HomeMy WebLinkAbout20140090 Ver 4_U-2579B sediment loss_20180918Wanucha, Dave
From:
Sent:
To:
Cc:
Subject:
Euliss, Amy
Tuesday, September 18, 2018 3:58 PM
Wanucha, Dave
Kiser, Marcus K; Nifong, Johnny R; Suggs, Phillip H; Wyrick, Scott D
U-2579B sediment loss_
The basin at site 24 had a partial failure in the basin berm, resulting in @40-50 5 gallon buckets of sediment loss into the
wetland. The berm is being repaired and the wetland is being cleaned. There are a couple other sites that I'm going to look at
(sites 11 and the dissipater at the west end of the project (plan sheet 5, permit sheet 3) tomorrow. I'll let you know if we have
any additional losses to report after the visit.
Amy Euliss
Division 9 Environmental Officer
North Carolina Department of Transportation
336 747 7802 office
aeuliss .ncdot.qov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167
I!Irr�7ail �;urre,�l�ui�dc,i��:e, C�u ai�d ��ruir7 U•ii� �ci�dcr i� �ul����;�E� �C�u U•ic, I"J,�, I ul�li�; I'�Ee,�;ur;� I...aw ai�d rr�7ay I�c rll��:lu�crl �C�u �C�h•ih�rl I�artle,�,