HomeMy WebLinkAbout19880312 Ver 1_COMPLETE FILE_19880101I _ e .
DIVISION OF ENVIRONMENTAL MANAGEMENT
WATER QUALITY SECTION
s concernYng an application Jor State Fe ral CAMA Permit(s) from
It !? 1?1_ &V144_ 11
A. PERMIT:
This office cannot comment on this project until after the close of the Section
401 Certification Public Comments Period.
T s office has no objection to the issuance of the permit(s) for the proposed
roject ith the following conditions:
That the activity be conducted in such a manner as to prevent significant
increases in turbidity outside the area of construction or construction-
related discharge (increases of 25 NTU's or less are not considered
significant).
That the instream turbidity not be increased by more than 50 NTU's as a
result of the proposed activity after a reasonable opportunity for dilu-
tion and mixture.
That turbidity levels in shall not be increased
by more than 10 NTU's as a result of the proposed activity after a reason-
able opportunity for dilution and mixture.
B. CERTIFIC ION STATUS:
Certification is not required
for this project.
Certification is required for
this project. Such action to
process the certification has
been initiated. Proposed
Certification will be acted on
or after .
The proposed project is certified
under General Certification
A) No. 1179 issued on January 25,
1977, for sewer line construction
B) No. 1272 issued on November 10,
1978, for bulkhead construction.
D) No. 1431 issued on October 16,
1980, for boat ramp construction.
E) No. 1664 issued on September 8,
1983, for Rip-Rap Placement.
C) No. 1273 issued on November 10, F) No. 1665 issued on September 19,
1978, for discharges of liquid 1983, for incidental bridge
effluent from diked upland disposal construction.
areas.
WATER QUALITY SECTION'
DIVISION OF ENVIRONMENTAL MANAGEMENT
NK D AT f-) x'!;:°/t:'t'ti°3 :{ /•t?:0i REV DATE 06/09/88
ACTION ADD FILE ' 1.} FCf='t 4"{ (l:I .;•; 0 1 PSG•I .D )
FORMAT
:. NEXT ... r•: C:D )
1•, • fDst.. 6•) R°f rat .,:
F?, 0040'?
AC ACTION ADD, ENTER DATA. REC. ADDED IS 00426 FRD DATA
r' r:OJO : 0042 7 I'•Rt. J : RUSSELL, ,.s{' ! I° I° H COUNTY: T t::fW : REGION: 0-,`
ASSIGN ED
TO: W:.?4'{ 47
:.?..t:I:R``1 R NOTICE:
•'•`
TYPE CERTIFICATION RECOMMEND DATES 1 ! R R , R :: D
404 PN: 401 RED: ISSUE: Y RECEIVED : 88060-`
CAMA ONLY: GC: DENY: INITIAL REPORT:
DI:.: {..:teaMr: • f R..:! . :.{x.{.. ' ' HOLD: •.:: { 8 0:`Y':,
RECEIVING ST REAM: U { ._.f'.1R...!.?R...MAR°•.R...;... ,::•O{..;R\'D CLASS: ...... BASIN: PAS
COMMENTS:
SITE LOCATED IN : j.: R..f x....t. R `t G 3 {..; {',I HARBOUR SUBDI VISION
PROPOSED 40 .I.;...s•, ;11,x: 2 PILINGS
( ONE ACRE D EVELOPED
COPIES: WARO -CENTRAL-MILLE-DCM
r,
MEMORANDUM
TO: Bill Moore
FROM: Robert Abernethy
SUBJECT: APPLICATION FOR CAMA MAJOR PERMIT AND/OR
DREDGE AND FILL-PERMIT
DATE: June 6, 1988
6y
1
4,
Attached is an application by JOSEPH C. RUSSELL
which was received by me on 4/26/88 I am considering
this application complete, have acknowledged receipt, and have begun
processing.
If you have any questions, do not hesitate to contact me.
/yll
MEMORANDUM
TO: Bill Moore
FROM: Robert Abernethy
SUBJECT: APPLICATION FOR CAMA MAJOR PERMIT AND/OR
DREDGE AND FILL PERMIT .DATE!
"tea
June 6, 1988
? ?g>
Attached is an application by JOSEPH C. RUSSELL
which was received by me-on
419611_$.$I am considering
this application complete, have acknowledged receipt, and have begun
processing.
If you have any questions, do not hesitate to contact me.
/yl 1
Photo ref. 137-497 OFFICE OP COASTAL MANAGLML•:N'T p
U-22 FIELD INVESTIGATION REPORT ? La t. 3 00' 45"
Longf 750 43' 40"
1. Applicant's name JOSEPH C. RUSSELL
2. Location of project site Lot 33, Sect. P, Lee Court, Col ington Harbour
Kill Devil 11s, Dare oun y, man made Cana o emar a oun .
3. Investigation type: Dredge b Fill X CAMA X
4. Investigative procedure: (A) Dates of site visit 5/3/88
(B) Was applicant present yes
5. Processing procedure: Application received 4/26/88 OfficeEl iz. City
6. Site description: (A) Local Land Use Plan Dare County-
'Land classification from LUPtransition
Development constraints identified in LUP n o ne
(B) AEC(s) involved: Ocean Hazard Estuarine shoreline
Coastal wetlandsPublic trust waters X
Estuarine waters X Other
(C) Vater dependent: Yes X No Other
(D) intended use: Public Pr(vate X Commercial
(E) Type of waste water treatment: Existing none
Planned n o n e
(F) Type of structures: Existing
n e n e---_-
Planned none
(G) Estimated annual rate of erosion-N/A Source
7. -Habitat description: AREA
(A) Vegetated wetlands: Dredged Filled Other
none
(B) Non-vegetated wetlands:
none
(C) Other:
1%
(D) Total area disturbed:
a. Project summary Applicant pLopoSPs to rnngfriirt a.; iei-A' w4de by
40; long out to -6' water
neighbor and 2 pilings will be placed 8' from the northern neighbor.
No coastal wetlands will be impacted.. Width of channel at this point
is 225 '
40
JOSEPH C. RUSSELL
BIO REPORT
PAGE 2
SITE REPORT
The applicant, Joseph C. Russell, 421 Peace Haven Drive,
Norfolk, Virginia 23502, holds title to lot 33, section P,
Colington Harbour, N.C. The property is bulkheaded and dominated
by yard grasses and sumac bushes. There are no coastal wetlands
involved. Width of the man-made canal is 225' and 1 pier
approximately 35' long exists 200' north of the project.
The applicant proposes to construct a wooden dock 4' wide by
40' long extending out to -6' of water. Pier will be placed 21'
from the southern property line, lot P-32, who has no objections
and 25' from the northern property line. In addition, applicant
proposes tp. install 2 mooring pilings 8' from the northern
property line, lot P-34. This neighbor objects to this
placement.
ANTICIPATED IMPACTS
Placement of this pier will result in some degree of
restriction of the public's use of this man-made canal connected
to Albemarle Sound.
CAMA REVIEW
The proposal is consistent with the conservation
classification as identified by the Dare County LUP.
r
Submitted by: Robert Abernethy
Date: May 6, 1988
R
Please type or print. Carefully describe all an,
A
ticipated development activities, including cons c
tion, excavation, filling, paving, land clearing, a d
stormwater control. If the requested information s'
not-relevant to your project, write N/A (not ap-
plicable). Items 1.4 and 8-9 must be completed for
all projects.
J L-0
R Z Describe the planned use of the proj, t.
JO /Ve0A /? ,U'd f r - `p
OCM'EC AGcGss %o go,-q,
1 APPLICANT
a. Name ?rQsEA z/ . ?ri Ss? L G
Address :Z2/ ?Acc hoc ?0 e
City AJo,e fo L,? State vA
Zip 1?3So.- I Day phone bf Z - 6- _016
./ Landowner or Authorized agent
b. Project name (if any A/'r
c. If the applicant is not the landowner, also give
the owner's name and address.
G oNi?yU' E 3a- w /ySSo L
9i9 - spy/ - e 7
2 LOCATION OF PROPOSED
PRO EC"T'
a. Street address or seco ary road number
,Co i 3.3 SEc - /9 - L _-z Coug 7-
b. City, town, community, or landmark
C'o 2i v4 %.y L1s/.e Bo -.e A'i L .Oza, L f?? 4:5..t/6
c. County ll,,.y,ee ;?_ 9y1
d. Is proposed work within city limits or planning
jurisdiction? Co Z/ Toy -h'2 Z o we i9s c .
e. Name of body of water nearest project
3 DESCRIPTION : AND PLANNED,;
USE OI~. PROPOSED. PROJECT
? • ?YY
a. Describe all development activities you propose
(for example, building a home, motel, marina,
bulkhead, or pier). , ,
/ 2
%Liw9s C/a"l %e /?oa?c /9
.t3o ?D %? ' S'GE f'LH y
If you plan to build a marina, also complete
and attach Form DCM-MP-2.
b. Is the proposed activity maintenance of an ex-
isting project, new work, or both?
,U,,w u)o,eh'
c. Will the project be for community, private, or
commercial use?
r; r d r "G
CHARACTERISTICS
LoT - _33 ??e ???
a. Size of entire tract S1 Z E ?0 X /3 "O
b. Size of individual lot(s)
c. Elevation of tract above mean sea level or Na-
tional Geodetic Vertical Datum
d. Soil type(s) and texture(s) of tract &;L
e. Vegetation on tract A//y
f. Man-made features now on tract
g. What is the CAMA Land Use Plan Classifica-
tion of the site? (Consult the local land use
plan.)
? Conservation Transitional
?- Developed Community
Rural Other
h. How is the tract zoned by local government?
4cs1oFwi ?o I-
i. How are adjacent waters classified?
ax-
J. Has a professional archaeological survey been
carried out for the tract?, e4Lt
If so, by whom?
5 77771
j
IOPM NT `
Complete this section if the project includes any
upland development.
a. Type and number of buildings, facilities, or
structures ?roposed
b. Number of lots or parcels
c. Density (Give' the number of residenti€tl units
and the units p r acre.)
d. Size of area to be aded or disturbed
e. If the proposed pro ct wilt disturb more than
one acre of land, th D?ision of Land
Resources must recei an erosion and sedimen-
tation control plant ast 30 days before land
disturbing activit? begi If applicable, has a
sedimentation/and erosion control plan been
submitted to/the Division Land Resources?
f. Give tl,(e percentage of the t ct within 75 feet
of mean high water to be cove d by im-
permeable surfaces, such as pave ent,
.Wildings, or rooftops.
R- `` g{
8 { 'A6MtI4fi AL IS?T o t1VCATto 1
In addition to the completed application form,
following-items must be submitted:
00A, rf' nt
A copy of the deed (with state application only or
other instrument under which .the applicant claims
title to the affected property. If the applicant is not
claiming to be the owner of said property, then for-
ward a copy of the deed or other instrument under
which the owner claims title, plus written permis-
sion from the owner to carry out the project.
An accurate work plat (including plan view and
cross sectional drawings) drawn to scale in black
ink on 8 V2 x 11 white paper. (Refer to Coastal
Resources Commission Rule 7J.0203 for a detailed
description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if 16
high quality copies are provided by the applicant.
(Contact the U.S. Army Corps of Engineers regard-
ing that agency's use of larger drawings.) A site or
location map is a part of plat requirements and it
must be sufficiently detailed to guide agency per-
sonnel unfamiliar with the area to the site. Include
county road (SR) numbers, landmarks, and the like.
A stormwater management plan, if applicable, that
may have been developed in consultation with the
Division of Environmental Management.
A list of the names and complete addresses of the
adjacent waterfront .(riparian) landowners. These
individuals have 30 days in which to submit com-
ments on the proposed project to the Division of
Coastal Management. The applicant must advise
the adjacent landowners of this opportunity by sen-
ding a copy of the permit application to them by
registered or certified mail. This notification is re-
quired by G.S. 113-229(d).
f vctov,
Name 1
Address
Name 'a t3,r ?
Address*-Z/-Y-
/?/ L L
Name
Address
"t-'r ie
0 - A,iVv fA/Ee /`- J?2.
L • C?.ev3o - ?3 S?
e ,e,t? G
L Gs . A),C• -? 7951f
-5/fa) Ilerle/))/SS/e-v
list of previous state or federal permits issued
work on the project tract. Include permit
tubers, permittee, and issuing dates.
A check for $100 made payable to the Depart-
ment of Natural Resources and Community
Development to cover the costs of processing the
application.
A signed AEC hazard notice for projects in ocean-
front and inlet areas.
A statement on the use of public funds. If the
project involves the expenditure of public funds, at-
tach a statement documenting compliance with the
North Carolina Environmental Policy Act
(N.C.G.S. 113A-1 to 10).
9 CERTIFICATION AND, FERMIS.
SION ENTER ON LAND
Any permit issued in response to this application
will allow only the development described in the
application. The project will be subject to condi-
tions and restrictions contained in the permit.
I certify that to the best of my knowledge, the pro-
posed activity complies with the State of North
Carolina's approved Coastal Management Program
and will be conducted in a manner consistent with
such program.
I further certify that I am authorized to grant, and
do in fact, grant permission to representatives of
state and federal review agencies to enter on the
aforementioned lands in connection with
evaluating information related to this permit ap-
plication and follow-up monitoring of project.
This is the 2_2_ day of
X to Assac
,Q,, ?` C{
Landowner thorized agent )64-rZ e-
Send the completed application materials to the
Division of Coastal Management Gffice nearest you
and the U.S. Army Corps of Engineers. See the
map on the inside front cover for the appropriate
DCM office and addresses and phone number.
3
/U
M
i
f
- P? I+r'S
r
i
PJv/k s. ???
R1 virew- 4010 7- 4,.-
S, 5.e? A c. Rarfe //
dim
i
GO?/S?YVG !O^? / o A--II/ all g::// p X G</ Z /c
pr-r .?4., eeS , .Ga s ec f 1
tir r- c ss o- ry ?C
s
7
d2 ?? W1,06 /f T /?OiNi .p r ` Go wsT,G '
E1v
APP 2 '
CiC dO S?
11
74 . 14-2 3,3
, s e •; G. ?' Gi r ,.11 a P, .pv...?s? &
`v
bl .._ 2
`, o ?fPr?
v ?
l
z?' ?I
? 5 /) ?121C s
x;
i
•R .
A O
l1
0
i
I
i
•; R7
i N
7° O
G u
1Y
i ~
I
. z
0
i ;
C n -
p
0
°
•
S G=
m o-
n". D
i^°
I ° >
A
<° m
I
•
I
" ? <
€ ? 1ti
?
? ?y'Q ?i
l ypg =
f ?
I °
A y
= -
°
?
. ?i
r
a ,,li Q
_
mm
? i i - Z •b
.
•
,
? v
3
tl
bt
_?oF Z
M ? +
a
.
. `*
C
s
a
0
a
`
C
3?Sn
r °t
m aria
m
m
o
m _a
IA/. •??"Ea
n a" <n
I5 Y' to ?y
?. S Y
G
R98
I
MN zm - m
e ooi?
+ Nz v='s
e
w .
cm ?0.
2S . io m
z Z' A e
mi 9 a
_
o=
.bm n
m
m
A
-11 nxyi N
n
+ °a O <
m m
> nyii
:°
m o xo?
o°6i
.
-
I
n
D a
m
O
ia'' .° o
z S
z
C
:, c
_
+ " o
6i -