Loading...
HomeMy WebLinkAboutWQ0001604_Final Permit_19891109State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor William W. Cobey, Jr., Secretary November 9, 1989 Mr. Richard O. Tillis, Richmond County Manager Richmond County Board of Commissioners P.O. Box 504 Richmond County Courthouse Rockingham., NC 28379 Dear Mr. Tillis: R. Paul Wilms Director Subject; Permit No. WQ0001604 Richmond County Board of Commissioners Richmond County Water Plant Permit Renewal/Amendment Richmond County In accordance with your application received June 12, 1989, we are forwarding herewith Permit No. WQ00001604, dated November 9, 1989, to Richmond County Board of Commissioners for the construction and operation of the subject recycle facility. This permit shall be effective from the date of issuance until April 30, 1993, shall supersede Permit No. 9040 issued April 5, 1983 and shall be subject to the conditions and limitations as specified therein. If any parts, requirements, or limitations contained in this permit are unacceptable to you, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Box 11666, Raleigh, NC 27604. Unless such demands are made this permit shall be final and binding. One set of approved plans and specifications is being forwarded to you. If you need additional information concerning this matter, please contact Mr. William Barlow at 919/733-5083. "Sincerely, Wilms cc: Richmond County Health D Fayetteville Regional Office Harwood Beebe Company i Pollution Prevention Pays P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-7015 An Equal Opportunity Affirmative Action Employer NORTH CARO ENVIRONMENTAL MANAGEA COMMISSION 1b DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES RALEIGH RECYCLE SYSTEM PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Richmond County Board of Commissioners Richmond County FOR THE continued operation of the alum sludge and settled solids removal facility with supernate and filtrate water recycling which consist of a 126,500 gallon sludge holding tank, polymer tanks, a pH adjustment system for solids requiring disposal, the construction of 18,000 square feet of conventional sand drying beds, a polymer injection manhole and the addition of a Trans -Vac continuous sludge removal system in the existing and proposed sedimentation basins to increase the capacity of the water treatment plant from 2.0 MGD to 4.0 MGD and all associated pipes, valves and appurtenances to serve the Richmond County Water Treatment Plant with no discharge of wastewater to the surface waters, pursuant to the application received June 12, 1989 and in conformity with the project plan, specifications, and other supporting data subsequently filed and approved by the Department of Environment, Health and Natural Resources and considered a part of this permit. This permit shall be effective from the date of issuance until April 30, 1993, shall supersede Permit No. 9040 issued April 5, 1983, and shall be subject to the following specified conditions and limitations: This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans, specifications, and other supporting data. 2. This permit is effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The facilities shall be properly maintained and operated at all times. 4. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Environmental Management accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of the request will be considered on its merits and may or may not be approved. 5. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications. Mail the Certification to the Permits and Engineering Unit, P.O. Box 27687, Raleigh, NC 27611. 6. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. 7. The Fayetteville Regional Office, phone no. 919/486-0707, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an in-place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. 8. The sludge generated from these treatment facilities must be disposed of in accordance with General Statute 143-215.1 and in a manner approved by the North Carolina Division of Environmental Management. 9. The issuance of this permit shall not relieve the Permittee of the responsibility for damages to surface or groundwaters resulting from the operation of this facility. 10. The facilities shall be effectively maintained and operated as a non -discharge system to prevent the discharge of any wastewater resulting from the operation of this facility. 11. Diversion or bypassing of untreated wastewater from the treatment facilities is prohibited. 12. Any monitoring deemed necessary by the Division of Environmental Management to insure surface and ground water protection will be established and an acceptable sampling reporting schedule shall be followed. 13. Adequate inspection, maintenance, and cleaning shall be provided by the Permittee to insure proper operation of the subject facilities. 14. The Permittee or his designee shall inspect the wastewater recycle facilities to prevent malfunctions and deterioration, operator errors and discharges which may cause or lead to the release of wastes to the environment, a threat to human health, or a nuisance. The Permittee shall keep an inspection log or summary including at least the date and time of inspection, observations made, and any maintenance, repairs, or corrective actions taken by the Permittee. This log of inspections shall be maintained by the Permittee for a period of three years from the date of the inspection and shall be made available upon request to the Division of Environmental Management or other permitting authority. 15. Any duly authorized officer, employee, or representative of the Division of Environmental Management may, upon presentation of credentials, enter and inspect any property, premises or place on or related to the disposal site and facility at any reasonable time for the purpose of determining compliance with this permit; may inspect or copy any records that must be kept under the terms and conditions of this permit; or may obtain samples of groundwater, surface water, or leachate. 16_ The annual administering and compliance fee must be paid by the Permittee within thirty (30) days. after being billed by the Division. Failure to pay the fee accordingly may cause the Division to initiate action to revoke this permit as specified by 15 NCAC 2H .0205 (c)(4). 2 17. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an enforcement action by the Division of Environmental Management in accordance with North Carolina General Statute 143-215.6. 18. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 19. A set of approved plans and specifications for the subject project must be retained by the Permittee for the life of this project. 20. Noncompliance Notification: The Permittee shall report by telephone to the Fayetteville Regional Office, telephone no. 919/486.1541, as soon as possible, but in no case more than 24 hours or on the next working day following the occurrence or first knowledge of the occurrence of any of the following: a. Any occurrence at the wastewater treatment facility which results in the treatment of significant amounts of wastes which are abnormal in quantity or characteristic, such as the dumping of the contents of a basin or tank; the known passage of a slug of hazardous substance through the facility; or any other unusual circumstances. b. Any process unit failure, due to known or unknown reasons, that render the facility incapable of adequate wastewater treatment such as mechanical or electrical failures of pumps, aerators, compressors, etc. C. Any failure of a pumping station, sewer line, or treatment facility resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. d. Any time that self-monitoring information indicates that the facility has gone out of compliance with its permit limitations. Persons reporting such occurrences by telephone shall also file a written report in letter form within 15 days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not reoccur. 21. The Permittee, at least six (6) months prior to the expiration of this permit, shall request its extension. Upon receipt of the request, the Commission will review the adequacy of the facilities described therein, and if warranted, will extend the permit for such period of time and under such conditions and limitations as it may deem appropriate. 22. The Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge of the wastewater treatment facilities. The operator must hold a certificate of the grade at least equivalent to the classification assigned to the wastewater treatment facilities by the Certification Commission. Within thirty days after the wastewater treatment facilities are 50% complete, the Permittee must submit a letter to the Certification Commission which designates the operator in responsible charge. 23. Solids, sludges, or other pollutants removed or resulting from the wastewater treatment process shall be contained and disposed of in such a manner as to prevent any contamination of the surface or groundwaters of the State. The pH of these wastes shall be adjusted to a pH between 6.0 to 7.0 before disposal. i 3 Permit issued this the 9th day of October, 1989 RTH CARPI INA YNN�ROPIMENTAL MANAGEMENT COMMISSION Paul Wilms, D'r&b or Division of Environmental Wanagement By Authority of the Environmental Management Commissioh Permit No. WQ0001604 November 9, 1989 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full rime) the construction of the project, for the Project Name Location Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Date 1 In Registration No