HomeMy WebLinkAbout20181055 Ver 1_Certification of Completion_20180928ROY COOPER
U�4V
MICHAEL S. REGAN
Secraetwy
LINDA CULPEPPER
lrrrerira DIrscw
WR Project No.
DWR# 18-1055
NCq'rH CAROLINA
Errlrironmental Quality
Applicant: Kevin Dean Klingensmith
Project Name:
County:
Henderson
UT Sentell Creek Pond Removal and Stream Restoration
Date of Issuance of 401 Water Quality Certification: August 29, 2018
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 and
Buffer Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh,
NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or
the project engineer. It is not necessary to send certificates from all of these.
Applicant's Certification
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature: Date:
Agent's Certification
I, Gregory D Jennings , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature: D Date: September 28, 2018
If this project was designed b3ra Certified Professional
1, Gregory D Jennings as a duly registered Professional Engineer (i.e.,
Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to
observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to
the best of my abilities, due care and diligence was used in the observation of the construction such that the
construction was observed to be built within substantial compliance and intent of the 401 Water Quality
Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature: 415(- D Registration No. PE # 25454
Date September 28, 2018
North Carolina Department of Environmental Quality I Division of Water Resources
2090 US 70 Highway, Swannanoa, NC 28778
828.296.4500