Loading...
HomeMy WebLinkAbout19880382 Ver 1_COMPLETE FILE_19880101DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS it P.O. BOX 1890 l WILMINGTON, NORTH CAROLINA 28402-1890 - ! May 26, 1988 IN REPLY REFER TO Regulatory Branch SUBJECT: File No. SAWC088-N-028-0320 Mr. John Parker Division of Coastal Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Dear Mr. Parker: Reference the application of Mr. David Wark for a Department of the Army permit to construct and backfill a bulkhead on a manmade canal off Pamlico Sound, Frisco, Dare County, North Carolina. The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the State authorization: a. The bulkhead will be positioned in strict accordance with permit plans.. b. All backfill materials will be obtained from a high ground source and confined landward of the permitted bulkhead. c. The fill material will be clean and free of any pollutants except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. d. The activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area of construction or construction-related discharge. Increases such that the turbidity in the waterbody is 50 NTU's or less are not considered significant. -2- Questions or comments may be addressed to Ms. Alison Arnold, telephone (919) 343-4634. Sincerely, Charles W. Hollis Chief, Regulatory Branch J Copies Furnished: Mr. William Mills Water Quality Section Division of Environmental Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Ms. L. K. (Mike) Gantt „ U.S. Fish and Wildlife Service Post Office Box 25039 Raleigh, North Carolina 27611-5039 Ms. Beverly Etheridge, Chief Wetlands Section Region IV Marine and Estuarine Branch U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Mr. David Griffin Elizabeth City Regional Office North Carolina Division of Coastal Management 108 South Water Street Elizabeth City, North Carolina 27909 Mr. Randy Cheek National Marine Fisheries Service Habitat Conservation Division Pivers Island Beaufort, North Carolina 28516 IN REPLY REFER TO Regulatory Branch DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 May 12, 1988 SUBJECTS' File No. SAWCO88-N-028-0320 Mr. William Mills Water Quality Section Division of Environmental Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Dear Mr. Mills: Js Enclosed is the application of Mr. David Wark, represented by Coastland Development Consultants, for Department of the Army authorization and a State Water Quality Certification to construct and backfill a bulkhead on a manmade canal off Pamlico Sound, Frisco, Dare County, North Carolina. Your receipt of this letter verifies your acceptance of a valid request for certification in accordance with Section 325.2(b)(ii) of our administrative regulations. We are considering authorizing the proposed activity pursuant to Section 404 of the Clean Water Act, and we have determined that a water quality certification may be required under the provisions of Section 401 of the same law. A Department of the Army permit will not be granted until the certification has been obtained or waived. In accordance with our administrative regulations, 60 days after receipt of a request for certification is a reasonable time for State action. Therefore, if you have not acted on the request by July 12, 1988, the District Engineer will deem that waiver has occurred. Questions or comments may be addressed to Ms. Alison Arnold, telephone (919) 343-4634. Sincerely, V,he,-s W. Ho toryy Regula ra nch Enclosure -2- Copies Furnished (without enclosure): Mr. John Parker Division of Coastal Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. David Griffin Elizabeth City Regional Office North Carolina Division of Coastal Management 108 South Water Street Elizabeth City, North Carolina 27909 iw Ul.y L_ L) k/t `/. Please type or print. Carefully describe all a tns 1 B'00 d. Describe the planned use of the project. ticipated' development activities, including c b Shore l i n e erosion c o n t r o l tion, excavation, filling, paving, land clearistorm?;_ater Control. If the requested informa-?? not relevant to your project, write N/A (not ap- plicable). Items 1.4 and 8-9 must be complet °r' aWECEIVED-LAND AND WATER all projects. GRARACTERISTIC 9 S 198 „`- 1,: APPLICANT KtUJU TORY a. Name Coastland Dev.Consultants Address 122 Sir Walter Raleigh Dr. City Kill Devil 11:8t6lL5 N. C. Zip 2 7 9 4 8 Day phone 44 1 - 2 5.51 Landowner or X Authorized agent b. Project name (if any) None c. If the applicant is not the landowner, also give the owner's name and address. David Wark 115 South Bay Avenue Beach Haven, N.J. 08008 2 LOCATION OF PROPOSED _'' a. Street address or secondary road number Captain's Court b. City, town, community, or landmark Frisco c. County Dare d. Is proposed work within city limits or planning jurisdiction? Yes e. Name of body of water nearest pro ect Man made canal off of Pamlico 3 DESCI II?TIt N =AND PL'I N ED USE OF PROPOSED T'RC)rEr CT . a. Describe all development activities you propose (for example, building a home, motel, marina, bulkhead or pier). Bulkhead If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of an ex- isting project, new work, or both? New Will the project be for community, private, or commercial use? Private a. Size of entire tract 145 ' x 13 0 ' 7^ BRAIGN Size of individual lot(s) N/A c. Elevation of tract above mean sea level or Na- tional Geodetic Vertical Datum 3 `' d. Soil type(s) and texture(s) of tract Sandy loam e. Vegetation on tract Lawn grass , Juncus Spartina spp. f. Man-made features now on tract sin lgi e family residence g. What is the CAMA Land Use Plan Classifica- tion of the site? (Consult the local land use plan.) Conservation X Transitional Developed Community Rural Other h. How is the tract zoned by local government? none i. How are adjacent waters classified? SA j. Has a professional archaeological survey been carried out for the tract? No If so, by whom? 5 VPtAND DEVEL0PIEN'?'$ SoundComplete this section if the project includes any upland development. N [ a. Type and number of buildings, facilities, or structures proposed c. Number of lots or parcels Density (Give the number of residential units and the units per acre.) d. Size of area to be graded or disturbed If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimen- tation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? Give the percentage of the tract within 75 feet of mean high water to be covered by im- permeable surfaces, such as pavement, buildings, or rooftops. g. List the materials, such as marl, paver stone, asphalt, or concrete, to be used for paved surfaces, h. If 4pplicatie, has a stormwater management plan been submitted to the Division of En- vironmental Management? i. Describe proposed sewage disposal and/or waste water treatment facilities. j. Have these facilities received state or local approval? k. Describe existing treatment facilities. b. C. d. e. f. 9. Amount of materia below water level Type . of material- Does the are land, swam High ground Dimensions Location of 1 to be excavated from in cubic yards a to be excavated include marsh- ps, or other wetlands? _ excavation, in cubic yards of spoil disposal area spoil disposal area h. Do you claim title to the disposal area? i. If not, attach a letter granting permission from the owner. Will a disposal area be available for future maintenance?/ If so, where? Does the disposal area include any marshland, swamplland,lor water areas? Will the fill material be placed below mean high water? Amount of fill in cubic yards Type of fill material Source of fill material Will fill material be placed on marsh or other wetlands? Dimensions of the wetland to be filled How will excavated or fill material be kept on site and erosion controlled? j• 1. Des;xibe location and type of dikcharges to waters of the state (for example ;-!surface runoff, k. sanitary wastewater, industrial/commercial effluent, or "wash down"). 1. M n. m. Water supply source o. n. If the project is oceanfront development, describe the steps that will be taken to main- P. tain established public beach accessways or pro- q. vide new access. o. If the project is on the oceanfront, what will be the elevation above mean sea level of the first habitable floor? icv TION ?IlrtFORO'°? a. Describe below the purpose of proposed excava- tion or fill activities (excluding bulkheads, which are covered in Section 7). N/A Length Width Depth Access channel (MLW) or (NWL) Boat basin Other (break- water, pier, boat ramp, rock jetty) Fill placed in wetiand or below MHW Upland fill areas r. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? s. Will wetlands be crossed in transporting equip- ment to the project site? If yes, explain the steps that will be taken to lessen en- vironmental impacts. :7 SHORELINE `i A .?. 'I4Q T a. Length of bulkhead or riprap 14 5 ' b. Average distance waterward of mean high water or normal water level 1 ' c. Shoreline erosion during preceding 12 months, in feet 1 to 21 d. Type of bulkhead material s a l t f r P a t e d w o o s e. Amount of fill, in cubic yards, to be placed below mean high water 2 f. Type of fill material sand 8 ADDY'AYONAL%INFOR t?- :- In addition to the completed application form, following items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then for- ward a copy of the deed or other instrument under which the owner claims title, plus written permis- sion from the owner to carry out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on 8 V2 x 11 white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 16 high quality copies are provided by the applicant. (Contact the U.S. Army Corps of Engineers regard- ing that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency per- sonnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit com- ments on the proposed project to the Division of Coastal Management. The applicant must advise the adjacent landowners of this opportunity by sen- ding a copy of the permit application to them by registered or certified mail. This notification is re- quired by G.S. 113-229(d). Name_ Address M Name _ Address Name Address list of previous state or federal permits issued r ork-on the project tract. Include permit E:;; nu bers, permime, and issuing dates. A check for $100 made payable to the Depart- ment, of Natural Resources and Community Development to cover the costs of processing the application. A signed AEC hazard notice for projects in ocean- front and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, at- tach a statement documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). i?A 'I+?? 1_A??i? ?ERM?Sy era ?' orrA EAR! i Any permit issued in response to -this application will allow only the development described in the application. The project will be subject to condi- tions and restrictions contained in the permit. I certify that to the best of my knowledge, the pro- posed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit ap- plication and follow-up monitoring of project. This is the 2 3 - day of M A_,, h 19 X Lan owner o Authorized age Send the completed application materials to the Division of Coastal Management Office nearest you and the U.S. Army Corps of Engineers. See the map on the inside front cover for the appropriate DCM office and addresses and phone number. wM n n C X • 0 1- P. b td (D z? o n o N• ? ?-* r w o ? ?c a• x (D ?c o "Xi m co X N• m ? rr MOIQ (D m cn a? rD On n (D (D n i co b rt w N• v? n ' o G r* I n m rri 9 C) t b C rt `c w 'CJ 1:? O w C w (D a (1. cr (D rz? n ? w ` x w m r• D) F :3 o a w h, EV rs p o E ? b w N• a ? b • r1 l7y C=7 O O x ,? 'v b w (D (D rr W n n n n rr w N• ti C =_n b? co O o? l? ti td h b w b H ? n m w o b o b w (n Cu O " n b m ty M (D w w .'D (D a N 0Q w w c (Z• (D (D -- w H Q N `C CJ td k-- Lo n l] O Oo d 7C nO fi x(D - N (D w Q. r n rr O cr r+ 4 _._... a Ent Bri David Wark Brigands Bay, Dare County 3/23/88 Page 2 of 2 SIDE ELEVATION of PROPOSED BULKHEAD not to scale ja Pctr.l ;?o Soy General Location Map not to scale c? n c x 0 ?- F'• v ;7v (n w (D z ? rr o h :E; (D N X rt r w o F- I-Ii A ao (D O v F•n C ! w i b rt w 0 u? n j 0 I h n ? rn ' ~ I rri 00 D ry O 't7 10 (D (D rj r-S ? rr (n O i n 0 1 a w 0 o• w w m O k r* (n r1 c-* w r• 10 31) w m w CL !r ? n w 0 w N• 0 0 w ?n F1, 0 rn b w N• 0 En 0 a fc td H r! oo n rD w O w Cn a O rt n ''U cn d m (D w w a w a !-oo w bd c a rD m ?w H p' N `C d b7 n II O 00 d a n O rt 7C (D - N (D w r n rr O 0' CL G ?C DIVISION OF ENVIRONMENTAL MANAGEMENT WATER QUALITY SECTION M Comments concerning an application: for State Federal PAMA Permit(s) from /I A A. PERMIT: This office cannot comment on this project until after the close of the Section 401 Certification Public Comments Period. This office has no objection to the issuance of the permit(s) for the proposed /'?project with the following conditions: _ That the activity be conducted in such a manner as to prevent significant increases in turbidity outside the area of construction or construction- related discharge (increases of 25 NTU's or less are not considered significant). That the instream turbidity not be increased by more than 50 NTU's as a result of the proposed activity after a reasonable opportunity for dilu- tion and mixture. That turbidity levels in shall not be increased by more than 10 NTU's as a result of the proposed activity after a reason- able opportunity for dilution and mixture. B. CERTIFICATION STATUS: Certification is not required for this project. Certification is required for this project. Such action to process the certification has been initiated. Proposed Certification will be acted on or after The proposed project is certified under General Certification A) No. 1179 issued on January 25, D) No. 1431 issued on October 16, 1977, for sewer line construction 1980, for boat ramp construction. ?-} No. 1272 issued on November 10, E) No. 1664 issued on September 8, 1978, for bulkhead construction. 1983, for Rip-Rap Placement. C) No. 1273 issued on November 10, F) No. 1665 issued on September 19, 1978, for discharges of liquid 1983, for incidental bridge effluent from diked upland disposal construction. areas. WATER QUALITY SECTION DIVISION OF ENVIRONMENTAL MANAGEMENT 1: t:DA1A Di"/f::AM¢'t/•t•7t:)1 REV D{•ylE 0.5/16/8f-.3 ACTION ADD FILE ) .al...i:Ai°iA401 P;:t,i:f`r t Ff.iR{°lAl {,1RDFf::Arlt"t i••1I:..X .T' Rf::i:? 00409 ACTION ADD, ENTER DATA, REC. ADDED IS 00407 FR{:v DATA i'•'h;O:.it : ::t l:} ASSIGNED i'`i. J : .1i::}RKA r .flfRt'?? ID TO: ;1d...t i`.i /,cY'v J JOIN COUNTY: T NOTICE: ?li='ti''•4: N REGION: 0 TYPE CECERTIFICATION 1 RECOMMEN . ... E,.*-..*.' D 's'sr??t ( :,:;.: r:: D?i t ; t?1, t.t' 404 I::'i.% 40•i RI:::f;? ISSUE: `r RECi..I'':ET.?. 880509 CAMA ONLY: GC: BULKHEADS DENY: INITIAL R EPORT: 1.tI..:/CA` .: f r:•t::. " 1': ::.,.:. .rr..,,....i.! .....1 i l•t ! ? ,• I" .: ..:tJ.t 1 1-`, t'• :'Its ... 1J FINAL REP ORT: 880516 RECEIVING STREAM: l i'T'.... i•}r"iMI... .I. t.: i.? SOUND CLA SS: .'t..+ BASIN: TAI:.-..-' COMMENTS: SITE LOCATED AT BRIGANDS BAY SUBDIVISION AT FRISCO F' R1=' f:T Si::: E BULKHEAD 145 i... : < ONE ARCE DEVELOPED COPIES: t,.,;. # I:;; D.... f: i::: P`: t Rr:'t i....... M.;. I...1......... ;? t.:. . PJI A? 1 '? 1988 ?NATE NIS1?'t??aN OPi+ ooNs R . MEMORANDUM T0. FROM: SUBJECT: DATE: Bill Moore David R. Griffin APPLICATION FOR CAMA MAJOR PERMIT AND/OR DREDGE AND FILL PERMIT May 6, 1988 fi 1 Attached is an application by COASTLAND DEV. CONSL. - WARK which was received by me on 4/18/88 I am considering this application complete, have acknowledged receipt, and have begun processing. If you have any questions, do not hesitate to contact me. /yl1 MEMORANDUM TO: Bi11 Moore FROM: David R. Griffin SUBJECT: APPLICATION FOR CAMA MAJOR PERMIT AND/OR ?J DREDGE AND FILL PERMIT DATE: May 6, 1988 Attached is an application by _ OASTLAND DEV. GQNSL- - RK which was received by me on 4;18;88 I am considering this application complete, have acknowledged receipt, and have begun processing. If you have any questions, do not hesitate to contact me. /ylI 1. 2. 3. 4 5. 6. (A) Vegetated wetlands: Coastal wetlands. (B) ureagea Filled Other „_ 500 ft.Z Non-vegetated wetlands: (C) Other: AREA •ti OFFICE OF COASTAL M4ACEMEN1 FIELD INVESTIGATION REPORT Applicant's name COASTLAND DEVELOPMENT CONSULTANTS - WARK Location of project site off Captain's Court, Brigands Bay Subdivision, rnoto net. 14- ?-19, _ Investigation type: Dredge b Fill' X CAMA X Investigative procedure: (A)'Datee of site visit 4/26/88 (B) Was applicant present no . Processing procedure: Application received' 4/18/88 Office E 1 i z . City Site description: (A) Local Land Use Plan Dare . Land classification from LUP , •ra n s i i o n + Development constraints identified in LUP none (B) AEC(s) involved: Ocean Hazard Estuarine shoreline X Coastal wetlands x Public trust waters Estuarine waters XOther (C) Water dependent: Yes No X Other (D) Intended use: Public Private X Commercial (E) Type of waste water treatment: Existing septic tank and drain field Planned none (F)' Type of structures: Existing 2-story residence Planned bulkhead (G) Estimated annual rate of erosion 1' - 2' Source Applicant 7. -Habitat description: (D) Total area disturbed: ' snn ft.2 8. Project summary Applicant proposes to bulkhead 145' of shoreline.of hi _proi)erty in Brigands Bay Subdivi.. inn, Frisco. Dare- Tn addition- the applicant proposes to ba,ckfill behind the bulkhead: COASTLAND DEVELOPMENT CONSULTANTS - WARK BIO REPORT PAGE 2 SITE REPORT The applicant owns property on a man-made canal off Captain's Court in Brigands Bay Subdivision, Frisco, Dare County. A two-story single-family residence is located on the property along with a few cedar and myrtles. The shoreline along the canal is vegetated with Spartina alterniflora and Juncus roemerianus extending back eight to fifteen feet from NWL. A low drainage area exists on the east side of the property. This area is vegetated with emergent Spartina cynosuroides. This area serves to drain upland storm runoff from adjacent lots into the man-made canal. A portion of this area is coastal wetlands with the remaining low area being 11404" wetlands. The applicant proposes to construct a wooden bulkhead 145' across the shoreline of his property. The alignment will be 1' waterward of MHW and 21-3' waterward of the landward edge of the coastal wetlands. On the western property line, the bulkhead will angle,out 7' beyond NWL to adjoin an existing bulkhead. On the eastern side of the property, the bulkhead will extend waterward of the low drainage area. Once constructed, this low drainage area will be backfilled. ANTICIPATED IMPACTS Approximately 500 square feet of coastal wetlands will be lost by the construction and subsequent backfilling of the bulkhead. Some short-termed, localized turbidity will result from the bulkhead construction. Water will no longer drain from adjacent lots through the low drainage area and into the canal. CAMA REVIEW Although Frisco Village is classified as transition and thus no constraints are identified for this project, coastal wetland fringes exist throughout Brigands Bay and as a whole represent a significant coastal wetlands. Submitted by: David R. Griffin Date: May 5, 1988 hbid V Lv Please type or print. Carefully describe all a APR 1 ticipated development activities, including c nstr? tion, excavation, filling, paving, land clearin „ stormwater control. If the requested informat not relevant to your project, write N/A (riot ap- plicable). Items 1-4 and 8-9 must be completed for all projects. 1: APPLICANT a. Name Coastland Dev.Consultants Address 122 Sir Walter Raleigh Dr. City Kill Devil H:8j" N.C. Zip 2 7 9 4 8 Day phone 4 41- 2 5 51 Landowner or X Authorized agent b. Project name (if any) None c. If the applicant is not the landowner, also give the owner's name and address. David Wark 115 South Bay Avenue Beach Haven, N.J. 08008 2. ' LOCA`T'ION OF PROPOSED PROJECT a. Street address or secondary road number Captain's Court b. City, town, community, or landmark Frisco c. County Dare d. Is proposed work within city limits or planning jurisdiction? Yes e. Name of body of water nearest pro ect Man made canal off of Pamlico 3 DESCRIPTION AND PLANNED: _ USE OF PROPOSED PROJECT a. Describe all development activities you propose (for .example, building a home, motel, marina, bulkhead or pier). Buikheaa If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of an ex- isting project, new work, or both? New c. Will the project be for community, private, or commercial use? Private EC Describe the planned use of the project. Shoreline erosion control .4 LAND AND WATER CHARACTERISTICS a. Size of entire tract 14 5 ' x 13 0 ' b. Size of individual lot(s) N/A c. Elevation of tract above mean sea level or Na- tional Geodetic Vertical Datum 3 d. Soil type(s) and texture(s) of tract sandy loam. e. Vegetation on tract Lawn grass, Juncus Spartina spp. f. Man-made features now on tract s i n g l e family residence g. What is the CAMA Land Use Plan Classifica- tion of the site? (Consult the local land use plan.) Conservation X Transitional Developed Community Rural Other h. How is the tract zoned by local government? none i. How are adjacent waters classified? SA j. Has a professional archaeological survey been carried out for the tract? No If so, by whom? 5 UPLAND DEVELOPMENT SoundComplete this section if the project includes any upland development. N a. Type and number of buildings, facilities, or structures proposed b. Number of lots or parcels c. Density (Give the number of residential units and the units per acre.) d. Size of area to be graded or disturbed e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimen- tation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? f. Give the percentage of the tract within 75 feet of mean high water to be covered by im- permeable surfaces, such as pavement, buildings, or rooftops. 9 g. List the materials, such as marl, paver stone, asphalt, or concrete, to be used for paved surfaces. h. If applicable, has a stormwater management plan been submitted to the Division of En- vironmental Management? i. Describe proposed sewage disposal and/or waste water treatment facilities. b.. Amount of material to be excavated from below water level in cubic yards c. Type. of material d. Does the area to be excavated include marsh- land, swamps, or other wetlands? . e. High ground excavation, in cubic yards f. Dimensions of spoil disposal area g. Location of spoil disposal area h. Do you claim title to the disposal area? j. Have these facilities received state or local If not, attach a letter granting permission from approval? the owner. k. Describe existing treatment facilities. _ i. Will a disposal area be available for future - maintenancet.. ------ If so, where? j. Does the disposal area include any marshland, 1. Describe location and type of discharges to swamplland,lor water areas? waters of the state (for example surface runoff, k. Will the fill material be placed below mean sanitary wastewater, industrial/commercial high water? effluent, or "wash down"). 1. Amount of fill in cubic yards m. Type of fill material n. Source of fill material m. Water supply source o. Will fill material be placed on marsh or other n. If the project is oceanfront development, wetlands? describe the steps. that will be taken to main- p. Dimensions of the wetland to be filled tain established public beach accessways or pro- q. How will excavated or fill material be kept on vide new access. site and erosion controlled? o. If the project is on the oceanfront, what will r. What type of construction equipment will be be the elevation above mean sea level of the used (for example, dragline, backhoe, or first habitable floor? hydraulic dredge)? . "EXCAVATION AND TILL ? I1' T4VO?TION s. Will wetlands be crossed to transporting equi - p s ment to the project site? If yes, explain the steps that will be taken to lessen en- a. Describe below the purpose of proposed excava- vironmental impacts. tion or fill. activities (excluding bulkheads, which are covered in Section 7). NIA Length Width Depth Access channel (MLW) or (NWL) Boat basin Other (break- water, pier, boat ramp, , rock jetty) Fill placed in wetland or below MHW Upland fill areas 7 SHORELINE STABILIZATION a. Length of bulkhead or riprap 1 4 5 ' b. Average distance waterward of mean high water or normal water level 1 ' c. Shoreline erosion during preceding 12 months, in feet 1 to 2, d. Type of bulkhead material G a l t -t r e a t p ct wood e. Amount of fill, in cubic yards, to be placed below mean high water 2 f. Type of fill material sand 2 a 8 Ab DYTIONA,L INFORbCATION? In addition to the completed application form, following items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then for- ward a copy of the deed or other instrument under which the owner claims title, plus written permis- sion from the owner to carry out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on 8 Y2 x 11 white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 16 high quality copies are provided by the applicant. (Contact the U.S. Army Corps of Engineers regard- ing that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide. agency per- sonnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. -A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit com- ments on the proposed project to the Division of Coastal Management. The applicant must advise the adjacent landowners of this opportunity by sen- ding a copy of the permit application to them by. registered or certified mail. This notification is re- quired by G.S. 113.229(d). Name Ma„rice M Perkins Address Box 178 Manahawkin N 1 08050 Name Caries Boxlev Address Box 414 R»xtnn?N_(' 27920 Name Address r list of previous state or federal permits issued Or vork on the project tract. Include permit 06P4 - €9 nu bers, permittee, and issuing dates. A check for $100 made payable to the Depart- ment of Natural Resources and Community Development to cover the costs of pr6cessing the application. A signed AEC hazard notice for projects in ocean- front and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, at- tach a statement documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). 9 CERTIFICATION AND PERMIS= SION TO ENTER''ON LAND Any permit issued in response to this application will allow only the development described in the application. The project will be subject to condi- tions and restrictions contained in the permit. I certify that to the best of my knowledge, the pro- posed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit ap- plication and follow-up monitoring of project. This is the -2 3 day of m;; T„w , 19- 8 X Lan owner o Authorized age Send the completed application materials to the Division of Coastal Management Office nearest you and the U.S. Army Corps of Engineers. See the map on the inside front cover for the appropriate DCM office and addresses and phone number. w b rt w W C) O n a -o ?o w.. co b C) rs • o b td (D O h (D 1-C o C X ? N• x (n z ]• r* E (D N• rw ? a 0'0 v w ? F+• CA N? ? N• w 7d Uo (D F+• P. a? (D o0 0 ? 0 (D (D t ro ? n ? 0 b 1 O to C- (D G x 0 N• w •F ? a w ? b • r{ w M O O x b b w (D (D r* W ?t ?S rt r* b 7 to o rn , o? 3 w w a (D n w w 0 0 ?n •v w 0 W O G O a W ro N• b n ea n (D Q) O 10 O b w W a O n n ?d (n t= (A (D w w a N a?-j oa wez+ ca (D (D w -? t7 N %.C, t) b7 oil 0 Wt7 ax t'7 Nib 00w 4v 0 O n (D - N lD w a t" C7 r* O v a ?c David Wark Brigands Bay, Dare County 3/23/88 .Page 2 of 2 I. ?ris/Court /A,rTreeboo?er'""court General Location Map not to scale v SIDE ELEVATION of PROPOSED BULKHEAD not to scale aPV LA Entrance t.o Brigan Bay Ad nug Har or K roject Pc?..I:GO Soo n w 'a n w En n 0 0 H r* 'D w tri n H G >S 0 H. 10 x cn W m z =; rr O H :c m H. >?? rw0 m I-el 0 v H, D) X ?• m 0 ? od m En W H. N. ad (D 0'Q O F- r) m m H v0 0 m a G F' 7s' O+ m Co r.. w ran r m I 00 !! I rn o ? • r4 co m O o x. m m r* M H H n ? ? r•r w N• 0 b? m o ?n w ? w a n w w F? ?j o D) Fh rn 0 H, ro w a 0 to O ?kA CL l°€ o? 1 H b N• b H 00 H m w O b O b w cn a O H 0 b cn t7 cn m w w 9•m m(D --w ? D• N `?; t7 t7y n 11 0 OD d aX, t7 NM Cbw PO :?r C') O H 7q m -N m w a r ? O tr a ? ?c r•r