July 6, 2009
Jim Blanchard Associates
306 North NC Hwy 11 & 903
Kenansville, NC 28349
Division of Water Quality
401/Wetlands Unit
1650 Mail Service Center
Raleigh, NC 27699-1650
09-0756
211
CA e
-vy1
JUL ,, U
26,0.3
1YETL4 1191A4QST^1?A1N,Ly} gRA"! 1
SUBJECT: Calypso Storm Drainage Upgrade PCN Application, Duplin County.
Please find enclosed five copies of the Pre-Construction Notification Application Form for
Calypso Storm Drainage Upgrade. I am also enclosing two full size copies of the project plans
and three reduced size copies of the project plans and a check in the amount of $570.00 for the
project fee. The project is located in town limits of Calypso, Duplin County.
If additional information or clarification is required, please feel free to contact me at (910) 271-
0613.
Sincerely,
9L7U?#c
Stephen T. Blanchard, PE
Phone: 910.296.1921
Fax: 910.296.1922
,f ..
O??O'FyWjATf;7
r-i
0Nii? -<
09--4 756
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.4 January 2009
Pre-Construction Notification (PCN) Form
l
A. Applicant Information ob
JrA
1. Processing
I a. Type(s) of approval sought from the Corps: Q Section 404 Permit ? Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: 3 or General Permit (GP) number:
1 c. Has the NWP or GP number been verified by the Corps? ? Yes ? No
1 d. Type(s) of approval sought from the DWQ (check all that apply):
?X 401 Water Quality Certification - Regular N Non-404 Jurisdictional General Permit
? 401 Water Quality Certification - Express ? Riparian Buffer Authorization
le. Is this notification solely for the record
because written approval is not required? For the record only for DWQ
401 Certification:
? Yes ? No For the record only for Corps Permit:
N Yes ? No
If. Is payment into a mitigation bank or in-lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or in-lieu fee program.
? Yes ? No
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below. N Yes NX No
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes NX No
2. Project Information
2a. Name of project: Calypso Storm Drainage Upgrade
2b. County: Duplin
2c. Nearest municipality / town: Calypso r,.
2d. Subdivision name: N/A
2e. NCDOT only, T.I.P. or state project no: 20 C9
3. Owner Information DEAR - WATER QUALITY
3a. Name(s) on Recorded Deed: Town of Calypso ATER ePWCH
3b. Deed Book and Page No. N/A
3c. Responsible Party (for LLC if
applicable): Honorable Mayor, Dick Lewis
3d. Street address: P.O. Box 327
3e. City, state, zip: Calypso, NC 28325
3f. Telephone no.: (919) 658-9221
3g. Fax no.:
3h. Email address:
Page 1 of 10
PCN Form - Version 1.4 January 2009
4. Applicant Information (if different from owner)
4a. Applicant is: ? Agent ? Other, specify:
4b. Name:
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name: Steve Blanchard, PE
5b. Business name
(if applicable): Jim Blanchard Associates, P.C.
5c. Street address: 306 North NC Hwy 11 & 903
5d. City, state, zip: Kenansville, NC 28349
5e. Telephone no.: (910) 296-1921
5f. Fax no.: (910) 296-1922
5g. Email address: steve@jimblanchardassociates.com
Page 2 of 10
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): 256100722150
1 b. Site coordinates (in decimal degrees): Latitude: 35.154753 Longitude: -78.10472
1c. Property size: acres
2. Surface Waters
2a. Name of nearest body of water to proposed project: Dick's Branch;
2b. Water Quality Classification of nearest receiving water: C;SW
2c. River basin: Cape Fear
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Land Use is Residential; Project upgrades storm drainage within the Town Limits of Calypso; Permit is needed for maintenance of culvertss under 1 st
Street and 2nd Street at the headwaters of Dick's Branch. Branch is heavily deposited with sediment/debris, culvert is about 80% blocked.
3b. List the total estimated acreage of all existing wetlands on the property: 0.2
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 700
3d. Explain the purpose of the proposed project:
Project upgrades storm drainage within the Town Limits of Calypso; Permit is needed for maintenance of culverts under 1 st Street and 2nd Street.
3e. Describe the overall project in detail, including the type of equipment to be used:
Project will remove sediment and debris for a distance of 175 feet upstream/downstream of 1 st St. and 2nd St. Excavator working from the bank.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past? ? Yes ? No ? Unknown
Comments: Blue Line Stream on DFIRM
4b. If the Corps made the jurisdictional determination, what type
of determination was made? ? Preliminary ? Final
4c. If yes, who delineated the jurisdictional areas?
Name (if known): Agency/Consultant Company:
Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past? ? Yes ? No ? Unknown
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ? Yes ? No
6b. If yes, explain.
Page 3 of 10
PCN Form - Version 1.4 January 2009
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
? Wetlands ?X Streams - tributaries ? Buffers ? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
Wetland impact
number
Permanent (P) or
Temporary T 2b.
Type of impact 2c.
Type of wetland 2d.
Forested 2e.
Type of jurisdiction
Corps (404,10) or
DWQ (401, other) 2.
Area of
impact
(acres)
W1 - Choose one Choose one Yes/No -
W2 - Choose one Choose one Yes/No -
W3 - Choose one Choose one Yes/No -
W4 - Choose one Choose one Yes/No -
W5 - Choose one Choose one Yes/No -
W6 - Choose one Choose one Yes/No -
2g. Total Wetland Impacts:
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
Stream impact
number
Permanent (P) or
Temporary (T) 3b.
Type of impact 3c.
Stream name 3d.
Perennial (PER) or
intermittent (INT)? 3e.
Type of
jurisdiction 3f.
Average
stream
width
(feet) 3g.
Impact
length
(linear
feet)
S1 P Excavation Dick's Branch PER Corps 5 700
S2 - Choose one -
S3 - Choose one
S4 - Choose one
S5 - Choose one
S6 - Choose one
3h. Total stream and tributary impacts 700
3i. Comments:
Maintenance to remove sediment from culverts.
Page 4 of 10
PCN Form - Version 1.4 January 2009
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individual) list all open water impacts below.
4a.
Open water
impact number
Permanent (P) or
Temporary T 4b.
Name of waterbody
(if applicable) 4c.
Type of impact 4d.
Waterbody
type 4e.
Area of impact (acres)
01 - Choose one Choose
02 - Choose one Choose
03 - Choose one Choose
04 - Choose one Choose
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If and or lake construction proposed, then complete the chart below.
5a.
Pond ID number 5b.
Proposed use or
purpose of pond 5c.
Wetland Impacts (acres) 5d.
Stream Impacts (feet) 5e.
Upland
(acres)
Flooded Filled Excavated Flooded Filled Excavated
P1 Choose one
P2 Choose one
5f. Total:
5g. Comments:
5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an impacts require mitigation, then you MUST fill out Section D of this form.
6a. Project is in which protected basin? ? Neuse ? Tar-Pamlico ? Catawba ? Randleman ? Other:
6b.
Buffer Impact
number-
Permanent (P) or
Temporary T 6c.
Reason for impact 6d.
Stream name 6e.
Buffer
mitigation
required? 6f.
Zone 1
impact
(square
feet 6g.
Zone 2
impact
(square
feet
61 - Yes/No
B2 - Yes/No
B3 - Yes/No
B4 - Yes/No
B5 - Yes/No
B6 - Yes/No
6h. Total Buffer Impacts:
6i. Comments:
Page 5 of 10
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Design is to perform maintenance for the 1st Street and 2nd Street culverts since this method provides minimal impact as compared to replacement of
the culverts.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Mechanical equipment used will be required to work from the bank and not allowed in the stream bed.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State? ? Yes Q No
2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps
2c. If yes, which mitigation option will be used for this
project? ? Mitigation bank
? Payment to in-lieu fee program
? Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type: Choose one
Type: Choose one
Type: Choose one Quantity:
Quantity:
Quantity:
3c. Comments:
4. Complete if Makin a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ? Yes
4b. Stream mitigation requested: linear feet
4c_ If using stream mitigation, stream temperature: Choose one
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f_ Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form - Version 1.4 January 2009
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires Yes X No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 7 of 10
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ?X No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
? Yes ? No
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? 0%
2b. Does this project require a Stormwater Management Plan? ? Yes No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
This project does not add any impervious area to the watershed.
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
2e. Who will be responsible for the review of the Stormwater Management Plan?
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project?
? Phase II
3b. Which of the following locally-implemented stormwater management programs ? NSW
? USMP
apply (check all that apply): ? Water Supply Watershed
? Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No
attached?
4. DWQ Stormwater Program Review
?Coastal counties
?HQW
4a. Which of the following state-implemented stormwater management programs apply ?ORW
(check all that apply): ?Session Law 2006-246
? Other:
4b. Has the approved Stormwater Management Plan with proof of approval been ? Yes ?X No
attached?
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No
5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No
Page 8 of 10
PCN Form - Version 1.4 January 2009
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
la. Does the project involve an expenditure of public (federal/state/local) funds or the 0 Yes ? No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ? Yes ?X No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.
In-Process Yes
E] 0 No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes EX No
or Riparian Buffer Rules (15A NCAC 2B.0200)?
2b. Is this an after-the-fact permit application? ?Yes Xg No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes 0 No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
No Sewage generated from this project.
Page 9 of 10
PCN Form - Version 1.4 January 2009
S. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or ? Yes ?X No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ? No
impacts?
5c. If yes, indicate the USFWS Field Office you have contacted. -
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
USFWS website; Endangered Species in Duplin County are not found in creek beds.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
Corps of Engineers PCN instructions.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation ? Yes Z No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
NC State Historic Preservation Office
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? Yes ? No
8b. If yes, explain how project meets FEMA requirements:
Project only provides maintenance and will not create any development within the floodplain that may increase the magnitude of a flood event.
8c. What source(s) did you use to make the floodplain determination?
FEMA documentation, experience.
Steve Blanchard, PE 05-04-2009
Applicant/Agent's Printed Name Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization
letter from the applicant is provided.)
Page 10 of 10
o
AGENT AUTHORIZATION FORM
PROJECT DESCRIPTION: Calypso Storm Drainage Upgrade
Owner: Town of Calypso
Location: Within Town Limits
Description: Storm Drainage Improvements
Please print: I i
?
Board Member: (A Ie n e- 1,o ry, b e-,r
Board Member:
The undersigned, Board Members of the above noted project, do hereby authorize
Steve Blanchard, PE of Jim Blanchard Associates
(Contractor / Agent) (Name of consulting firm)
to act on my behalf and take all actions necessary for the processing, issuance and acceptance of
this permit or certification and any and all standard and special conditions attached.
Property Owner's Address (if different than property above):
Telephone:
We hereby certify the above information submitted in this application is true and accurate to the
best of our knowledge.
9
Au ri d Signature
Date: "90p 9
0-4//
Authorized Signature
Date: ?7J 7/,o ?