall be removed at the same interval as the septic tank
is cleaned out.
d. The system shall be inspected monthly to make certain of the proper operation of the drip line,
that the vegetative growth allows a proper drip pattern, that the soil is assimilating the disposed
treated wastewater with no surface runoff, and that no objectionable odors are being generated.
III. MONITORING AND REPORTING REQUIREMENTS
1. Any monitoring deemed necessary by the Division to insure surface and ground water protection will
be established and an acceptable sampling reporting schedule shall be followed.
2. The Permittee shall maintain records of all maintenance performed on the system and irrigation area,
as required in Condition II(12) for a minimum of five years. This information shall be provided to
the Division upon request.
3. Noncompliance Notification:
The Permittee shall report by telephone to the Mooresville Regional Office, telephone number (704)
663-1699, as soon as possible, but in no case more than 24 hours or on the next working day
following the occurrence or first knowledge of the occurrence of any of the following:
a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of
adequate wastewater treatment, such as mechanical or electrical failures of pumps, emitters, etc.;
or
b. Any failure of a pumping station or treatment facility resulting in a by-pass directly to receiving
waters without treatment of all or any portion of the influent to such station or facility.
Occurrences outside normal business hours may also be reported to the Division's Emergency
Response personnel at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting such
occurrences by telephone shall also file a written report in letterform within five (5) days following
first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken
to ensure that the problem does not recur.
IV. INSPECTIONS
1. Adequate inspection, maintenance, and cleaning shall be provided by the Pernittee to insure proper
operation of the subject facilities.
2. Any duly authorized officer, employee, or representative of the Division may, upon presentation of
credentials, enter and inspect any property, premises or place on or related to the disposal site or
facility at any reasonable time for the purpose of determining compliance with this permit, may
inspect or copy any records that must be maintained under the terms and conditions of this permit,
and may obtain samples of groundwater, surface water, or leachate.
V. GENERAL CONDITIONS
1. This permit shall become void unless the facilities are constructed in accordance with the conditions
of this permit, the approved plans and specifications, and other supporting data.
This permit is effective only with respect to the nature and volume of wastes described in the
application and other supporting data.
This permit is not transferable. In the event there is a desire for the facilities to change ownership, or
there is a name change of the Permittee, a formal permit request must be submitted to the Division
accompanied by documentation from the parties involved, and other supporting materials as may be
appropriate. The approval of this request will be considered on its merits and may or may not be
approved.
4
4. Upon the availability of a municipal or regional sewerage collection system, the subject wastewater
treatment facilities shall be abandoned and all wastewater discharged into the municipal or regional
sewerage system.
S. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee
to an enforcement action by the Division in accordance with North Carolina General Statute 143-
215.6A to 143-215.6C,
6. The issuance of this permit does not preclude ,the Permittee from complying with any and all statutes,
rules, regulations, or ordinances, which may be imposed by other government agencies (local, state,
and federal), which have jurisdiction.
This permit may be revoked if the Permittee fails to abide by the conditions of the "Operation and
Maintenance Agreement" previously signed by the Permittee.
The Permittee shall retain a set of approved plans, specifications and operation and maintenance
manual of the subject facility for the life of the project.
9. The Permittee shall pay the annual administering and compliance fee within 30 days of being billed
by the Division. Failure to pay the fee accordingly may cause the Division to initiate action to revoke
this permit as specified by 15A NCAC 2T .0105 (e)(3).
10. The Permittee, at least six (6) months prior to the expiration of this permit, shall request its extension.
Upon receipt of the request, the Commission will review the adequacy of the facilities described
therein, and if warranted, will extend the Permit for such period of time and under such conditions
and limitations, as it may deem appropriate.
Permit issued this the 4th day of April, 2008,
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
iA Coleen H. Sullins, Director
Division of Water Quality
By Authority of the Environmental Management Commission
Permit Number WQ0032548
5
Permit No. WQ0032548
April 4, 2008
ENGINEER'S CERTIFICATION
Partial Final
I, , as a duly registered Professional Engineer in the State of
North, Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the
project,
Project Name
Location and County
for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the
observation of the construction such that the construction was observed to be built within substantial
compliance and intent of this permit, the approved plans and specifications, and other supporting materials.
Signature Registration No,
Date
2
PN �(aad
xa
Q3
�eddr Clr�te Rd
.c
v �
a G°
e�
North rarner Rd'
US Highw°y 521
Im
OPERATION AND MAINTENANCE AGREEMENT
SINGLE FAMILY RESIDENCE SURFACE IRRIGATION SYSTEM
DIVISION OF WATER QUALITY
Property Owner(s) (as appearing on the property deed): Charles & Beverly MCLamb
Mailing Address: 1700 Walden Pond Lane, Waxhaw, NC 28173
Facility Address (if different than above): Lot #5 Hartwood Farms, Waxhaw Creek Road, Waxhaw, NC 28173
Disposal Method: ❑ SPRAY IRRIGATION M DRIP HZRIGATION (Check One)
County:
Union County
Permit No.
IIWe agree to operate and maintain the wastewater treatment system as follows:
1. The Permittee is responsible for the operation and maintenance of the entire treatment and disposal
system including, but not limited to, the following items:
a. The septic tank shall be checked annually and pumped out as needed. The effluent filter shall be
checked and cleaned at the same frequency of the septic tank.
b. The sand filter surface shall be raked and leveled every six (6) months and any vegetative growth
shall be removed by hand (accessible sand filters only].
c. Check one:
❑ The tablet chlorinator shall be checked every week. Tablets shall be added so as to provide
proper chlorination.
0 The ultraviolet disinfection unit shall be checked every week. The lamp shall be cleaned
and/or replaced to ensure proper disinfection.
d. The storage, pump, and alarm systems shall be inspected monthly. The scum layer shall be
removed at the same time interval as the septic tank is pumped out.
e. The irrigation system shall be inspected monthly to make certain of proper operation, that
vegetative growth does not interfere with the system inspection or operation, that the soil is
assimilating the disposed treated wastewater with no surface runoff, and that no objectionable
odors are being generated.
2. Failure of the Permittee to properly operate this system is subject to a penalty up to $25,000 per day.
3. Failure to meet the permit conditions or violation of the State's surface or groundwater regulations
will require evacuating the dwelling and may void the permit.
NOTE: All persons (owners) appearing on the legally registered property deed must sign this O&M
Agreement
I/We understand the above re e e s and ee to th erms as part of the issued permit. %
Owner(s) Signature(s): Date: �� t G
Owner(s) Signature(s): Date:
SFR O&M (version 07/07)