Loading...
HomeMy WebLinkAboutWQ0000510_Final Permit_19881202 (2)d i+` STAT[ v State of North Carolina Department of Natural Resources and Community Development Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor R. Paul Wilms S. Thomas Rhodes, Secretary Director December 2, 1988 Mr. William Nichols P. 0. Box 631 Durham, NC 27702 Subject: Operation and Maintenance Agreement for Permit No. WQ0000510 William Nichols Residence Spray Irrigation Wastewater Disposal System Durham County T.- Mr. Nichols: With reference to the above mentioned project, the attached Operation and Maintenance Agreement must be signed by the Permittee. within thirty (30) days after issuance of the subject permit or the permit may be voided. If there are any questions concerning this matter, please contact Mr. Jack Floyd, at telephone number 919/7335083, ext. 549. Sincerely yours, R. Paul Wilms AM/tla cc: Durham County Health Department Raleigh Regional office Mr. Dennis R. Ramsey Duane Stewart .Pollution Pretrnfion PQy,i P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-701 An Equal Opportunity Affirmadve Action Employer 9 OPERATION ANI] MAINTENANCE AGREEMENT FOR THE DIVISION OF ENVIRONMENTAL MANAGEMENT Permit No. WQ0000510 December 2, 1988 William Nichols Single Family Residence Wastewater Treatment System Final Disposal by Spray Irrigation Durham County I, William Nichols, agree to operate and maintain the wastewater treatment system as follows: 1. The Permittee is responsible for the operation and maintenance of the entire treatment and disposal system including, but not limited to, the following items: a. The septic tank shall be checked every six (5) months and pumped out as required. b. The tablet chlorinator shall be checked every week until the actual usage rate is established and thence on a monthly basis. Tablets shall be added so as to provide proper chlorination. c. The storage system, pump system, and alarm system shall be inspected monthly. The scum layer shall be removed at the same interval as the septic tank is cleaned out. The alarm system and pump operation shall be checked monthly. d. The spray system shall be inspected monthly to make certain of the sprayers proper operation that the vegetative growth allows proper spray patterns that the soil is absorbing the disposed treated wastewater with no surface runoff and that no objectionable odors are being generated. 2. Failure of the Permittee to properly operate this system is subject to a penalty lip to $1.0,000 per day. 3. Failure to meet permit conditions or violation of the State's surface or groundwater regulations will require cessation of occupancy of the residence. I understand that failure to comply with these conditions along with the permit conditions may result in voiding the permit. William Nichols, Owner Notary Seal and Signature