Loading...
HomeMy WebLinkAbout20140090 Ver 4_U-2579B sediment loss_20180918Wanucha, Dave From: Sent: To: Cc: Subject: Euliss, Amy Tuesday, September 18, 2018 3:58 PM Wanucha, Dave Kiser, Marcus K; Nifong, Johnny R; Suggs, Phillip H; Wyrick, Scott D U-2579B sediment loss_ The basin at site 24 had a partial failure in the basin berm, resulting in @40-50 5 gallon buckets of sediment loss into the wetland. The berm is being repaired and the wetland is being cleaned. There are a couple other sites that I'm going to look at (sites 11 and the dissipater at the west end of the project (plan sheet 5, permit sheet 3) tomorrow. I'll let you know if we have any additional losses to report after the visit. Amy Euliss Division 9 Environmental Officer North Carolina Department of Transportation 336 747 7802 office aeuliss .ncdot.qov 375 Silas Creek Parkway Winston Salem, NC 27127-7167 I!Irr�7ail �;urre,�l�ui�dc,i��:e, C�u ai�d ��ruir7 U•ii� �ci�dcr i� �ul����;�E� �C�u U•ic, I"J,�, I ul�li�; I'�Ee,�;ur;� I...aw ai�d rr�7ay I�c rll��:lu�crl �C�u �C�h•ih�rl I�artle,�,