Loading...
HomeMy WebLinkAboutWQ0006100_Final Permit_19920608State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor George T. Everett, PhD William W. Cobey, Jr., Secretary Director June 8, 1992 Mr. Bob Raines, Associate Superintendent Nash County Board of Education 930 Eastern Avenue Nashville, North Carolina 27856 Subject: Permit No. WQ0006100 Amendment Nash County Board of Education Cooper's Elementary School Subsurface Disposal System Nash County Dear Mr. Raines: In accordance with your application received January 27, 1992 and the request from the Raleigh Regional Office for an amendment, we are forwarding herewith Permit No. WQ0006100 as amended, dated June 8, 1992, to Nash County Board of Education for the construction and operation of a 10,380 GPD subsurface wastewater disposal system. This permit amendment consists of the inclusion of condition 12 which states that the Raleigh Regional Office and the Nash County Health Department shall be notified at least seventy-two (72) hours prior to the initiation of construction of the subject wastewater treatment facility. This permit shall void Permit No. WQ0006100 issued May 11, 1992 and shall be effective from the date of issuance until April 30, 1997, and shall be subject to the conditions and limitations as specified therein. Please pay particular attention to the monitoring requirements in this permit. Failure to establish an adequate system for collecting and maintaining the required operational information will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable to you, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. Regional Offices Asheville Fayetteville Mooresville Raleigh Washington Wilmington Winston-Salem 704/251-6208 919/486-1541 704/663-1699 919/733-2314 919/946-6481 919/395-3900 919/761-2351 Pollution Prevention Pays P.O. Sox 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 An Equal Opportunity Affirmative Action Employer If you need additional information concerning this matter, please contact,Ms. Angela Y. Griffin at 9191733-5083. cc: Nash County Health Department Raleigh- Regional Office, Water Quality Raleigh Regional Office, Groundwater Groundwater Section, Jack Floyd Training and Certification Unit (no revised rating) Ellinwood Design Associates, Ltd. Facilities Assessment Unit NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES RALEIGH SUBSURFACE DISPOSAL SYSTEM PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Nash County Board of Education Nash County FOR THE construction and operation of a 10,380 GPD subsurface wastewater disposal system consisting of a 8,000 gallon septic tank, a 4,000 gallon septic tank, a 5,000 gallon pump tank, a 5,000 emergency storage tank, each equipped with duplex 120 GPM pumps with audible and visual high water alarms and controls, two (2) pressure manifolds with approximately 8,640 linear feet of 4 -inch force main to serve Cooper's Elementary School with no discharge of wastes to the surface waters, pursuant to the application received January 27, 1992 and the request from the Raleigh Regional Office for an amendment and in conformity with the project plan, specifications, and other supporting data subsequently filed and approved by the Department of Environment, Health and Natural Resources and considered a part of this permit. This permit shall void Permit No. WQ0006100 issued May 11, 1992 and shall be effective from the date of issuance until April 30, 1997, and shall be subject to the following specified conditions and limitations: 1. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications. Mail the Certification to the Permits and Engineering Unit, P.O. Box 29535, Raleigh, NC 27626-0535. 2. The Raleigh Regional Office and the Nash County Health Department shall be notified at least seventy-two (72) hours prior to the initiation of construction of the subject wastewater treatment facility. 3. The Raleigh Regional Office, phone no. (919) 571-4700, shall be notified at least forty- eight (48) hours in advance of backfilling of the installed facilities so that an in-place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as construction of additional or replacement wastewater treatment or disposal facilities. 5. The issuance of this permit shall not relieve the Permittee of the responsibility for damages to surface or groundwaters resulting from the operation of this facility. 6. This permit shall become voidable if the soils fail to adequately absorb the wastes and may he. reccinded unless the facilities are installed, maintained, and operated in a manner which will protect the assigned water quality standards of the surface waters and ground waters. 7. Adequate measures shall be taken to divert stormwater from the disposal area and prevent wastewater runoff from the subsurface disposal field. 8. The sludge generated from these treatment facilities must be disposed of in accordance with General Statute 143-215.1 and in a manner approved by the North Carolina Division of Environmental Management. 9. A usable reserve area shall be maintained for wastewater disposal. The reserve area shall ilavt the capability of accommodating the average daily flow of the facility being served V iawat exceeding the loading rates of the reserve area while meeting all required buffer requirements. 10. Diversion or bypassing of the untreated wastewater from the treatment facilities is prohibited. 11. The following buffers shall be maintained: a) 100 feet between disposal area and any public or private water supply including wells b) 100 feet between disposal area and "SA and SB" classified surface waters c) 50 feet between disposal area and any stream, lake, river or natural drainageway d) 50 feet between disposal area and property lines e) 10 feet between disposal area and surface water interceptor drains or diversions (upslope) f) 25 feet between disposal area and surface water interceptor drains or diversions (downslope) and groundwater drainage systems. 12. A leakage test shall be performed on the septic tank and dosing tank to insure that any exfiltration occurs at a rate which does not exceed twenty (20) gallons per twenty-four (24) hour per 1,000 gallons of tank capacity. The engineer's certification will serve as proof of compliance with this condition. 1. The facilities shall be properly maintained and operated at all times. 2 2. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8A, .0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III, and IV facility at least daily, excluding weekends and holidays, and must properly manage and document daily operation and maintenance of the facility and must comply with all other conditions of Title 15A, Chapter 8A, .0202. Once the facility iulassified, the Permittee must submit a letter to the Certification Commission which designates the operator in responsible charge within thirty days after the wastewater treatment facilities are 50% complete. 3. The application rates to the disposal field shall not exceed 0.40 GPD/ft2. 4. The facilities shall be effectively maintained and operated as a non -discharge system to prevent the discharge of any wastewater resulting from the operation of this facility. 5. No traffic or equipment shall be allowed on the disposal area except while installation occurs or while normal maintenance is being performed. 6. A suitable cover shall be maintained on the disposal area and the disposal area shall be routinely mowed. The clippings shall be periodically removed to prevent the build-up of thatch. 7. The pressure heads on the two (2) manifolds shall be inspected periodically to ensure even distribution to all of the force main lines. 1. Any monitoring deemed necessary by the Division of Environmental Management to insure surface and ground water protection will be established and an acceptable sampling reporting schedule shall be followed. 2. The nitrification lines shall be maintained as necessary (including purging of the lines) in order to ensure that they remain free of obstructing materials. Adequate records showing all maintenance shall be maintained by the Permittee. 3. A record shall be maintained of all residuals removed from this facility. This record shall include the name of the hauler, permit authorizing the disposal or a letter from a municipality agreeing to accept the residuals, date the residuals were hauled, and volume of residuals removed. The Permittee shall report by telephone to the Raleigh Regional Office, telephone no. (919) 571-4700, as soon as possible, but in no case more than 24 hours or on the next working day following the occurrence or first knowledge of the occurrence of any of the following: a. Any occurrence at the wastewater treatment facility which results in the treatment of significant amounts of wastes which are abnormal in quantity or characteristic, such as the dumping of the contents of a basin or tank; the known passage of a slug of hazardous substance through the facility; or any other unusual circumstances. 3 b. Any process unit failure, due to known or unknown reasons, that render the facility incapable of adequate wastewater treatment such as mechanical or electrical failures of pumps, aerators, compressors, etc. c. Any failure of a pumping station, sewer line, or treatment facility resulting in a by- pass of all or any portion of the influent to such station or facility. d. Any time that self-monitoring information indicates that the facility has gone out of compliance with its permit limitations. Persons reporting such occurrences by telephone shall also file a written report in letter form within 15 days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. I : i ►! *� ; 81:0111114 51u 1 Biel 1. Any groundwater quality monitoring as deemed necessary by the Division of Environmental Management shall be provided. 1. Adequate inspection, maintenance, and cleaning shall be provided by the Permittee to insure proper operation of the subject facilities. 2. The Permittee or his designee shall inspect the wastewater treatment and disposal facilities to prevent malfunctions and deterioration, operator errors and discharges which may cause or lead to the release of wastes to the environment, a threat to human health, or a nuisance. The Permittee shall keep an inspection log or summary including at least the date and time of inspection, observations made, and any maintenance, repairs, or corrective actions taken by the Permittee. This log of inspections shall be maintained by the Permittee for a period of three years from the date of the inspection and shall be made available upon request to the Division of Environmental Management or other permitting authority. 3. Any duly authorized officer, employee, or representative of the Division of Environmental Management may, upon presentation of credentials, enter and inspect any property, premises or place on or related to the disposal site and facility at any reasonable time for the purpose of determining compliance with this permit; may inspect or copy any records that must be kept under the terms and conditions of this permit; or may obtain samples of groundwater, surface water, or leachate. 1. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans, specifications and other supporting data. 2. This permit is effective only with respect to the nature and volume of wastes described in the application and other supporting data. 4 3. This permit is not transferable. In the event there is desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Environmental Management accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 4. A set of approved plans and specifications for the subject project must be retained by the applicant for the life of the project. 5. The annual administering and compliance fee must be paid by the Permittee within thirty (30) days after being billed by the Division. Failure to pay the fee accordingly may cause the Division to initiate action to revoke this permit as specified by 15 NCAC 2H .0205 (c)(4). 6. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an enforcement action by the Division of Environmental Management in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 7. The subject wastewater treatment and disposal facilities shall be connected to an operational publicly owned wastewater collection system within 180 days of its availability to the subject facilities, if the subject wastewater treatment or disposal facilities are in noncompliance with the terms and conditions of this non -discharge permit or the governing statutes or regulations. Prior to the initiation of these connection activities, appropriate approval must be received from this Division. 8. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 9. The Permittee, at least six (6) months prior to the expiration of this permit, shall request its extension. Upon receipt of the request, the Commission will review the adequacy of the facilities described therein, and if warranted, will extend the permit for such period of time and under such conditions and limitations as it may deem appropriate. Permit issued this the 8th day of June, 1992 CAROLINA e T. Everett, Division of Environ By Authority of the Permit No. WQ0006100 Amendment MANAGEMENT COMiVIISSION Management Commission 5 Permit No. WQ0006100 Amendment June S, 1992 engineer's Certification 1, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Project Name = Location Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signa Date 0 Registration c.�� -. - - � �+ •� �raJ � �' _ rte#' "'�'- - r- Rei_ �� •` :i - � 1756 ' zor _ c �.. _ _ � - / * 1 z0 Cern Cem Cem\ � B l . • • . Sandi- Cray _ Cie7T3 cem5 ?6.7 CUM res ch") ` ,rem r43 - Field 71 ..1' r i 5? /• ` � Oak Leve] .14 �f I + �i..J C •*"`� mac. =31 232 57'3Cr ` 234 fW/NSTEAD CROSSROADS) WWSTEAO CROSSROADS WX. 9712.5 1 f 5455 N SW ;urvey WILSON IN, C. 4119 F' SCALE 1:24 000 MH GH 00 50 D TODD 2000 3000 4000 5000 5000 7 ' 1 KILOM 107 MILS �'�j' CONTOUR INTERVAL 10 FEET 31 MILS NATIONAL GEODETIC VERTICAL DATUM OF 1929 he U7M GR14 AND 1974 MAGNETIC NORTH Z) a7 Na DECLINATION AT CENTER OF SHEET THIS MAP COMPLIES WITH NATIONAL MAP ACCURACY STANDARDS FOR SALE BY U. S. GEOLOGICAL SURVEY, RESTON. VIRGINIA 22092 A FOLDER DESCRIB 4G TOPOGRAPHIC MAPS AND SYMBOLS rS AVAILA13LE ON REQU1 RATING SCALE -FOR CLASSIFICATION OF FACILITIES Name of Plant: (fC6po2S C - _Fm SC ,jC- Owner or Contact Person: BaB 'P.AlI3f�S - SSoc Sc,ti 1 ,.,;,EE -r Mailing Address: - 930 cA­sT><P-tJ 1"Emuc closed cycle systems (clef. No. 11), and facilities /VG ----- County: AIASW Telephone: y59- 7a�1 NPDES Permit No. NCOO Nondisc. Per. No. W¢ 00061160 IssueDate: xpikation Date: Existing Facility New Facility ✓ Rated By: 514,4F�1 1c.- Date: .3 / Reviewed (Train. & Cert.) Reg, Office Reviewed (Train. & Cert.) Central Office ORC Plant Class: (circle one) ITEM POINTS (1) industrial Pretreatment Units and/or Industrial Pretreatment Program (see definilion No. 33) 4 (2) DP551Q FLOW OF PLANT IN GPD (not applicable to non -contaminated cooling waters, sludge handling facilities for water purification plan[$, totally closed cycle systems (clef. No. 11), and facilities consisting only of Item (4) (d) or Items (4) (d) and (11) (d)L 0 20,000 .......................... 20,001 -. 50,000 .....................I. (/,) 54,001 -- 100.000 .......................... 3 100,001 •• 250,000 .......................... 4 250,001 -- 500,000 .......................... 5 500,001 -•1,400,000 .......................... 8 1,030,001 -- 2,000,000 ........................ 10 2,000,001 (and up) - rate 1 point additional for each 200,000 gpd capacity up to a maximum of 3 �80 -c> Design Flow (gpd) /U op (3) PRELIMINARY UNITS (see definition no. 32) (a) Bar Screens ................................ 1 or (b) Mechanical Screens, Static Screens or Comminuting Devices ....... I ... ............. 2 (c) Grit Removal ............................... 1 or (d) Mechanical or Aerated Grit Removal ........... 2 (e) Flow Measuring Device ....................... 1 or (f) Instrumented Flow Measurement .............. 2 (g) Preaeration................................ 2 (h) Influent Flow -Equalization ................... 2 (i) Grease or Oil Separators - Gravity .......... 2 Mechanical .......... 3 Dissolved Air Flotation, 8 G) Prechlorinalion ... I ........................ 1 _ 5 14) PRIMARY TREATMENT UNITS p-� (a) Septic Tank (see definition no. 43) .............. eT (b) Imhoff Tank .......... 5 (c) Primary Clarifiers ............................ 5 (d) Seilling Ponds or Settling Tanks for inorganic Non-toxic Materials (sludge handling facilities for water purification plants, sand, gravel, stone, and other mining operations except recreational activities such' as gem or gold mining) ...................................... 2 Grace II IIS IV Total Points 12— ,5) 2 (5) SECONDARY TRE;. T MENT UNITS (a) Carbonaceous Stage (i)Aeiatio. - High Purity Oxygen System ..... Diffused Air System , ......... . Mechanical Air System (fixed, floating or rotor) .............. Separate Sludge Reaeralion ..... (ii) TriG:::ng Filler High Rale ................... Standard Rale ............... Packed Tower ............... (iii) 5iolocical Aerated Filter or Aerated Sioloci=al Filter ...................... (iv) Aerated Lagoons ..................... . (v) Ro'al ng Biological Conlectars .......... (vi) Sanc Filters- inlerGsittenl biological ... . recirculating biological . . (vii) S;abil:zation Lagoons ................... (vii i)Cfarifie .................. . .......... . (ix) Single stage system for combined carbonaceous removaS of BOD and nitro_aenous removal by nitrification (see def. No. 12) (Points for this item have to be in addition to items (5) (a) (i) through (5) (a) (viii) ................ . (x) Nutrient additions to enhance BOD removal.. ............................ (xi) Biologicat Culture ('Super Bugs') addition to enhance organic compound removal ..... (b) Nitrogenous Stage (i) Aeralian - High Purity Oxygen System ..... Diffused Air System ........... Mechanical Air System (fixed, floating, or rotor) ...... ...... Separate Sludge Reaeration .... . (5) Trickling Filter - High Rate ............. . Standard Rate ............ Packed 'rower ........... . (iii) Biological Aerated Filter or Aerated Biological Filler ......................... (iv) Rotating Biological Conlactors ............ (v) Sand Filler - intermittent biological ....... . recirculating biological ..... - . . (vi) Ctarifier................................ (6) TERTIARY OR ADVANCED TREATMENT UNIT Sludge Digestion Tank - Hea,ed ........ . ...... (10) CHEMICAL ADDITION SYSTEM (S) (See delinilbn No. 9) (a) Activated Carbons Beds - (nal applicable to chemical additions rated as item 3 (b) without carbon regeneration .................. 5 (3) (j) (5) (a) (xi), (6) (a), (5) (b), (7) (b), (7) (e), Sludge Drying Beds - Gravity................. 2 with carbon regeneration ............. . ...... is (9) (a) (or 9} (c) 5 points each: List: 9) (b) ( (d) �1 Powdered or Granular Activated Carbon Feed - (e) , , 5 (f) without carbon regeneration ................. 5 (g) 5 with carbon regeneration .. _ . 15 . 5 �c) Air Stripping .. . .. . ...... . .............. . . 5 . . . 5 (d) Denitrification Process (separate process) . . . . . 1 C) . . . ' . Sludge Incinerator - (not including activated (e) Eler_-rodialysis ..........., .......... . ....... 5 (11) MISCELLANEOUS UNITS (k) (f) Foam Separation .................... . .. (a) Holding Ponds, Holding Tanks or Sellling Ponds 10 (g) Ion Exchange . '.............................. 5 for Organic or Toxic Materials including wastes (b) (h) Land Applicalion of Treated Effluent from mining operations containing n4rogan and/or (see definition no. 22b) (not applicable for 10 phosphorous compounds in amounts significantly -by contracting to a land application operator who sand, gravel, clone and other similar mining holds the land application permit ............... greater than is common for domestic wastewater .......... 4 -land application of sludge by a contractor who does operations) (b) Effluent Flow Equalizalion (not applicable to sloraoe (i) on agriculluraliy managed sites (See def. 10 basins which are inherent in land application systems). 2 Landfilled (burial) .............................. No. 4) .............. _ .................. _ . 1 0 (c) Stage Discharce (no[ applicable to storage basins (a) Chlorination ............................. (ii) by high rate infiltration on non-agriculturally managed sales (includes rotary distributors inherent in land application syslems....................................... Pumps.. Dechlorination ........................ 5 and similar fixed nozzle systems) ........... 4 (d) .............. .. . ......... ............................................................. (e) Stand-By Power S p I Y................................................................ 3 3 Radiation .......................... (iii) by subsurface disposal (includes Sow pressure (f) Thermal Pollulio- Control Device ........................... 3 pipe systems and gravity systems except al plants consisting of septic tank and nitrifica- tion tines only) ....... . . ................. . .. P TOTAL (i) Mlcroscreens....... ........................... POINTS (j) Phosphorus Remo-4 by Biologicai Processes CLASS IF!)CATION (See def. No. 26) ............................ 20 (k) polishing Ponds - wilhoul aeration .. _ .... 2 Class I........................................................... 5 - 25 Points with aeration .......... 5 Class 11 ........................................................ 26- 50 Points (1) Post Aeration - cascade .............. 0 Class 111....................................................... 51- 65 Points diflused or mechanicat . , . 5 Class IV........................................................ 66- Up Points (m) Reverse Osmosis ...................... . ........ 5 (n) Sand or Mixed-Media Fillers - low rate ........... 2 Facilities having a rating o` one through four points, inclusive, high rate .. _ ....... 5 do not require a certified operator. Classification of all other -5) Treatment processes for removal of metal or facilities requires a comparable grade operator in responsible cyanide....... ............................. 1 5 charge. r) Treatment processes for removal or toxic materials other than metal or cyanide .. _ ...... 1 5 Facilities having an acliva,ed sludge process will be assigned a minimum classification o`. Class it. r SLUDGE TREATMENT (a) Sludge Digestion Tank - Hea,ed ........ . ...... 10 Aerobic ............... 5 Unhealed ...... ....... 3 (b) Sludge Slabilization (chemical or thermal) .... ... 5 (c) Sludge Drying Beds - Gravity................. 2 Vacuum Assisted ....... 5 (d) Sludge Eluirialion ............................. 5 (e) Sludge Conditioner (chemical or thermal) ........ 5 (f) Sludge Thickener (gravity) ...................... 5 (g) Dissolved Air Flotation Unit (not applicable to a unit rates as (3) (i) ......... 8 (h) Sludge Gas Utilization (including gas storage) . ... 2 (i) Sludge Holding Tank - Aerated ................ 5 Non-aerated ............ 2 (j) Sludge Incinerator - (not including activated carbon regeneration) ..... 10 (k) Vacuum Filler, Centrifuge or Filler Press or other similar dewatering devices .................... 10 (8) SLUDGE DISPOSAL (including incineraled ash) (a) Lagoons ........................................ 2 (b) Land App)icalion (surface and subsurface) (see definilion 22a) -where the facility holds the land app. permit .. 10 -by contracting to a land application operator who holds the land application permit ............... 0 -land application of sludge by a contractor who does not hold the permit for the wastewater treatment facility where the a sludge is generated ......... 10 (c) Landfilled (burial) .............................. 5 (9) DISINFECTION (a) Chlorination ............................. 5 (b) Dechlorination ........................ 5 fc) Ozone ........... ................... 5 (d) Radiation .......................... 5 Facilities having Irealment processes for the removal of metal or cyanide will be assigned a minimum classification of Class II. Facilities having treatment processes for the biological removal of phosphorus will be assigned a minimum classification of Class Ill. In -plant processes and related control equipment which are an integral part of industrial production shall not be considered waste treatment. Likewise, discharges of wastewater from residences having a design flow of 1,000 gpd or less, shall not be subject to rating. ADDITIQNAl QO.MMENTS: