HomeMy WebLinkAbout20181288 Ver 1_eSAW-2016-01900_9/18/2018 3:19 PMPage 1 of 2 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2016-01900 County: Harnett County U.S.G.S. Quad: Olivia NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Owner/Applicant: Harnett County Address: PO Box 759 Lillington, North Carolina 27546 Size (acres) 18.5 Nearest Town Cameron Nearest Waterway Hide Branch River Basin Cape Fear USGS HUC 03030004 Coordinates Latitude: 35.2921 Longitude: -79.1183 Location description:The site is located at 721 Ponderosa Road in Cameron, Harnett County, NC. The site is entirely wooded and contains four wetlands totaling approximately 1.7 acres of 388 linear feet of perennial stream channel as depicted on the attached Figure 3: Jurisdictional Features Map dated December 2016. Indicate Which of the Following Apply: A. Preliminary Determination X There are waters, including wetlands, on the above described property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The waters, including wetlands, have been delineated, and the delineation has been verified by the Corps to be sufficiently accurate and reliable. Therefore this preliminary jurisdiction determination may be used in the permit evaluation process, including determining compensatory mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other resource protection measures, a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. There are wetlands on the above described property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However, since the waters, including wetlands, have not been properly delineated, this preliminary jurisdiction determination may not be used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an effective presumption of CWA/RHA jurisdiction over all of the waters, including wetlands, at the project area, which is not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters of the U.S. on your property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. B. Approved Determination There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. There are waters of the U.S., including wetlands, on the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. We recommend you have the waters of the U.S. on your property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. SAW-2016-01900 The waters of the U.S., including wetlands, on your project area have been delineated and the delineation has been verified by the Corps. If you wish to have the delineation surveyed, the Corps can review and verify the survey upon completion. Once verified, this survey will provide an accurate depiction of all areas subject to CWA and/or RHA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. The waters of the U.S., including wetlands, have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on ______________. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. There are no waters of the U.S., to include wetlands, present on the above described project area which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Wilmington, NC, at (910) 796-7215 to determine their requirements. Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material, construction or placement of structures, or work within navigable waters of the United States without a Department of the Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Emily Greer at (910) 251-4567 or Emily.C.Greer@usace.army.mil. C. Basis For Determination: This site exhibits wetland criteria as described in the 1987 Corps Wetland Delineation Manual and the Atlantic and Gulf Coastal Plain Regional Supplement to the 1987 Wetland Delineation Manual, and the waterbody exhibits an Ordinary High Water Mark as indicated by changes in soil character and absence of terrestrial vegetation. D. Remarks:NA E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps’ Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303-8801 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by__NA_________. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** Corps Regulatory Official: ______________________________________________________GREER.EMILY.C.1385325300 Digitally signed by GREER.EMILY.C.1385325300 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=GREER.EMILY.C.1385325300 Date: 2017.09.06 18:23:25 -04'00' SAW-2016-01900 Date:September 6, 2017 Expiration Date:NA The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. Copy Furnished: Chris Hopper Carolina Ecosystems Electronically provided SAW-2016-01900 NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: Harnett County File Number: SAW-2016-01900 Date:September 6, 2017 Attached is: Figure 3: Jurisdictional Features Map dated December 2016 See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A PROFFERED PERMIT (Standard Permit or Letter of permission) B PERMIT DENIAL C APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at http://www.usace.army.mil/inet/functions/cw/cecwo/reg or Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. x ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. x OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit x ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. x APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. x ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. x APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. SAW-2016-01900 E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the appeal process you may contact: District Engineer, Wilmington Regulatory Division, Attn: Emily Greer 69 Darlington Avenue Wilmington, NC 28403 If you only have questions regarding the appeal process you may also contact: Mr. Jason Steele, Administrative Appeal Review Officer CESAD-PDO U.S. Army Corps of Engineers, South Atlantic Division 60 Forsyth Street, Room 10M15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site investigations. ________________________________________ Signature of appellant or agent. Date: Telephone number: For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division,Attn: Emily Greer, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 1 ATTACHMENT A PRELIMINARY JURISDICTIONAL DETERMINATION FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PRELIMINARY JURISDICTIONAL DETERMINATION (JD):____________________________________ B. NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD: ___________________________________________________________ ___________________________________________________________ C. DISTRICT OFFICE, FILE NAME, AND NUMBER: ___________________________________________________________ D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: ___________________________________________________________  (USE THE ATTACHED TABLE TO DOCUMENT MULTIPLE WATERBODIES AT DIFFERENT SITES) State: NC County/parish/borough: _____________ City: ______________ Center coordinates of site (lat/long in degree decimal format): Lat. ___________________ °N; Long. ____________________ °W. Universal Transverse Mercator: ____________________________________ Name of nearest waterbody: ______________________________________ Identify (estimate) amount of waters in the review area: Non-wetland waters: ____________linear feet: __________ width (ft) and/or _________ acres. Cowardin Class: _____________________________________________ Stream Flow: ________________________________________________ Wetlands: ___________acres. Cowardin Class: _____________________________________________ Name of any water bodies on the site that have been identified as Section 10 waters: Tidal: ______________________________________________________ Non-Tidal: __________________________________________________ September 7, 2017 Chris Hopper, Carolina Ecosystems, Inc. 3040 NC Hwy 42 W, Clayton, NC 27520 Wilmington, Harnett County / 721 Ponderosa Rd / JD, SAW-2016-01900 PIN 9566-41-6276.000 at 721 Ponderosa Road in Cameron, Harnett County, NC Harnett Cameron 35.2921 -79.1184 Neills Coon Branch 388 3 R3 Perennial 1.68 Palustrine Forested (PFO) 2 E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): Office (Desk) Determination. Date: ______________________________ Field Determination. Date(s): ___________________________________ SUPPORTING DATA. Data reviewed for preliminary JD (check all that apply - checked items should be included in case file and, where checked and requested, appropriately reference sources below): Maps, plans, plots or plat submitted by or on behalf of the applicant/consultant:_____________________________________________ Data sheets prepared/submitted by or on behalf of the applicant/consultant. Office concurs with data sheets/delineation report. Office does not concur with data sheets/delineation report. Data sheets prepared by the Corps:______________________________ Corps navigable waters’ study:__________________________________ U.S. Geological Survey Hydrologic Atlas:__________________________ USGS NHD data USGS 8 and 12 digit HUC maps U.S. Geological Survey map(s). Cite scale & quad name:______________ USDA Natural Resources Conservation Service Soil Survey. Citation:_______________________________________________ National wetlands inventory map(s). Cite name:_____________________ State/Local wetland inventory map(s):_____________________________ FEMA/FIRM maps:____________________________________________ 100-year Floodplain Elevation is:_________________________________ (National Geodectic Vertical Datum of 1929) Photographs: Aerial (Name & Date): ______________________or Other (Name & Date):_________________________ Previous determination(s). File no. and date of response letter:_________ Other information (please specify):_______________________________ ✔12 December 2016 ✔ Vicinity Map, Figure 3: Jurisdictional Features Map dated December 2016 ✔ ✔ ✔ ✔ ✔ ✔ ✔ Olivia (2013) 1:24K Quadrangle Map NRCS Web Soils Survey USFW NWI Online Wetland Mapper ✔2013 NC Statewide Aerial Photography SimeSuite 2017 3 1. The Corps of Engineers believes that there may be jurisdictional waters of the United States on the subject site, and the permit applicant or other affected party who requested this preliminary JD is hereby advised of his or her option to request and obtain an approved jurisdictional determination (JD) for that site. Nevertheless, the permit applicant or other person who requested this preliminary JD has declined to exercise the option to obtain an approved JD in this instance and at this time. 2. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring “pre-construction notification” (PCN), or requests verification for a non-reporting NWP or other general permit, and the permit applicant has not requested an approved JD for the activity, the permit applicant is hereby made aware of the following: (1) the permit applicant has elected to seek a permit authorization based on a preliminary JD, which does not make an official determination of jurisdictional waters; (2) that the applicant has the option to request an approved JD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an approved JD could possibly result in less compensatory mitigation being required or different special conditions; (3) that the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) that the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) that undertaking any activity in reliance upon the subject permit authorization without requesting an approved JD constitutes the applicant’s acceptance of the use of the preliminary JD, but that either form of JD will be processed as soon as is practicable; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a preliminary JD constitutes agreement that all wetlands and other water bodies on the site affected in any way by that activity are jurisdictional waters of the United States, and precludes any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an approved JD or a preliminary JD, that JD will be processed as soon as is practicable. Further, an approved JD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331, and that in any administrative appeal, jurisdictional issues can be raised (see 33 C.F.R. 331.5(a)(2)). If, during that administrative appeal, it becomes necessary to make an official determination whether CWA jurisdiction exists over a site, or to provide an official delineation of jurisdictional waters on the site, the Corps will provide an approved JD to accomplish that result, as soon as is practicable. GREER.EMILY.C. 1385325300 Digitally signed by GREER.EMILY.C.1385325300 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=GREER.EMILY.C.1385325300 Date: 2017.09.06 18:23:48 -04'00' Ponderosa Road Preliminary JD Table December 2016Table 1. WetlandsHydrologic Cowardin WET UPWA Bottomland Hardwood Forest Non-Riparian PFO0.04WA WA35.2932-79.1179WB Bottomland Hardwood Forest Non-Riparian PFO0.90WB WA*35.2920-79.1182WC Bottomland Hardwood Forest Riparian PFO0.73WB* WA*35.2908-79.1206WD Bottomland Hardwood Forest Non-Riparian PFO0.01WB* WA*35.2919-79.1196Table 2. StreamsSite Name Latitude Longitude Cowardin ClassificationEstimated Amount of Aquatic Resource in Review AreaStreams(linear feet)Neills Coon Branch 35.2913 -79.1203 R3 367Geographic authority to which the aquatic resource "may be" subjectSection 404LatLongUSACE FormsWetland ID NCWAMClassSize (Acres)11 = Approximate* = No form completed, but see referenced form due to similarity of community- = No data Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX,Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User CommunityDecember 2016Figure 3: JurisdictionalFeatures Map0 190 380Feet³Ponderosa Rd.Harnett County2013 NC Statewide Aerial PhotographsProperty BoundaryStreamWetlandsWAWBWCWD8"BD8#BD8$BD8%BD4USFBNMG