Loading...
HomeMy WebLinkAbout19880003 Ver 1_COMPLETE FILE_19880101i Permit Class Permit Number NEW STATE OF NORTH CAROLINA 172-88 Department of Natural R.es srces ?n:d Community Development 0 Wxt Coasj eto mkis t_o ssion ?<< ' ± for, Mal6*beevel pment'inlan,Aria v?rronmental Concft-? , uant tc? 1vCG 3 V1ti f <? Excavation«atid/or?f11}ngpilrsu an?t to NCGS 113-229 Issued to Anchorage Inn/Shore Juniper Corp., P.O. Box 130, Ocracoke, NC 27960 authorizing development in Hyde County at Silver Lake, off NC 12 as requested in the permittee's application dated 6/13/88 including attached plats, 2, gazebo dated received 7/19/88 and gas pumps dated recd. 7/26/88. This permit, issued on 1qY , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may.subject permittee to a fine, imprisonment or civil action; or may cause the permit to be null and void. (1) The project will adhere strictly to the submitted plans. (2) The gazebo will have half-wall sides to allow for clear visibility for boating navigation. (3) The activity will be conducted in such a manner as to prevent significant increases in turbidity outside the area of construction or construction- related discharge. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31. 1991 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DNRCD and the Chairman of the Coastal Resources Commission. r 1 David W. Owens, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee DIVISION OF ENVIRONMENTAL MANAGEMENT WATER QUALITY SECTION Comments concernIng an application for State Federal CAMA Permit(s) from f A. PERMIT: This office cannot comment on this project until after the close of the Section 401 Certification Public Comments Period. This office has no objection to the issuance of the permit(s) for the proposed project with the following conditions: That the activity be conducted in such a manner as to prevent significant increases in turbidity outside the area of construction or construction- related discharge (increases of 25 NTU's or less are not considered significant). That the instream turbidity not be increased by more than 50 NTU's as a result of the proposed activity after a reasonable opportunity for dilu- tion and mixture. --- - That turbidity levels in shall not be increased by more than 10 NTU's as a result of the proposed activity after a reason- able opportunity for dilution and mixture. B. CERTIFICATION STATUS: Certification is not required for this project. Certification is required for this project. Such action to process the certification has been initiated. Proposed Certification will'be acted on or after The proposed project is certified under General Certification A) No. 1179 issued on January 25, D) No. 1431 issued on October 16, 1977, for sewer line construction 1980, for boat ramp construction. B) No. 1272 issued on November 10, E) No. 1664 issued on September 8, 1978, for bulkhead construction. 1983, for Rip-Rap Placement. C) No. 1273 issued on November 10, F) No. 1665 issued on September 19, 1978, for discharges of liquid 1983, for incidental bridge effluent from diked upland disposal construction. areas. WATER QUALITY SECTION DIVISION OF ENVIRONMENTAL MANAGEMENT FORMAT r' ., :.. { 11..11' ACTION ADD. ENTER THE DATA TO eE STORED FRD DATA PRO= 00455 P ROj: ANCHORA GE INN C(XjNTY: HYDE REGION: 0"I" f i r :... CERTIFICATI ON RECOMMEND .. r .... ,.. Y .... . 404 t i,. t , 401 R ISSUE: RECEIVED: CAMA ONLY: Y GC: DENY: INITIAL REPORT: .," s:..:'t.. :..Y.. .;sf. u ,F?l •'+`it..: .:> . . ?`s i " +'`R i::. Q .. .. . HOLD: .'.i`'`ii ... REPORT ._... .. so ... RECEIVING STRE AK: .{. 1.. :i ?...k i.... 'f Ki.. CLAS S. NC BASIN: .:j i r. COMMENTS: SITE LOCATED ' O FF APPLICANT PROP < ONE ACRE DEV OSES TO WDNS ELOPED TRUCf A 12 X 22 FT &AZESO ON EXISTING WOnDEN COPIES: WARO-C EAVRU -ill U57 -1011 RECEIVED A U G 0 8,11988 WATEF MEMORANDUM TO! Bill Moore . FROM: David R. Griffin SUBJECT: APPLICATION FOR CAMA MAJOR PERMIT AND/OR DREDGE AND FILL.PERMIT DATE: July 26, 1.988 FAST TRACK , Attached is an application by ANCHORAGE INN, SHORE JUNIPER CORP. which was received by me on 7/19/88 - I am considr?rinq this application complete, have acknowledged receipt, and have h erlun processing. If you have any questions,.do not hesitate to contact me, /yll MEMORANDUM TO : 8 i 1 1 Moore FROM: David R. Griffin SUBJECT: APPLICATION FOR LAMA MAJOR PERMIT AND/OR DREDGE AND FILL PERMIT DATE: July 26, 1988 FAST TRACK Attached is an application by ANCHORAGE INN, SHORE JUNIPER CORP. which was received by me on 7/19/88 • i am considering this application complete, have acknowledged receipt, and have hP !711 n processing. If you have any queStions, do not hesitate to contact me, /y11 FAST TRACK OFFICE OF COASTAL MANAGEMENT Lat:3506' 55"N FIELD INVESTIGATION REPORT Long:75°59' 1211W, 1. APPLICANT'S NAME ANCHORAGE INN, SHORE JUNIPER CORPORATION 2. LOCATION OF PROJECT SITE Anchorage Inn, Hwy. 12, Silver Lake, Ocracoke. Hvde Countv. Photo ref. 148-369, _K-4 3. INVESTIGATION TYPE: DREDGE & FILL CANA X 4. INVESTIGATIVE PROCEDURE: (A) DATES OF SITE VISIT 7/21/88 (B) WAS APPLICANT PRESENT yes 5. PROCESSING PROCEDURE: APPLICATION RECEIVED 7/19/88 OFFICE Elizabeth City SITE DESCRIPTION: (A) LOCAL LAND USE PLAN LUP none (B) AEC(S) INVOLVED: OCEAN HAZARD ESTUARINE SHORELINE COASTAL WETLANDS .. PUBLIC TRUST WATERS X ESTUARINE WATERS X OTHER (C) WATER DEPENDENT: YES NO X OTHER (D) INTENDED USE: PUBLIC PRIVATE COMMERCIAL X (E) TYPE OF WASTE WATER TREATMENT; EXISTING septic tank & drain PLANNED None field (F) TYPE OF STRUCTURES: EXI PLANNED gazebo on pier AREA DREDGED FILLED OTHER (G) ESTIMATED ANNUAL RATE OF EROSION N/A SOURCE 7. HABITAT DESCRIPTION: (A) VEGETATED WETLANDS (B) NON-VEGETATED WETLANDS: (C) OTHER: swimmi (D) TOTAL AREA DISTURBED: 400 sq. ft. (-.01 acre) 8. PROJECT SUMMARY: Applicant proposes to construct a 22' X 22' roofed, unenclosed gazebo on his eastern-most existing pier. ANCHORAGE INN, SHORE JUNIPER CORPORATION BIO REPORT PAGE 2 FAST TRACK PROJECT DESCRIPTION Applicant currently owns and operates Anchorage Inn Motel adjacent Silver Lake in Ocracoke, Hyde County. Water-related amenities currently present include three piers, bulkheading, a swimming pool and a shore-front office. All of these were permitted under LAMA major development permit 452-80, #47-85 or.#40-87. The applicant desires to enlarge the existing pier-end on his eastern-most pier and construct a 22' X 22' roofed, unenclosed gazebo. ANTICIPATED IMPACTS This project will not adversely affect submerged vegetation or wetlands. CAMA REVIEW This project is consistent with the developed classification. in the 1981 Hyde County LUP. Submitted by: David R. Griffin Date: July 25, 1588 Please type or print. Carefully describe all an- rd. ticipated development activities, including constiuc- tion, excavation, filling, paving, land clearing, arad stormwater control. If the requested information is not relevant to your project, write NIA (not ap- plicable). Items 1-4 and 8-9 must be completed for "; .: all projects. 1 APPLICANT , ,yc-4-1c?r11GQ J:?_ NN a. Name o r N' G ti- Address. 0. R d6 -!- 3 City C`) r co Y\.? State N c--- Zip ?- 9 6 o Day phone 91 9 Z.'8 i 101 -X Landowner or Authorized agent b. Project name (if any) c. If the applicant is not the landowner, also give the owner's name and address. 2 LOCATION OF PROPOSED PROJECT C. e. Name of body of water nearest project da. Street address or secondary road number 1? w V . 1 a-. b. Ci town, community, or landmark b crfic0Y-e_ County k . Is proposed work within city limits or planning jurisdiction? S S'k, I y ""r 1_-A K-e.__ X', 3 DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. Describe all development activities you propose (for example, building a home, motel, marina, bulkhead, or pier). ll\\ Cc. N 1 n C F, y e ti ?C e?-F - ,a N & L, t 61 If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of an ex- isting project, new work, or both? n),NJ c. Will the project be for community, private, or commercial use? . GOcr,) frnerc i -A l planned_ use of the U ?. 4 LAND AND ,WATER--'' CHARACTERISTICS a. Size of entire tract -7 -4 3 r b. Size of individual lot(s) N .1 -A c. Elevation of tract above mean sea level or Na- tional Geodetic Vertical Datum d. Soil type(s) and texture(s) of tract Awn f. h. i. j• Vegetation on tract !a r h= Man-ma a feature ow on tract sha VAiat is the C AMA Land se Plan Classifica- tion of the site? (Consult the local land use plan.) Conservation Transitional X Developed Community Rural Other How is the tract zoned y local government? A) (t, _T -?Zow e (? How are adjacent waters classified? Has a professional archaeological survey been carried out for the tract? ly C? If so, by whom? g' 5 LJPLAND'DEVELOPMENT Complete this section if t e roject includes any upland development. N' a. Type and number of buildings, facilities, or structures proposed b. Number of lots or parcels c. Density (Give the number of residential units and the units per acre.) d. Size of area to be graded or disturbed e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimen- tation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? f. Give the percentage of th-ETfact within 75 feet of mean high water to be covered by im- permeable surfaces, such as pavement, buildings, or rooftops. g. List the materials, such as marl, paver stone, asphalt, or concrete, to be used for paved surfaces. h. If applicable, has a stormwater management plan been submitted to the Division of En- vironmental Management? i. Describe proposed sewage disposal and/or waste water treatment facilities. j. Have these facilities received state or local approval? k. Describe existing treatment facilities. 1. Describe location and type of discharges to waters of the state (for example?, surface runoff, sanitary wastewater, industrial/commercial effluent, or "wash down"). m. Water supply source n. If the project is oceanfront development, describe the steps that will be taken to main- tain established public beach accessways or pro- vide new access. o. It the project is on the oceanfront, what will be the elevation above mean sea level of the first habitable floor? 6 EXCAVATION AND FILL: INFORMATION a. Describe below the purpose of proposed excava- tion or fill activities (excluding bulkheads, which are covered in Section 7). Length Width Depth Access channel (MLW) or (NWL) Boat basin Other (break- water, pier, boat ramp, rock jetty) Fill placed in wetland or below MHW Upland fill areas b. Amount of material to be excavated from below water level in cubic yards c. Type of material d. Does the area to be excavated include marsh land, swamps, or other wetlands? e. High ground excavation, in cubic yards f. Dimensions of spoil disposal area g. Location of spoil disposal area h. Do you claim title to the disposal area? If not, attach a letter granting permission from the owner. i. Will a disposal area be available for future maintenance?? If so, where? j. Does the disposal area include any marshland, swamplland,lor water areas? k. Will the fill material be placed below mean high water? 1. Amount of fill in cubic yards m. Type of fill material n. Source of fill material o. Will fill material be placed on marsh or other wetlands? p. Dimensions of the wetland to be filled q. How will excavated or fill material be kept on site and erosion controlled? r. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? s. Will wetlands be crossed in transporting equip- ment to the project site? If yes, explain the steps that will be taken to lessen en- vironmental impacts. 7 SHORELINE STABILIZATION a. Length of bulkhead or riprap b. Average distance waterward of mean high water. or normal water level c. Shoreline erosion during preceding 12 months, in feet d. Type of bulkhead material e. Amount of fill, in cubic yards, to be placed below mean high water f. Type of fill material 2 A, J ADDI'TIbNAL tNFOR T'IQM I In addition to the completed applica on Rol 4h following items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then for- ward a copy of the deed or other instrument under which the owner claims title, plus written permis- sion from the owner to carry out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on 8 V2 x 11 white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 16 high quality copies are provided by the applicant. (Contact the U.S. Army Corps of Engineers regard- ing that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency per- sonnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit com- ments on the proposed project to the Division of Coastal Management. The applicant must advise the adjacent landowners of this opportunity by sen- ding a copy of the permit application to them by registered or certified mail. This notification is re- quired by G.S. 113-229(d). II Name t ?ba rS Y?) Address t'. C, . 15 04- S Name Address _P, o . !?t!2 on 1 r? ' V C ?$-`7 ` GG0 Name Address +?A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. -4- ??--430 ?Z 5- A check for $d'06 made payable to the Depart- ment of Natural Resources and Community Development to cover the costs of processing the application. A signed AEC hazard notice for projects in ocean- front and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, at- tach a statement documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). 9 CERTIFICA'+N A1VD ` PERMIS v SION , TO ENTER ON LAND Any permit issued in response to this application will allow only the development described in the application. The project will be subject to condi- tions and restrictions contained in the permit I certify that to the best of my knowledge, the pro- posed activity complies with the State of N6ith Carolina's approved Coastal Management Pi"ogram and will be conducted in a manner consisteAt with such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection-with evaluating information related to this permit ap- plication and follow-up monitoring of project. This is the 1 5 day of ?' --' , X 1 a l ?l'Ci?` Landowner or Authorized agent Send the completed application materials to the Division of Coastal Management Office nearest you and the U.S. Army Corps of Engineers.. See the map on the inside front cover for the appropriate DCM office and addresses and phone number. Sd ? T' i ?I of i 1 I I I N fl?r?.r? ccn WY'o` 5 ?Ar?e N ?c ? I' i'? t G? ,t N C 1 X..0.2 5 ?? O U 2.1"' ? pI N C'r ,i ?NCS s ee ?at ao VFD v. c