Loading...
HomeMy WebLinkAboutWQ0003573_Final Permit_19901029State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor WiIIiam W. Cobey, Jr., Secretary October 29, 1990 Mr. James F. Wallwork Environmental Coordinator E.I. du Pont de Nemours and Company Post Office Drawer Z Fayetteville, North Carolina 28302 George T. Everett, Ph.D. Director Subject: Permit No. NCO003573 Authorization to Construct E.I. du Pont de Nemours and Co. Wastewater Treatment Facility Bladen County Dear Mr. Wallwork: A letter of request for an Authorization to Construct was received July 12, 1990 by the Division and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of a 205,000 gallon sludge digestion tank, the utilization of the existing concrete basin (approved for sludge digestion in the Authorization to Construct issued December 15, 1989) as part of the flow retention system, the removal of the existing retention tank when inspection indicates the need, and any piping changes necessary to place these facilities in operation. These facilities are to be constructed as additions to or alterations of the facilities permitted in the Authorization to Construct issued December 15, 1989 only as stated herein. All previously facilities not specifically addressed herein are to remain as previously permitted. This Authorization to Construct is issued in accordance with Part III paragraph B of NPDES Permit No. NCO003573 issued March 13, 1987, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0003573. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Environmental Management. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. Pollution Prevention Pays P.O. Box 27687, Raleigh, North Carolina 27611-7697 'telephone 919-733-7615 An Equal Opportunity Affirmative Action Employer October 29, 1990 Mr. James F. Wallwork Page Two The Fayetteville Regional Office, phone no. (919) 487-1541, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an in -place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to the Permits and Engineering Unit, P.O. Box 27687, Raleigh, NC 27611. The Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge of the wastewater treatment facilities. The operator must hold a certificate of the grade at least equivalent to the classification assigned to the wastewater treatment facilities by the Certification Commission. Within thirty days after the wastewater treatment facilities are 50% complete, the Permittee must submit a letter to the Certification Commission which designates the operator in responsible charge. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Environmental Management in accordance with North Carolina General Statute 143-215.6. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. if you have any questions or need additional information, please contact Mr. Dana Bolden, telephone number 919i733-5083. S cerely, George T. cc: Bladen County Health Department r- Fayetteville Regional Office s 0 Permit No. NC0003573 Authorization to Construct October 29, 1990 Engineer's Cmifi ation I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Project Name Location Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Date ..-VI Registration No. • - r