Loading...
HomeMy WebLinkAbout20181055 Ver 1_Certification of Completion_20180928ROY COOPER U�4V MICHAEL S. REGAN Secraetwy LINDA CULPEPPER lrrrerira DIrscw WR Project No. DWR# 18-1055 NCq'rH CAROLINA Errlrironmental Quality Applicant: Kevin Dean Klingensmith Project Name: County: Henderson UT Sentell Creek Pond Removal and Stream Restoration Date of Issuance of 401 Water Quality Certification: August 29, 2018 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 and Buffer Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification I, Gregory D Jennings , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: D Date: September 28, 2018 If this project was designed b3ra Certified Professional 1, Gregory D Jennings as a duly registered Professional Engineer (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: 415(- D Registration No. PE # 25454 Date September 28, 2018 North Carolina Department of Environmental Quality I Division of Water Resources 2090 US 70 Highway, Swannanoa, NC 28778 828.296.4500